CN104956877B - The solid native grass planting method of Riparian Zone chad beach - Google Patents

The solid native grass planting method of Riparian Zone chad beach Download PDF

Info

Publication number
CN104956877B
CN104956877B CN201510319791.9A CN201510319791A CN104956877B CN 104956877 B CN104956877 B CN 104956877B CN 201510319791 A CN201510319791 A CN 201510319791A CN 104956877 B CN104956877 B CN 104956877B
Authority
CN
China
Prior art keywords
soil
inner ring
chad
outer ring
riparian zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510319791.9A
Other languages
Chinese (zh)
Other versions
CN104956877A (en
Inventor
耿玉清
杜庆
王冬梅
郭玉珊
张琳琳
张艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Forestry University
Original Assignee
Beijing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Forestry University filed Critical Beijing Forestry University
Priority to CN201510319791.9A priority Critical patent/CN104956877B/en
Publication of CN104956877A publication Critical patent/CN104956877A/en
Application granted granted Critical
Publication of CN104956877B publication Critical patent/CN104956877B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Botany (AREA)
  • Environmental Sciences (AREA)
  • Revetment (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention provides a kind of method of the solid native grass planting of Riparian Zone chad beach, it comprises the following steps:Digged pit on Riparian Zone chad beach;Outer ring and inner ring are sequentially placed into along crater wall;Filling soil in the inner ring, the mixture of filling soil and soil-solidified-agent between the inner ring and outer ring, crushed-gravel is filled between the outer ring and crater wall;Inner ring and outer ring are extracted, solid native plant is planted in inner ring soil.This method step is simple, material requested is few, by the design of inner ring and outer ring, establishes the protection system of four layers of fixing soil, withstands washing away for rainwater or river to greatest extent.Meanwhile revegetation area is big, afforestation effect is good.

Description

The solid native grass planting method of Riparian Zone chad beach
Technical field
The present invention relates to soil remediation field, in particular to a kind of solid native grass planting method of Riparian Zone chad beach.
Background technology
In 20 th century laters, with the development of surge and the industrial and agricultural production of population, as most important river in nature The ecological environment of the stream ecosystem receives serious threat.Important component of the Riparian Zone as river ecosystem, bag The area untill river water effect is wholly absent, its special position on the riverbed and high water level between high-low water level are included Putting makes its Wild animal and plant resources that are richly stored with, water resource, climate resources and tourist resources etc..On land and aqueous systems Under the double influence effect of system, Riparian Zone, which has, improves bio-diversity and Productivity of Ecological System, administers and protection water and soil is dirty Dye, many functions such as regulation micro climate and beautification ecological environment.Yet with the interference and destruction of mankind's activity, Riparian Zone Vegetation seriously degenerate cause soil to be largely lost in, ultimately result in Riparian Zone to logistics, can flow, information flow and biology flow performance corridor The event resolves in road, filter and barrier.With concern of the China to ecological problem, the reparation of Riparian Zone degenerated vegetation into For the focus of ecological research field.Due to high chad soil caused by a large amount of losses of Riparian Zone soil, seriously govern The recovery process of vegetation.
Widely used method is that cement and several materials are integrated into one in Riparian vegetation recovery project at present Rise and various forms of eco-concretes are made.Wherein, with porous continuous type green concrete using more.Porous continuous type greening Concrete is formed by mixings such as coarse aggregate, mixing material, cement, chemical addition agent and water, without fine aggregate, see in appearance as Edible " saqima ".The concrete technology of this method is:
The domatic carry out for first having to be administered is smooth, and prefabricated normal concrete framework is laid after smooth;It is porous Continuous type green concrete raw material is from gathering materials, is formed with cement, admixture and several materials of additive.Determining proportioning Afterwards plus water is fully mixed thoroughly, is then cast in prefabricated concrete frame;Subsequently into curing period, the time of curing period is generally More than three days.The control of basicity is carried out during maintenance to the concrete soil body, due to Ca can be produced in cement hydration process (OH)2, therefore alkalescence would generally be presented in concrete bodies, it is necessary to and the control of basicity is carried out, otherwise can not growing plant;Curing period mistake Afterwards, the filling of hole is carried out, ecological type porous concrete hole is a specific artificial plant growing environment, packing material Chemical property and the various plants that are provided needed for nutrient, determine that can plant in ecological type porous concrete just Often germinate, take root, long term growth.The base material of filling soil is generally the cultivated plant soil or loess of suitable for plant growth, and as needed Add the additional materials such as a certain amount of fertilizer, water-loss reducer, organic matter, humus;Finally carry out top layer covering with new soil, top layer soil moved in improve the original It is layed in concrete for plant growth surface, forms the space of vegetation primary growth, there is provided the nutrient of vegetation primary growth, moisture and prevents Concrete surface crosses heat affecting plant growth, and reduces moisture evaporation in concrete for plant growth before plant possesses soil-water protection, prevents Only the porous continuous type green concrete filling material of its underpart is lost in.
Although porous continuous type green concrete method for recovering vegetation is unique better method of actual measurement, its manufacture craft Complexity, porous continuity concrete not only needs to pour, and needs to conserve, then carries out the filling of hole and the soil on top layer covers Lid, its excessive cycle, workload is big, and manufacturing cost is not low.Concrete inherently hardens solid soil material simultaneously, though it is more Hole, but itself influence to natural environment is still not clear.The porosity of porous continuity green concrete is understood according to research It is optimal for 25%~40%, therefore its actual green coverage is limited, can not realize highdensity afforestation effect.Material requested One of the shortcomings that various and this method.Finally, during the covering with new soil of top layer, the table soil can not be protected, very greatly It may be taken away by current scour, and exposed porous continuity green concrete, do not reach expected revegetation effect.
In view of this, it is special to propose the present invention.
The content of the invention
It is an object of the invention to provide a kind of solid native grass planting method of Riparian Zone chad beach, this method step is simple, institute Need material few, by the design of inner ring and outer ring, establish the protection system of four layers of fixing soil, rain can be withstood to greatest extent Water or river wash away.Meanwhile revegetation area is big, afforestation effect is good.
In order to realize the above-mentioned purpose of the present invention, spy uses following technical scheme:
A kind of solid native grass planting method of Riparian Zone chad beach, comprises the following steps:Digged pit on Riparian Zone chad beach;Edge Crater wall is sequentially placed into outer ring and inner ring;Filling soil in the inner ring, filling soil is consolidated with soil between the inner ring and outer ring The mixture of agent, crushed-gravel is filled between the outer ring and crater wall;Inner ring and outer ring are extracted, solid soil is planted in inner ring soil Plant.
The solid native grass planting method of Riparian Zone chad beach provided by the invention, by introducing setting for inner ring and outer ring in hole Meter, the protection system of four layers of fixing soil is established, washing away for rainwater or river can be withstood to greatest extent.First, filled out in inner ring The solid native plant of soil plantation is filled, root system of plant is fixed soil and not easily runed off, and can recover the plant of Riparian Zone chad beach Quilt.Second, the soil filled between inner ring and outer ring is consolidated under the protection of not solid native plant by adding soil in soil Agent strengthens the consolidation effect of soil, ensures that soil is not easy to be washed away by flowing water so as to increasing the interaction between soil particle, Reduce the loss of soil.Third, the soil for being mixed with soil-solidified-agent filled between the inner ring and outer ring also soil to being filled in inner ring Earth plays protective action, because the soil filled outside inner ring is mixed with soil-solidified-agent, the enhancing of its degree of packing, is formed outside inner ring One new barrier, enhance the scour resistance of filling soil in inner ring.Moreover, the root system in growing process can also This region is extended to, further retains more soil, is advantageous to follow-up revegetation.Fourth, lead between outer ring and crater wall Cross that filling hardness is big, is not easy the crushed-gravel that is flushed away so that hole constitutes system independent on beach, is for outermost protection System, protect the soil in hole.
Riparian Zone chad beach provided by the invention consolidates native grass planting method, and the soil filled in inner ring and outer ring can take nearby Soil, using sorted out when digging pit come soil, can also be fetched from the region beyond hole.Filled between outer ring and crater wall Crushed-gravel can also draw materials nearby, utilize the crushed-gravel sorted out on chad beach.Step is simple, and materials are few, greatlys save Human and material resources and financial resources.
In method provided by the invention, the size in hole can influence to consolidate the effect of native grass planting.It is preferred that the depth cheated be 20~ 30cm, volume are 0.05~0.10m3.The size in hole is controlled in the range of this, washing away for large area is not easily caused, one In fixed beach area, small and scattered heatable adobe sleeping platform can reduce the chance washed away by water.And based on the consideration of solid native root system of plant, will Hole it is deep-controlled in 20~30cm, be advantageous to the abundant growth of root system of plant, so as to ensure farthest to play solid soil shield Slope function.
The soil filled between inner ring and outer ring has protection to make with the soil filled in soil solidification agent composition internally circle With, but because its degree of packing is larger, soil consolidation degree is larger, is unfavorable for the extension of root system of plant, and it is therefore, preferably, described Spacing between inner ring and outer ring is 8~10cm, can play good protective action, also will not suppress to plant because of area is excessive The growth of thing root system;As outermost guard system, the spacing between the outer ring and crater wall is preferably 2~4cm, wherein filling out The crushed-gravel filled can support the structure entirely cheated, and play good protective action.
Soil-solidified-agent plays a part of fixing soil, and the curing dose of addition is relatively more, and the solid native effect played is high, can Washing away for water is reduced to greatest extent.But undue consolidation also influences the growth of plant.Preferably, the quality of the soil-solidified-agent The 0.4%~0.6% of soil quality is accounted for, preferable addition can promote the consolidation between soil particle, also not interfere with plant The acid-base value of the growth of thing and soil in itself.
Preferably, soil-solidified-agent is also included in the soil of filling in the inner ring, the soil mixed in the inner ring soil The quality of curing agent accounts for the 0.2%~0.3% of the soil quality filled in inner ring.By in inner ring soil mixed soil solidify Agent, worked along both lines with solid native plant, further ensure that the enhancing of erosion durability of soil energy.Moreover, the matter of the soil-solidified-agent of mixing Amount does not interfere with the growth of solid native root system of plant yet.
Soil-solidified-agent is preferably ionic soil-solidified-agent, and brand is road nation EN-1 soil-solidified-agents, strong ion exchange Promote soil is active, and road nation EN-1 soil-solidified-agents are nontoxic, it is nuisanceless, pollution-free, do not destroy ecological environment, it is solid using this Agent reaches not only safety and stability but also environment-friendly double effects.Meanwhile road nation EN-1 soil-solidified-agents can improve soil texture, Increase the saturated hydraulic conductivity and the content of organic matter of soil, be advantageous to absorption of the root system of plant to nutrient, promote the photosynthetic work of plant With.
Preferably, the soil density of filling is 1.3~1.5g/cm in the inner ring3, filled between the inner ring and outer ring The density of mixture be 1.5~1.7g/cm3, can either ensure that the degree of packing of soil reduces washing away by flowing water, be also beneficial to The abundant growth of root system of plant.
Preferably, the crushed-gravel particle diameter filled between the outer ring and inwall is 10~25mm.It is preferred that the particle diameter of crushed-gravel For 10~25mm, ensure that bulk density effect is best, using the teaching of the invention it is possible to provide good strength and stability, good water permeability is also can guarantee that, Not easy freezing.
It is further preferred that the solid native grass planting method of Riparian Zone chad beach provided by the invention the crushed-gravel gap it Between also fill up soil, increase the bond strength between crushed-gravel, also provide certain space for the growth of root system of plant.
Preferably, the solid native plant is any one in Bermuda grass, Trifolium repense, clover, paspalum notatum, seashore paspalum, It can adapt to the growing environment of Riparian Zone chad beach.It is further preferred that the solid native plant is Bermuda grass, it germinates soon, Germination percentage is high, and needed nutrient matter is few, good salt tolerance, adapts to the barren situation of Riparian Zone chad beach soil glue;Water-tolerant, Rainy season can be spent without destroyed;Its coring system is powerful, and rhizome spreading force is strong, and the effect of fixed soil moved in improve the original protrudes.
Compared with prior art, beneficial effects of the present invention are:
(1) by introducing the design of inner ring and outer ring in hole, the protection system of four layers of fixing soil is established, is guaranteed Withstand washing away for rainwater or river.First, the solid native plant of filling soil plantation, root system of plant are fixed soil and are not easy in inner ring It is lost in, and the vegetation of Riparian Zone chad beach can be recovered.Second, the soil filled between inner ring and outer ring is in not solid soil Under the protection of plant, increase the interaction between soil particle, enhancing soil by adding soil-solidified-agent in soil The consolidation effect of earth, ensure that soil is not easy to be washed away by flowing water.Third, that is filled between inner ring and outer ring is mixed with soil-solidified-agent Soil also plays protective action to the soil filled in inner ring, and because the soil filled outside inner ring is mixed with soil-solidified-agent, its is tight Solidity strengthens, and a new barrier has been formed outside inner ring, protects the soil filled in inner ring to be not easy to be washed away by flowing water.It is fourth, outer Enclose that hardness is big, is not easy the crushed-gravel that is flushed away by filling between crater wall so that hole constitutes system independent on beach, most For outermost guard system, the soil in hole is protected.
(2) Riparian Zone chad beach provided by the invention consolidates native grass planting method, and the soil filled in inner ring and outer ring can be just Closely fetch earth, using sorted out when digging pit come soil.The crushed-gravel filled between outer ring and crater wall can also draw materials nearby, profit With the crushed-gravel sorted out on chad beach.Step is simple, and materials are few, greatlys save human and material resources and financial resources.
(3) in the present invention, in the soil filled between inner ring and outer ring, the quality of the soil-solidified-agent of addition accounts for soil matter The 0.4%~0.6% of amount, can promote the consolidation between soil particle, do not interfere with yet plant growth and soil in itself Acid-base value.
(4) in the present invention, soil-solidified-agent, the matter of the soil-solidified-agent of addition are also added in the soil filled in inner ring Amount accounts for the 0.2%~0.3% of the soil quality filled in inner ring.By the mixed soil curing agent in inner ring soil, with solid soil Plant is worked along both lines, and further ensures that soil not easily runs off.Moreover, the quality of the soil-solidified-agent of mixing does not interfere with solid soil yet The growth of root system of plant.
(5) soil-solidified-agent is preferably ionic soil-solidified-agent, and brand is road nation EN-1 soil-solidified-agents, and strong ion is handed over Change promote soil it is active, road nation EN-1 soil-solidified-agents and it is nontoxic, nuisanceless, pollution-free, do not destroy ecological environment, use The curing agent reaches not only safety and stability but also environment-friendly double effects.Meanwhile road nation EN-1 soil-solidified-agents can improve soil Structure, increase the saturated hydraulic conductivity and the content of organic matter of soil, be advantageous to absorption of the root system of plant to nutrient, promote the light of plant Cooperation is used.
(6) solid native plant is any one in Bermuda grass, Trifolium repense, clover, paspalum notatum, seashore paspalum, and the solid soil is planted Thing germination is fast, and germination percentage is high, and needed nutrient matter is few, requires not tight to soil, it is barrenr to adapt to Riparian Zone chad beach soil Situation, water-tolerant, its coring system it is powerful, rhizome spreading force is strong, and the effect of fixed soil moved in improve the original protrudes.
Embodiment
Embodiment of the present invention is described in detail below in conjunction with embodiment, but those skilled in the art will Understand, the following example is merely to illustrate the present invention, and is not construed as limiting the scope of the present invention.It is unreceipted specific in embodiment Condition person, the condition suggested according to normal condition or manufacturer are carried out.Agents useful for same or the unreceipted production firm person of instrument, it is The conventional products that can be obtained by commercially available purchase.
Embodiment
Dry season, site preparation is carried out on Riparian Zone chad beach, the big gravel on beach is cleared, to ensure not Influence follow-up step.
Digged pit on whole good beach, cheat and cheated for cylinder, a diameter of 50cm, depth 30cm.Also can be by hole Shape is set as other shapes, such as the section in hole to be square, rectangle, ellipse, parallelogram, its solid soil reached Grass planting effect is the same.In the present embodiment, do not enumerate, only so that cylinder is cheated as an example, circular effect is best, does not have Corner angle, reduction are washed away.
After digging good hole, inner ring and outer ring are put into hole.The position of inner ring and outer ring is such:It is closer to the distance by crater wall For outer ring, it is distant for inner ring by crater wall.Inner ring and outer ring are circle, and spacing between the two is 10cm, outer circle remote The distance of crater wall is 3cm.Inner ring is identical with the cross sectional shape in hole with the shape of outer ring.If the section in hole is square, rectangle, Ellipse, parallelogram, then inner ring and outer ring select square, rectangle, ellipse, parallelogram successively.Inner ring and The material of outer ring does not do particular/special requirement, can be selected according to budget.
After putting inner ring and outer ring well, the crushed-gravel that particle diameter is 10~25mm is filled between outer ring and crater wall.Due to gravel Particle diameter differ, filling when, the less crushed-gravel of particle diameter is placed on bottom, and the larger crushed-gravel of particle diameter is placed on top, so The consolidation of accumulation is good, and stability is strong, is not easy to be washed away by flowing water.Can also there is certain gap in crushed-gravel, in order to further Increase the bond strength between crushed-gravel, can filling soil, the soil of filling also be also the life of root system of plant between crushed-gravel Length provides certain space, is easy to the extension of root system of plant.
Soil is put into inner ring, is put into while compacting soil, the density for ensureing last soil are 1.5g/cm3. The step in the soil that uses can fetch earth nearby, utilize the soil collected when digging pit.If there is the larger soil of particle diameter in soil It block, need to crush, if there is the debris such as the larger rubble of particle diameter, tree root, metal derby, need to remove.Filled out to further ensure that in inner ring The soil filled is not easily runed off, and road nation EN-1 soil-solidified-agents are added in the soil that can be also filled in inner ring, and the soil of addition is consolidated The quality of agent accounts for the 0.25% of the soil quality filled in inner ring.By the mixed soil curing agent in inner ring soil, with consolidating Native plant is worked along both lines,.Moreover, the quality of the soil-solidified-agent of mixing does not interfere with the growth of solid native root system of plant yet.Specifically Implementation is to choose the location that gravel is more, soil is few in Riparian Zone, carries out clear base, and carrying soil is placed on standby herein;Measure Go out the optimum moisture content of soil, the quality for the water that should be added in soil is calculated according to optimum moisture content.Take respective quality Water, soil-solidified-agent is added thereto abundant dissolving, the content for ensureing curing agent in soil is 0.25%, after by curing agent and water Mixture be fitted into watering can and equably spray into soil, in order to ensure sprinkling ground uniformly, can be layered and spray and be stirred continuously;Spray After spilling end, the soil for being mixed with curing agent is allowed in inner ring, compacting.In inner ring after populated soil, then in inner ring and outside The mixture of road nation's EN-1 soil-solidified-agents and soil is filled between circle.It is put into while compacting soil, ensures last soil Density be 1.7g/cm3.The same above-mentioned steps of preparation method of the mixture.
In addition, the chad of the surface covering 30-50mm thickness for the soil that can be also filled between inner ring and outer ring, further Soil protection, reduction are washed away.At this moment, crushed-gravel then between outer ring and crater wall is accumulated, ensures what is filled between outer ring and crater wall The height of crushed-gravel is also highly concordant with the chad of covering.
Finally, carefully inner ring and outer ring are pulled out, Bermuda grass seed is sprinkled into inner ring soil, and covered with soil Lid, pours a small amount of water, that is, completes the work of whole.Transfer to the repeatable utilization of the inner ring come and outer ring.
In addition, whole pitted surface can be covered with film, spill a water after 8 hours.A water is spilt daily later, is taken off after 3 days Film is removed, both can guarantee that the survival rate of Bermuda grass, can also cause road nation EN-1 soil-solidified-agents to play best effect.
Compared with existing Riparian vegetation recovery technology, the solid native grass planting side of Riparian Zone chad beach of invention offer Method maximally utilises minimum material, simplest technique, environmentally friendly material and realizes that Riparian Zone chad beach is planted It is resumed purpose.
First:Recover the vegetation of Riparian Zone chad beach to greatest extent.Dry season, this is carried out in Riparian Zone chad beach Technology for recovering vegetation in patent, because the germination of Bermuda grass is fast, germination percentage is high, and needed nutrient matter is few, water-tolerant, so its Can well-grown, and rainy season can be spent in a short time, without destroyed.
Second:Realize the solid native effect of Riparian Zone chad beach.First, the Bermuda grass grown in inner ring has powerful coring System, the effect of fixed soil moved in improve the original are fine.Second, the soil filled between inner ring and outer ring leads under the protection of not solid native plant Cross and soil-solidified-agent is added in soil so as to increase the interaction between soil particle, strengthen the consolidation effect of soil, subtract The probability that few soil is washed away by flowing water.Third, the soil for being mixed with soil-solidified-agent filled between inner ring and outer ring is also in inner ring The soil of filling plays protective action, because the soil filled outside inner ring is mixed with soil-solidified-agent, its degree of packing enhancing, in inner ring It is outer to form a new barrier, protect the soil filled in inner ring to be not easy to be washed away by flowing water.Fourth, lead between outer ring and crater wall Cross that filling hardness is big, is not easy the crushed-gravel that is flushed away so that hole constitutes system independent on beach, protection the most outermost System, protect the soil in hole.
3rd:Realize the landscape effect of Riparian Zone.In the vegetation recovery procedure for carrying out Riparian Zone chad beach, according to plant Be resumed engineered paths design difference (technology for recovering vegetation is carried out with row or column), and selection it is floristic not Together, it is possible to achieve the landscape effect of plant.
4th:Reduce manpower, financial resources and the material resources of Riparian Zone chad beach revegetation.First, Internal and external cycle can be held It is continuous to use, only need a set of Internal and external cycle during a site preparation;Then, curing agent add amount it is few, but can realize compared with Good solid native effect;Finally, the price of curing agent and grass seeds is not expensive that soil needed for soil moved in improve the original can take nearby in itself. In addition, Small side effects of the road nation EN-1 ionics soil-solidified-agent utilized in the patent to soil environment.
Although illustrate and describing the present invention with specific embodiment, but will be appreciated that without departing substantially from the present invention's Many other change and modification can be made in the case of spirit and scope.It is, therefore, intended that in the following claims Including belonging to all such changes and modifications in the scope of the invention.

Claims (11)

1. a kind of solid native grass planting method of Riparian Zone chad beach, it is characterised in that digged pit on Riparian Zone chad beach;Along crater wall It is sequentially placed into outer ring and inner ring;Filling soil in the inner ring, filling soil and soil-solidified-agent between the inner ring and outer ring Mixture, fill crushed-gravel between the outer ring and crater wall;Inner ring and outer ring are extracted, solid soil is planted in inner ring soil and is planted Thing.
2. the solid native grass planting method of Riparian Zone chad beach according to claim 1, it is characterised in that the hole depth is 20 ~30cm, volume are 0.05~0.10m3
3. the solid native grass planting method of Riparian Zone chad beach according to claim 2, it is characterised in that the inner ring and outer ring Between spacing be 8~10cm, the spacing between the outer ring and crater wall is 2~4cm.
4. the solid native grass planting method of Riparian Zone chad beach according to claim 1, it is characterised in that the inner ring and outer ring Between the quality of soil-solidified-agent account for the 0.4%~0.6% of soil quality.
5. the solid native grass planting method of Riparian Zone chad beach according to claim 1, it is characterised in that filled in the inner ring Soil in also include soil-solidified-agent;The quality of soil-solidified-agent account for the soil quality filled in inner ring 0.2%~ 0.3%.
6. the solid native grass planting method of Riparian Zone chad beach according to any one of Claims 1 to 5, it is characterised in that described Soil-solidified-agent is ionic curing agent.
7. the solid native grass planting method of Riparian Zone chad beach according to claim 1, it is characterised in that filled in the inner ring Soil density be 1.3~1.5g/cm3, the density for the mixture filled between the inner ring and outer ring is 1.5~1.7g/cm3
8. the solid native grass planting method of Riparian Zone chad beach according to claim 1, it is characterised in that the outer ring and crater wall Between the crushed-gravel particle diameter filled be 10~25mm.
9. the solid native grass planting method of Riparian Zone chad beach according to claim 8, it is characterised in that the crushed-gravel gap Between filling soil.
10. the solid native grass planting method of Riparian Zone chad beach according to claim 1, it is characterised in that the solid native plant For any one in Bermuda grass, Trifolium repense, clover, paspalum notatum, seashore paspalum.
11. the solid native grass planting method of Riparian Zone chad beach according to claim 6, it is characterised in that the soil solidification Agent is EN-1 soil-solidified-agents.
CN201510319791.9A 2015-06-11 2015-06-11 The solid native grass planting method of Riparian Zone chad beach Expired - Fee Related CN104956877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510319791.9A CN104956877B (en) 2015-06-11 2015-06-11 The solid native grass planting method of Riparian Zone chad beach

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510319791.9A CN104956877B (en) 2015-06-11 2015-06-11 The solid native grass planting method of Riparian Zone chad beach

Publications (2)

Publication Number Publication Date
CN104956877A CN104956877A (en) 2015-10-07
CN104956877B true CN104956877B (en) 2017-11-10

Family

ID=54211118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510319791.9A Expired - Fee Related CN104956877B (en) 2015-06-11 2015-06-11 The solid native grass planting method of Riparian Zone chad beach

Country Status (1)

Country Link
CN (1) CN104956877B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105248141B (en) * 2015-11-23 2018-07-20 北京林业大学 A kind of plant cover cultivation methods of ruckle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1038744A (en) * 1988-03-04 1990-01-17 伊藤嘉英 The method for planting of seedling
US5383943A (en) * 1992-08-08 1995-01-24 Shin-Etsu Chemical Co. Ltd. Soil block for pot plant cultivation and a method of cultivating pot plants using the same
CN2764136Y (en) * 2005-01-25 2006-03-15 海南绿菲环境工程有限公司 Coconut palm fibre belt lawn for slope protection
JP2006121911A (en) * 2004-10-26 2006-05-18 Daikichi Suematsu Greening planting method for building, or the like
CN202969396U (en) * 2012-11-15 2013-06-05 交通运输部公路科学研究所 Slope protection structure for road waste disposal site
CN104131572A (en) * 2014-08-19 2014-11-05 福建农林大学 Method for governing red soil strongly-eroded slope

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1038744A (en) * 1988-03-04 1990-01-17 伊藤嘉英 The method for planting of seedling
US5383943A (en) * 1992-08-08 1995-01-24 Shin-Etsu Chemical Co. Ltd. Soil block for pot plant cultivation and a method of cultivating pot plants using the same
JP2006121911A (en) * 2004-10-26 2006-05-18 Daikichi Suematsu Greening planting method for building, or the like
CN2764136Y (en) * 2005-01-25 2006-03-15 海南绿菲环境工程有限公司 Coconut palm fibre belt lawn for slope protection
CN202969396U (en) * 2012-11-15 2013-06-05 交通运输部公路科学研究所 Slope protection structure for road waste disposal site
CN104131572A (en) * 2014-08-19 2014-11-05 福建农林大学 Method for governing red soil strongly-eroded slope

Also Published As

Publication number Publication date
CN104956877A (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN104782383B (en) A kind of high, gradient slope zoology green-recovery is sowed grass seeds by duster base material and its preparation method and application
CN102652480B (en) Vegetation recovery method for acid metal mine solid waste stock dump
CN103931371B (en) A kind of biological control method of rock side-slope
CN101761086B (en) Three-dimensional net greening technique for roadbed side slope
CN103265355B (en) Plant growth matrix with high water retention for spray seeding revegetation and preparation method thereof
CN103866776B (en) A kind of building waste gabion wall ecological bank protecting method
CN110832964A (en) Building aggregate mine in-situ soil improvement and greening method
CN105519274A (en) Integration method of large-scale coastal newly reclaimed beach agricultural land ecologicalization exploitation
CN108093729A (en) Side-slope greening and protection method
CN105918056B (en) One kind, which is checked winds and fixed drifting sand, is retained greening method
CN203896685U (en) Tree planting structure in coastal saline-alkali land
CN102668835A (en) Revegetation method for tailings dams in northern region
CN102204434A (en) Method for preventing water erosion desertification by using biological crust
CN102138508B (en) Method for greening and protecting steep road side slope by using biological crust
CN104969749A (en) Method for quickly planting cynodon dactylon on ecological concrete slope
CN103416278A (en) Method for culturing vegetation in Karst landform region
CN107396807A (en) A kind of implantation methods of arid biogeographic zone transplanting big tree
CN107237334B (en) A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN109287386A (en) A kind of Football Field Turf and method of construction built using building waste
CN109257987A (en) Arid and semi-arid lands salt-soda soil dry type desalination and efficient technique of rainwater utilization scheme
CN107155790A (en) A kind of method that saline-alkali soil is improved by microbial fermented stalk
CN107338800A (en) A kind of cast-in-place construction method of green concrete in salt-soda soil
CN103858554A (en) Method for governing and improving soda saline and alkaline land through magnet tailing composite modifying agents
CN106605469A (en) Coastal reclamation land ecological restoration and greening method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110