switch
vertical shift
steel rail
track
sleeper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510321573.9A
Other languages
Chinese (zh)
Other versions
CN104878665B (en
Inventor
孙晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Xintie Aite Machinery Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510321573.9A priority Critical patent/CN104878665B/en
Publication of CN104878665A publication Critical patent/CN104878665A/en
Application granted granted Critical
Publication of CN104878665B publication Critical patent/CN104878665B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/02Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to an overall longitudinal movement device for a railway turnout. The device is characterized in that 5-15 pairs of longitudinal movement flat cars are arranged below to-be-moved turnout sleepers and arranged in the linear direction of turnout rails, and the lower surface of each longitudinal movement flat car is located on a grooved foundation bed directly or through a wooden sleeper; each longitudinal movement flat car comprises a support and rolling devices, and rolling end surfaces of the rolling devices bulge out of the upper surface of the support. The longitudinal movement device is reasonable in design, light to use, time-saving, labor-saving, safe and reliable; a longitudinal movement method can fundamentally solve the problem of high probability of construction delay due to longer skylight time occupied by erection and dismounting when simple rails are used for conventional longitudinal movement of the railway turnout.

Description

The overall longitudinal-moving device of railway switch and vertical shift method thereof
Technical field
The present invention relates to the overall longitudinal-moving device of a kind of railway switch and vertical shift method thereof, belong to a kind of small-sized railway machinery equipment.
Background technology
Railway switch/section of track change be covered with traversing enter a method, vertical shift enter a method.In electrified sections, owing to limiting by obstacles such as catenary masts, vertical shift enters a method and uses commonplace, namely set up simple and easy track at pre-inserted track switch/section of track place with rail and connect with existing line, pulley is encased inside between track switch/section of track is with existing line rail, promote track switch/section of track and enter position along simple and easy track vertical shift, then switch changing and laying unit is used to play track switch/section of track, withdraw from pulley and simple and easy track, be encased inside pulley whereabouts track switch/section of track and longitudinal accurate adjustment is carried out to track switch/section of track, reuse switch changing and laying unit to play track switch/section of track and withdraw from pulley, whereabouts track switch/section of track makes track switch/section of track substantially in place, thus complete track switch/section of track and change paving.
The main program of current vertical shift method construction is, as shown in Figure 1:
Overlay track switch/section of track: carry out Site, select and overlay suitable, the steady firmly platform of the scaffolding heights such as position sleeper rail, platform is assembled track switch/section of track.
Change front preparation: to be hung on by switch changing and laying unit with gantry crane and overlay track switch/section of track and set by precalculated position, parallelly penetrate first segment slide rail, installed traversing pulley, got out sleeper head, spreading slide rail, connecting cleat and bolt.
Block construction: remove old track switch/section of track to be changed, excavate railway roadbed, smooth railway roadbed controls roadbed absolute altitude well and side, both sides is wide, set up simple and easy track with rail and connect with existing line.Simultaneously spreading slide rail traversing track switch/section of track are on existing line, withdraw from cross sliding rail and pulley, under track switch/section of track pillow and be encased inside pulley between existing line, promoting track switch/section of track vertically moves into position along simple and easy track, use switch changing and laying unit to play track switch/section of track and withdraw from pulley and simple and easy track, whereabouts track switch/section of track is encased inside the longitudinal accurate adjustment of pulley, withdraws from pulley whereabouts track switch/section of track in place and connect with existing line, backfill railway ballast, trimming circuit, complete and change paving.
Current this vertical shift enters a method and changes in paving at track switch/section of track and there is following weak point:
Use rail to set up simple and easy track, need railcar to be transported in advance by rail and put in place, and there is handling, transportation safety risk, also uneconomical.
Setting up simple and easy track need be solid by standard gauge nail, and rail is long and from great, thus set up simple and easy track labour take many, labour intensity large, and it is longer to take Window time when setting up.
Simple and easy track to be positioned at below track switch/section of track and from great, after track switch/section of track enters position, manpower removes difficulty, need when thus using railcar that rail is longitudinally pulled and removed that railcar is in place, bolt hangs wire rope, pull in prevent from scraping the existing railway equipment such as short trouble, therefore during simple and easy dismantling of track, also holding time is longer, and has the security risk of scratching existing railway equipment.
Simple and easy track has certain altitude, often can not exactitude position during railcar vertical shift, need be encased inside the artificial longitudinally adjustment again of pulley, increase by one pulley and be encased inside operation, waste Window time.
To sum up, existing track switch/section of track vertical shift enters construction method and exists and take that blocking time is long, security risk is large, manpower and materials drop into the shortcomings such as many, labour intensity is large.
Summary of the invention
The technical problem to be solved in the present invention is to provide the overall longitudinal-moving device of a kind of railway switch and vertical shift method thereof, this longitudinal-moving device reasonable in design, use light, time saving and energy saving, safe and reliable, vertical shift method can fundamentally solve existing railway switch vertical shift use rail simple and easy track time set up and remove take Window time longer easily cause construction time delay problem.
For overcoming the above problems, concrete technical scheme of the present invention is as follows: the overall longitudinal-moving device of a kind of railway switch, 5 ~ 15 pairs of vertical shift flatcars are set in the below of switch sleeper to be moved, and arrange along the rectilinear direction of railroad turnout steel rail, each vertical shift flatcar soffit by sleeper or be directly landed in fluting bedding on; Wherein vertical shift flatcar is made up of bearing and tourelle, and the rolling end face of tourelle protrudes from the upper surface of bearing.
Described tourelle is made up of the roller cylinder of several parallel arrangements, roller bearing or ball, and wherein roller cylinder is parallel with the axis of roller bearing and the length direction of switch sleeper.
The width of described switch sleeper is L1, and the clearance distance of two neighboring track switch track pillows is L2, and roller cylinder, roller bearing or ball in tourelle at least arrange 3, adjacent shaft distance between centers of tracks is a, total spacing is an, and arranges a < L1, an > L2.
Former and later two end faces of described bearing are provided with inclined-plane, and are provided with guide wheel at upper surface of support two ends near inclined-plane place, and the top of guide wheel is lower than the top of roller cylinder, roller bearing or ball.
Utilize the method for railway switch overall longitudinal-moving device vertical shift track switch, comprise the following steps:
1) by railroad turnout steel rail to be moved together with on it connect switch sleeper by pulley support on existing track;
2) manpower or railcar driven forward railroad turnout steel rail is passed through in the rear end of railroad turnout steel rail to be moved;
3) when railroad turnout steel rail front end enters a segment distance in fluting bedding, use track switch to overlay machine and is sling in front end, sleeper and paired vertical shift flatcar are encased inside the below of switch sleeper, and the spacing of vertical shift flatcar is less than the minimum length of the switch sleeper on it;
4) continue driven forward railroad turnout steel rail, railroad turnout steel rail moves ahead on vertical shift flatcar, is withdrawn from, again below the end of railroad turnout steel rail, place one group of sleeper and vertical shift flatcar when existing track pulley foremost enters and drops in fluting bedding;
5) continue driven forward railroad turnout steel rail, move in circles step 4), until railroad turnout steel rail vertical shift enters position, then on the overall longitudinal-moving device of track switch, carries out longitudinal accurate adjustment to railroad turnout steel rail;
6) overlay machine with track switch to be lifted by railroad turnout steel rail, remove sleeper and vertical shift flatcar, it is in place that namely whereabouts railroad turnout steel rail completes vertical shift;
7) track switch is indulged shift-out bit and is adopted railroad turnout steel rail to pull in the other direction, and operating process to step 1) reverse operating by step 6), can realize track switch vertical shift and shift out.
The overall longitudinal-moving device of this railway switch adopts the tourelle on vertical shift flatcar substituted for and originally overlays track, not only easy to loading and unloading, and transportation safety, improves the efficiency of vertical shift track switch.
Tourelle adopts the form of roller cylinder, roller bearing or ball, can not only realize switch sleeper and move thereon, and overcomes the discontinuous feature defect in space that formation is arranged at switch tie interval, achieves continuous vertical shift.
For ensureing that vertical shift flatcar can the feature of transmission support continuously, roller, roller bearing or ball arrange at least 3 groups, its maximum spacing must be less than sleeper bottom width and consider that sleeper concrete edge strength problem appropriateness reduces, total spacing of roller, roller bearing or ball must be greater than the empty width of sleeper and consider that sleeper concrete edge strength problem appropriateness strengthens, thus ensures to have at least a sleepers to be positioned on roller, roller bearing or ball in switch sleeper longitudinal movement.
The outermost roller summit, two ends of roller, roller bearing or ball is lower slightly compared with other roller, roller bearing or ball summit, and during to solve eccentric force, vertical shift flatcar appropriateness upwarps and adjacent sleeper produces small amount of deflection problem downwards because of switch sleeper deadweight reason.Former and later two end faces of bearing are provided with inclined-plane simultaneously, prevent in track switch vertical shift process, the scratching vertical shift flatcar bearing because there is amount of deflection.
The method of railway switch overall longitudinal-moving device vertical shift track switch is adopted to not only increase the efficiency of track switch vertical shift, and accurate positioning, safe and reliable.
Accompanying drawing explanation
Fig. 1 is the structural representation of track switch vertical shift in background technology.
Fig. 2 is the structural representation of the overall longitudinal-moving device of railway switch.
Fig. 3 is the top view of the overall longitudinal-moving device of railway switch.
Fig. 4 is the structural representation of vertical shift flatcar.
Fig. 5 is the A-A sectional view embodiment one of Fig. 4.
Fig. 6 is the A-A sectional view embodiment two of Fig. 4.
Fig. 7 is the A-A sectional view embodiment three of Fig. 4.
Fig. 8 is the theoretical schematic diagram of vertical shift flatcar.
Detailed description of the invention
As shown in Figures 2 and 3, the overall longitudinal-moving device of a kind of railway switch, 5 ~ 15 pairs of vertical shift flatcars 3 are set in the below of switch sleeper 2 to be moved, and arrange along the rectilinear direction of railroad turnout steel rail 1, the spacing of often pair of vertical shift flatcar 3 is less than the minimum length of the switch sleeper 2 on it, is landed on fluting bedding 5 at the soffit of each vertical shift flatcar 3 by sleeper 4; Wherein vertical shift flatcar 3 is made up of bearing 11 and tourelle 10, and the rolling end face of tourelle 10 protrudes from the upper surface of bearing 11.
As shown in Figure 4 and Figure 5, the constructive embodiment one of vertical shift flatcar 3: described tourelle 10 is made up of the roller cylinder 15 of several parallel arrangements, be connected by bearing 16 between roller cylinder 15 with bearing 11, wherein the axis of roller cylinder 15 is parallel with the length direction of switch sleeper 2, bearing 16 can bear larger radial load, ensure that the continuous vertical shift of switch sleeper.
As shown in Figure 4 and Figure 6, the constructive embodiment two of vertical shift flatcar 3: described tourelle 10 is by the roller bearing 18 of several parallel arrangements, wherein the axis of roller bearing 18 is parallel with the length direction of switch sleeper 2, rotate in the groove that roller bearing can be arranged on bearing 11, not only achieve the continuous vertical shift of switch sleeper, and the height of bearing 11 can reduce a lot, alleviate the deadweight of vertical shift flatcar.
As shown in figs. 4 and 7, the constructive embodiment three of vertical shift flatcar 3: described tourelle 10 is made up of several balls 20, ball 20 is embedded in bearing 11, be as the criterion not come off, and the height of bearing 11 can reduce a lot, alleviate vertical shift flatcar deadweight, if desired can on ball-type vertical shift flatcar traversing track switch, adjust its direction.
As shown in Figure 8, the width of described switch sleeper 2 is L1, the clearance distance of two neighboring track switch track pillows 2 is L2, and the roller cylinder 15 in tourelle 10, roller bearing 18 or ball 20 at least arrange 3, and adjacent shaft distance between centers of tracks is a, total spacing is an, and a < L1 is set, an > L2, only these parameter requests guaranteed, the continuity of guarantee track switch vertical shift, and can not be blocked by the space of sleeper.
As shown in Figure 4, described former and later two end faces of bearing 11 are provided with inclined-plane, and be provided with guide wheel 13 at bearing 11 upper surface two ends near inclined-plane place, the top of guide wheel 13 lower than the top of roller cylinder 15, roller bearing 18 or ball 20, when this structure avoids switch sleeper to produce amount of deflection and vertical shift flatcar produce and interfere.
Utilize the method for railway switch overall longitudinal-moving device vertical shift track switch, comprise the following steps:
1) railroad turnout steel rail 1 to be moved is supported on existing track 7 together with the switch sleeper 2 that it connects by pulley 8;
2) manpower or railcar driven forward railroad turnout steel rail 1 is passed through in the rear end of railroad turnout steel rail 1 to be moved;
3) when railroad turnout steel rail 1 front end enters a segment distance in fluting bedding, use track switch to overlay machine 9 to be sling in front end, sleeper 4 and paired vertical shift flatcar 3 are encased inside the below of switch sleeper 2, and the spacing of vertical shift flatcar 3 is less than the minimum length of the switch sleeper 2 on it;
4) driven forward railroad turnout steel rail 1 is continued, railroad turnout steel rail 1 moves ahead on vertical shift flatcar 3, withdrawn from when existing track 7 pulley 8 foremost enters and drops in fluting bedding, below the end of railroad turnout steel rail 1, again placed one group of sleeper 4 and vertical shift flatcar 3;
5) continue driven forward railroad turnout steel rail 1, move in circles step 4), until railroad turnout steel rail 1 vertical shift enters position, then on the overall longitudinal-moving device of track switch, carries out longitudinal accurate adjustment to railroad turnout steel rail 1;
6) overlay machine 9 with track switch to be lifted by railroad turnout steel rail 1, remove sleeper 4 and vertical shift flatcar 3, it is in place that namely whereabouts railroad turnout steel rail 1 completes vertical shift;
7) track switch is indulged shift-out bit and is adopted railroad turnout steel rail 1 to pull in the other direction, and operating process to step 1) reverse operating by step 6), can realize track switch vertical shift and shift out.
In like manner for the general knowledge of this area, also railroad turnout steel rail can be replaced with section of track rail, can realize the vertical shift of section of track rail, be equally also in the protection domain of the application.

Claims (5)

1. the overall longitudinal-moving device of railway switch, it is characterized in that: 5 ~ 15 pairs of vertical shift flatcars (3) are set in the below of switch sleeper (2) to be moved, and arrange along the rectilinear direction of railroad turnout steel rail (1), pass through sleeper (4) at the soffit of each vertical shift flatcar (3) or be directly landed on fluting bedding (5); Wherein vertical shift flatcar (3) is made up of bearing (11) and tourelle (10), and the rolling end face of tourelle (10) protrudes from the upper surface of bearing (11).
2. the overall longitudinal-moving device of railway switch as claimed in claim 1, it is characterized in that: described tourelle (10) is made up of the roller cylinder (15) of several parallel arrangements, roller bearing (18) or ball (20), and wherein roller cylinder (15) is parallel with the length direction of switch sleeper (2) with the axis of roller bearing (18).
3. the overall longitudinal-moving device of railway switch as claimed in claim 2, it is characterized in that: the width of described switch sleeper (2) is L1, the clearance distance of two neighboring track switch tracks pillow (2) is L2, roller cylinder (15) in tourelle (10), roller bearing (18) or ball (20) at least arrange 3, adjacent shaft distance between centers of tracks is a, total spacing is an, and arranges a < L1, an > L2.
4. the overall longitudinal-moving device of railway switch as claimed in claim 3, it is characterized in that: described bearing (11) former and later two end faces are provided with inclined-plane, and being provided with guide wheel (13) at bearing (11) upper surface two ends near inclined-plane place, the top of guide wheel (13) is lower than the top of roller cylinder (15), roller bearing (18) or ball (20).
5. utilize the method for railway switch overall longitudinal-moving device vertical shift track switch, it is characterized in that comprising the following steps:
1) railroad turnout steel rail (1) to be moved is supported on existing track (7) together with the switch sleeper (2) that it connects by pulley (8);
2) manpower or railcar driven forward railroad turnout steel rail (1) is passed through in the rear end of railroad turnout steel rail (1) to be moved;
3) when railroad turnout steel rail (1) front end enters a segment distance in fluting bedding, use track switch to overlay machine (9) to be sling in front end, sleeper (4) and paired vertical shift flatcar (3) are encased inside the below of switch sleeper (2), and the spacing of vertical shift flatcar (3) is less than the minimum length of the switch sleeper (2) on it;
4) driven forward railroad turnout steel rail (1) is continued, railroad turnout steel rail (1) moves ahead on vertical shift flatcar (3), withdrawn from when existing track (7) pulley foremost (8) enters and drops in fluting bedding, below the end of railroad turnout steel rail (1), again placed one group of sleeper (4) and vertical shift flatcar (3);
5) continue driven forward railroad turnout steel rail (1), move in circles step 4), until railroad turnout steel rail (1) vertical shift enters position, then on the overall longitudinal-moving device of track switch, carries out longitudinal accurate adjustment to railroad turnout steel rail (1);
6) overlay machine (9) with track switch to be lifted by railroad turnout steel rail (1), remove sleeper (4) and vertical shift flatcar (3), it is in place that whereabouts railroad turnout steel rail (1) namely completes vertical shift;
7) track switch is indulged shift-out bit and is adopted railroad turnout steel rail (1) to pull in the other direction, and operating process to step 1) reverse operating by step 6), can realize track switch vertical shift and shift out.
CN201510321573.9A 2015-06-12 2015-06-12 Railway switch entirety longitudinal-moving device and its vertical shift method Active CN104878665B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510321573.9A CN104878665B (en) 2015-06-12 2015-06-12 Railway switch entirety longitudinal-moving device and its vertical shift method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510321573.9A CN104878665B (en) 2015-06-12 2015-06-12 Railway switch entirety longitudinal-moving device and its vertical shift method

Publications (2)

Publication Number Publication Date
CN104878665A true CN104878665A (en) 2015-09-02
CN104878665B CN104878665B (en) 2017-06-23

Family

ID=53946328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510321573.9A Active CN104878665B (en) 2015-06-12 2015-06-12 Railway switch entirety longitudinal-moving device and its vertical shift method

Country Status (1)

Country Link
CN (1) CN104878665B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254762A (en) * 2020-03-20 2020-06-09 中铁上海工程局集团有限公司 Four-wheel small flat car for pre-assembled turnout slippage and construction method
CN111877063A (en) * 2020-08-08 2020-11-03 那玉金 Device for railway construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5146677A (en) * 1991-03-06 1992-09-15 Holman Curtis W Rail anchor remover
CN201310063Y (en) * 2008-12-04 2009-09-16 中铁六局集团有限公司 Railway switch translation positioner
CN102535276A (en) * 2011-12-01 2012-07-04 孙晓伟 Integrally-moving device for railway turnout junctions
CN202809415U (en) * 2012-10-16 2013-03-20 孙晓伟 Railway turnout integrated lengthways moving device
CN204753280U (en) * 2015-06-12 2015-11-11 孙晓伟 Device is moved to whole indulging of railway switch

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5146677A (en) * 1991-03-06 1992-09-15 Holman Curtis W Rail anchor remover
CN201310063Y (en) * 2008-12-04 2009-09-16 中铁六局集团有限公司 Railway switch translation positioner
CN102535276A (en) * 2011-12-01 2012-07-04 孙晓伟 Integrally-moving device for railway turnout junctions
CN202809415U (en) * 2012-10-16 2013-03-20 孙晓伟 Railway turnout integrated lengthways moving device
CN204753280U (en) * 2015-06-12 2015-11-11 孙晓伟 Device is moved to whole indulging of railway switch

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111254762A (en) * 2020-03-20 2020-06-09 中铁上海工程局集团有限公司 Four-wheel small flat car for pre-assembled turnout slippage and construction method
CN111877063A (en) * 2020-08-08 2020-11-03 那玉金 Device for railway construction
CN111877063B (en) * 2020-08-08 2021-12-21 中铁二十一局集团第一工程有限公司 Device for railway construction

Also Published As

Publication number Publication date
CN104878665B (en) 2017-06-23

Similar Documents

Publication Publication Date Title
CN109457626A (en) A method of precast beam being installed in height-limit area
CN103726421B (en) Height and span adjustable track paver for metro construction
CN111441199A (en) Rapid construction device and method for turnout during reconstruction of existing station
CN107386128A (en) Double-T shaped beam bridge changes beam construction system
CN107675633A (en) The method that the existing whole hole of bridge is changed
CN103277112B (en) Tunnel Engineering train formula fast lifting folding work platform
CN104878665A (en) Overall longitudinal movement device for railway turnout and longitudinal movement method adopting overall longitudinal movement device
CN109338831B (en) Ballastless track deviation rectifying method based on rope saw cutting
CN204753280U (en) Device is moved to whole indulging of railway switch
CN203321529U (en) Train type rapid lifting and folding work platform for tunnel engineering
CN110004953B (en) Slope or retaining wall construction trolley
CN102535277B (en) Device for completely moving railway turnout
CN100543228C (en) Change railway switch construction technology and switch changing and laying equipment
CN212505666U (en) Turnout inserting and laying walking device for transformation of existing station
CN102900027A (en) Dismounting method of bailey beam with upwardly strode existing lines and underneath penetrated existing bridge
JP2003239204A (en) Wheel returning method and wheel returning device for railway vehicle
CN106437174B (en) Rail transport device for inclined operation surface and construction method thereof
RU2572485C1 (en) Method of construction and repair of continuous welded rail, track panel and track laying system for its realisation
CN108239896A (en) Existing railway Disease Treatment of Foundation Base fixed track usage plan constructing structure and construction method
CN203307694U (en) Railway turnout integral transverse moving device with lifting function
CN204825527U (en) Construction structures is moved to whole indulging of this line D roof beam
CN207031936U (en) A kind of bracket
CN101748689B (en) High-speed railway hoisting and laying method and special gantry crane running rubber cushion blocks
JP2010007243A (en) Railroad girder movement and installation equipment, railroad girder movement and installation method, and railroad girder removal method
CN210439083U (en) Maglev track panel transportation and pushing system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190806

Address after: 024000 Garage No. 5-107, Building 28, Chenglong Jiayuan District, Songshan District, Chifeng City, Inner Mongolia Autonomous Region

Patentee after: Inner Mongolia Xintie Aite Machinery Co., Ltd.

Address before: The rich and Songshan District, Chifeng city the Inner Mongolia Autonomous Region garden 024000 room 0411 No. 8-3

Patentee before: Sun Xiaowei