CN107386128A - Double-T shaped beam bridge changes beam construction system - Google Patents

Double-T shaped beam bridge changes beam construction system Download PDF

Info

Publication number
CN107386128A
CN107386128A CN201710835375.3A CN201710835375A CN107386128A CN 107386128 A CN107386128 A CN 107386128A CN 201710835375 A CN201710835375 A CN 201710835375A CN 107386128 A CN107386128 A CN 107386128A
Authority
CN
China
Prior art keywords
fortune
special train
double
upside
changes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710835375.3A
Other languages
Chinese (zh)
Inventor
王治斌
蒋中明
王嵽显
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Fifth Survey and Design Institute Group Co Ltd
Original Assignee
China Railway Fifth Survey and Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Fifth Survey and Design Institute Group Co Ltd filed Critical China Railway Fifth Survey and Design Institute Group Co Ltd
Priority to CN201710835375.3A priority Critical patent/CN107386128A/en
Publication of CN107386128A publication Critical patent/CN107386128A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to double-T shaped beam bridge to change frame equipment technical field, there is provided a kind of double-T shaped beam bridge changes beam construction system.The system include being arranged on change beam opening position change erecting machine, changing erecting machine includes girder, girder is provided with the two hanging beam dollies that can be moved along its length, girder is set up on bridge floor by frong guide column and BB1, frong guide column and BB1 are Collapsible structure, make to change beam process is not influenceed by natural conditions such as wind-force, will not be made to fall beam to cause a deviation, be improved and change beam efficiency;The both sides for changing erecting machine are respectively provided with the fortune beam special train, fortune beam dolly and upside-down mounting gantry for applying mechanically the new beam of transport and old beam of plugging into.The system can effectively reduce the lifting altitude of equipment in work progress, realize smoothly completed under the operating mode for having track clearance requirement T-shaped beam change beam operation, it can ensure on the premise of not causing any unnecessary influence on former line facility, that completes whole hole simple supported T-beam safe efficiently in " skylight point " changes frame construction.

Description

Double-T shaped beam bridge changes beam construction system
Technical field
The present invention relates to double-T shaped beam bridge to change frame equipment technical field, and in particular to a kind of double-T shaped beam bridge changes beam construction system System.
Background technology
The old beam serious plant disease of China's current portions railroad bridge is directed to, the present situation of replacing is needed badly, in conventional existing railway Circuit bridge is changed in frame construction, it is necessary to be closed for a long time to circuit, and limited by building interim sidewalk or suspension bridge for vehicle Speed is current, then recycles Bridge Erector or the mode of support is set up under bridge and complete hole-specifically to change frame construction working, cost is high, work Phase is grown, and workload is big, and the normal operation of existing line is had a great influence.
The content of the invention
The purpose of the present invention is to propose to it is a kind of can be safe efficient complete whole hole simple supported T-beam change frame construction change Beam construction system.
To achieve the above object, beam construction system is changed the invention provides a kind of double-T shaped beam bridge, including:
The erecting machine that changes for changing beam opening position is arranged on, the erecting machine that changes includes girder, and the girder is provided with can be along it Two hanging beam dollies of length direction motion, the girder are set up on bridge floor by frong guide column and BB1, the frong guide column It is Collapsible structure with BB1;
Be arranged on change erecting machine side be used to transport the first fortune beam special train for treating the new beam of frame, two first for feeding beam Transport beam dolly and for that will treat that the new beam of frame hangs onto two described first two transported on beam dollies from the described first fortune beam special train First upside-down mounting gantry;And
Be arranged on change erecting machine opposite side two second of the old beam fortune beam dollies that are used to plug into, for by old beam transport from The second of field transports beam special train and for old beam to be hung onto on the second fortune beam special train from two the second fortune beam dollies Two second upside-down mounting gantry.
Preferably, the both lateral sides of the girder have the edge of a wing;The hanging beam dolly includes moving cart and across beam, institute The top for stating moving cart is provided with the driving wheel coordinated with the top side on the edge of a wing of the girder both sides, and the driving wheel is used to drive Length direction of the moving cart along the girder moves;The bottom side of the hanging beam dolly is provided with mounting groove, described across beam It is described to be provided with elevator across beam relative to the girder transverse shifting in the mounting groove and by drive mechanism Machine.
Preferably, the frong guide column and BB1 are telescopic oil cylinder.
Preferably, the bottom of the frong guide column and BB1 is equipped with cushion block.
Preferably, at least two roof beams structure, the roof beam structure bag are equipped with the first fortune beam special train and the second fortune beam special train Base and two diagonal braces being arranged on base are included, two diagonal braces are set in splayed, for inserting the longeron of T-shaped beam Wherein, the base is supported on the bottom of T-shaped beam, and two diagonal braces are against on the web of T-shaped beam both sides respectively.
Preferably, described first upside-down mounting gantry and second upside-down mounting gantry are Collapsible structure, the first fortune beam special train Two gantry crane supports are removably provided with the second fortune beam special train, the gantry crane support is for supporting first upside-down mounting Gantry and second upside-down mounting gantry.
Preferably, two loop wheel machine supports are removably provided with the first fortune beam special train, the loop wheel machine support is used for The lower section of hanging beam dolly is supported on when changing erecting machine and marching into the arena and withdraw from the arena.
Preferably, in addition to two rows of tracks and multiple loop wheel machine sleeper beams, multiple loop wheel machine sleeper beams, which are erected at, changes beam position two On the T-shaped beam bridge of side, two tracks are respectively erected on multiple loop wheel machine sleeper beams of both sides to be changed of setting a roof beam in place.
Preferably, the both sides of the track are extended at the both ends of multiple loop wheel machine sleeper beams, described leading for supporting Post, BB1, first upside-down mounting gantry and second upside-down mounting gantry.
Preferably, the first fortune beam special train and the second fortune beam special train include headstock and more piece flatcar, first fortune The headstock of the headstock of beam special train and the described second fortune beam special train is to be detachably connected between setting, each flatcar.
From the foregoing, it will be observed that the system by liftable frong guide column and BB1, realizes the overall landing for changing erecting machine, then Coordinate the motion of hanging beam dolly, realize the erection of new beam and the dismounting of old beam, by the overall landing of equipment, make to change beam process not Influenceed by natural conditions such as wind-force, will not make to fall beam to cause a deviation, improved and change beam efficiency;Furthermore it is also possible to effectively reduce The lifting altitude of equipment in work progress, realize smoothly completed under the operating mode for having track clearance requirement T-shaped beam change beam behaviour Make, it is ensured that on the premise of not causing any unnecessary influence on former line facility, completed safe efficiently in " skylight point " Whole hole simple supported T-beam changes frame construction.
Brief description of the drawings
Fig. 1 is a kind of front view for changing beam construction system of double-T shaped beam bridge of the embodiment of the present invention;
Fig. 2 is a kind of stereogram for changing beam construction system of double-T shaped beam bridge of the embodiment of the present invention;
Fig. 3 is the schematic diagram for changing erecting machine part of the embodiment of the present invention;
Fig. 4 is the state diagram changed when erecting machine lifts by crane of the embodiment of the present invention;
Fig. 5 is the state diagram changed when erecting machine hangs old beam of the embodiment of the present invention;
Fig. 6 is the state diagram changed when erecting machine hangs new beam of the embodiment of the present invention;
Fig. 7 is a kind of state diagram changed when beam construction system is marched into the arena of double-T shaped beam bridge of the embodiment of the present invention;
Fig. 8 is the enlarged drawing at A in Fig. 7;
Fig. 9 is the enlarged drawing at B in Fig. 7;
Figure 10 is the enlarged drawing at C in Fig. 7;
Figure 11 is the schematic diagram of the track and loop wheel machine sleeper beam at the first upside-down mounting gantry position of the embodiment of the present invention;
Figure 12 is the track for changing erecting machine opening position of the embodiment of the present invention and the schematic diagram of loop wheel machine sleeper beam.
Reference:
1st, the first fortune beam special train;2nd, first upside-down mounting gantry;3rd, the first fortune beam dolly;4th, erecting machine is changed;41st, frong guide column;42、 Girder;421st, the edge of a wing;43rd, BB1;44th, hanging beam dolly;441st, moving cart;442nd, across beam;443rd, lift rope;5th, frame is treated New beam;6th, the second fortune beam dolly;7th, Jiu Liang;8th, second upside-down mounting gantry;9th, the second fortune beam special train;10th, flatcar;11st, roof beam structure;111、 Diagonal brace;112nd, base;12nd, gantry crane support;13rd, loop wheel machine support;14th, loop wheel machine sleeper beam;15th, track.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained on the premise of creative work is not made, belongs to the scope of protection of the invention.
With reference to shown in Fig. 1 to Fig. 3, a kind of double-T shaped beam bridge provided in an embodiment of the present invention changes beam construction system, including sets Put and change erecting machine 4 change beam opening position, changing erecting machine 4 includes girder 42, and girder 42 is provided with and can moved along its length Two hanging beam dollies 44, hanging beam dolly 44 is used to hanged treat the new beam 5 of frame and old beam 7;Girder 42 is led by frong guide column 41 with after Post 43 is set up on bridge floor, and frong guide column 41 and BB1 43 are Collapsible structure, can specifically be used telescopic oil cylinder, thus be made Girder 42 and two hanging beam dollies 44 can move up and down, and realized with this and treat rising and falling for the new beam 5 of frame and old beam 7;Set a roof beam in place changing The side of machine 4, the system also include being used to transport the first fortune beam special train 1 for treating the new beam 5 of frame, the two first fortune beams for feeding beam Dolly 3 and two the first upside-down mountings on two first fortune beam dollies 3 are hung onto for the new beam 5 of frame will to be treated from the first fortune beam special train 1 Gantry 2;Changing the opposite side of erecting machine 4, the system also include being used for plugging into old beam 7 two second fortune beam dollies 6, for will be old Beam 7 transports the second fortune beam special train 9 left the theatre and hangs onto the second fortune beam special train 9 for old beam 7 to be transported into beam dollies 6 from two second On two second upside-down mounting gantry 8.
With reference to shown in Fig. 4 to Fig. 6, by liftable frong guide column 41 and BB1 43, the overall landing of equipment can be achieved, Coordinate the motion of hanging beam dolly 44 again, realize the erection of new beam and the dismounting of old beam 7, by the overall landing of equipment, make to change beam Process is not influenceed by natural conditions such as wind-force, will not make to fall beam to cause a deviation, and is improved and is changed beam efficiency;Furthermore it is also possible to have Effect reduces the lifting altitude of equipment in work progress, realizes and T-shaped beam is smoothly completed under the operating mode for having track clearance requirement Change beam operation, it is ensured that safe efficient in " skylight point " on the premise of not causing any unnecessary influence on former line facility The frame that changes that whole hole simple supported T-beam is completed on ground is constructed.
With reference to shown in figure 3, the both lateral sides of girder 42 have the edge of a wing 421;Hanging beam dolly 44 includes moving cart 441 and horizontal stroke Bridge 442, the top of moving cart 441 are provided with the driving wheel coordinated with the top side on the edge of a wing 421 of the both sides of girder 42, that is, moved small The top of car 441 has two row's driving wheels, moving cart 441 by the cooperation of two row's driving wheels and 42 liang of side wing edges 421 of girder and Hang and be located on girder 42, the driving wheel is used to drive length direction of the moving cart 441 along girder 42 to move;Hanging beam dolly 44 Bottom side is provided with mounting groove, is arranged on across beam 442 in mounting groove and by drive mechanism relative to the transverse shifting of girder 42, horizontal Bridge 442 is provided with hoist engine, and the lift rope 443 of hoist engine, which is used to bundle, treats the new beam 5 of frame or old beam 7 to be replaced, passes through volume The contraction of rope 443 is raised, the lower section for being bundled in girder 42 of the new beam 5 of frame or old beam 7 tightly will be treated, and then by across the phase of beam 442 For the transverse shifting of girder 42, realize that the bias of T-shaped beam is risen and fallen, so as to realize T-shaped beam bridge upstream side and downlink side roof beam structure 11 Replacing.
In certain embodiments, the bottom of frong guide column 41 and BB1 43 is equipped with cushion block, and cushion block can increase frong guide column 41 With the support strength and stability of BB1 43, and cushion block cross-sectional area is preferably greater than the cross section of frong guide column 41 and BB1 43 Product, the lifting surface area so supported is bigger, and support is more steady.
With reference to shown in Fig. 7 and Fig. 8, at least two roof beams structure 11 are equipped with the first fortune beam special train 1 and the second fortune beam special train 9, Roof beam structure 11 includes base 112 and two diagonal braces 111 being arranged on base 112, and two diagonal braces 111 set in splayed, are used for It is inserted the longeron of T-shaped beam, base 112 is supported on the bottom of T-shaped beam, and two diagonal braces 111 are against T-shaped beam both sides respectively On web, that is, the longeron of T-shaped beam and the intersection of crossbeam are supported on, for when equipment is marched into the arena, treating the new beam 5 of frame or withdrawing from the arena Old beam 7 forms support.
With reference to shown in Fig. 7 and Fig. 9, first upside-down mounting gantry 2 and second upside-down mounting gantry 8 are Collapsible structure, and first transports beam Special train 1 and second is transported and two gantry crane supports 12 is removably provided with beam special train 9, and gantry crane support 12 is used to support first to fall Upside-down mounting gantry 8, gantry 2 and second is filled, because the width between two supporting legs at upside-down mounting gantry is greater than the He of the first fortune beam special train 1 Second fortune beam special train 9, so when first upside-down mounting gantry 2 and second upside-down mounting gantry 8 are marched into the arena, it is necessary to by above-mentioned gantry crane support 12 To support, treat that the first fortune beam special train 1 and the second fortune beam special train 9 transport at first upside-down mounting gantry 2 and second upside-down mounting gantry 8 in place When, the supporting leg at first upside-down mounting gantry 2 and second upside-down mounting gantry 8 is extended downwardly from and is supported on bridge floor, while departs from gantry crane support 12, gantry crane support 12 can be from the first fortune beam special train 1 and second after first upside-down mounting gantry 2 and second upside-down mounting gantry 8 has been transported Unload on fortune beam special train 9, be loaded on when first upside-down mounting gantry 2 and second upside-down mounting gantry 8 are withdrawn from the arena.
With reference to shown in Fig. 7 and Figure 10, two loop wheel machine supports 13, loop wheel machine are also removably provided with the first fortune beam special train 1 Support 13 is used to be supported on the lower section of hanging beam dolly 44 when changing erecting machine 4 and marching into the arena, change when erecting machine 4 is marched into the arena frong guide column 41 and after Guide pillar 43 is contraction state, when change erecting machine 4 arrive at change beam position when, frong guide column 41 and BB1 43 are extended downwardly from and supported On bridge floor, while two hanging beam dollies 44 depart from loop wheel machine supports 13, and loop wheel machine support 13 is changed after erecting machine 4 from first having transported Unloaded on fortune beam special train 1, erecting machine 4 to be changed is loaded on when withdrawing from the arena.
With reference to shown in Figure 11 and Figure 12, the system also includes two rows of tracks 15 and multiple loop wheel machine sleeper beams 14, multiple loop wheel machine pillows Beam 14, which is erected at, to be changed on the T-shaped beam bridge of beam position both sides, and two tracks 15 are respectively erected in multiple loop wheel machines of both sides to be changed of setting a roof beam in place On sleeper beam 14, two tracks 15 are that the first fortune beam special train 1, second transports the fortune beam of beam special train 9, first dolly 3 and the second fortune beam dolly 6 Dedicated track 15.
Further, the both ends of multiple loop wheel machine sleeper beams 14 extend the both sides of errant 15, for support frong guide column 41, after Guide pillar 43, first upside-down mounting gantry 2 and second upside-down mounting gantry 8, the material of loop wheel machine sleeper beam 14 is firm, sets steadily, can be to first Upside-down mounting gantry 2, second upside-down mounting gantry 8 and the support for changing the formation stabilization of erecting machine 4.
As shown in fig. 7, the first fortune beam special train 1 and the second fortune beam special train 9 include headstock and more piece flatcar 10, wherein, the The headstock of the headstock of one fortune beam special train 1 and the second fortune beam special train 9 is to be detachably connected between each flatcar 10 backwards to setting. When the transport of each equipment is marched into the arena, the flatcar 10 of the flatcar 10 of the first fortune beam special train 1 and the second fortune beam special train 9 can be connected to each other, After each equipment after in place and installation, then the flatcar 10 of the flatcar 10 for transporting beam special train 1 by first and the second fortune beam special train 9 divides each other Open, finally change after beam terminates and be again connected the flatcar 10 of the first fortune beam special train 1 with the flatcar 10 of the second fortune beam special train 9, to transport Each equipment is withdrawn from the arena.
The work progress of the system is:
1st, preparation
1) march into the arena
2) section of track is cut:The segmentation 32m sections of track are stepped up waiting to set a roof beam in place.It is required that first drilling, post-tensioning rail is fixed, then saws rail, finally Upper junction plate is fixed.After the completion of, it still may insure normally to drive a vehicle on circuit.
3) railway ballast is removed, sleeper beam is installed:Railway ballast is removed, is changed waiting to set a roof beam in place to install respectively across end and its in addition appropriate location The special sleeper beam of erecting machine and inverted gantry crane.Sleeper beam is horizontally through two rail, is supported near two panels " T " web, sets It must not influence normally to drive a vehicle after good.
4) other subsequent treatments:Such as, dead bearing coupling bolt is embroidered in processing, it is ensured that changing can back out when setting a roof beam in place;Cut " T " Horizontal-associate board concrete protective layer etc..
5) withdraw from the arena
Another " skylight point " implementation is operated in above, is not take up the formal engineering time.
2nd, frame construction is changed
1) vehicle is organized, new beam is transported and equipment is entered the court;
2) according to the placement location of sleeper beam, by upside-down mounting gantry and erecting machine installation is changed in place.
3) untie to wait to set a roof beam in place and step up section of track coupling bolt, hang out the 32m sections of track, meet at low clearance fortune beam dolly, by two Upside-down mounting gantry coordinates upside-down mounting, gives fortune beam special train again.Once the 32m sections of track, which hang out girder span, can remove on beam railway ballast (without whole Remove, the certain railway ballast of old sill bolt is removed).During this period, by new beam upside-down mounting on low clearance fortune beam dolly.
4) hang except first " T " beam, the old beam changed is placed on low clearance fortune beam dolly, and turn by upside-down mounting gantry Move on on fortune beam special train, then transport is withdrawn from the arena;Continue to hang except second " T " beam, ditto.
5) marched into the arena using transporting beam special train and transport new beam, and low clearance is transferred to by upside-down mounting gantry and transported on beam dolly, carry beam on the back Fall beam to changing erecting machine opening position and carrying out lifting, complete the erection of a piece of new beam;Second the same.
6) the dress 32m sections of track are returned, recover track structure.
7) equipment Removal, entrucking.
8) personnel, Jiu Liang, equipment are withdrawn from the arena.
In summary, it is proposed by the present invention change erecting beam construction technology can ensure not cause existing line it is any unnecessary broken On the premise of bad, frame construction is changed in the whole hole that freely-supported " T " beam on existing line is safely and fast completed in " skylight point ", effectively Ground solves the problem of current cost height, workload during changing erecting beam construction, long-term closed-loop, is available for road bureau's permanent-way technology It is equipped with and uses.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. a kind of double-T shaped beam bridge changes beam construction system, it is characterised in that including:
The erecting machine that changes for changing beam opening position is arranged on, the erecting machine that changes includes girder, and the girder is provided with can be along its length Two hanging beam dollies of direction motion, the girder are set up on bridge floor by frong guide column and BB1, and the frong guide column is with after Guide pillar is Collapsible structure;
It is arranged on the first fortune beam special train that the new beam of frame is treated for transporting for changing erecting machine side, the two first fortune beams for feeding beam Dolly and for will treat the new beam of frame from described first fortune beam special train hang onto two it is described first fortune beam dollies on two first Upside-down mounting gantry;And
It is arranged on two second fortune beam dollies of the old beam that is used to plug into for changing erecting machine opposite side, for old beam to be transported into what is left the theatre Second transports beam special train and for old beam to be hung onto to two on the second fortune beam special train from two the second fortune beam dollies Second upside-down mounting gantry.
2. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that horizontal the two of the girder Side has the edge of a wing;The hanging beam dolly includes moving cart and is provided with and the girder across beam, the top of the moving cart The driving wheel that the top side on the edge of a wing of both sides coordinates, the driving wheel are used to drive length side of the moving cart along the girder To movement;The bottom side of the hanging beam dolly is provided with mounting groove, described to be arranged on across beam in the mounting groove and pass through driving machine Structure is described to be provided with hoist engine across beam relative to the girder transverse shifting.
3. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that the frong guide column is led with after Post is telescopic oil cylinder.
4. double-T shaped beam bridge according to claim 3 changes beam construction system, it is characterised in that the frong guide column is led with after The bottom of post is equipped with cushion block.
5. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that the first fortune beam special train At least two roof beams structure are equipped with the second fortune beam special train, the roof beam structure includes base and two diagonal braces being arranged on base, Two diagonal braces are set in splayed, and for being inserted the longeron of T-shaped beam, the base is supported on the bottom of T-shaped beam, Two diagonal braces are against on the web of T-shaped beam both sides respectively.
6. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that described first upside-down mounting gantry It is Collapsible structure with second upside-down mounting gantry, is removably provided with the first fortune beam special train and the second fortune beam special train Two gantry crane supports, the gantry crane support are used to support described first upside-down mounting gantry and second upside-down mounting gantry.
7. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that the first fortune beam special train On be removably provided with two loop wheel machine supports, the loop wheel machine support is used to be supported on hanging beam when changing erecting machine and marching into the arena and withdraw from the arena The lower section of dolly.
8. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that also including two rows of tracks and Multiple loop wheel machine sleeper beams, multiple loop wheel machine sleeper beams, which are erected at, to be changed on the T-shaped beam bridge of beam position both sides, two track difference framves It is located on multiple loop wheel machine sleeper beams of both sides to be changed of setting a roof beam in place.
9. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that multiple loop wheel machine sleeper beams Both ends extend the both sides of the track, for supporting the frong guide column, BB1, first upside-down mounting gantry and the second upside-down mounting Gantry.
10. double-T shaped beam bridge according to claim 1 changes beam construction system, it is characterised in that the first fortune beam special train Include headstock and more piece flatcar, the headstock of the first fortune beam special train and the described second fortune beam special train with the second fortune beam special train Headstock is to be detachably connected between each flatcar backwards to setting.
CN201710835375.3A 2017-09-15 2017-09-15 Double-T shaped beam bridge changes beam construction system Pending CN107386128A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710835375.3A CN107386128A (en) 2017-09-15 2017-09-15 Double-T shaped beam bridge changes beam construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710835375.3A CN107386128A (en) 2017-09-15 2017-09-15 Double-T shaped beam bridge changes beam construction system

Publications (1)

Publication Number Publication Date
CN107386128A true CN107386128A (en) 2017-11-24

Family

ID=60350770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710835375.3A Pending CN107386128A (en) 2017-09-15 2017-09-15 Double-T shaped beam bridge changes beam construction system

Country Status (1)

Country Link
CN (1) CN107386128A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109019332A (en) * 2018-09-30 2018-12-18 田间 A kind of aerial slide device and method of T plate
CN109183620A (en) * 2018-09-05 2019-01-11 广东省长大公路工程有限公司 Telescoping bracket, steel box-girder hanging device and hanging method
CN110735404A (en) * 2019-11-26 2020-01-31 中铁第五勘察设计院集团有限公司 Variable width guide beam
CN110804960A (en) * 2019-11-26 2020-02-18 中铁第五勘察设计院集团有限公司 Whole hole beam frame replacing method
CN113481881A (en) * 2021-06-29 2021-10-08 中交二公局第三工程有限公司 Construction method for splicing, widening and dismantling reconstruction of T-shaped structure navigation bridge with hanging beams
WO2021254236A1 (en) * 2020-06-16 2021-12-23 中铁工程设计咨询集团有限公司 Construction method for replacement of girder structure of bridge
CN114875813A (en) * 2021-12-16 2022-08-09 长沙理工大学 Construction equipment and construction method for conveniently and easily dismantling and rebuilding reinforced concrete steel frame arch bridge

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003253623A (en) * 2002-03-04 2003-09-10 Taisei Corp Rebuilding construction method for bridge beam
CN101818480A (en) * 2010-04-15 2010-09-01 中铁科工集团有限公司 Box girder transfer platform and girder transferring and girder loading working procedures thereof
CN102102317A (en) * 2009-12-22 2011-06-22 中铁科工集团有限公司 Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
JP2014066007A (en) * 2012-09-24 2014-04-17 Nexco-East Engineering Co Ltd Removal method of existent bridge and renewal method of existent bridge
CN104790295A (en) * 2014-12-17 2015-07-22 中铁六局集团海外工程有限公司 Construction method of tire type gantry crane frame beam
CN106436586A (en) * 2015-08-10 2017-02-22 北京万桥兴业机械有限公司 Single-line or double-line railway bridge dismantling and replacing machine
CN207567659U (en) * 2017-09-15 2018-07-03 中铁第五勘察设计院集团有限公司 Double-T shaped beam bridge changes beam construction system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003253623A (en) * 2002-03-04 2003-09-10 Taisei Corp Rebuilding construction method for bridge beam
CN102102317A (en) * 2009-12-22 2011-06-22 中铁科工集团有限公司 Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
CN101818480A (en) * 2010-04-15 2010-09-01 中铁科工集团有限公司 Box girder transfer platform and girder transferring and girder loading working procedures thereof
JP2014066007A (en) * 2012-09-24 2014-04-17 Nexco-East Engineering Co Ltd Removal method of existent bridge and renewal method of existent bridge
CN104790295A (en) * 2014-12-17 2015-07-22 中铁六局集团海外工程有限公司 Construction method of tire type gantry crane frame beam
CN106436586A (en) * 2015-08-10 2017-02-22 北京万桥兴业机械有限公司 Single-line or double-line railway bridge dismantling and replacing machine
CN207567659U (en) * 2017-09-15 2018-07-03 中铁第五勘察设计院集团有限公司 Double-T shaped beam bridge changes beam construction system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183620A (en) * 2018-09-05 2019-01-11 广东省长大公路工程有限公司 Telescoping bracket, steel box-girder hanging device and hanging method
CN109019332A (en) * 2018-09-30 2018-12-18 田间 A kind of aerial slide device and method of T plate
CN110735404A (en) * 2019-11-26 2020-01-31 中铁第五勘察设计院集团有限公司 Variable width guide beam
CN110804960A (en) * 2019-11-26 2020-02-18 中铁第五勘察设计院集团有限公司 Whole hole beam frame replacing method
CN110804960B (en) * 2019-11-26 2021-06-25 中铁第五勘察设计院集团有限公司 Whole hole beam frame replacing method
WO2021254236A1 (en) * 2020-06-16 2021-12-23 中铁工程设计咨询集团有限公司 Construction method for replacement of girder structure of bridge
CN113481881A (en) * 2021-06-29 2021-10-08 中交二公局第三工程有限公司 Construction method for splicing, widening and dismantling reconstruction of T-shaped structure navigation bridge with hanging beams
CN114875813A (en) * 2021-12-16 2022-08-09 长沙理工大学 Construction equipment and construction method for conveniently and easily dismantling and rebuilding reinforced concrete steel frame arch bridge
CN114875813B (en) * 2021-12-16 2024-02-23 长沙理工大学 Construction equipment and construction method for dismantling and rebuilding reinforced concrete steel frame arch bridge

Similar Documents

Publication Publication Date Title
CN107386128A (en) Double-T shaped beam bridge changes beam construction system
CN207567659U (en) Double-T shaped beam bridge changes beam construction system
CN207498755U (en) A kind of traveling trolley adjusted with horizontal extension and vertical supporting
CN108560927A (en) A kind of Lift-on/Lift-off System and its application method of reinforced concrete column
CN203021883U (en) Wheel-track railway track laying unit
CN207932932U (en) A kind of twin beams slope Bridge Erector
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN106285020A (en) High-altitude precoated plate fitting machine
CN202544854U (en) Lining trolley for subway station
CN105544546B (en) Discarded object for underground engineering clears up conveying arrangement and method
CN107700367A (en) A kind of integrated bridge machine
CN207498754U (en) A kind of novel track-laying machine of city track traffic engineering
CN102561200B (en) Pushing device for bridge erecting machine to pass roadbed and method for bridge erecting machine to pass roadbed
CN104110002B (en) A kind of method for changing steel truss girder bridge floorings
CN107604828A (en) The Bridge Erector of double-T shaped beam bridge
CN107604825B (en) The bridging method of T-type beam bridge
CN106939554A (en) Expanded letter steel girder erecting machine and its beam erecting method
CN106400700A (en) Double-line cantilever type bridge formation machine
CN207567670U (en) The Bridge Erector of T-shaped beam bridge
CN107858935A (en) Two straddle type Bridge Erectors
CN112323657A (en) Integrated prefabricated bridge dismantling machine and prefabricated bridge dismantling method
CN107401124A (en) The Bridge Erector of T-shaped beam bridge
CN209778099U (en) Lifting and mounting integrated device for steel truss between sections of arc-shaped roof
CN204804360U (en) High altitude prefabricated plate mounting plate
CN204151685U (en) Rear feeding beam formula steel girder segment cantilever Bridge Erector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124

RJ01 Rejection of invention patent application after publication