CN104876148B - Power distribution construction drawing device - Google Patents
Power distribution construction drawing device Download PDFInfo
- Publication number
- CN104876148B CN104876148B CN201510289426.8A CN201510289426A CN104876148B CN 104876148 B CN104876148 B CN 104876148B CN 201510289426 A CN201510289426 A CN 201510289426A CN 104876148 B CN104876148 B CN 104876148B
- Authority
- CN
- China
- Prior art keywords
- fixing band
- ring body
- motor
- ring
- drawing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 238000004804 winding Methods 0.000 claims abstract description 18
- 230000000694 effects Effects 0.000 claims description 9
- 210000003141 lower extremity Anatomy 0.000 claims description 6
- 238000007789 sealing Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- 210000000689 upper leg Anatomy 0.000 claims description 2
- 230000007547 defect Effects 0.000 abstract description 3
- 238000003379 elimination reaction Methods 0.000 abstract description 3
- 210000002414 leg Anatomy 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 244000025254 Cannabis sativa Species 0.000 description 3
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 description 3
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 description 3
- 235000009120 camo Nutrition 0.000 description 3
- 235000005607 chanvre indien Nutrition 0.000 description 3
- 239000011487 hemp Substances 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 241000195622 Astasia Species 0.000 description 1
- 206010010947 Coordination abnormal Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 238000009958 sewing Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/18—Power-operated hoists
- B66D3/20—Power-operated hoists with driving motor, e.g. electric motor, and drum or barrel contained in a common housing
-
- A—HUMAN NECESSITIES
- A62—LIFE-SAVING; FIRE-FIGHTING
- A62B—DEVICES, APPARATUS OR METHODS FOR LIFE-SAVING
- A62B35/00—Safety belts or body harnesses; Similar equipment for limiting displacement of the human body, especially in case of sudden changes of motion
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Emergency Lowering Means (AREA)
- Basic Packing Technique (AREA)
Abstract
Power distribution construction drawing device, is used for solving in distribution line defect elimination process, and the personnel on line bar obtain Work tool or the problem of electric power components and parts inconvenience.It includes girdle ring, the first fixing band, the second fixing band, motor, reel and clamper, and described girdle ring includes the first ring body of C shape and the second ring body of C shape, is provided with the first fixing band and the second fixing band between the first ring body and the second ring body;Rear side at the second ring body is fixed with motor and the accumulator of drive motor work, outfan at motor is provided with reel, hinge bar that described clamper includes being arranged on motor, being hingedly mounted on a pair supporting rod bottom hinge bar, be rotatably installed in the roller of supporting rod free end, two rollers coordinate with the contact outside of two baffle plates respectively;Being fixed with bracing wire on described winding wheel, the other end in described bracing wire is fixed with the sack that can seal.This drawing device can reduce the movement range of staff, it is to avoid potential safety hazard during lift bracing wire.
Description
Technical field
The present invention relates to distribution line maintenance technology field, specifically a kind of power distribution construction drawing device.
Background technology
In distribution line defect elimination process, the rope made of hemp that electric power maintenance personnel generally use comparison thick is fastened on seat belt, by the people under line bar, Work tool and components and parts to be replaced being tied up the one end at the rope made of hemp, the electric power maintenance personnel on line bar by Work tool and need the electrical equipment changed lift to construct to line masthead end by the mode of the free-hand pulling rope made of hemp.Under this mode, it is easy to because lift weight causes the workmen's astasia on line bar, it is caused potential safety hazard.
Summary of the invention
It is an object of the invention to provide a kind of power distribution construction drawing device, be used for solving in distribution line defect elimination process, the personnel on line bar obtain Work tool or the problem of electric power components and parts inconvenience.
This invention address that its technical problem is adopted the technical scheme that: power distribution construction drawing device, it is characterized in that, it includes girdle ring, the first fixing band, the second fixing band, motor, reel and clamper, described girdle ring includes the first ring body of C shape and the second ring body of C shape, one end of described first ring body and one end of the second ring body are articulated and connected, and the other end of described first ring body and the other end clamping of the second ring body connect;One end of described first fixing band is fixed on the rear end of the first ring body, the other end of described first fixing band and the front end clamping of the second ring body connect, one end of described second fixing band is fixed on the rear end of the second ring body, the other end of described second fixing band and the front end clamping of the first ring body connect, the rear side of described first fixing band and the rear side of the second fixing band are arranged in a crossed manner, and between described first fixing band and the second fixing band, be provided with a pair connection band, described connection band and the first fixing band, the second fixing band surround the space being enclosed within user neck;A lower limb ring being enclosed within user thigh and the fixing connection in the middle part of lower limb ring described in two it is respectively equipped with in the bottom of described first ring body and the second ring body;
Rear side at described second ring body is fixed with motor and the accumulator of drive motor work, and the outfan at described motor is provided with reel, and described reel includes wheel shaft, the winding wheel that is fixed on wheel shaft and the baffle plate being arranged on winding wheel two ends;Described motor is provided with clamper, hinge bar that described clamper includes being arranged on motor, it is hingedly mounted on a pair supporting rod bottom hinge bar by rotating shaft, is rotatably installed in the roller of supporting rod free end, connecting, the supporting rod rotating shaft with hinge bar is provided with torsion spring, under the effect of described torsion spring, the free end of two supporting rods is drawn close mutually, and supporting rod is vertically arranged with corresponding roller, two rollers coordinate with the contact outside of two baffle plates respectively;Being fixed with bracing wire on described winding wheel, the other end in described bracing wire is fixed with the sack that can seal.
Further, it is respectively arranged at two ends with retainer ring and fixing band dead bolt at described first ring body, also retainer ring and fixing band snap close it is respectively equipped with at the two ends of described second ring body, retainer ring is connected for fixing with the first fixing band and the second fixing band, and fixing band snap close is for being connected with the fixing band dead bolt clamping on the first fixing band and the second fixing band.
Further, the intersection at described first fixing band and the second fixing band is provided with deconcentrator, and described first fixing band and the second fixing band are each attached on deconcentrator.
Further, being provided with into the elongated slot that X-shaped is arranged on described deconcentrator, described first fixing band and the second fixing band lay respectively in two elongated slots.
Further, the installation end of described hinge bar and the outer wall of motor are articulated and connected, and are provided with torsion spring between described hinge bar and motor, and under the effect of this torsion spring, the free end of hinge bar is drawn close to the side at reel place.
Further, being provided with two installing holes in the bottom of described hinge bar free end, the installation end of supporting rod is placed in installing hole.
Further, the opening end at described sack is provided with sealing rope, is provided with balancing weight in described sack.
Further, described girdle ring, reel and clamper are insulating part.
The invention has the beneficial effects as follows: power distribution construction drawing device provided by the invention, drawing device is worn by user, it is possible to play the effect of seat belt, in case falling during pole-climbing or when standing on line bar.Drawing device is provided with motor and reel, reel being rotated by motor, to be wound around or release bracing wire, bracing wire is fixed with sack, sack is placed with Work tool.Staff on line bar, can be operated by button and realize the rotation of motor, and then realize the lifting to bracing wire by the rotation of driven by motor reel, and required Work tool is just thus lifted to eminence.Staff on line bar is without free-hand lift bracing wire, and then can reduce the movement range of staff, it is to avoid potential safety hazard during lift bracing wire.And sack lifts under the driving of motor, save the muscle power of staff.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the present invention;
Fig. 2 is the schematic diagram of girdle ring;
Fig. 3 is the A place partial enlarged drawing in Fig. 2;
Fig. 4 be girdle ring open schematic diagram;
Fig. 5 is the B place partial view in Fig. 1;
Fig. 6 is the schematic diagram of reel;
Fig. 7 is the schematic diagram of clamper;
Fig. 8 be reel with clamper coordinate schematic diagram
In figure: 1 first ring body, 11 is protruding, 12 dead bolts, 2 second ring bodies, 21 fixtures, three-point line device, 31 retainer ring, 32 fixing band snap closes, 4 is hinged, 51 first fixing bands, 52 second fixing bands, 53 connect band, 6 motors, 7 reels, 71 wheel shafts, 72 baffle plates, 73 winding wheels, 731 string holes, 8 bottom bands of trouser legs, 9 clampers, 91 hinge bars, 92 installing holes, 93 supporting rods, 94 rollers, 10 bracing wires, 13 sacks, 14 balancing weights, 15 sealing ropes.
Detailed description of the invention
As shown in Figures 1 to 8, the invention mainly comprises girdle ring, deconcentrator the 3, first fixing band the 51, second fixing band 52, connect band 53, motor 6, reel 7, the bottom bands of trouser legs 8, clamper 9, bracing wire 10 and sack 13, below in conjunction with accompanying drawing, present invention is described.
As in figure 2 it is shown, girdle ring mainly includes the first ring body 1 and the second ring body 2, the first ring body and the second ring body are the working of plastics of C shape, the first ring body and the second ring body it should be guaranteed that enough structural strength, it is also possible to be made up of other insulant.Be provided with protruding 11 in one end of the first ring body, the corresponding end at the second ring body is provided with breach, and projection is placed in breach, and the first ring body is connected by breach and the second ring body hinged 4.As shown in Figure 4, the other end at the first ring body is provided with dead bolt 12, and the corresponding end at the second ring body is provided with snap close, is stuck in snap close by dead bolt to realize being relatively fixed of the first ring body and the second ring body, the now girdle ring ovalisation of the first ring body and the second ring body composition.A retainer ring 31 and a fixing band snap close 32 it is provided with on the top of the first ring body, a retainer ring 31 and a fixing band snap close 32 it also is provided with on the top of the second ring body, retainer ring 31 and fixing band snap close are integrally fixed on the first ring body and the second ring body, and the effect of retainer ring and fixing band snap close is to install fixing band.Fixing band is divided into the first fixing band 51 and the second fixing band 52, as shown in Figure 1, one end of first fixing band is tied up in the retainer ring being held within the first ring body, and the other end at the first fixing band is provided with fixing band dead bolt, and the fixing band snap close on this fixing band dead bolt and the second ring body connects and fixes.One end of second fixing band is fixed in the retainer ring on the second ring body, and the other end of the second fixing band is provided with fixing band dead bolt, the fixing band snap close snap-fit engagement on this fixing band dead bolt and the first ring body.One end of one end of first fixing band and the second fixing band is crossed as an X-shaped, and it is provided with deconcentrator 3 in the intersection of the first fixing band and the second fixing band, deconcentrator is circular insulating part, deconcentrator is provided with into the elongated slot that X-shaped is arranged, first fixing band and the second fixing band are through in the elongated slot of correspondence respectively, and first fixing band and deconcentrator be relatively fixed, the second fixing band and deconcentrator are relatively fixed.Being provided with a pair connection band 53 between the first fixing band and the second fixing band, each two ends connecting band are fixed with the first fixing band and the second fixing band respectively and are connected, and fixed form can be sewing.When dressing, neck is enclosed within and connects in the space that band, the first fixing band and the second fixing band surround by user, is placed in by upper body between the first fixing band and the second fixing band.
A bottom bands of trouser legs 8 it is provided with, as it is shown in figure 5, the two ends of this bottom bands of trouser legs are separately fixed at the two ends of the first ring body in the bottom of the first ring body;Being provided with another bottom bands of trouser legs in the bottom of the second ring body, the two ends of this bottom bands of trouser legs are separately fixed at the two ends of the second ring body.The middle part of two bottom bands of trouser legs is sewed together, and during wearing, two lower limbs are respectively protruding in two bottom bands of trouser legs by user.
Being provided with a pair fixture 21 on outer wall on rear side of the second ring body, be installed with motor 6 in fixture, fixture can be braid over braid, it is also possible to for the fixing card of isolation material, is placed in fixture by motor card.Being fixed with reel 7 on the output shaft of motor, as shown in Figure 6, reel includes wheel shaft 71, baffle plate 72 and winding wheel 73, is fixed with winding wheel 73 on wheel shaft, is respectively fixed with baffle plate 72 on the wheel shaft at winding wheel two ends.Wheel shaft is fixing with motor output shaft to be connected, and when wheel shaft rotates, just can drive the rotation of winding wheel, and then realize bracing wire winding on winding wheel.The setting of baffle plate, can avoid bracing wire to deviate from from winding wheel.Being provided with string holes radially and axial axis hole on winding wheel, string holes is connected with axis hole, during fixing bracing wire, is fixed on baffle plate one end of bracing wire after string holes and axis hole.Motor is provided with clamper 9, as it is shown in fig. 7, clamper includes hinge bar 91, supporting rod 93 and roller 94, the installation end of hinge bar is hingedly mounted on the outer wall of motor, and it is provided with torsion spring at the pin joint place of hinge bar Yu motor, under the effect of torsion spring, the free end of hinge bar is downward-sloping.Being provided with two installing holes 92 in the bottom of hinge bar, be provided with a supporting rod 93 by rotating shaft hinged 4, and be equipped with a torsion spring in each rotating shaft in each installing hole, under the effect of torsion spring, the free end of two supporting rods is drawn close to centre.Free end at each supporting rod is rotatablely equipped with a roller 94, and the plane at roller place and supporting rod are vertically arranged.During use, as shown in Figure 8, by two roller clips on clamper on reel so that two rollers contact cooperation with the lateral surface of corresponding baffle plate respectively.So, when reel rotates, under the effect of supporting rod and torsion spring, there is between roller and baffle plate certain pressure so that be in close contact between roller and baffle plate.When reel rotates, relative between roller with baffle plate roll.So, surrounding a space between baffle plate, winding wheel, supporting rod and hinge bar, bracing wire is just limited in this space.The other end in bracing wire 10 is dismountable is provided with sack 13, and the opening end of sack adopts sealing rope 15 sealing.The lower end of bracing wire can be sewn on the outer wall of sack opening end, tightens sealing rope and realizes the closing of sack opening end.Bottom sack, it is provided with balancing weight 14, to form pulling force in the bottom of bracing wire, makes bracing wire wind around on winding wheel.
During use, girdle ring is enclosed within waist by user, then fixes first, second fixing band and is provided with one end of fixing band dead bolt, is extend in the bottom bands of trouser legs by lower limb.The roller ensured on clamper is close on baffle plate, Work tool needed for staff on line bar or components and parts can be placed in sack by ground staff, and seal, now the staff on line bar starts motor, reel is rotated, bracing wire is wrapped on reel gradually, and namely sack is promoted to eminence, to facilitate the staff on line bar to take.Being provided with accumulator on girdle ring, accumulator electrically connects with motor, thinks that motor provides the energy.When again needing Work tool, drive motor rotates backward so that sack returns to ground.Subsequently, other Work tool is placed in sack by surface personnel, in order to the staff on line bar takes.
Claims (8)
1. power distribution construction drawing device, it is characterized in that, it includes girdle ring, the first fixing band, the second fixing band, motor, reel and clamper, described girdle ring includes the first ring body of C shape and the second ring body of C shape, one end of described first ring body and one end of the second ring body are articulated and connected, and the other end of described first ring body and the other end clamping of the second ring body connect;One end of described first fixing band is fixed on the rear end of the first ring body, the other end of described first fixing band and the front end clamping of the second ring body connect, one end of described second fixing band is fixed on the rear end of the second ring body, the other end of described second fixing band and the front end clamping of the first ring body connect, the rear side of described first fixing band and the rear side of the second fixing band are arranged in a crossed manner, and between described first fixing band and the second fixing band, be provided with a pair connection band, described connection band and the first fixing band, the second fixing band surround the space being enclosed within user neck;A lower limb ring being enclosed within user thigh and the fixing connection in the middle part of lower limb ring described in two it is respectively equipped with in the bottom of described first ring body and the second ring body;
Rear side at described second ring body is fixed with motor and the accumulator of drive motor work, and the outfan at described motor is provided with reel, and described reel includes wheel shaft, the winding wheel that is fixed on wheel shaft and the baffle plate being arranged on winding wheel two ends;Described motor is provided with clamper, hinge bar that described clamper includes being arranged on motor, it is hingedly mounted on a pair supporting rod bottom hinge bar by rotating shaft, is rotatably installed in the roller of supporting rod free end, connecting, the supporting rod rotating shaft with hinge bar is provided with torsion spring, under the effect of described torsion spring, the free end of two supporting rods is drawn close mutually, and supporting rod is vertically arranged with corresponding roller, two rollers coordinate with the contact outside of two baffle plates respectively;Being fixed with bracing wire on described winding wheel, the other end in described bracing wire is fixed with the sack that can seal.
2. power distribution construction drawing device according to claim 1, it is characterized in that, it is respectively arranged at two ends with retainer ring and fixing band dead bolt at described first ring body, also retainer ring and fixing band snap close it is respectively equipped with at the two ends of described second ring body, retainer ring is connected for fixing with the first fixing band and the second fixing band, and fixing band snap close is for being connected with the fixing band dead bolt clamping on the first fixing band and the second fixing band.
3. power distribution construction drawing device according to claim 2, is characterized in that, the intersection at described first fixing band and the second fixing band is provided with deconcentrator, and described first fixing band and the second fixing band are each attached on deconcentrator.
4. power distribution construction drawing device according to claim 3, is characterized in that, is provided with into the elongated slot that X-shaped is arranged on described deconcentrator, and described first fixing band and the second fixing band lay respectively in two elongated slots.
5. power distribution construction drawing device according to claim 1, it is characterized in that, the installation end of described hinge bar and the outer wall of motor are articulated and connected, and are provided with torsion spring between described hinge bar and motor, and under the effect of this torsion spring, the free end of hinge bar is drawn close to the side at reel place.
6. power distribution construction drawing device according to claim 5, is characterized in that, is provided with two installing holes in the bottom of described hinge bar free end, and the installation end of supporting rod is placed in installing hole.
7. power distribution construction drawing device according to claim 1, is characterized in that, the opening end at described sack is provided with sealing rope, is provided with balancing weight in described sack.
8. power distribution construction drawing device according to claim 1, is characterized in that, described girdle ring, reel and clamper are insulating part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510289426.8A CN104876148B (en) | 2015-05-30 | 2015-05-30 | Power distribution construction drawing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510289426.8A CN104876148B (en) | 2015-05-30 | 2015-05-30 | Power distribution construction drawing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104876148A CN104876148A (en) | 2015-09-02 |
CN104876148B true CN104876148B (en) | 2016-07-06 |
Family
ID=53943877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510289426.8A Expired - Fee Related CN104876148B (en) | 2015-05-30 | 2015-05-30 | Power distribution construction drawing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104876148B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105854201B (en) * | 2016-06-23 | 2019-03-15 | 国网山东省电力公司济阳县供电公司 | Power distribution construction drawing device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202236962U (en) * | 2011-09-28 | 2012-05-30 | 塞卡尔(北京)工业技术有限公司 | Special safety belt for wind power |
CN203936881U (en) * | 2014-02-20 | 2014-11-12 | 创科户外产品技术有限公司 | Harness system and electric tool assembly for electric tool |
CN104326390A (en) * | 2014-11-28 | 2015-02-04 | 国家电网公司 | Traction device of working tool at high place of power transmission tower |
CN204778570U (en) * | 2015-05-30 | 2015-11-18 | 国网山东济南市历城区供电公司 | Distribution construction is carried and is drawn ware |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2003275158B2 (en) * | 2002-10-04 | 2009-06-11 | Msa Technology, Llc | Full body harness for fall arrest |
-
2015
- 2015-05-30 CN CN201510289426.8A patent/CN104876148B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202236962U (en) * | 2011-09-28 | 2012-05-30 | 塞卡尔(北京)工业技术有限公司 | Special safety belt for wind power |
CN203936881U (en) * | 2014-02-20 | 2014-11-12 | 创科户外产品技术有限公司 | Harness system and electric tool assembly for electric tool |
CN104326390A (en) * | 2014-11-28 | 2015-02-04 | 国家电网公司 | Traction device of working tool at high place of power transmission tower |
CN204778570U (en) * | 2015-05-30 | 2015-11-18 | 国网山东济南市历城区供电公司 | Distribution construction is carried and is drawn ware |
Also Published As
Publication number | Publication date |
---|---|
CN104876148A (en) | 2015-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106517043B (en) | A kind of power test anti-fall device for climbing | |
CN108452451A (en) | Mobile power line shaft tower climbs personal safety guard method and device | |
CN105470867B (en) | It is a kind of that bar method and its device are stepped on based on unmanned plane automatically | |
CN205116912U (en) | Transformer substation's maintenance is with safe device that blocks | |
CN204778570U (en) | Distribution construction is carried and is drawn ware | |
CN102040166A (en) | Hoisting tool for equipment on pillar | |
CN103663189A (en) | Moving arm tower crane installation method | |
CN104326390B (en) | Transmission tower high-rise working instrument traction apparatus | |
CN104876148B (en) | Power distribution construction drawing device | |
CN110440197A (en) | Electric lifting High-Pole Lamp | |
CN105854201B (en) | Power distribution construction drawing device | |
CN207186929U (en) | A kind of high altitude escape bag | |
CN109718510A (en) | A kind of maintenance of power construction is with having the sliding folded dialysis stagnated that can connect prompt drop foot hook | |
CN201744418U (en) | Multifunctional semi-automatic high-pressure sprayer device | |
CN204402335U (en) | A kind of strain insulator Special maintenance tool | |
CN110130671B (en) | Internal reinforcing device and repairing method for broken telegraph pole | |
CN208970901U (en) | A kind of ground line fast assembling-disassembling device | |
CN208858136U (en) | Attached lifting scaffold lifting device | |
CN207235952U (en) | A kind of ox, which is disputed over trifles, processes with convenient fixed mechanism | |
CN207418219U (en) | A kind of photovoltaic agricultural greenhouse component overhauls more changing device | |
CN206660483U (en) | A kind of multi functional beauty training rope | |
CN206971682U (en) | A kind of Building class climbing device | |
CN107069541B (en) | A kind of overhead transmission line maintenance unit | |
CN207082777U (en) | A kind of ground wire walks device certainly | |
CN201823187U (en) | Mechanical device for shaft rescue |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160706 Termination date: 20200530 |
|
CF01 | Termination of patent right due to non-payment of annual fee |