CN208858136U - Attached lifting scaffold lifting device - Google Patents

Attached lifting scaffold lifting device Download PDF

Info

Publication number
CN208858136U
CN208858136U CN201821344185.8U CN201821344185U CN208858136U CN 208858136 U CN208858136 U CN 208858136U CN 201821344185 U CN201821344185 U CN 201821344185U CN 208858136 U CN208858136 U CN 208858136U
Authority
CN
China
Prior art keywords
fixing piece
lifting device
chain
fixed pulley
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821344185.8U
Other languages
Chinese (zh)
Inventor
朱良
陈云周
杨宗祥
李天启
王增贵
王建楠
郝正东
张晶
饶云东
吴维鑫
秦鑫
刘绍宁
罗吉祥
王继昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Jian Jian Construction Machinery Co Ltd
Original Assignee
Yunnan Jian Jian Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Jian Jian Construction Machinery Co Ltd filed Critical Yunnan Jian Jian Construction Machinery Co Ltd
Priority to CN201821344185.8U priority Critical patent/CN208858136U/en
Application granted granted Critical
Publication of CN208858136U publication Critical patent/CN208858136U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of attached lifting scaffold lifting device, it includes scaffold main body, it is characterized in that, it further includes lifting device, for carrying out the fixed fixing piece and tensioning apparatus of attached wall with building structure, the fixing piece includes the first fixing piece and the second fixing piece, the lifting device and tensioning apparatus are connect with the scaffold main body respectively, the lifting device includes driving motor and chain, the chain is driven by the driving motor, the chain is connect with first fixing piece and the second fixing piece, first fixing piece and the second fixing piece are connected by the transmission rope being stretched on the tensioning apparatus, the tensioning apparatus, first fixing piece, second fixing piece, transmission rope, pulley structure is formed between chain, when use, first fixing piece, second fixing piece can carry out attached wall with building structure by turns and fix, and it is described First fixing piece, the second fixing piece can be gone up and down by turns under lifting device effect.

Description

Attached lifting scaffold lifting device
[technical field]
The utility model relates to construction hanging device, in particular to a kind of attached lifting scaffold lifting device.
[background technique]
Currently, using attached lifting scaffold (being commonly called as climbing frame) when high-rise and construction of super highrise building more.Adhering lifting foot Hand cradle, refers to using various forms of frame structures and attached support structure, by being set on frame body or in engineering structure Special lifting device realizes the construction scaffolding of lifting.The lifting device that attached lifting scaffold uses usually rises loop chain slowly Cucurbit, principle are as shown in Figure 5: the chain 22 of ring-chain hoist and an attached wall fixing piece 70, tensioning apparatus 40 form pulley structure, When work, which carries out attached wall with building structure and fixes, and when ring-chain hoist work, chain 22 is driven and drives Scaffold lifting, and while scaffold is gone up and down, ring-chain hoist also synchronization lifting.After going up and down one layer, gone up and down next time When, it just needs to remove the attached wall fixing piece 70 from current location, then be fixed at the position of higher level.Again solid When the fixed attached wall fixing piece 70, not only need manually to dismount the attached wall fixing piece 70, but also need to carry out jack, by ring-chain hoist It refunds to suitable distance, just can be carried out promotion next time.It is time-consuming and laborious when practical application, it is unfavorable for improving efficiency.This Outside, it during carrying out jack, can not accurately be controlled, and ring-chain hoist heavier-weight, if misoperation, ring-chain hoist Then may damage scaffold, to cause safety accident or cause security risk.
[utility model content]
The purpose of the utility model is to solve the above problems and to provide a kind of novel attached lifting scaffold lifting devices.
To achieve the above object, the utility model provides a kind of attached lifting scaffold lifting device comprising foot hand Frame body, which is characterized in that it further includes lifting device, for carrying out the fixed fixing piece of attached wall and tensioning dress with building structure Set, the fixing piece includes the first fixing piece and the second fixing piece, the lifting device and tensioning apparatus respectively with the foot hand Frame body connection, the lifting device includes driving motor and chain, and the chain is driven by the driving motor, the chain It is connect with first fixing piece and the second fixing piece, first fixing piece and the second fixing piece are by being stretched in the tensioning Transmission rope connection on device, the tensioning apparatus, the second fixing piece, transmission rope, form pulley between chain at the first fixing piece Structure is fixed in use, first fixing piece, the second fixing piece can carry out attached wall with building structure by turns, and described first Fixing piece, the second fixing piece can be gone up and down by turns under lifting device effect.
The lifting device includes head sprocket, the first accessary sprocket wheel, the second accessary sprocket wheel, and first accessary sprocket wheel and second is from chain Wheel is respectively arranged on the two sides of the head sprocket, and the first in-line gears are equipped on first fixing piece, fixed described second Part is equipped with the second in-line gears, and the chain is sheathed on the head sprocket, and one end of the chain successively bypasses described the One in-line gears and the first accessary sprocket wheel and connect with one end of the transmission rope, the other end of the chain successively bypasses described second In-line gears and the second accessary sprocket wheel and connect with the other end of the transmission rope.
The tensioning apparatus include the first fixed pulley, the second fixed pulley and third fixed pulley, one end of the transmission rope with One end of the chain connects, and the other end of the transmission rope successively bypasses first fixed pulley, the first in-line gears, second fixed Pulley, the second in-line gears, third fixed pulley and connect with the other end of the chain.
The tensioning apparatus is equipped with pedestal, the first suspension hook is equipped on the pedestal, on the top of the scaffold main body Or bottom end is equipped with the first sling point, first suspension hook is connect with first sling point.
It is equipped with the second sling point in the other end opposite with tensioning apparatus of the scaffold main body, the lifting device is set There is the second suspension hook, second suspension hook is connect with second sling point.
First fixed pulley, the second fixed pulley and third fixed pulley are respectively arranged on the pedestal, and the second fixed pulley Between first fixed pulley and third fixed pulley.
First in-line gears include the first driving wheel and the second driving wheel of coaxial arrangement, second in-line gears Third driving wheel and the 4th driving wheel including coaxial arrangement, the chain bypass the first in-line gears and the second in-line gears When, it is set around on first driving wheel and third driving wheel;The transmission rope is coaxial around the first in-line gears and second When gear, haves mercy on and be set on the second driving wheel and the 4th driving wheel.
The favorable attributes of the utility model are, efficiently solve the above problem.The adhering lifting foot of the utility model Hand cradle lifting device is set there are two fixing piece --- the first fixing piece and the second fixing piece, when work, one of fixing piece with Building structure carries out attached wall and fixes, another fixing piece can then be gone up and down with entirety and be gone up and down to next attached wall fixed point, from And when next round being facilitated to go up and down, it can directly remove former fixing piece and another fixing piece is directly anchored to next attached wall fixed point Place repeats dismounting without carrying out to same fixing piece, carries out artificial jack without to lifting device.The utility model it is attached Elevating scaffold lifting device since setting is there are two fixing piece, thus can be fixed and go up and down by turns, only need to control Driving motor rotates forward reversion, can go up and down loose another fixing piece to suitable position while elevating scaffold It sets, to facilitate the lifting of next round, therefore its is very convenient to use, a large amount of manpower and time can be saved.In addition, this The attached lifting scaffold lifting device of utility model, without carrying out jack, between lifting device and scaffold main body away from It is constant from relatively, thus lifting device can not hit scaffold main body, and then safety can be improved.The attachment liter of the utility model Lifting device for scaffold drops, and structure novel is easy to use, and highly-safe, and it has strong practicality, preferably pushes greatly Extensively.
[Detailed description of the invention]
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the principles of the present invention schematic diagram.
Fig. 3 is the principles of the present invention schematic diagram.
Fig. 4 is the principles of the present invention schematic diagram.
Fig. 5 is the schematic illustration of background technique.
Wherein, scaffold main body 10, the first sling point 11, the second sling point 12, vertical main framework 13, horizontal supporting truss 14, lifting device 20, driving motor 21, chain 22, head sprocket 23, the first accessary sprocket wheel 24, the second accessary sprocket wheel 25, the second suspension hook 26, the first fixing piece 30, the first in-line gears 31, the first driving wheel 311, the second driving wheel 312, tensioning apparatus 40, first are fixed Pulley 41, the second fixed pulley 42, third fixed pulley 43, pedestal 44, the first suspension hook 45, the second fixing piece 50, the second in-line gears 51, third driving wheel 511, the 4th driving wheel 512, transmission rope 60, attached wall fixing piece 70.
[specific embodiment]
The following example is being explained further and supplementing to the utility model, does not constitute any limit to the utility model System.
As shown in Figure 1 to 4, its broad outlines of the attached lifting scaffold lifting device of the utility model are, set There are two fixing pieces: the first fixing piece 30 and the second fixing piece 50 can be gone up and down by turns, and can be carried out by turns with building structure Attached wall is fixed, therefore in lifting process, by the fixed by turns of two fixing pieces and can go up and down the entire dress dress of realization The lifting set.
The attached lifting scaffold lifting device of the utility model includes scaffold main body 10, lifting device 20, fixing piece With tensioning apparatus 40.Institute's fixing piece includes the first fixing piece 30 and the second fixing piece 50.
As shown in Figure 1 to 4, the scaffold main body 10 is the structure gone up and down, need to successively be climbed with architectural engineering Or decline, specific structure and structural requirement, it can refer to well-known technique.Under normal conditions, the scaffold main body 10 includes perpendicular To main frame 13, horizontal supporting truss 14 and frame body framework three parts.Vertical main framework 13 perpendicular to building structure alien invasion, And connect with attached support structure, it is to be primarily subjected to and transmit vertical and horizontal loading vertical frame.Horizontal supporting truss 14 are parallel to building wall, are primarily subjected to frame body vertical load, are a kind of vertical load to be transferred to vertical main framework 13 horizontal supporting structure.Frame body framework is the frame between adjacent two vertical main framework 13 and on horizontal supporting truss 14 Body.
As shown in Figure 1 to 4, the tensioning apparatus 40 and lifting device 20 are connected for convenience of setting, in the scaffold Top, the bottom end of main body 10 are respectively equipped with the first sling point 11 and the second sling point 12.Wherein, the first sling point 11 is for connecting Tensioning apparatus 40, the second sling point 12 is for connecting lifting device 20.The knot of first sling point 11 and the second sling point 12 Structure and requirement, can refer to well-known technique, both is oppositely arranged.In the present embodiment, first sling point 11 is set to scaffold The top of main body 10, second sling point 12 are set to the bottom end of scaffold main body 10.In other embodiments, first hanging Point 11 can also be set to the bottom end of scaffold main body 10, and the second sling point 12 can also be set to the top of scaffold main body 10.
As shown in Figure 1 to 4, the lifting device 20 includes driving motor 21, chain 22, head sprocket 23, first from chain Take turns the 24, second accessary sprocket wheel 25, the second suspension hook 26.
As shown in Figure 1 to 4, well known driving motor can be selected for providing lifting drive in the driving motor 21 21, such as conical rotor motor.
As shown in Figure 1 to 4, the head sprocket 23 is driven by the driving motor 21, and specific driving structure can refer to Well-known technique.For example, when it is implemented, Electric Chain Blocks, driving motor 21, head sprocket can be selected in the lifting device 20 23 setting can refer to the internal structure of well known electric block.The head sprocket can be driven after providing power by driving motor 21 23 rotations.
As shown in Figure 1 to 4, first accessary sprocket wheel 24 and the second accessary sprocket wheel 25 are respectively symmetrically set to the head sprocket 23 Two sides are used to be arranged the chain 22 and form pulley structure.
As shown in Figure 1 to 4, second suspension hook 26 is set on the lifting device 20, with second sling point 12 connections.Structure and the load requirement of second suspension hook 26, can refer to well-known technique.
As shown in Figure 1 to 4, the lifting device 20 removes driving motor 21, chain 22, head sprocket 23, the first accessary sprocket wheel 24, except the second accessary sprocket wheel 25, the second suspension hook 26, other internal electrical structures can refer to well-known technique, for example, braking Unit, control unit, deceleration unit etc..In the present embodiment, the lifting device 20 selects ring-chain hoist.
As shown in Figure 1 to 4, first fixing piece 30 and the second fixing piece 50 are used to carry out attached wall with building structure solid Fixed, concrete shape structure can be set as desired, for example, it, which can be set into, to be directly anchored in building structure, The wall-attached supporting seat that Cheng Keyu is fixed in building structure can be set to be fixedly connected.In use, the first fixing piece 30 and A fixing piece in two fixing pieces 50 is fixed in building structure, another fixing piece is with integral elevating.
As shown in Figure 1 to 4, the chain 22 and transmission rope 60 are connected for convenience, are set on first fixing piece 30 There are the first in-line gears 31, the second in-line gears 51 are equipped on second fixing piece 50.First in-line gears 31 wrap The first driving wheel 311 and the second driving wheel 312 of coaxial arrangement are included, second in-line gears 51 include the third of coaxial arrangement Driving wheel 511 and the 4th driving wheel 512.First driving wheel 311 and third driving wheel 511, can for chain 22 to be arranged Select the sprocket wheel to match with the chain 22.Second driving wheel 312 and the 4th driving wheel 512 are for being arranged transmission rope 60, the driving wheel that can be arranged the transmission rope 60 can be selected, concrete type can be depending on the type of transmission rope 60, example Such as, the sheave for being arranged wirerope can be selected.
The transmission rope 60 is for being driven, and in the present embodiment, selects wirerope.It, can also be by having in other embodiments There is the object of similar functions to replace.
As shown in Figure 1 to 4, the tensioning apparatus 40 includes pedestal 44, the first suspension hook 45, the first fixed pulley 41, second Fixed pulley 42 and third fixed pulley 43.The shape of the pedestal 44 can be set as desired, and be used to be arranged described first and hang Hook 45, the first fixed pulley 41, the second fixed pulley 42 and third fixed pulley 43.First suspension hook 45 and first sling point 11 Connection, specific structure and load requirement, can refer to well-known technique.First fixed pulley 41, the second fixed pulley 42 and third Fixed pulley 43 is for being tensioned the transmission rope 60 and forming pulley structure and be driven.First fixed pulley 41, second is calmly sliding Wheel 42 and the setting of the interval of third fixed pulley 43, wherein the second fixed pulley 42 be set to the first fixed pulley 41 and third fixed pulley 43 it Between.
For being driven, set-up mode is as follows for the chain 22 and the transmission rope 60:
As shown in Figure 1 to 4, the middle part of the chain 22 is sheathed on the head sprocket 23, one end of the chain 22 according to It is secondary around first driving wheel 311, the first accessary sprocket wheel 24 and connect with one end of transmission rope 60;The other end of the chain 22 according to It is secondary bypass the 4th driving wheel 512, the second accessary sprocket wheel 25 and connect with the other end of transmission rope 60.One end of the transmission rope 60 with When chain 22 connects, the other end successively bypasses the first fixed pulley 41, the second driving wheel 312, the transmission of the second fixed pulley the 42, the 4th Wheel 512, third fixed pulley 43 and connect with the other end of chain 22 so that tensioning apparatus 40, chain 22, transmission rope 60, First fixing piece 30, the second fixing piece 50, the pulley structure that closing chain type is formed between lifting device 20, can be used for being driven.
When work, by one of fixing piece in fixing piece, such as the first fixing piece 30 carries out attached wall with building structure and consolidates It is fixed, then start the lifting device 20, under the action of driving motor 21, the chain 22, transmission rope 60 are passed It is dynamic, and the single unit system in addition to the first fixing piece 30 is gone up and down, meanwhile, another fixing piece in fixing piece, such as Second fixing piece 50 also synchronization lifting.When single unit system is gone up and down to desired height, by original fixing piece --- first is fixed Part 30 is separated with building structure, then by another fixing piece --- and the second fixing piece 50 carries out attached wall with building structure and fixes, Then start lifting device 20, can realize layer-by-layer lifting.
To describe in more detail its working principle, the present embodiment is illustrated for being promoted:
As shown in Fig. 2, current whole device is in lower floor, as lowest part is located at the position 1F.At this point, fixed by first Part 30 carries out attached wall with building structure and fixes, and the first fixing piece 30 is fixed on higher position position, the position 3F as shown in Figure 2; At this point, starting the driving motor 21, driving motor 21 is rotated forward, clockwise direction as shown in Figure 2, chain 22, transmission rope 60 It is driven along mode shown in Fig. 2, to drive lifting device 20, the second fixing piece 50, scaffold main body 10, tensioning apparatus 40 are lifted up.
When lifting device 20, the second fixing piece 50, scaffold main body 10, tensioning apparatus 40 are elevated a floor, Integrality is as shown in Figure 3: the lowest part of its whole device is located at the position 2F, and the second fixing piece 50 is located at the position 4F;At this point, will First fixing piece 30 is separated with building structure, and then the second fixing piece 50 is fixed in the building structure of the position 4F, is then driven Dynamic motor 21 is inverted by counter clockwise direction as shown in Figure 3 so that chain 22, transmission rope 60 along direction shown in Fig. 3 into Row transmission, drives lifting device 20, the first fixing piece 30, scaffold main body 10, tensioning apparatus 40 to be lifted up.
When lifting device 20, the first fixing piece 30, scaffold main body 10, tensioning apparatus 40 are elevated a floor, Integrality is as shown in Figure 4: the lowest part of its whole device is located at the position 3F, and the first fixing piece 30 is located at the position 5F, at this point, will Second fixing piece 50 is separated with building structure, and the first fixing piece 30 is then fixed on the position 5F, then sequentially repeats above-mentioned step Suddenly, it can successively be promoted.During being somebody's turn to do, basic ideas are to fix the first fixing piece 30 and the second fixing piece 50 by turns, Then pass through the rotating forward reversion of control driving motor 21, another loose fixing piece of promotion by turns and scaffold main body 10, to realize the purpose successively promoted.
When needing to carry out step-down operation, basic principle is same as above, and when decline need to only control the rotation side of driving motor 21 To reversed opposite with rotation when being promoted.
Although being disclosed by above embodiments to the utility model, the scope of the utility model is not limited to In this, under conditions of conceiving without departing from the utility model, above each component can be understood similar with technical field personnel Or equivalent element is replaced.

Claims (7)

1. a kind of attached lifting scaffold lifting device comprising scaffold main body (10), which is characterized in that it further includes lifting Device (20), fixing piece and tensioning apparatus (40) for fixing with building structure progress attached wall, the fixing piece includes first Fixing piece (30) and the second fixing piece (50), the lifting device (20) and tensioning apparatus (40) respectively with the scaffold main body (10) it connects, the lifting device (20) includes driving motor (21) and chain (22), and the chain (22) is by the driving electricity Machine (21) driving, the chain (22) connect with first fixing piece (30) and the second fixing piece (50), and described first is fixed Part (30) and the second fixing piece (50) are connected by the transmission rope (60) being stretched on the tensioning apparatus (40), the tensioning dress Set (40), the first fixing piece (30), the second fixing piece (50), transmission rope (60), chain form pulley structure between (22), use When, first fixing piece (30), the second fixing piece (50) can carry out attached wall with building structure by turns and fix, and described first is solid Determining part (30), the second fixing piece (50) can go up and down by turns in the case where the lifting device (20) act on.
2. attached lifting scaffold lifting device as described in claim 1, which is characterized in that the lifting device (20) includes Head sprocket (23), the first accessary sprocket wheel (24), the second accessary sprocket wheel (25), first accessary sprocket wheel (24) and the second accessary sprocket wheel (25) point Not She Yu the head sprocket (23) two sides, on first fixing piece (30) be equipped with the first in-line gears (31), described Second fixing piece (50) is equipped with the second in-line gears (51), and the chain (22) is sheathed on the head sprocket (23), and should One end of chain (22) successively bypass first in-line gears (31) and the first accessary sprocket wheel (24) and with the transmission rope (60) One end connection, the other end of the chain (22) successively bypass second in-line gears (51) and the second accessary sprocket wheel (25) and with The other end of the transmission rope (60) connects.
3. attached lifting scaffold lifting device as claimed in claim 2, which is characterized in that the tensioning apparatus (40) includes First fixed pulley (41), the second fixed pulley (42) and third fixed pulley (43), one end of the transmission rope (60) and the chain (22) one end connection, the other end of the transmission rope (60) successively bypass first fixed pulley (41), the first in-line gears (31), the second fixed pulley (42), the second in-line gears (51), third fixed pulley (43) and with the other end of the chain (22) connect It connects.
4. attached lifting scaffold lifting device as claimed in claim 3, which is characterized in that the tensioning apparatus (40) is equipped with Pedestal (44) is equipped with the first suspension hook (45) on the pedestal (44), sets on the top of the scaffold main body (10) or bottom end Have the first sling point (11), first suspension hook (45) connect with first sling point (11).
5. attached lifting scaffold lifting device as claimed in claim 4, which is characterized in that in the scaffold main body (10) The other end opposite with tensioning apparatus (40) be equipped with the second sling point (12), the lifting device (20) be equipped with the second suspension hook (26), second suspension hook (26) connect with second sling point (12).
6. attached lifting scaffold lifting device as claimed in claim 4, which is characterized in that first fixed pulley (41), Second fixed pulley (42) and third fixed pulley (43) are respectively arranged on the pedestal (44), and the second fixed pulley (42) is positioned at described Between first fixed pulley (41) and third fixed pulley (43).
7. attached lifting scaffold lifting device as claimed in claim 2, which is characterized in that first in-line gears (31) The first driving wheel (311) and the second driving wheel (312) including coaxial arrangement, second in-line gears (51) include coaxially setting The third driving wheel (511) and the 4th driving wheel (512) set, the chain (22) are same around the first in-line gears (31) and second When shaft gear (51), it is set around on first driving wheel (311) and third driving wheel (511);The transmission rope (60) around When crossing the first in-line gears (31) and the second in-line gears (51), haves mercy on and be set to the second driving wheel (312) and the 4th driving wheel (512) on.
CN201821344185.8U 2018-08-20 2018-08-20 Attached lifting scaffold lifting device Active CN208858136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821344185.8U CN208858136U (en) 2018-08-20 2018-08-20 Attached lifting scaffold lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821344185.8U CN208858136U (en) 2018-08-20 2018-08-20 Attached lifting scaffold lifting device

Publications (1)

Publication Number Publication Date
CN208858136U true CN208858136U (en) 2019-05-14

Family

ID=66415016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821344185.8U Active CN208858136U (en) 2018-08-20 2018-08-20 Attached lifting scaffold lifting device

Country Status (1)

Country Link
CN (1) CN208858136U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756199A (en) * 2018-08-20 2018-11-06 云南建投建筑机械有限公司 Attached lifting scaffold lifting gear

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756199A (en) * 2018-08-20 2018-11-06 云南建投建筑机械有限公司 Attached lifting scaffold lifting gear

Similar Documents

Publication Publication Date Title
CN108756199A (en) Attached lifting scaffold lifting gear
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
CN204490367U (en) A kind of outdoor handling machine for building
CN108149914B (en) Forward and backward rotation simultaneous lifting system and method for all-steel attached lifting scaffold
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN208858136U (en) Attached lifting scaffold lifting device
CN205795604U (en) High-lift operation hanging cradle
CN105735629B (en) Build attached lifting scaffold lifting device
CN204676872U (en) A kind of lifting scaffold hoisting mechanism
CN205241084U (en) Lifting machine
CN107651564B (en) A kind of craning weight of same device for adjusting posture
CN210457310U (en) High-efficient safe building material hoisting device
CN208071214U (en) A kind of material lifting device of automatic discharging
CN110498350A (en) A kind of multifunctional safe building tower crane
CN201074402Y (en) Tool type scaffold
CN201999679U (en) Automatic reciprocating and looping system of electric block
CN206692228U (en) A kind of construction lifting machine
CN209583455U (en) A kind of outdoor handling machine for building
CN211473331U (en) Hanging basket for steel structure installation
CN209554597U (en) A kind of multifunctional lift
CN206985557U (en) A kind of double girder crane for preventing object crooked
CN208500178U (en) A kind of building hanging basket for house construction engineering
CN204609271U (en) Building attached lift scaffold lifting appliance
CN207245144U (en) A kind of combination type high-altitude suspension apparatus fixed frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Attached lifting scaffold lifting device

Effective date of registration: 20230515

Granted publication date: 20190514

Pledgee: Huaxia Bank Co.,Ltd. Kunming Daguan Branch

Pledgor: YUNNAN CONSTRUCTION INVESTMENT CONSTRUCTION MACHINERY CO.,LTD.

Registration number: Y2023530000036