CN104746437A - Self-anchoring type mounting method of suspension bridge - Google Patents
Self-anchoring type mounting method of suspension bridge Download PDFInfo
- Publication number
- CN104746437A CN104746437A CN201510187858.8A CN201510187858A CN104746437A CN 104746437 A CN104746437 A CN 104746437A CN 201510187858 A CN201510187858 A CN 201510187858A CN 104746437 A CN104746437 A CN 104746437A
- Authority
- CN
- China
- Prior art keywords
- girder
- steel box
- main
- steel
- span
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510187858.8A CN104746437B (en) | 2015-04-20 | 2015-04-20 | A kind of self-anchored suspension bridge installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510187858.8A CN104746437B (en) | 2015-04-20 | 2015-04-20 | A kind of self-anchored suspension bridge installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104746437A true CN104746437A (en) | 2015-07-01 |
CN104746437B CN104746437B (en) | 2016-10-05 |
Family
ID=53586640
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510187858.8A Active CN104746437B (en) | 2015-04-20 | 2015-04-20 | A kind of self-anchored suspension bridge installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104746437B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105696470A (en) * | 2016-01-18 | 2016-06-22 | 中国铁建大桥工程局集团有限公司 | Synchronous quick steel box girder in-situ incremental launching and tower column construction method |
CN106049293A (en) * | 2016-07-29 | 2016-10-26 | 四川天元机械工程股份有限公司 | Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method |
CN107059637A (en) * | 2017-05-16 | 2017-08-18 | 武汉工程大学 | Long span self-anchoring type suspension bridge system conversion method |
WO2018133045A1 (en) * | 2017-01-20 | 2018-07-26 | 中国铁建大桥工程局集团有限公司 | Method for mounting self-anchored suspension bridge |
CN109267497A (en) * | 2018-11-28 | 2019-01-25 | 中国铁建大桥工程局集团有限公司 | A kind of Stiffening Girder of Self-Anchored Suspension Bridge closure method |
CN109914258A (en) * | 2019-04-08 | 2019-06-21 | 中国铁建大桥工程局集团有限公司 | A kind of self-anchored suspension bridge cat road track cable steering structure |
CN110904857A (en) * | 2019-12-30 | 2020-03-24 | 中国铁建投资集团有限公司 | Temporary buckling tower installation method for self-anchored suspension bridge construction |
CN110907299A (en) * | 2019-11-21 | 2020-03-24 | 中国矿业大学 | Main cable multipoint variable load bending fatigue monitoring device and monitoring method thereof |
CN113322814A (en) * | 2021-05-10 | 2021-08-31 | 中国建筑第六工程局有限公司 | Construction method of cable-stayed bridge steel box girder spanning multiple obstacles |
CN113550224A (en) * | 2021-08-09 | 2021-10-26 | 山东省交通规划设计院集团有限公司 | Double-main-hole single-tower self-anchored suspension bridge structural system and construction process |
CN113605255A (en) * | 2021-09-17 | 2021-11-05 | 中国铁建大桥工程局集团有限公司 | Rapid construction method for steel truss and steel box combined beam bridge in offshore height-limiting and navigation-limiting area |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007051426A (en) * | 2005-08-15 | 2007-03-01 | Public Works Research Institute | Bridge and construction method of bridge |
CN101078198A (en) * | 2007-07-04 | 2007-11-28 | 湖南省交通规划勘察设计院 | Steel box beam erection method for self-anchored suspension bridge |
KR100889022B1 (en) * | 2008-04-10 | 2009-03-19 | (주)신흥이앤지 | Bridge constructing method |
CN101418543A (en) * | 2008-11-21 | 2009-04-29 | 上海市政工程设计研究总院 | Self-anchored rope-suspension bridge inclined drawing construction method |
CN101581072A (en) * | 2008-05-14 | 2009-11-18 | 上海远东国际桥梁建设有限公司 | Method for bridging self-anchoring suspension bridge |
CN102587291A (en) * | 2012-03-27 | 2012-07-18 | 中交四航局第一工程有限公司 | Walking type multipoint pushing construction method and walking type multipoint pushing construction system for steel box girder |
CN103233427A (en) * | 2013-04-27 | 2013-08-07 | 长沙理工大学 | Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge |
CN103266573A (en) * | 2013-06-17 | 2013-08-28 | 中铁山桥集团有限公司 | Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method |
-
2015
- 2015-04-20 CN CN201510187858.8A patent/CN104746437B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007051426A (en) * | 2005-08-15 | 2007-03-01 | Public Works Research Institute | Bridge and construction method of bridge |
CN101078198A (en) * | 2007-07-04 | 2007-11-28 | 湖南省交通规划勘察设计院 | Steel box beam erection method for self-anchored suspension bridge |
KR100889022B1 (en) * | 2008-04-10 | 2009-03-19 | (주)신흥이앤지 | Bridge constructing method |
CN101581072A (en) * | 2008-05-14 | 2009-11-18 | 上海远东国际桥梁建设有限公司 | Method for bridging self-anchoring suspension bridge |
CN101418543A (en) * | 2008-11-21 | 2009-04-29 | 上海市政工程设计研究总院 | Self-anchored rope-suspension bridge inclined drawing construction method |
CN102587291A (en) * | 2012-03-27 | 2012-07-18 | 中交四航局第一工程有限公司 | Walking type multipoint pushing construction method and walking type multipoint pushing construction system for steel box girder |
CN103233427A (en) * | 2013-04-27 | 2013-08-07 | 长沙理工大学 | Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge |
CN103266573A (en) * | 2013-06-17 | 2013-08-28 | 中铁山桥集团有限公司 | Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105696470A (en) * | 2016-01-18 | 2016-06-22 | 中国铁建大桥工程局集团有限公司 | Synchronous quick steel box girder in-situ incremental launching and tower column construction method |
CN105696470B (en) * | 2016-01-18 | 2017-05-17 | 中国铁建大桥工程局集团有限公司 | Synchronous quick steel box girder in-situ incremental launching and tower column construction method |
CN106049293A (en) * | 2016-07-29 | 2016-10-26 | 四川天元机械工程股份有限公司 | Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method |
CN106049293B (en) * | 2016-07-29 | 2017-10-13 | 德阳天元重工股份有限公司 | Stiffening girder of suspension bridge installation method and used shifting system is swung on navigable river |
WO2018133045A1 (en) * | 2017-01-20 | 2018-07-26 | 中国铁建大桥工程局集团有限公司 | Method for mounting self-anchored suspension bridge |
CN107059637A (en) * | 2017-05-16 | 2017-08-18 | 武汉工程大学 | Long span self-anchoring type suspension bridge system conversion method |
CN109267497A (en) * | 2018-11-28 | 2019-01-25 | 中国铁建大桥工程局集团有限公司 | A kind of Stiffening Girder of Self-Anchored Suspension Bridge closure method |
CN109914258A (en) * | 2019-04-08 | 2019-06-21 | 中国铁建大桥工程局集团有限公司 | A kind of self-anchored suspension bridge cat road track cable steering structure |
CN109914258B (en) * | 2019-04-08 | 2024-01-23 | 中国铁建大桥工程局集团有限公司 | Self-anchored suspension bridge catwalk bearing cable steering structure |
CN110907299A (en) * | 2019-11-21 | 2020-03-24 | 中国矿业大学 | Main cable multipoint variable load bending fatigue monitoring device and monitoring method thereof |
CN110907299B (en) * | 2019-11-21 | 2021-11-02 | 中国矿业大学 | Main cable multipoint variable load bending fatigue monitoring device and monitoring method thereof |
CN110904857A (en) * | 2019-12-30 | 2020-03-24 | 中国铁建投资集团有限公司 | Temporary buckling tower installation method for self-anchored suspension bridge construction |
CN113322814A (en) * | 2021-05-10 | 2021-08-31 | 中国建筑第六工程局有限公司 | Construction method of cable-stayed bridge steel box girder spanning multiple obstacles |
CN113550224A (en) * | 2021-08-09 | 2021-10-26 | 山东省交通规划设计院集团有限公司 | Double-main-hole single-tower self-anchored suspension bridge structural system and construction process |
CN113605255A (en) * | 2021-09-17 | 2021-11-05 | 中国铁建大桥工程局集团有限公司 | Rapid construction method for steel truss and steel box combined beam bridge in offshore height-limiting and navigation-limiting area |
Also Published As
Publication number | Publication date |
---|---|
CN104746437B (en) | 2016-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746437B (en) | A kind of self-anchored suspension bridge installation method | |
CN101418543B (en) | Self-anchored rope-suspension bridge inclined drawing construction method | |
WO2018133045A1 (en) | Method for mounting self-anchored suspension bridge | |
CN102192368B (en) | Large-span overhead pipeline sliding installation method | |
CN104480862B (en) | A kind of erection method of cable stayed bridge end bay steel truss girder | |
CN201943007U (en) | Constant amplitude frame beam crane capable of being used in combination with movable support frame | |
CN103669216A (en) | Steel box girder scattered-splicing sliding device and installation method | |
CN106012797A (en) | All-ground-anchor type single-tower double-span cable-stayed bridge structure and construction method thereof | |
CN103882812B (en) | Across the construction method of girder in stayed-cable bridge | |
CN103911956B (en) | A kind of large span stayed-cable bridge steel truss girder mounting method | |
CN105970836A (en) | Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever | |
CN109778718A (en) | Construction method for long-span continuous steel box girder main span pure cantilever assembly mid-span closure | |
CN104652283A (en) | Asynchronous splicing construction method for symmetrically splicing main steel girder erection cranes of cable-stayed bridge | |
CN106192776A (en) | A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology | |
CN101380954A (en) | Suspension train traffic system with hanging rail | |
CN106192755A (en) | A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation | |
CN101509229B (en) | Method for constructing side span beam section without joist bracket of large-span steel box girder cable-stayed bridge | |
CN201102544Y (en) | Hanging train traffic system of hanging rail | |
CN210420902U (en) | Concrete box girder flange plate cutting and dismantling stabilizing device | |
CN205775786U (en) | A kind of novel railway curve Cable-stayed Bridge with Slanted Pylon | |
CN104314009A (en) | Large segment lifting mechanism and use method thereof | |
CN105568867A (en) | Low-position sliding fast construction method for steel box girder | |
CN208009277U (en) | A kind of short sliding installation system of land-based area large-tonnage steel box beam | |
CN102535344A (en) | Concrete transportation method for bridge body of high-pier bridge in gully region | |
CN204703068U (en) | A kind of up suspention section assembling traversing carriage bridge fabrication machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Song Weijun Inventor after: Gao Xuewen Inventor after: Liu Zhi Inventor after: Zhou Chaowei Inventor after: Chang Jie Inventor after: Cai Wendao Inventor after: Xing Ruxiang Inventor after: Zhang Qing Inventor after: Chen Ningxian Inventor after: Gong Guofeng Inventor after: Shi Jiuzhou Inventor after: Qi Zhanguo Inventor after: Li Xianghai Inventor after: Zhu Linda Inventor after: Yu Shaobin Inventor after: Zhu Yongsheng Inventor before: Chen Ningxian Inventor before: Shi Jiuzhou Inventor before: Zhu Yongsheng Inventor before: Chang Jie Inventor before: Cai Wentao Inventor before: Xing Ruxiang Inventor before: Zhang Qing |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |