CN104746437A - Self-anchoring type mounting method of suspension bridge - Google Patents

Self-anchoring type mounting method of suspension bridge Download PDF

Info

Publication number
CN104746437A
CN104746437A CN201510187858.8A CN201510187858A CN104746437A CN 104746437 A CN104746437 A CN 104746437A CN 201510187858 A CN201510187858 A CN 201510187858A CN 104746437 A CN104746437 A CN 104746437A
Authority
CN
China
Prior art keywords
girder
steel box
main
steel
span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510187858.8A
Other languages
Chinese (zh)
Other versions
CN104746437B (en
Inventor
陈宁贤
石九州
朱永胜
常洁
蔡文涛
邢如祥
张庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201510187858.8A priority Critical patent/CN104746437B/en
Publication of CN104746437A publication Critical patent/CN104746437A/en
Application granted granted Critical
Publication of CN104746437B publication Critical patent/CN104746437B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a self-anchoring type mounting method of a suspension bridge. The method comprises the steps of constructing a main pier and a side pier; erecting beams and splicing through a crane; mounting a medium supporting pier of a side span steel box beam; mounting the side span steel box beam; mounting a temporary steel tower; mounting a main span steel box beam and a temporary cable; mounting a main cable and a lifting cable; converting the systems. The method is free of the limitation of navigation of a waterway; an ultrahigh bracket cannot be constructed in the river at a gorge region with steep bank slopes, so that the input is reduced; the longitudinal moving load can be decreased, and the longitudinal moving range, so that the long-distance and large-tonnage propping and pushing can be avoided, and as a result, the risk of construction safety in longitudinal moving can be reduced; a propping pushing bracket can be avoided being scoured by flood and floating articles, so that the safety risk of construction is reduced, and the construction is sped up.

Description

A kind of self-anchored suspension bridge mounting method
Technical field
The invention belongs to technical field of bridge construction, especially relate to a kind of self-anchored suspension bridge mounting method.
Background technology
Along with China's economy and social fast development, infrastructure construction is maked rapid progress, and bridge construction technology improves constantly, and large span self-anchoring type steel box-girder suspension bridge increases gradually.Build the large span self-anchored suspension bridge crossing over rivers,lakes and seas, by the impact of hydrogeological conditions etc., difficulty of construction is very big.
Utilize prior art to set up and cross over the large span self-anchored suspension bridge of rivers,lakes and seas, the having high input of needs, risk are high.The process that self-anchoring type steel box-girder suspension bridge is built is generally as follows: first install steel box-girder girder, then install main push-towing rope and be anchored at girder two ends, then installs hoist cable and by girder load transfer on main push-towing rope.Wherein, it is crucial that the installation of steel box-girder girder.
The mount scheme of large span self-anchoring type steel box-girder girder of suspension bridge normally adopts Support Method and incremental launching construction: set up top pushing platform in spanning one or both ends, the supporting construction of several supports as steel box-girder girder is set up in the middle of spanning, by pushing tow mode by steel box-girder girder from one end to the other side pushing tow or from two ends to middle pushing tow, thus complete the installation of steel box-girder.But there is following defect in Support Method and pushing installation scheme: 1, Support Method needs to set up support in river course, and this is unallowed in a lot of place.Such as at Yangtze upriver areas, river course is narrow, and shipping is busy, and The turbulent river crashes its way through, is not allow to set up any obstruction in river course.2, in the area, river, valley that bank slope is steep, the discrepancy in elevation in bridge floor and riverbed is very large, and often exceed 100 meters, install steel girder according to Support Method, the support height in river course will more than 100 meters, support engineering huge structure, and cost is high; So high support carries out growing distance, large-tonnage incremental launching construction, also there is great structural safety risk, and the flood swelled in volume in these places breaks, flow velocity is large, have a large amount of drift in flood, forms great threat safely to support.3, local at some, limit by traffic condition, steel box girder segment cannot transport directly to the top pushing platform position at spanning two ends, unit piece can only be made in factory, loose mail is transported to top pushing platform position, on top pushing platform, spelling becomes steel box girder segment again, piecemeal incremental launching construction, has a strong impact on the speed of steel box-girder installation.
Summary of the invention
In view of this, the present invention is intended to propose a kind of self-anchored suspension bridge mounting method, not by river course navigation restriction, superelevation support need not be set up in river course at the narrow valley region that bank slope is steep thus reduce to drop into, vertical shift load can be reduced, reduce vertical shift scope to avoid on superelevation support long distance, large-tonnage pushing tow thus reduce vertical shift construction safety risk, flood drift can be avoided to impact superelevation pushing tow support in river course to reduce construction safety risk, and steel box-girder installation speed can be accelerated.
For achieving the above object, technical scheme of the present invention is achieved in that
A kind of self-anchored suspension bridge mounting method, comprises the steps:
1. construction main pylon pier and main bridge abutment pier;
2. the frame support bracket of jointing steel box beam in main pylon pier, and on the slipway beam on frame support bracket top, steel nose girder is installed;
3. assembled girder erection crane on the loop wheel machine base on slipway beam, the simultaneously middle buttress of assembled end bay steel box-girder in end bay;
4. utilize girder erection crane by frame support bracket on the first sections steel beam lifting and be connected with steel nose girder, again by the first sections girder steel, steel nose girder and girder erection crane together to end bay pushing tow, again girder erection crane is retracted into the first sections girder steel front end, with this by section assembling end bay steel box-girder;
5. after end bay steel box-girder pushing installation being put in place, the assembled interim head tower on main pylon pier top;
6. remove steel nose girder, then between abutment pier top and the first sections girder steel, build anchor span concrete beam, anchor span concrete beam and end bay steel box-girder are connected to entirety;
7. utilize girder erection crane free cantilever erection main span steel box girder segment, hang interim drag-line simultaneously, this interim drag-line one end is anchored on main span steel box-girder, and the other end is anchored on interim head tower, until complete main span steel box girder assembling;
8. lift span centre closure segment, the main span steel box-girder of the left and right sides is closed up;
9. cable saddle and main push-towing rope and cord clip and hoist cable are installed; Then in order symmetrical stretch-draw hoist cable, remove interim drag-line, by girder load transfer on hoist cable and main push-towing rope, complete system transform;
10. remove interim head tower, remove buttress in the middle of frame support bracket and end bay steel box-girder.
Further, step 7. in, respectively from two in the middle of side direction main spans by section assembling main span steel box-girder, and synchronous symmetry hangs interim drag-line.
Further, step 9. in, described main push-towing rope two ends are anchored at dual-side respectively across on steel box-girder.
Relative to prior art, a kind of self-anchored suspension bridge mounting method of the present invention has following advantage: not by river course navigation restriction, at the narrow valley region that bank slope is steep, superelevation support need not be set up in river course thus reduce to drop into, vertical shift load can be reduced and reduce vertical shift scope to avoid long distance large-tonnage pushing tow thus to reduce vertical shift construction safety risk, flood drift can be avoided to impact pushing tow support thus reduce construction safety risk, can speed of application be accelerated.
Accompanying drawing explanation
The accompanying drawing forming a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is Bridge Pier Construction and the assembled schematic diagram of girder erection crane in the present invention;
Fig. 2 is end bay steel box-girder scheme of installation in the present invention;
Fig. 3 is interim head tower scheme of installation in the present invention;
Fig. 4 is that in the present invention, main span steel box-girder is installed and interim drag-line scheme of installation;
Fig. 5 is main push-towing rope and hoist cable scheme of installation in the present invention;
Fig. 6 is self-anchored suspension bridge structural representation in the present invention after system transform.
Description of reference numerals:
1-Support bracket, 2-slipway beam, 3-steel nose girder, 4-girder erection crane, buttress in the middle of 5-, 6-main pylon pier, 7-end bay steel box-girder, the interim head tower of 8-, 9-first beam sections, the interim drag-line of 10-, 11-main push-towing rope, 12-hoist cable, 13-abutment pier, 14-anchor span concrete beam, 15-main span steel box-girder, 16-loop wheel machine base, 17-riverbed line, 18-water level.
Detailed description of the invention
It should be noted that, when not conflicting, the embodiment in the present invention and the feature in embodiment can combine mutually.
Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
A kind of self-anchored suspension bridge mounting method, comprises the steps:
1. as shown in Figure 1, construction main pylon pier 6 and main bridge abutment pier 13;
2. the frame support bracket 1 of jointing steel box beam in main pylon pier 6, and on the slipway beam 2 on frame support bracket 1 top, steel nose girder 3 is installed;
It should be noted that, frame support bracket 1 here doublely can do end bay steel box-girder incremental launching construction platform, and structure is reliable, easy construction.
3. assembled girder erection crane 4 on the loop wheel machine base 16 on slipway beam 2, the simultaneously middle buttress 5 of assembled end bay steel box-girder in end bay;
4. as shown in Figure 2, utilize girder erection crane 4 that first sections girder steel 9 is lifted upper frame support bracket 1, and lead with steel, 3 connect, again by the first sections girder steel 9, steel nose girder 3 and girder erection crane 4 together to end bay pushing tow, girder erection crane 4 is retracted into the first sections girder steel 9 front end again, repeats above step, by section assembling end bay steel box-girder; It should be noted that, the first sections girder steel 9 is mainly used as the girder steel of the end bay steel-concrete adapter section be combined with anchor span concrete beam 14.
5. as shown in Figure 3, after end bay steel box-girder pushing installation is put in place, the assembled interim head tower 8 on main pylon pier 6 top;
6. remove steel nose girder 3, then between abutment pier 13 top and the first sections girder steel 9, build anchor span concrete beam 14, anchor span concrete beam 14 and end bay steel box-girder are connected to entirety;
7. as shown in Figure 4, utilize girder erection crane 4 free cantilever erection main span steel box girder segment, hang interim drag-line 10 simultaneously, this interim drag-line 10 one end is anchored on main span steel box-girder, and the other end is anchored on interim head tower 8, until complete main span steel box girder assembling;
8. lift span centre closure segment, the main span steel box-girder of the left and right sides is closed up;
9. as shown in Figure 5, cable saddle and main push-towing rope 11 and cord clip and hoist cable 12 are installed; Then in order symmetrical stretch-draw hoist cable 12, remove interim drag-line 10, by girder load transfer on hoist cable 12 and main push-towing rope, complete system transform;
It should be noted that, the stretch-draw that hoist cable 12 must be symmetrical in order, to ensure the balance of steel box-girder, makes the structural strength of suspension bridge obtain reliable guarantee.
10. as shown in Figure 6, remove interim head tower 8, remove buttress 5 in the middle of frame support bracket 1 and end bay steel box-girder.
Wherein, step 7. in, respectively from two in the middle of side direction main spans by section assembling main span steel box-girder, and synchronous symmetry hangs interim drag-line 10.
Wherein, step 9. in, described main push-towing rope 11 two ends are anchored at dual-side respectively across on steel box-girder.
Self-anchored suspension bridge mounting method provided by the invention is not by river course navigation restriction, at the narrow valley region that bank slope is steep, superelevation support need not be set up in river course thus reduce to drop into, vertical shift load can be reduced and reduce vertical shift scope to avoid long distance large-tonnage pushing tow thus to reduce vertical shift construction safety risk, flood drift can be avoided to impact pushing tow support thus reduce construction safety risk, can speed of application be accelerated.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (3)

1. a self-anchored suspension bridge mounting method, is characterized in that, comprises the steps:
1. construction main pylon pier and main bridge abutment pier;
2. the frame support bracket of jointing steel box beam in main pylon pier, and on the slipway beam on frame support bracket top, steel nose girder is installed;
3. assembled girder erection crane on the loop wheel machine base on slipway beam, the simultaneously middle buttress of assembled end bay steel box-girder in end bay;
4. utilize girder erection crane by frame support bracket on the first sections steel beam lifting and be connected with steel nose girder, again by the first sections girder steel, steel nose girder and girder erection crane together to end bay pushing tow, again girder erection crane is retracted into the first sections girder steel front end, with this by section assembling end bay steel box-girder;
5. after end bay steel box-girder pushing installation being put in place, the assembled interim head tower on main pylon pier top;
6. remove steel nose girder, then between abutment pier top and the first sections girder steel, build anchor span concrete beam, anchor span concrete beam and end bay steel box-girder are connected to entirety;
7. utilize girder erection crane free cantilever erection main span steel box girder segment, hang interim drag-line simultaneously, this interim drag-line one end is anchored on main span steel box-girder, and the other end is anchored on interim head tower, until complete main span steel box girder assembling;
8. lift span centre closure segment, the main span steel box-girder of the left and right sides is closed up;
9. cable saddle and main push-towing rope and cord clip and hoist cable are installed; Then in order symmetrical stretch-draw hoist cable, remove interim drag-line, by girder load transfer on hoist cable and main push-towing rope, complete system transform;
10. remove interim head tower, remove buttress in the middle of frame support bracket and end bay steel box-girder.
2. a kind of self-anchored suspension bridge mounting method according to claim 1, is characterized in that: step 7. in, respectively from two in the middle of side direction main spans by section assembling main span steel box-girder, and synchronous symmetry hangs interim drag-line.
3. a kind of self-anchored suspension bridge mounting method according to claim 1, is characterized in that: step 9. in, described main push-towing rope two ends are anchored at dual-side respectively across on steel box-girder.
CN201510187858.8A 2015-04-20 2015-04-20 A kind of self-anchored suspension bridge installation method Active CN104746437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510187858.8A CN104746437B (en) 2015-04-20 2015-04-20 A kind of self-anchored suspension bridge installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510187858.8A CN104746437B (en) 2015-04-20 2015-04-20 A kind of self-anchored suspension bridge installation method

Publications (2)

Publication Number Publication Date
CN104746437A true CN104746437A (en) 2015-07-01
CN104746437B CN104746437B (en) 2016-10-05

Family

ID=53586640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510187858.8A Active CN104746437B (en) 2015-04-20 2015-04-20 A kind of self-anchored suspension bridge installation method

Country Status (1)

Country Link
CN (1) CN104746437B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696470A (en) * 2016-01-18 2016-06-22 中国铁建大桥工程局集团有限公司 Synchronous quick steel box girder in-situ incremental launching and tower column construction method
CN106049293A (en) * 2016-07-29 2016-10-26 四川天元机械工程股份有限公司 Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method
CN107059637A (en) * 2017-05-16 2017-08-18 武汉工程大学 Long span self-anchoring type suspension bridge system conversion method
WO2018133045A1 (en) * 2017-01-20 2018-07-26 中国铁建大桥工程局集团有限公司 Method for mounting self-anchored suspension bridge
CN109267497A (en) * 2018-11-28 2019-01-25 中国铁建大桥工程局集团有限公司 A kind of Stiffening Girder of Self-Anchored Suspension Bridge closure method
CN109914258A (en) * 2019-04-08 2019-06-21 中国铁建大桥工程局集团有限公司 A kind of self-anchored suspension bridge cat road track cable steering structure
CN110904857A (en) * 2019-12-30 2020-03-24 中国铁建投资集团有限公司 Temporary buckling tower installation method for self-anchored suspension bridge construction
CN110907299A (en) * 2019-11-21 2020-03-24 中国矿业大学 Main cable multipoint variable load bending fatigue monitoring device and monitoring method thereof
CN113322814A (en) * 2021-05-10 2021-08-31 中国建筑第六工程局有限公司 Construction method of cable-stayed bridge steel box girder spanning multiple obstacles
CN113550224A (en) * 2021-08-09 2021-10-26 山东省交通规划设计院集团有限公司 Double-main-hole single-tower self-anchored suspension bridge structural system and construction process
CN113605255A (en) * 2021-09-17 2021-11-05 中国铁建大桥工程局集团有限公司 Rapid construction method for steel truss and steel box combined beam bridge in offshore height-limiting and navigation-limiting area

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007051426A (en) * 2005-08-15 2007-03-01 Public Works Research Institute Bridge and construction method of bridge
CN101078198A (en) * 2007-07-04 2007-11-28 湖南省交通规划勘察设计院 Steel box beam erection method for self-anchored suspension bridge
KR100889022B1 (en) * 2008-04-10 2009-03-19 (주)신흥이앤지 Bridge constructing method
CN101418543A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Self-anchored rope-suspension bridge inclined drawing construction method
CN101581072A (en) * 2008-05-14 2009-11-18 上海远东国际桥梁建设有限公司 Method for bridging self-anchoring suspension bridge
CN102587291A (en) * 2012-03-27 2012-07-18 中交四航局第一工程有限公司 Walking type multipoint pushing construction method and walking type multipoint pushing construction system for steel box girder
CN103233427A (en) * 2013-04-27 2013-08-07 长沙理工大学 Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge
CN103266573A (en) * 2013-06-17 2013-08-28 中铁山桥集团有限公司 Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007051426A (en) * 2005-08-15 2007-03-01 Public Works Research Institute Bridge and construction method of bridge
CN101078198A (en) * 2007-07-04 2007-11-28 湖南省交通规划勘察设计院 Steel box beam erection method for self-anchored suspension bridge
KR100889022B1 (en) * 2008-04-10 2009-03-19 (주)신흥이앤지 Bridge constructing method
CN101581072A (en) * 2008-05-14 2009-11-18 上海远东国际桥梁建设有限公司 Method for bridging self-anchoring suspension bridge
CN101418543A (en) * 2008-11-21 2009-04-29 上海市政工程设计研究总院 Self-anchored rope-suspension bridge inclined drawing construction method
CN102587291A (en) * 2012-03-27 2012-07-18 中交四航局第一工程有限公司 Walking type multipoint pushing construction method and walking type multipoint pushing construction system for steel box girder
CN103233427A (en) * 2013-04-27 2013-08-07 长沙理工大学 Sling tensioning and system conversion method for double-tower three-span plane main cable self-anchorage type suspension bridge
CN103266573A (en) * 2013-06-17 2013-08-28 中铁山桥集团有限公司 Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696470A (en) * 2016-01-18 2016-06-22 中国铁建大桥工程局集团有限公司 Synchronous quick steel box girder in-situ incremental launching and tower column construction method
CN105696470B (en) * 2016-01-18 2017-05-17 中国铁建大桥工程局集团有限公司 Synchronous quick steel box girder in-situ incremental launching and tower column construction method
CN106049293A (en) * 2016-07-29 2016-10-26 四川天元机械工程股份有限公司 Method for installing stiffening beam of suspension bridge over navigable river and swing shift system used in method
CN106049293B (en) * 2016-07-29 2017-10-13 德阳天元重工股份有限公司 Stiffening girder of suspension bridge installation method and used shifting system is swung on navigable river
WO2018133045A1 (en) * 2017-01-20 2018-07-26 中国铁建大桥工程局集团有限公司 Method for mounting self-anchored suspension bridge
CN107059637A (en) * 2017-05-16 2017-08-18 武汉工程大学 Long span self-anchoring type suspension bridge system conversion method
CN109267497A (en) * 2018-11-28 2019-01-25 中国铁建大桥工程局集团有限公司 A kind of Stiffening Girder of Self-Anchored Suspension Bridge closure method
CN109914258A (en) * 2019-04-08 2019-06-21 中国铁建大桥工程局集团有限公司 A kind of self-anchored suspension bridge cat road track cable steering structure
CN109914258B (en) * 2019-04-08 2024-01-23 中国铁建大桥工程局集团有限公司 Self-anchored suspension bridge catwalk bearing cable steering structure
CN110907299A (en) * 2019-11-21 2020-03-24 中国矿业大学 Main cable multipoint variable load bending fatigue monitoring device and monitoring method thereof
CN110907299B (en) * 2019-11-21 2021-11-02 中国矿业大学 Main cable multipoint variable load bending fatigue monitoring device and monitoring method thereof
CN110904857A (en) * 2019-12-30 2020-03-24 中国铁建投资集团有限公司 Temporary buckling tower installation method for self-anchored suspension bridge construction
CN113322814A (en) * 2021-05-10 2021-08-31 中国建筑第六工程局有限公司 Construction method of cable-stayed bridge steel box girder spanning multiple obstacles
CN113550224A (en) * 2021-08-09 2021-10-26 山东省交通规划设计院集团有限公司 Double-main-hole single-tower self-anchored suspension bridge structural system and construction process
CN113605255A (en) * 2021-09-17 2021-11-05 中国铁建大桥工程局集团有限公司 Rapid construction method for steel truss and steel box combined beam bridge in offshore height-limiting and navigation-limiting area

Also Published As

Publication number Publication date
CN104746437B (en) 2016-10-05

Similar Documents

Publication Publication Date Title
CN104746437B (en) A kind of self-anchored suspension bridge installation method
CN101418543B (en) Self-anchored rope-suspension bridge inclined drawing construction method
WO2018133045A1 (en) Method for mounting self-anchored suspension bridge
CN102192368B (en) Large-span overhead pipeline sliding installation method
CN104480862B (en) A kind of erection method of cable stayed bridge end bay steel truss girder
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN106012797A (en) All-ground-anchor type single-tower double-span cable-stayed bridge structure and construction method thereof
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN103911956B (en) A kind of large span stayed-cable bridge steel truss girder mounting method
CN105970836A (en) Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever
CN109778718A (en) Construction method for long-span continuous steel box girder main span pure cantilever assembly mid-span closure
CN104652283A (en) Asynchronous splicing construction method for symmetrically splicing main steel girder erection cranes of cable-stayed bridge
CN106192776A (en) A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology
CN101380954A (en) Suspension train traffic system with hanging rail
CN106192755A (en) A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN101509229B (en) Method for constructing side span beam section without joist bracket of large-span steel box girder cable-stayed bridge
CN201102544Y (en) Hanging train traffic system of hanging rail
CN210420902U (en) Concrete box girder flange plate cutting and dismantling stabilizing device
CN205775786U (en) A kind of novel railway curve Cable-stayed Bridge with Slanted Pylon
CN104314009A (en) Large segment lifting mechanism and use method thereof
CN105568867A (en) Low-position sliding fast construction method for steel box girder
CN208009277U (en) A kind of short sliding installation system of land-based area large-tonnage steel box beam
CN102535344A (en) Concrete transportation method for bridge body of high-pier bridge in gully region
CN204703068U (en) A kind of up suspention section assembling traversing carriage bridge fabrication machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Song Weijun

Inventor after: Gao Xuewen

Inventor after: Liu Zhi

Inventor after: Zhou Chaowei

Inventor after: Chang Jie

Inventor after: Cai Wendao

Inventor after: Xing Ruxiang

Inventor after: Zhang Qing

Inventor after: Chen Ningxian

Inventor after: Gong Guofeng

Inventor after: Shi Jiuzhou

Inventor after: Qi Zhanguo

Inventor after: Li Xianghai

Inventor after: Zhu Linda

Inventor after: Yu Shaobin

Inventor after: Zhu Yongsheng

Inventor before: Chen Ningxian

Inventor before: Shi Jiuzhou

Inventor before: Zhu Yongsheng

Inventor before: Chang Jie

Inventor before: Cai Wentao

Inventor before: Xing Ruxiang

Inventor before: Zhang Qing

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant