CN106192755A - A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation - Google Patents

A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation Download PDF

Info

Publication number
CN106192755A
CN106192755A CN201510212875.2A CN201510212875A CN106192755A CN 106192755 A CN106192755 A CN 106192755A CN 201510212875 A CN201510212875 A CN 201510212875A CN 106192755 A CN106192755 A CN 106192755A
Authority
CN
China
Prior art keywords
steel
girder
steel box
width
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510212875.2A
Other languages
Chinese (zh)
Inventor
唐香君
吴文平
丁剑强
张婷
谈超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201510212875.2A priority Critical patent/CN106192755A/en
Publication of CN106192755A publication Critical patent/CN106192755A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation, using the mode of segmentation thrusting slip and synchronous control technique, solving transit route the most through, river course, the both sides depth of water can not can not meet the problems such as crane barge draft, operation side be the most crowded.The method of the invention is workable, and high-altitude installation effectiveness is high, improves the installation positioning precision of fish-bellied type shaped form cross a river double width steel box-girder simultaneously, reduces error rate, improve the quality of bridge steel structure, reduces the installation risk of steel construction.

Description

A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
Technical field
The present invention relates to the construction method of installation of a kind of bridge steel structure, particularly a kind of fish-bellied type shaped form cross a river double width steel Box beam steel bridge construction method of installation.
Background technology
For different types of rridges structural steelwork, typical structure therein is more, especially fish-bellied type shaped form cross a river double width The bridge steel structure of steel box-girder is the novel moulding in recent years occurred.Conventional construction method is " lifting of river course piling+crane barge ", The transit route of the sections that there is double width steel bridge the most through, river course, the both sides depth of water can not can not meet crane barge drinking water, construction The contradictions such as the scope of operation is the most crowded.If taking Hoisting Program, then offshore side in both sides, river course is both needed to carry out dredging to meeting crane barge Draft.Auxiliary work amount is big, and the transport of mud after dredging, the problem stacking, process headache the most especially.Dike The dredging in river course, bank side is likely to cause potential safety hazard for embankment.Seriously constrain project progress.
Summary of the invention
The invention aims to solve the deficiencies in the prior art, it is provided that the fish-bellied type that a kind of positioning precision is high, error is little Shaped form cross a river double width steel box-girder steel bridge construction method of installation.
In order to realize object above, the present invention relates to a kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge installation side Method, specifically comprising the following steps that of the method
(1) fish-bellied type shaped form cross a river double width steel box-girder is carried out segmentation, ensure that segmentation weight meets lifting machine and plays principal characteristic Energy;
(2) determine the position of centre of gravity of every sections, and determine lifting position according to position of centre of gravity, and hanger is set;
(3) determine sliding rail position and steel-pipe pile position, river course and riverbank are beaten steel pipe column, steel pipe column is installed even Connecing tie-rod, respectively two width sliding rail beam and sliding rails about erection, the most left width arranges preformed hole;
(4) mounting slip bracket on right width track, two guide rails of right width track are respectively mounted thrustor, with floating Hang in first section of steel box-girder lifting to right width sliding bracket, utilize thrustor by first section of steel box-girder along track to a side slip To assigned position, and it is fixed;Mounting slip bracket on left width track, two guide rails of left width track are respectively mounted Thrustor, with crane barge by second segment steel box-girder lifting to left width sliding pallet frame, utilizes thrustor by second segment steel box-girder Slide onto assigned position to side along track, and be fixed;
(5) repeat step (4), segmentation steel box-girder carried out hoisting slide successively according to the mode that left and right width is staggered and fixes, Right width steel box-girder section from two lateral in the middle of complete closure, left width steel box-girder section from two lateral in the middle of install to preformed hole two rear flank Suspend;
(6) in preformed hole, squeeze into steel-pipe pile, lift interim spandrel girder with crane barge, interim spandrel girder arranges beam section auxiliary Help the temporary rest pier of installation;
(7) left width residue steel box girder segment is directly lifted with crane barge until left width joins the two sections of a bridge, etc.
Described a kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation, hanger quantity in step (2) It it is 4.
Described a kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation, when making steel pipe column, at steel-pipe pile Specify elevation location that steel-pipe pile settlement observation point is set, periodically observation steel-pipe pile sedimentation situation;
Described a kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation, logical between steel-pipe pile and steel-pipe pile Cross steel pipe column connection tie-rod to be welded to connect, be welded to connect between sliding rail beam and steel-pipe pile, sliding rail and sliding rail Karma mode is used to fix between beam;
Described a kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation, two guide rails of sliding rail are Concentric circular;During in step (4), (5), thrustor promotes steel box-girder sliding, the pushing tow point on two guide rails The ratio of displacement is equal to the ratio of guide rail radius.
The present invention uses " divide lifting elements+river course piling and arrange sliding supporting system+crane barge segment lifting+thrusting slip " Method solve fish-bellied type shaped form cross a river double width steel box-girder and the difficult problem in location be installed and avoid training of channel work Amount, the method for the invention is workable, and installation effectiveness is high, improves fish-bellied type shaped form cross a river double width steel case simultaneously The space mounting positioning precision of beam, reduces error rate, improves the quality of bridge steel structure, reduces Steel Structure Installation Security risk.
Accompanying drawing explanation
It is clearly understood to make present disclosure be easier to, below according to specific embodiment and combine accompanying drawing, to this Invention is described in further detail, wherein
Fig. 1 is that sliding of the present invention carries system schematic diagram.
Wherein 1-1 is right width steel-pipe pile;1-2 is left width steel-pipe pile;1-3 is the steel-pipe pile at left width span centre preformed hole;1-4 For right width sliding rail beam;1-5 is right width sliding rail;1-6 is left width sliding rail beam;1-7 is left width sliding rail; 1-8 is interim spandrel girder;1-9 is temporary rest pier;1-10 is preformed hole.
Fig. 2 is sliding rail beam and track generalized section in sliding carrying system of the present invention.
Fig. 3 is the temporary rest pier schematic diagram on sliding of the present invention carrying system span centre load-bearing girder steel.
Fig. 4 is that steel box girder segment of the present invention divides schematic diagram.
Fig. 5 is steel box girder segment suspension centre of the present invention and hanger arranges schematic diagram.
Wherein 5-1 is steel box girder segment;5-2 is hanger.
Fig. 6 is steel box girder segment synchronization-sliding effect schematic diagram of the present invention.
In figure, 6-1 is steel box girder segment;6-2 be steel-pipe pile, 6-3 be sliding carrying girder steel, 6-4 be tie-rod;6-5 is for sliding Shift bracket;6-6 is sliding rail;6-7 is thrustor.
Fig. 7 is that integral installation of the present invention has been constructed rear schematic diagram.
Detailed description of the invention
(embodiment 1)
Fish-bellied type shaped form cross a river double width steel box-girder is carried out segmentation, and two width about steel box-girder are divided into left width by the present embodiment 21 sections, right 20 sections, as shown in Figure 2.
Determine the position of centre of gravity of every sections, and determine lifting position according to position of centre of gravity, and hanger 5-2, this enforcement are set In example, hanger quantity is 4, as shown in Figure 5.
Fish-bellied type shaped form cross a river double width steel box girder segment integral installation construction process is as follows:
Flow process 1: subregion beats right width steel pipe column 1-1 and left width steel pipe column 1-2 on river course and riverbank, installs steel pipe column even Connect tie-rod, set up right width sliding rail beam 1-4, right width sliding rail 1-5 and left width sliding rail beam 1-6, left width respectively Sliding rail 1-7.Left width span centre arranges preformed hole 1-10 and does not closes, in order to crane barge carries out the lifting of right width bridge section. In steel-pipe pile work progress, specify elevation location that steel-pipe pile settlement observation point is set at every steel-pipe pile, periodically observation steel Pile tube sedimentation situation.
It is connected tie-rod by steel pipe column between steel-pipe pile with steel-pipe pile to be welded to connect, weld between sliding rail beam and steel-pipe pile Connect, between sliding rail and sliding rail beam, use Karma mode to fix
Flow process 2: crane barge anchors, first section of beam Y20 transport puts in place.
Flow process 3: as shown in Figure 6, mounting slip bracket 6-5 on sliding rail 6-6, two guide rails of track are pacified respectively Dress thrustor 6-7, with crane barge by Y20 lifting to sliding bracket 6-5, along sliding rail 6-6 to a bank sliding. When sliding, owing to for curve sliding, two guide rails of sliding rail 6-6 are concentric circular, in order to realize synchronization-sliding Requirement, the ratio of the displacement of the pushing tow point on two guide rails is equal to the ratio of guide rail radius.
The sliding of flow process 4:Y20 puts in place, adjusts sections position, and is fixed.
Flow process 5: after crane barge anchoring, the transport of Z21 beam section puts in place.
Flow process 6: with reference to flow process 3, by Z21 along left width sliding rail to a bank sliding.
The sliding of flow process 7:Z21 puts in place, adjusts sections position, and is fixed.
Flow process 8: by aforementioned same flow process, fixes Y1, Z1 segment lifting sliding successively.
Flow process 9: by aforementioned same flow process, is staggered installation of left and right width steel box girder segment successively from two sides to centre.Wherein, After left width Z7, Z13 are in place, the installation of left width beam section suspends;Right width beam section is then installed to closure.
Flow process 10: squeeze into steel-pipe pile 1-3 in left width preformed hole 1-10, lifts left width interim spandrel girder 1-8 with crane barge, And temporary rest pier 1-9 is set on interim spandrel girder.
Flow process 11: fix with crane barge lifting left width residue beam section Z8, Z9, Z10, Z11 sliding successively.
Flow process 12: lifting Z10 joins the two sections of a bridge, etc.
The present embodiment is merely to illustrate the present invention rather than limits the scope of the present invention, after having read the present invention, this Skilled person all falls within, to the amendment of the various equivalent form of values of the present invention, the model that the application claims are limited Enclose.

Claims (5)

1. a fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation, it is characterised in that the method Specifically comprise the following steps that
(1) fish-bellied type shaped form cross a river double width steel box-girder is carried out segmentation, ensure that segmentation weight meets lifting machine and plays principal characteristic Energy;
(2) determine the position of centre of gravity of every sections, and determine lifting position according to position of centre of gravity, and hanger is set;
(3) determine sliding rail position and steel-pipe pile position, river course and riverbank are beaten steel pipe column, steel pipe column is installed even Connecing tie-rod, respectively two width sliding rail beam and sliding rails about erection, the most left width arranges preformed hole;
(4) mounting slip bracket on right width track, two guide rails of right width track are respectively mounted thrustor, with floating Hang in first section of steel box-girder lifting to right width sliding bracket, utilize thrustor by first section of steel box-girder along track to a bank sliding To assigned position, and it is fixed;Mounting slip bracket on left width track, two guide rails of left width track are respectively mounted Thrustor, with crane barge by second segment steel box-girder lifting to left width sliding pallet frame, utilizes thrustor by second segment steel box-girder Slide onto assigned position along track to a bank, and be fixed;
(5) repeat step (4), segmentation steel box-girder carried out hoisting slide successively according to the mode that left and right width is staggered and fixes, Right width steel box-girder section completes closure from two sides to centre, and left width steel box-girder section is installed to preformed hole two rear flank from two sides to centre Suspend;
(6) in preformed hole, squeeze into steel-pipe pile, lift interim spandrel girder with crane barge, interim spandrel girder arranges beam section auxiliary Help the temporary rest pier of installation;
(7) left width residue steel box girder segment is directly lifted with crane barge until left width joins the two sections of a bridge, etc.
A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation the most according to claim 1, It is characterized in that: in step (2), hanger quantity is 4.
A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation the most according to claim 1, It is characterized in that: when making steel pipe column, specify elevation location that steel-pipe pile settlement observation point is set at steel-pipe pile, periodically observation Steel-pipe pile sedimentation situation.
A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation the most according to claim 1, It is characterized in that: between steel-pipe pile with steel-pipe pile by steel pipe column be connected tie-rod be welded to connect, sliding rail beam and steel-pipe pile Between be welded to connect, between sliding rail and sliding rail beam use Karma mode fix.
A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation the most according to claim 1, It is characterized in that: two guide rails of sliding rail are concentric circular;In step (4), (5), thrustor promotes steel box-girder sliding During shifting, the ratio of the displacement of the pushing tow point on two guide rails is equal to the ratio of guide rail radius.
CN201510212875.2A 2015-04-29 2015-04-29 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation Pending CN106192755A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510212875.2A CN106192755A (en) 2015-04-29 2015-04-29 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510212875.2A CN106192755A (en) 2015-04-29 2015-04-29 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation

Publications (1)

Publication Number Publication Date
CN106192755A true CN106192755A (en) 2016-12-07

Family

ID=57457582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510212875.2A Pending CN106192755A (en) 2015-04-29 2015-04-29 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation

Country Status (1)

Country Link
CN (1) CN106192755A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758742A (en) * 2016-12-29 2017-05-31 中国冶集团有限公司 A kind of curved variable cross-section fish-bellied type Steel Continuous Box beam and its construction method
CN107142832A (en) * 2017-05-23 2017-09-08 中建钢构有限公司 A kind of construction method of arc steel box-girder
CN108203931A (en) * 2018-03-09 2018-06-26 中铁十六局集团第三工程有限公司 A kind of steel box-girder slides bracket
CN108221701A (en) * 2018-03-09 2018-06-29 中铁十六局集团第三工程有限公司 A kind of steel box-girder mounting bracket
CN108301328A (en) * 2018-02-01 2018-07-20 广州市恒盛建设工程有限公司 One kind getting higher change and indulges horizontal curve steel box girder construction method
CN110725215A (en) * 2019-11-06 2020-01-24 郑州市市政工程总公司 Beam transporting structure of newly-built upper-layer bridge on existing bridge and beam transporting method using existing bridge
CN111764300A (en) * 2020-07-21 2020-10-13 安徽省交通建设股份有限公司 Curved steel beam pushing system and construction method
CN113065183A (en) * 2021-03-01 2021-07-02 中国建筑一局(集团)有限公司 Optimization method, optimization device and optimization system of construction scheme

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260649A (en) * 2008-04-21 2008-09-10 上海市政工程设计研究总院 Steel-concrete composite structure continuous beam bridge construction method
CN201132941Y (en) * 2007-12-04 2008-10-15 中铁大桥局股份有限公司 Self floating lower carrying pole beam of moveable formwork
CN101424074A (en) * 2008-12-04 2009-05-06 中铁大桥局股份有限公司 Whole arch precasted and floating chase erected continuous composite beam bridge closure method
JP2011208395A (en) * 2010-03-29 2011-10-20 Mitsui Eng & Shipbuild Co Ltd Structure and method for fixing planking for communication bridge between quay wall and floating body
CN102535343A (en) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201132941Y (en) * 2007-12-04 2008-10-15 中铁大桥局股份有限公司 Self floating lower carrying pole beam of moveable formwork
CN101260649A (en) * 2008-04-21 2008-09-10 上海市政工程设计研究总院 Steel-concrete composite structure continuous beam bridge construction method
CN101424074A (en) * 2008-12-04 2009-05-06 中铁大桥局股份有限公司 Whole arch precasted and floating chase erected continuous composite beam bridge closure method
JP2011208395A (en) * 2010-03-29 2011-10-20 Mitsui Eng & Shipbuild Co Ltd Structure and method for fixing planking for communication bridge between quay wall and floating body
CN102535343A (en) * 2012-02-02 2012-07-04 中铁大桥局股份有限公司 Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
唐香君: "《钢结构与金属屋面新技术应用》", 1 April 2015 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758742A (en) * 2016-12-29 2017-05-31 中国冶集团有限公司 A kind of curved variable cross-section fish-bellied type Steel Continuous Box beam and its construction method
CN106758742B (en) * 2016-12-29 2019-08-23 中国一冶集团有限公司 A kind of curved variable cross-section fish-bellied type Steel Continuous Box beam and its construction method
CN107142832A (en) * 2017-05-23 2017-09-08 中建钢构有限公司 A kind of construction method of arc steel box-girder
CN107142832B (en) * 2017-05-23 2019-08-13 中建钢构有限公司 A kind of construction method of arc steel box-girder
CN108301328A (en) * 2018-02-01 2018-07-20 广州市恒盛建设工程有限公司 One kind getting higher change and indulges horizontal curve steel box girder construction method
CN108203931A (en) * 2018-03-09 2018-06-26 中铁十六局集团第三工程有限公司 A kind of steel box-girder slides bracket
CN108221701A (en) * 2018-03-09 2018-06-29 中铁十六局集团第三工程有限公司 A kind of steel box-girder mounting bracket
CN110725215A (en) * 2019-11-06 2020-01-24 郑州市市政工程总公司 Beam transporting structure of newly-built upper-layer bridge on existing bridge and beam transporting method using existing bridge
CN111764300A (en) * 2020-07-21 2020-10-13 安徽省交通建设股份有限公司 Curved steel beam pushing system and construction method
CN111764300B (en) * 2020-07-21 2022-03-25 安徽省交通建设股份有限公司 Curved steel beam pushing system and construction method
CN113065183A (en) * 2021-03-01 2021-07-02 中国建筑一局(集团)有限公司 Optimization method, optimization device and optimization system of construction scheme
CN113065183B (en) * 2021-03-01 2022-05-17 中国建筑一局(集团)有限公司 Optimization method, optimization device and optimization system of construction scheme

Similar Documents

Publication Publication Date Title
CN106192755A (en) A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN101775809B (en) Construction method of marine self-floating type steel soleplate single-wall suspension box cofferdam and single-wall suspension box cofferdam
CN102192368B (en) Large-span overhead pipeline sliding installation method
CN104746437B (en) A kind of self-anchored suspension bridge installation method
CN101914897B (en) Construction method of single main cable inclined-suspender earth anchored suspension bridge
CN105088957B (en) Construction method for underwater reinforced concrete composite pile of cast-in-situ support of concrete ballast box beam of cable-stayed bridge
CN101078198B (en) Steel box beam erection method for self-anchored suspension bridge
CN102561191A (en) Integral lifting system and construction method for arch bridge ribs
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN111058458A (en) Construction method and structure based on cutter suction type ground connecting wall local replacement row pile support
CN108179735A (en) A kind of boulder bed large-sized deep water foundation construction platform and method
CN106192776A (en) A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology
CN103015442B (en) Method for constructing split type cofferdam
CN106151679B (en) The towed counterpart method in large diameter reinforced concrete pipe road
CN202689016U (en) Cofferdam assembling and lifting platform for double-wall steel cofferdam construction of deep-water bridge pier
CN208009277U (en) A kind of short sliding installation system of land-based area large-tonnage steel box beam
CN102071646A (en) Large-tonnage box girder sea system and construction method
CN101122115B (en) Construction method for tower crane shift
CN202989781U (en) Width widened cast-in-place box beam moving support
CN102747747B (en) Construction method for installing underground lattice column
CN106906750A (en) A kind of multi-functional across railway line swing bridge girder closing construction mould bases and its construction method
CN211898417U (en) Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted
CN204919348U (en) Supplementary head tower of using of self anchored suspension bridge installation
CN205907586U (en) Device of concrete is carried in wide riverway water facial height platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161207

WD01 Invention patent application deemed withdrawn after publication