CN104480862B - A kind of erection method of cable stayed bridge end bay steel truss girder - Google Patents
A kind of erection method of cable stayed bridge end bay steel truss girder Download PDFInfo
- Publication number
- CN104480862B CN104480862B CN201410723740.8A CN201410723740A CN104480862B CN 104480862 B CN104480862 B CN 104480862B CN 201410723740 A CN201410723740 A CN 201410723740A CN 104480862 B CN104480862 B CN 104480862B
- Authority
- CN
- China
- Prior art keywords
- internode
- bridge deck
- steel truss
- truss girder
- erection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410723740.8A CN104480862B (en) | 2014-12-03 | 2014-12-03 | A kind of erection method of cable stayed bridge end bay steel truss girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410723740.8A CN104480862B (en) | 2014-12-03 | 2014-12-03 | A kind of erection method of cable stayed bridge end bay steel truss girder |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104480862A CN104480862A (en) | 2015-04-01 |
CN104480862B true CN104480862B (en) | 2016-04-20 |
Family
ID=52755460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410723740.8A Active CN104480862B (en) | 2014-12-03 | 2014-12-03 | A kind of erection method of cable stayed bridge end bay steel truss girder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104480862B (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178186B (en) * | 2015-06-05 | 2016-12-07 | 山东聚源玄武岩纤维股份有限公司 | A kind of installation method of basalt fibre arcuately road overpass |
CN105317008B (en) * | 2015-09-08 | 2018-06-29 | 贵州省公路工程集团有限公司 | A kind of Integral lifting method of steel truss girder cable-stayed bridge steel truss girder segment |
CN106917358B (en) * | 2017-04-28 | 2018-11-20 | 北京城建道桥建设集团有限公司 | A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system |
CN108265628A (en) * | 2018-02-01 | 2018-07-10 | 中交路桥建设有限公司 | One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method |
CN108411783A (en) * | 2018-03-12 | 2018-08-17 | 中铁建大桥工程局集团第四工程有限公司 | A kind of steel truss girder joint assembling and construction method |
CN108951434B (en) * | 2018-10-10 | 2024-01-30 | 河北工业大学 | Control device and control method for curved light I-shaped steel beam bridge dragging construction cantilever end |
CN109356036A (en) * | 2018-11-26 | 2019-02-19 | 中铁六局集团有限公司 | Middle pier pier-side bracket and its construction method |
CN110468721B (en) * | 2019-08-29 | 2021-04-20 | 中铁大桥局集团有限公司 | Large-span trestle cantilever construction method |
CN110629677B (en) * | 2019-09-29 | 2021-01-26 | 中铁大桥局集团有限公司 | Method for erecting section steel beam on pier top short slideway beam |
CN111254831B (en) * | 2020-01-20 | 2021-05-14 | 中铁大桥局第七工程有限公司 | Hoisting method of steel structure frame beam of through arch bridge |
CN112609578B (en) * | 2020-11-24 | 2022-07-22 | 中铁二局集团有限公司 | Method for mounting steel truss girder at top section of bridge pier of cable-stayed bridge |
CN113846563B (en) * | 2021-09-18 | 2023-04-07 | 中铁大桥局集团有限公司 | Construction method for side span and auxiliary span steel truss girder erection of large-span cable-stayed bridge |
CN113718626B (en) * | 2021-09-22 | 2023-04-14 | 中铁大桥局集团有限公司 | Construction method suitable for highway and railway dual-purpose cable-stayed suspension cooperative system bridge |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3150572B2 (en) * | 1995-05-18 | 2001-03-26 | 三菱重工業株式会社 | Bridge erection equipment |
CN1900423A (en) * | 2006-07-10 | 2007-01-24 | 中铁大桥局股份有限公司 | Integrate section frame building method for steel truss |
CN102373671B (en) * | 2011-11-18 | 2013-08-07 | 中铁四局集团有限公司 | Steel trussed beam and flexible arch bridge construction method with vault pushing |
CN102535343B (en) * | 2012-02-02 | 2014-01-15 | 中铁大桥局股份有限公司 | Method for erecting girder on top of main tower mound of steel truss girder cable-stayed bridge |
CN103911956B (en) * | 2014-03-21 | 2015-11-18 | 中铁大桥局集团有限公司 | A kind of large span stayed-cable bridge steel truss girder mounting method |
-
2014
- 2014-12-03 CN CN201410723740.8A patent/CN104480862B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104480862A (en) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480862B (en) | A kind of erection method of cable stayed bridge end bay steel truss girder | |
CN103911956B (en) | A kind of large span stayed-cable bridge steel truss girder mounting method | |
CN102121234B (en) | Quick construction method of two-tower five-span steel truss girder cable-stayed bridge | |
CN103075017B (en) | Super-long-span cylindrical shell lattice structure construction method | |
CN102352604B (en) | Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof | |
CN101672011B (en) | Steel tube arch rib vertical lifting method | |
WO2018133045A1 (en) | Method for mounting self-anchored suspension bridge | |
CN105970836A (en) | Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever | |
CN103255726B (en) | A kind of construction method of continuous beam arch combination bridge | |
CN105604334A (en) | Rapid-construction method used for overall installation of large-span steel truss | |
CN104746437B (en) | A kind of self-anchored suspension bridge installation method | |
CN101418543A (en) | Self-anchored rope-suspension bridge inclined drawing construction method | |
CN104594201B (en) | A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel | |
CN103882812A (en) | Construction method for midspan main beams of cable-stayed bridge | |
CN104060545B (en) | Can be used for the suspension trestle waterborne of pumping of concrete and construction method thereof and purposes | |
CN105040986A (en) | Modular mounting technology for steel-structure door type frame roof system | |
CN104018426A (en) | Steel truss installation method | |
CN104314009A (en) | Large segment lifting mechanism and use method thereof | |
CN201554034U (en) | Horizontal embedding support structure for post-pouring belt of top-down construction | |
CN102587280B (en) | Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support | |
CN104060841A (en) | Large-span steel girder installation construction method | |
CN207452680U (en) | A kind of curve chord steel truss is put more energy into continuous beam | |
CN204039898U (en) | Can be used for the suspension trestle waterborne of pumping of concrete | |
CN108193778B (en) | A kind of construction method of goose egg shape steel construction | |
CN203846402U (en) | Steel-concrete superposed beam top plate support-free construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Pan Dongfa Inventor after: Jia Weizhong Inventor after: Hu Jun Inventor after: Yao Sen Inventor after: Xu Ye Inventor after: Zhang Dong Inventor after: Zhao Quancheng Inventor after: Zhu Mingquan Inventor after: Tu Manming Inventor after: Mao Weiqi Inventor after: Wu Fangming Inventor after: Ma Tao Inventor after: Zhao Kunpeng Inventor after: Zhang Aihua Inventor after: Qin Yonggang Inventor before: Pan Dongfa Inventor before: Hu Jun Inventor before: Yao Sen Inventor before: Xu Ye Inventor before: Zhang Dong Inventor before: Zhao Quancheng Inventor before: Tu Manming Inventor before: Mao Weiqi Inventor before: Wu Fangming Inventor before: Ma Tao Inventor before: Zhao Kunpeng Inventor before: Zhang Aihua Inventor before: Qin Yonggang Inventor before: Jia Weizhong |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |