CN104653194A - Multi-platform railway tunnel operation trolley - Google Patents
Multi-platform railway tunnel operation trolley Download PDFInfo
- Publication number
- CN104653194A CN104653194A CN201510091771.0A CN201510091771A CN104653194A CN 104653194 A CN104653194 A CN 104653194A CN 201510091771 A CN201510091771 A CN 201510091771A CN 104653194 A CN104653194 A CN 104653194A
- Authority
- CN
- China
- Prior art keywords
- working platform
- crossbeam
- platform
- column
- railway tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 22
- 239000010959 steel Substances 0.000 claims description 22
- 230000002787 reinforcement Effects 0.000 claims description 16
- 229910052742 iron Inorganic materials 0.000 claims description 11
- 238000010276 construction Methods 0.000 description 6
- 201000010099 disease Diseases 0.000 description 4
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000005484 gravity Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/122—Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
The invention provides a multi-platform railway tunnel operation trolley, which comprises at least two working platforms, wherein each working platform is provided with a support framework, each support framework comprises vertical columns, transverse beams and connecting ribs, and a clamping groove is formed in the lower end of each vertical column, and can be clamped on the transverse beam of the lower working platform. The multi-platform railway tunnel operation trolley has the advantages that the structure is simple, the splicing is convenient, and safety and practicality are realized.
Description
Technical field
The present invention relates to railway tunnel construction mechanical field, particularly relate to a kind of multi-platform railway tunnel Mobile workbench.
Background technology
In Concerning Railway Tunnel Construction construction and railway tunnel Disease Treatment process, usually need Mobile workbench to carry out constructing and renovating process.This Mobile workbench majority adopts welding manner, according to specific tunnel contour size, utilizes the Mobile workbench of the integrally welded formulas of section bar such as angle steel, channel-section steel, i iron.When railway tunnel Disease Treatment, require that speed wants fast, do not affect the normal pass of railway as far as possible, and the Mobile workbench of this integral type is too heavy, mobile inconvenient, operating efficiency is also lower, cause tunnel to renovate cycle stretch-out, the demand of regulation fast can not be met.And this industrial chassis is arranged according to particular tunnel overall size, the boom truck for a tunnel possibly cannot be applied to another tunnel.In addition, the disease position in tunnel is not fixed, thus when carrying out regulation operation, single industrial platform cannot meet the demands.。
Summary of the invention
It is simple and have the Mobile workbench of multilayer working platform that main purpose of the present invention is to provide a kind of structure.
For realizing above-mentioned main purpose, the invention provides multi-platform railway tunnel Mobile workbench, comprise at least two-layer working platform, every layer of working platform all has support frame.Wherein support frame comprises: two crossbeams arranged in parallel to each other; Be arranged between crossbeam and two ends all with the dowel of at least two of crossbeam gun iron link; The column of supporting traverse, and be provided with at least two root posts below every root crossbeam.Column lower end is provided with the draw-in groove that can be connected on its lower floor's working platform crossbeam; The crossbeam of lower floor's working platform is provided with position limiting structure, and restriction draw-in groove is along the movement of bearing of trend on crossbeam of crossbeam.
From above scheme, the support frame supports that working platform is formed by column, crossbeam and dowel, simple and the location that can realize on three-dimensional of structure, the crossbeam utilizing the draw-in groove of upper strata working platform to be connected to lower floor's working platform realizes the splicing of multilayer working platform, method is simple, all more for convenience, the setting of position limiting structure makes upper strata working platform can not move relative to lower floor's working platform, safe and reliable for splicing and dismounting.Different working platformes can be selected to carry out being spliced to form multi-platform boom truck according to dissimilar tunnel structure, meet the needs of practical application.
More concrete scheme is, position limiting structure is trapezoidal protrusion, and trapezoidal protrusion is arranged on the outside of outermost column, and the inclined plane of trapezoidal protrusion is in the face of column.
From above scheme, when upper strata working platform is arranged on lower floor's working platform, draw-in groove can move along inclined plane and utilize trapezoidal protrusion to realize the automatic location of upper strata working platform, and the splicing of working platform is flexibly convenient.
Another more concrete scheme is, along the bearing of trend of crossbeam, the column of upper strata working platform is between outermost two columns of its lower floor's working platform.From above scheme, along the bearing of trend of crossbeam, the column of orlop working platform has maximum span, and the column span of upper strata working platform is all less than the column span of its lower floor's working platform, makes boom truck more firm.
Scheme is more specifically, and on the column of orlop working platform, the bottom of the two side of draw-in groove is all provided with scroll wheel, scroll wheel be axially parallel to bearing of trend.From above scheme, orlop working platform has scroll wheel, boom truck can be moved along the direction perpendicular to crossbeam bearing of trend, namely facilitate boom truck to move along direction, tunnel.
Scheme is more specifically further, and the column of every layer of working platform is all provided with scroll wheel.From above scheme, when upper strata working platform is mounted to lower floor's working platform, scroll wheel can play and guide upper strata working platform along the effect of installing perpendicular to crossbeam direction, further facilitates splicing.
Further scheme is, crossbeam is formed by i iron, and when draw-in groove is stuck on crossbeam, scroll wheel abuts with the lower floor of i iron.From above scheme, utilize scroll wheel to abut with i iron lower floor and can realize working platform edge perpendicular to the location on crossbeam direction, thus the width of draw-in groove can be greater than the width of crossbeam, makes the splicing of working platform flexibly simple and easy further.
Preferably, working platform arranges steel mesh reinforcement, steel mesh reinforcement is welded on crossbeam.As seen from the above, operationally, staff can step down on steel mesh reinforcement and carry out operation, makes construction safer.
Preferably, also comprise side ladder, ladder upper end, side is provided with hook, and hook can hang on the crossbeam of the superiors' working platform.As seen from the above, utilize side ladder staff can climb up the working platform of random layer easily, and side ladder can be installed from boom truck and dismantle easily.
Preferably, along the bearing of trend of crossbeam, the column of upper strata working platform is arranged in the outermost dowel of its lower floor's working platform.As seen from the above, there is when working platform is stitched together dowel to be located thereon the outside of the column of layer working platform, make crossbeam more firm, not yielding to the support of its upper strata working platform.
Preferably, multilayer working platform is three layers or more.As seen from the above, the working platform of more than three layers makes construction operation convenient.
Accompanying drawing explanation
Fig. 1 is the structure chart of the embodiment of the present invention;
Fig. 2 is the structure chart of the superiors' working platform in the embodiment of the present invention;
Fig. 3 is the plan view of the superiors' working platform in the embodiment of the present invention, and wherein steel mesh reinforcement is removed;
Fig. 4 is the structure chart of intermediate layer working platform in the embodiment of the present invention;
Fig. 5 is the structure chart of orlop working platform in the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described.
As shown in Figure 1, the present embodiment comprises the three layers of working platform be superimposed, be respectively top layer working platform 1, middle working platform 2 and lower floor's working platform 3, ladder 4 upper ends, side are provided with hook 41, can hang on the crossbeam of top layer working platform 1 by linking up with 41 side ladders 4.
As shown in Figures 2 and 3, top layer working platform 1 comprises the support frame of crossbeam 11, column 12 and dowel 17 composition, wherein two crossbeams 11 are arranged in parallel to each other, article four, the two ends of dowel 17 are fixedly connected with two crossbeams 11 respectively, such as can adopt welding manner, between two dowels 17 of inner side, also be provided with the rib 18 parallel with crossbeam 11 bearing of trend.Steel mesh reinforcement 13 is arranged on above crossbeam 11, and arranges along the length of whole crossbeam 11, preferably welds together with crossbeam 11.Four root posts 12 are arranged on below two crossbeams 11 symmetrically, and for supporting traverse 11, preferably, upper end and the crossbeam 11 of column 12 weld together, or adopt other modes to interfix.The lower end of column 12 is provided with holder 14, holder 14 is provided with draw-in groove 15 and scroll wheel 16.Wherein, the bearing of trend of draw-in groove 15 and the axially all consistent with the bearing of trend of crossbeam 11 of scroll wheel 16.
As shown in Figure 4, middle working platform 2 comprises the support frame of crossbeam 21, column 22 and dowel 27 composition, wherein two crossbeams 21 are arranged in parallel to each other, article four, the two ends of dowel 27 are fixedly connected with two crossbeams 21 respectively, between two dowels 27 of inner side, be also provided with the rib 28 parallel with crossbeam 21 bearing of trend.Steel mesh reinforcement 23 only can be arranged on the both end sides above crossbeam 21, and without the need to arranging steel mesh reinforcement 23 on the mid portion of crossbeam 21, preferably, the inner side of steel mesh reinforcement 23 is fixed together with two dowels 27 in outside, to fix steel mesh reinforcement 23 further respectively.Four root posts 22 are arranged on below two crossbeams 21 symmetrically, and for supporting traverse 21, upper end and the crossbeam 21 of column 22 are fixed together.The lower end of column 22 is provided with holder 24, holder 24 is provided with draw-in groove 25 and scroll wheel 26.Wherein, the bearing of trend of draw-in groove 25 and the axially all consistent with the bearing of trend of crossbeam 21 of scroll wheel 26.Four trapezoidal protrusion 29 are set above two crossbeams 21, wherein the inclined plane of trapezoidal protrusion 29 mutually in the face of and all towards the inner side of crossbeam 21.
As shown in Figure 5, lower floor's working platform 3 comprises the support frame of crossbeam 31, column 32 and dowel 37 composition, wherein two crossbeams 31 are arranged in parallel to each other, article four, the two ends of dowel 37 are fixedly connected with two crossbeams 31 respectively, between two dowels 37 of inner side, be also provided with the rib 38 parallel with crossbeam 31 bearing of trend.Steel mesh reinforcement 33 only can be arranged on the both end sides above crossbeam 31, and without the need to arranging steel mesh reinforcement 33 on the mid portion of crossbeam 31, preferably, the inner side of steel mesh reinforcement 33 is fixed together with two dowels 37 in outside, to fix steel mesh reinforcement 33 further respectively.Four root posts 32 are arranged on below two crossbeams 31 symmetrically, and for supporting traverse 31, upper end and the crossbeam 31 of column 32 are fixed together.The lower end of column 32 is provided with holder 34, holder 34 is provided with draw-in groove 35 and scroll wheel 36.Wherein, the bearing of trend of draw-in groove 35 and the axially all consistent with the bearing of trend of crossbeam 31 of scroll wheel 36.Four trapezoidal protrusion 39 are set above two crossbeams 31, wherein the inclined plane of trapezoidal protrusion 39 mutually in the face of and all towards the inner side of crossbeam 31.
In the present embodiment, what crossbeam, column and dowel all adopted is i iron, is understandable that, it also can adopt the section bar of other structures, as channel-section steel, angle steel etc., or the form adopting two profiles material mutually to splice.
When three layers of working platform splicing, first middle working platform 2 can be superimposed upon on lower floor's working platform 3, and then upper strata working platform 1 is arranged on middle working platform 2.When splicing, middle working platform 2 is first made to be promoted to above lower floor's working platform 3, its draw-in groove 25 aims at crossbeam 31 substantially, and column 22 is positioned at the inner side of trapezoidal protrusion 39, then middle working platform 2 is put down, under the Action of Gravity Field of middle working platform 2 self, column 22 is by the inclined plane of trapezoidal protrusion 39 and the guiding of scroll wheel 26, automatically can correct and coordinate deviation between the crossbeam 31 of lower floor working platform 3, and make column 22 be positioned at terraced projection 39, draw-in groove 25 and crossbeam 31 clamping, scroll wheel 26 abuts with the lower floor of the i iron forming crossbeam 31, the middle working platform 2 of realization interfixes with lower floor's working platform 1.
And then promote above top layer working platform 1 to middle working platform 2, its draw-in groove 15 aims at crossbeam 21 substantially, and column 12 is positioned at the inner side of trapezoidal protrusion 29, then top layer working platform 1 is put down, under the Action of Gravity Field of himself, column 12 is by the inclined plane of trapezoidal protrusion 29 and the guiding of scroll wheel 16, automatically can correct and coordinate deviation between the crossbeam 21 of middle working platform 2, and make column 12 be positioned at trapezoidal protrusion 29, draw-in groove 15 and crossbeam 21 clamping, scroll wheel 16 abuts with the lower floor of the i iron forming crossbeam 21, thus realize interfixing of top layer working platform 1 and middle working platform 2, and then realize interfixing of whole boom truck.
The dismounting of the present embodiment is also quite convenient, first promote top layer working platform 1 and it is pulled down from middle working platform 2, and then in the middle of promoting, working platform 2 is pulled down it from lower floor's working platform 3.
When utilizing the present embodiment to carry out work, the boom truck after installing can be promoted in tunnel, and the scroll wheel 36 of lower floor's working platform 3 is moved along direction, tunnel, the bearing of trend of crossbeam is perpendicular to direction, tunnel, during to the position that needs are renovated, staff can climb up boom truck from side ladder 4, and selects suitable working platform according to the particular location of disease.Then subsequent work position can be pushed to.Having enough spaces between two columns 32 of lower floor's working platform 3 can allow Construction traffic pass through, thus can improve operating efficiency.
In other embodiments, the replacements such as the steel bar that steel mesh reinforcement can weld or adopt other modes and crossbeam to fix with two ends or steel plate, the position limiting structure of restriction draw-in groove position also can be other structures such as stopper slot, every layer of working platform can adopt the crossbeam of more than two, the column of three or more can be set under every root crossbeam, between crossbeam and column, oblique pull fixed support structure etc. can be provided with.
Claims (10)
1. multi-platform railway tunnel Mobile workbench, comprises at least two-layer working platform, and every layer of working platform all has support frame, and described support frame comprises;
Two crossbeams arranged in parallel to each other;
Article at least two, dowel, be arranged between described crossbeam and two ends all with described crossbeam gun iron link;
Column, supports described crossbeam, and is provided with at least two root posts below every root crossbeam;
It is characterized in that:
Described column lower end is provided with draw-in groove, and described draw-in groove can be connected on the crossbeam of its lower floor's working platform;
The crossbeam of described lower floor working platform is provided with position limiting structure, limits the bearing of trend movement on described crossbeam of described draw-in groove along described crossbeam.
2. multi-platform railway tunnel Mobile workbench according to claim 1, is characterized in that:
Described position limiting structure is trapezoidal protrusion, and described trapezoidal protrusion is arranged on the outside of described outermost column, and the inclined plane of described trapezoidal protrusion is in the face of described column.
3. multi-platform railway tunnel Mobile workbench according to claim 1, is characterized in that:
Along the bearing of trend of described crossbeam, the column of described upper strata working platform is between outermost two columns of its lower floor's working platform.
4. multi-platform railway tunnel Mobile workbench according to claim 3, is characterized in that:
On the column of described orlop working platform, the bottom of the two side of described draw-in groove is all provided with scroll wheel, described scroll wheel be axially parallel to described bearing of trend.
5. multi-platform railway tunnel Mobile workbench according to claim 4, is characterized in that:
The column of every layer of working platform is all provided with described scroll wheel.
6. multi-platform railway tunnel Mobile workbench according to claim 5, is characterized in that:
Described crossbeam is formed by i iron, and when described draw-in groove is stuck on described crossbeam, described scroll wheel abuts with the lower floor of described i iron.
7. the multi-platform railway tunnel Mobile workbench according to any one of claim 1 to 6, is characterized in that:
Described working platform arranges steel mesh reinforcement, and described steel mesh reinforcement is welded on described crossbeam.
8. the multi-platform railway tunnel Mobile workbench according to any one of claim 1 to 6, is characterized in that:
Side ladder, ladder upper end, described side is provided with hook, and described hook can hang on the crossbeam of the superiors' working platform.
9. the multi-platform railway tunnel Mobile workbench according to any one of claim 1 to 6, is characterized in that:
Along the bearing of trend of described crossbeam, the column of upper strata working platform is arranged in the outermost dowel of its lower floor's working platform.
10. the multi-platform railway tunnel Mobile workbench according to any one of claim 1 to 6, is characterized in that:
Described multilayer working platform is three layers or more.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510091771.0A CN104653194B (en) | 2015-02-28 | 2015-02-28 | Multi-platform railway tunnel operation trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510091771.0A CN104653194B (en) | 2015-02-28 | 2015-02-28 | Multi-platform railway tunnel operation trolley |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104653194A true CN104653194A (en) | 2015-05-27 |
CN104653194B CN104653194B (en) | 2017-05-17 |
Family
ID=53244765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510091771.0A Expired - Fee Related CN104653194B (en) | 2015-02-28 | 2015-02-28 | Multi-platform railway tunnel operation trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104653194B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106703827A (en) * | 2016-12-09 | 2017-05-24 | 云南省建筑科学研究院 | Simple auxiliary vehicle for tunnel quality detection |
CN107152289A (en) * | 2017-07-25 | 2017-09-12 | 重庆交通大学 | The vcehicular tunnel maintenance and reinforcement platform and device of low influence traffic |
CN107191195A (en) * | 2017-07-25 | 2017-09-22 | 重庆交通大学 | The vcehicular tunnel maintenance and reinforcement platform and device of uninterrupted traffic |
CN113389568A (en) * | 2021-07-02 | 2021-09-14 | 长治市山隧工程机械有限公司 | Tunneling trolley |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20313946U1 (en) * | 2003-09-05 | 2003-11-06 | DBT GmbH, 44534 Lünen | Support device for conveyor used in mining, has support boxes connected via keyed joints in between articulated support and base plate |
CN201447861U (en) * | 2009-08-12 | 2010-05-05 | 中铁一局集团有限公司 | Highway tunnel detachable aerial work platform wagon |
CN202039858U (en) * | 2011-04-11 | 2011-11-16 | 中铁隧道集团四处有限公司 | Automatically-folded multifunctional tunnel construction scaffolding |
CN102322853A (en) * | 2011-08-29 | 2012-01-18 | 中南大学 | Tunnel back break control laser lofting device |
CN202381102U (en) * | 2011-12-29 | 2012-08-15 | 中国葛洲坝集团股份有限公司 | Simple drill and blast construction trolley |
CN202441387U (en) * | 2012-02-06 | 2012-09-19 | 中铁十六局集团有限公司 | Multifunctional tunnel working rack |
CN202707071U (en) * | 2012-07-03 | 2013-01-30 | 葛洲坝集团基础工程有限公司 | Unfolded type tunnel construction lining trolley |
CN103670435A (en) * | 2013-12-24 | 2014-03-26 | 中铁西南科学研究院有限公司 | Existing line railway tunnel defect comprehensive improvement operation trolley |
CN103835727A (en) * | 2014-03-31 | 2014-06-04 | 中铁西南科学研究院有限公司 | Extended type multi-platform railway tunnel operation trolley |
CN204532360U (en) * | 2015-02-28 | 2015-08-05 | 中铁十九局集团第七工程有限公司 | Multi-platform railway tunnel Mobile workbench |
-
2015
- 2015-02-28 CN CN201510091771.0A patent/CN104653194B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20313946U1 (en) * | 2003-09-05 | 2003-11-06 | DBT GmbH, 44534 Lünen | Support device for conveyor used in mining, has support boxes connected via keyed joints in between articulated support and base plate |
CN201447861U (en) * | 2009-08-12 | 2010-05-05 | 中铁一局集团有限公司 | Highway tunnel detachable aerial work platform wagon |
CN202039858U (en) * | 2011-04-11 | 2011-11-16 | 中铁隧道集团四处有限公司 | Automatically-folded multifunctional tunnel construction scaffolding |
CN102322853A (en) * | 2011-08-29 | 2012-01-18 | 中南大学 | Tunnel back break control laser lofting device |
CN202381102U (en) * | 2011-12-29 | 2012-08-15 | 中国葛洲坝集团股份有限公司 | Simple drill and blast construction trolley |
CN202441387U (en) * | 2012-02-06 | 2012-09-19 | 中铁十六局集团有限公司 | Multifunctional tunnel working rack |
CN202707071U (en) * | 2012-07-03 | 2013-01-30 | 葛洲坝集团基础工程有限公司 | Unfolded type tunnel construction lining trolley |
CN103670435A (en) * | 2013-12-24 | 2014-03-26 | 中铁西南科学研究院有限公司 | Existing line railway tunnel defect comprehensive improvement operation trolley |
CN103835727A (en) * | 2014-03-31 | 2014-06-04 | 中铁西南科学研究院有限公司 | Extended type multi-platform railway tunnel operation trolley |
CN204532360U (en) * | 2015-02-28 | 2015-08-05 | 中铁十九局集团第七工程有限公司 | Multi-platform railway tunnel Mobile workbench |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106703827A (en) * | 2016-12-09 | 2017-05-24 | 云南省建筑科学研究院 | Simple auxiliary vehicle for tunnel quality detection |
CN107152289A (en) * | 2017-07-25 | 2017-09-12 | 重庆交通大学 | The vcehicular tunnel maintenance and reinforcement platform and device of low influence traffic |
CN107191195A (en) * | 2017-07-25 | 2017-09-22 | 重庆交通大学 | The vcehicular tunnel maintenance and reinforcement platform and device of uninterrupted traffic |
CN113389568A (en) * | 2021-07-02 | 2021-09-14 | 长治市山隧工程机械有限公司 | Tunneling trolley |
CN113389568B (en) * | 2021-07-02 | 2024-06-11 | 长治市山隧工程机械有限公司 | Tunneling trolley |
Also Published As
Publication number | Publication date |
---|---|
CN104653194B (en) | 2017-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105736016A (en) | Tunnel secondary lining steel bar framework construction equipment and application thereof | |
CN104653194A (en) | Multi-platform railway tunnel operation trolley | |
JP5823552B2 (en) | Method and apparatus for erection of bridge deck | |
JP4226488B2 (en) | Mobile suspension scaffolding for repairing bridges, elevated roads, etc. | |
CN104088449A (en) | Safe and fast double-track construction platform of super high-rise curtain wall | |
JP6247496B2 (en) | Steel structure construction method | |
CN204532360U (en) | Multi-platform railway tunnel Mobile workbench | |
CN202227590U (en) | Column rib locator for reinforced concrete column | |
CN112573426A (en) | Partition plate hoisting device for building fabricated building | |
CN205578009U (en) | Two lined steel bones RACK in tunnel equipment of being under construction | |
CN110681803A (en) | Wall body steel reinforcement cage establishment bed-jig | |
JP5484983B2 (en) | Method for assembling and dismantling bridge moving work device | |
JP2008050811A (en) | Movable suspended scaffolding apparatus | |
CN205558915U (en) | Portable operation device | |
CN107587885A (en) | Two lining trolley structures and assembling method in a kind of standard cross-section of tunnel | |
JP7306627B2 (en) | Carriage with rail feeder | |
CN104060813B (en) | The constructing device of large-span steel girder framework connection mode platform and constructional method | |
JP5777949B2 (en) | Synthetic floor slab erection machine and erection method | |
KR101770230B1 (en) | Form traveller | |
CN205714232U (en) | A kind of functional steel chassis of mobile liftable | |
CN104675094A (en) | Detachable type movable scaffold platform | |
JP7306628B2 (en) | Carriage with rail feeder | |
JP2019007137A (en) | Erection machine and moving method of erection machine | |
CN103556835B (en) | Floor slab trolley | |
CN202689494U (en) | Elevator shaft template support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 Termination date: 20200228 |