CN104538905A - Cable bridge - Google Patents

Cable bridge Download PDF

Info

Publication number
CN104538905A
CN104538905A CN201410661700.5A CN201410661700A CN104538905A CN 104538905 A CN104538905 A CN 104538905A CN 201410661700 A CN201410661700 A CN 201410661700A CN 104538905 A CN104538905 A CN 104538905A
Authority
CN
China
Prior art keywords
crane span
span structure
bridge
fixed projection
testing bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410661700.5A
Other languages
Chinese (zh)
Other versions
CN104538905B (en
Inventor
雍志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou three people Industrial Co., Ltd.
Original Assignee
Chengdu Huaruixiang Electrical Appliance Complete Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Huaruixiang Electrical Appliance Complete Equipment Co Ltd filed Critical Chengdu Huaruixiang Electrical Appliance Complete Equipment Co Ltd
Priority to CN201410661700.5A priority Critical patent/CN104538905B/en
Publication of CN104538905A publication Critical patent/CN104538905A/en
Application granted granted Critical
Publication of CN104538905B publication Critical patent/CN104538905B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a cable bridge, which comprises a right bridge and a left bridge connected with the right bridge, wherein an upper fixing plate and a lower fixing plate are arranged in a cavity formed by the left bridge and the right bridge and are connected through a splitter plate, and the splitter plate is provided with hollow hanging rods; a right cross-shaped deadman anchor and right air ports are arranged in the right bridge, wherein the right cross-shaped deadman anchor is used for performing a supporting function, the right air ports perform a ventilation function, the inner end surface of the right bridge is provided with right hooks, the top of the right bridge is provided with a right upper fixing bulge, and the bottom of the right bridge is provided with a right lower fixing bulge; and a left cross-shaped deadman anchor and left air ports are arranged in the right bridge, wherein the left cross-shaped deadman anchor is used for performing the supporting function, the left air ports perform the ventilation function, the inner end surface of the left bridge is provided with left hooks, the top of the left bridge is provided with a left upper fixing bulge, and the bottom of the left bridge is provided with a left lower fixing bulge. The cable bridge can favorably solve a problem of unstable structure of the traditional cable bridge.

Description

A kind of cable testing bridge
Technical field
The present invention relates to field of cable technology, be specifically related to a kind of cable testing bridge.
Background technology
Cable testing bridge is divided into slot type, pellet type and the structure such as ladder-type, grid type, is made up of support, trailing arm and installation accessories etc.In building, crane span structure can independently set up, also can be attached on various building and piping lane support, structure should be embodied simple, handsome in appearance, flexible configuration and the feature such as easy to maintenance, whole part all needs to carry out zinc-plated process, be arranged on the outer outdoor crane span structure of building, there is structural unstable problem in existing cable testing bridge, so need a kind of cable testing bridge badly to solve the problem.
Summary of the invention
The object of the invention is to for the deficiencies in the prior art, provide a kind of cable testing bridge, this cable testing bridge can solve existing cable testing bridge well and there is structural unstable problem.
For reaching above-mentioned requirements, the technical scheme that the present invention takes is: provide a kind of cable testing bridge, the left crane span structure that this cable testing bridge comprises right crane span structure and is connected with right crane span structure; Be provided with upper mounted plate and bottom plate in cavity between right crane span structure and left crane span structure, upper mounted plate is connected by demarcation strip with bottom plate, demarcation strip is provided with hollow peg; Right crane span structure inside is provided with for passive right cross spud pile and the right blow vent playing permeation functions, and the inner face of right crane span structure is provided with right hook, and the top of right crane span structure is provided with upper right fixed projection, and the bottom of right crane span structure is provided with bottom right fixed projection; Left crane span structure inside is provided with for passive left cross spud pile and the left blow vent playing permeation functions, and the inner face of left crane span structure is provided with left hook, and the top of left crane span structure is provided with upper left fixed projection, and the bottom of left crane span structure is provided with lower-left fixed projection.
The advantage that this cable testing bridge has is as follows:
(1) existing cable testing bridge can be solved well there is structural unstable problem by arranging right cross spud pile and left cross spud pile;
(2) extruding that also can prevent between cable to the suspension effect that is separated of cable can not only be played by arranging right hook and left hook;
(3) not only can reinforce cable testing bridge internal structure further while not blocking the circulation of this cable testing bridge inner air by arranging demarcation strip and hollow peg, and the effect of cable suspension can be played;
(4) achieving the detachable structure of this cable testing bridge by arranging right crane span structure and left crane span structure, facilitating and inspection and maintenance is carried out to its inside;
(5) by arranging upper hold-down nut and lower hold-down nut can be reinforced right crane span structure and left crane span structure.
Accompanying drawing explanation
Fig. 1 schematically shows the structural representation of the cable testing bridge according to the application's embodiment.
Wherein: 1, upper left fixed projection; 2, upper right fixed projection; 3, upper hold-down nut; 4, right crane span structure; 5, right cross spud pile; 6, right blow vent; 7, right hook; 8, bottom plate; 9, lower hold-down nut; 10, bottom right fixed projection; 11, lower-left fixed projection; 12, left hook; 13, upper mounted plate; 14, left blow vent; 15, left cross spud pile; 16, left crane span structure; 17, demarcation strip; 18, hollow peg.
Embodiment
For making the object of the application, technical scheme and advantage clearly, below in conjunction with drawings and the specific embodiments, the application is described in further detail.
In the following description, quoting of " embodiment ", " embodiment ", " example ", " example " etc. is shown that the embodiment of so description or example can comprise special characteristic, structure, characteristic, character, element or limit, but not each embodiment or example must comprise special characteristic, structure, characteristic, character, element or limit.In addition, reuse phrase " embodiment according to the application " although be likely refer to identical embodiment, and not necessarily refers to identical embodiment.
For the sake of simplicity, eliminate in below describing and well known to a person skilled in the art some technical characteristic.
According to an embodiment of the application, provide a kind of cable testing bridge, as shown in Figure 1, the left crane span structure 16 comprising right crane span structure 4 and be connected with right crane span structure 4; Be provided with upper mounted plate 13 and bottom plate 8 in cavity between right crane span structure 4 and left crane span structure 16, upper mounted plate 13 is connected by demarcation strip 17 with bottom plate 8, demarcation strip 17 is provided with hollow peg 18; Right crane span structure 4 inside is provided with for passive right cross spud pile 5 and the right blow vent 6 playing permeation functions, the inner face of right crane span structure 4 is provided with right hook 7, the top of right crane span structure 4 is provided with upper right fixed projection 2, and the bottom of right crane span structure 4 is provided with bottom right fixed projection 10; Left crane span structure 16 inside is provided with for passive left cross spud pile 15 and the left blow vent 14 playing permeation functions, the inner face of left crane span structure 16 is provided with left hook 12, the top of left crane span structure 16 is provided with upper left fixed projection 1, and the bottom of left crane span structure 16 is provided with lower-left fixed projection 11.
According to an embodiment of the application, the lower-left fixed projection 11 of this cable testing bridge and bottom right fixed projection 10 are fixed by lower hold-down nut 9, and upper left fixed projection 1 and upper right fixed projection 2 are fixed by upper hold-down nut 3.
This cable testing bridge can solve existing cable testing bridge well there is structural unstable problem by arranging right cross spud pile 5 and left cross spud pile 15 in use; The extruding that also can prevent between cable to the suspension effect that is separated of cable not only can be played by arranging right hook 7 and left hook 12; Not only can reinforce cable testing bridge internal structure further while not blocking the circulation of this cable testing bridge inner air by arranging demarcation strip 17 and hollow peg 18, and the effect of cable suspension can be played; Achieving the detachable structure of this cable testing bridge by arranging right crane span structure 4 and left crane span structure 16, facilitating and inspection and maintenance is carried out to its inside; By arranging upper hold-down nut 3 and lower hold-down nut 9 can be reinforced right crane span structure 4 and left crane span structure 16.
The above embodiment only represents several execution mode of the present invention, and it describes comparatively concrete and detailed, but can not be interpreted as limitation of the scope of the invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to scope.Therefore protection scope of the present invention should be as the criterion with described claim.

Claims (2)

1. a cable testing bridge, is characterized in that: the left crane span structure comprising right crane span structure and be connected with described right crane span structure; Be provided with upper mounted plate and bottom plate in cavity between described right crane span structure and left crane span structure, fixed plate is connected by demarcation strip with bottom plate, described demarcation strip is provided with hollow peg; Described right crane span structure inside is provided with for passive right cross spud pile and the right blow vent playing permeation functions, the inner face of described right crane span structure is provided with right hook, the top of described right crane span structure is provided with upper right fixed projection, and the bottom of described right crane span structure is provided with bottom right fixed projection; Described left crane span structure inside is provided with for passive left cross spud pile and the left blow vent playing permeation functions, the inner face of described left crane span structure is provided with left hook, the top of described left crane span structure is provided with upper left fixed projection, and the bottom of described left crane span structure is provided with lower-left fixed projection.
2. cable testing bridge according to claim 1, is characterized in that: described lower-left fixed projection and described bottom right fixed projection are fixed by lower hold-down nut, and described upper left fixed projection and upper right fixed projection are fixed by upper hold-down nut.
CN201410661700.5A 2014-11-19 2014-11-19 A kind of cable testing bridge Active CN104538905B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410661700.5A CN104538905B (en) 2014-11-19 2014-11-19 A kind of cable testing bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410661700.5A CN104538905B (en) 2014-11-19 2014-11-19 A kind of cable testing bridge

Publications (2)

Publication Number Publication Date
CN104538905A true CN104538905A (en) 2015-04-22
CN104538905B CN104538905B (en) 2017-08-25

Family

ID=52854397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410661700.5A Active CN104538905B (en) 2014-11-19 2014-11-19 A kind of cable testing bridge

Country Status (1)

Country Link
CN (1) CN104538905B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111463728A (en) * 2020-05-08 2020-07-28 俞国峰 Cable fixing bridge frame for electric power laying

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1214938A (en) * 1967-06-10 1970-12-09 Manfred Dahl Installation channel including a separating wall
JPH06303712A (en) * 1993-03-30 1994-10-28 Toshiba Eng Co Ltd Wiring duct
GB2373104A (en) * 2001-02-28 2002-09-11 Aggregate Ind Uk Ltd Cable duct with separate compartments
CN202790943U (en) * 2012-09-27 2013-03-13 浙江全通电缆有限公司 Profiles used for cable bridge frames
CN203589622U (en) * 2013-12-10 2014-05-07 福建省马尾造船股份有限公司 Cable crane span structure
CN103887753A (en) * 2014-04-10 2014-06-25 江苏神马电力股份有限公司 Composite material cable trench

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1214938A (en) * 1967-06-10 1970-12-09 Manfred Dahl Installation channel including a separating wall
JPH06303712A (en) * 1993-03-30 1994-10-28 Toshiba Eng Co Ltd Wiring duct
GB2373104A (en) * 2001-02-28 2002-09-11 Aggregate Ind Uk Ltd Cable duct with separate compartments
CN202790943U (en) * 2012-09-27 2013-03-13 浙江全通电缆有限公司 Profiles used for cable bridge frames
CN203589622U (en) * 2013-12-10 2014-05-07 福建省马尾造船股份有限公司 Cable crane span structure
CN103887753A (en) * 2014-04-10 2014-06-25 江苏神马电力股份有限公司 Composite material cable trench

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111463728A (en) * 2020-05-08 2020-07-28 俞国峰 Cable fixing bridge frame for electric power laying

Also Published As

Publication number Publication date
CN104538905B (en) 2017-08-25

Similar Documents

Publication Publication Date Title
CN202813997U (en) Leech drying rack
CN204059953U (en) Hang mould prefab form
CN204212408U (en) A kind of hole to be provided filling-up hole template
CN104538905A (en) Cable bridge
CN104319707A (en) Reinforced cable bridge
CN202913697U (en) Core model of reserved hole
CN204059718U (en) Openable metal sheet furred ceiling
CN204781931U (en) Early support system that tears open of plastic formwork
CN203669341U (en) Combined angle steel mold for concrete pouring faces with different elevations
CN203977862U (en) A kind of concrete cylindrical construction fastening devices
CN208328727U (en) The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device
CN203890893U (en) Supporting bracket for integral lifting of hollow slab girder
CN204282622U (en) A kind of stone beehive board installs node
CN206842015U (en) A kind of high efficiency turns sequence box
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs
CN205875410U (en) A hang module system all for tube structure room panel construction
CN204369396U (en) Steel plate strip hanging apparatus
CN204510015U (en) High span Steel Truss Beam takes assembling structure
CN204416899U (en) Steel bow bridge mainboard Lift-on/Lift-off System
CN203296232U (en) Aluminum ceiling lappet
CN208932782U (en) A kind of superimposed sheet hanging apparatus
CN204875520U (en) Abnormal shape high stand construction with system with and rebar positioning system thereof
CN205894407U (en) Suspension type curtain board
CN204510768U (en) A kind of without support operation frame
CN203742165U (en) Fabricated structure cast-in-place staircase shaping formwork

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170710

Address after: 518000 Guangdong Province, Shenzhen New District of Longhua City, Dalang street, Longsheng Gold Dragon Road community e-commerce incubator exhibition Tao Commercial Plaza E block 706

Applicant after: Shenzhen step Technology Transfer Center Co., Ltd.

Address before: Pixian 611733 Sichuan province Chengdu city TangChang Town North

Applicant before: CHENGDU HUARUIXIANG ELECTRICAL APPLIANCE COMPLETE EQUIPMENT CO., LTD.

TA01 Transfer of patent application right
CB03 Change of inventor or designer information

Inventor after: Wu Sanmin

Inventor before: Yong Zhihua

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170728

Address after: 516000, No. 45 South Bank Road, South Bank of Huicheng District, Huizhou, Guangdong

Applicant after: Huizhou three people Industrial Co., Ltd.

Address before: 518000 Guangdong Province, Shenzhen New District of Longhua City, Dalang street, Longsheng Gold Dragon Road community e-commerce incubator exhibition Tao Commercial Plaza E block 706

Applicant before: Shenzhen step Technology Transfer Center Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant