CN208328727U - The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device - Google Patents

The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device Download PDF

Info

Publication number
CN208328727U
CN208328727U CN201820818392.6U CN201820818392U CN208328727U CN 208328727 U CN208328727 U CN 208328727U CN 201820818392 U CN201820818392 U CN 201820818392U CN 208328727 U CN208328727 U CN 208328727U
Authority
CN
China
Prior art keywords
bridge
hoisting
arch bridge
bowstring arch
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820818392.6U
Other languages
Chinese (zh)
Inventor
岳忠文
杨长虹
黄翔
殷力立
赵宝成
刘广保
宋春晖
张岩
陈世云
公绪向
李超
李坚
王学敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HUAI'AN WATERWAY ADMINISTRATION
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
JIANGSU HUAI'AN WATERWAY ADMINISTRATION
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HUAI'AN WATERWAY ADMINISTRATION, CCCC SHEC Fourth Engineering Co Ltd filed Critical JIANGSU HUAI'AN WATERWAY ADMINISTRATION
Priority to CN201820818392.6U priority Critical patent/CN208328727U/en
Application granted granted Critical
Publication of CN208328727U publication Critical patent/CN208328727U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of shellfish thunders removed for bowstring arch bridge counter to hang combination boom device, belong to field of bridge construction, if the anti-combination boom device that hangs of shellfish thunder includes newly building bridge and the anti-device for hoisting of dried scallop thunder, newly building bridge is arranged side by side by old bowstring arch bridge to be removed, if the anti-device for hoisting of dried scallop thunder connects two bridges with old bowstring arch bridge to be removed across newly building bridge, each anti-device for hoisting of shellfish thunder is arranged along vertical bridge to parallel interval, each anti-device for hoisting of shellfish thunder includes a Bailey beam, and three groups of anti-device for hoisting in Bailey beam.The utility model can realize arch bridge without support removing when bowstring arch bridge need to remove progress reorganization and expansion construction in situ.

Description

The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device
Technical field
The utility model belongs to field of bridge construction, is applicable in the constructions such as arch bridge dismounting.
Background technique
20th century of China build bridge because operation the age it is longer, occur old unsafe bridge in various degree, some because traffic be saturated, Navigation capacity is promoted, and bridge is unsatisfactory for requirement, and more and more bridges need to be removed in situ carries out reorganization and expansion construction.Bowstring arch bridge Because combining arch bridge and beam bridge advantage, last century is widely adopted.Because bowstring arch bridge is statically indeterminate system, Normal practice, tied arch Bridge first sets up bracket, support tie bar and arch rib when removing in river, and then segmentation carries out arch rib dismounting.
It being continued to develop and is promoted by Navigation in Navigable, most of navigable river, which does not allow to carry out iceound or navigation hole width, to be reduced, Cause part bowstring arch bridge that can not carry out bracket support when removing.
Utility model content
The purpose of this utility model is that: it proposes that a kind of shellfish thunder removed for bowstring arch bridge is counter and hangs combination boom device, energy Enough when bowstring arch bridge need to remove progress reorganization and expansion construction in situ, realize arch bridge without support removing.
The utility model aim is realized by following technical proposals:
A kind of shellfish thunder removed for bowstring arch bridge is counter to hang combination boom device, if including newly building bridge and dried scallop thunder is counter lifts It sets, newly building bridge is arranged side by side by old bowstring arch bridge to be removed, if the anti-device for hoisting of dried scallop thunder is across newly building bridge and to be removed Old bowstring arch bridge connects two bridges, and for each anti-device for hoisting of shellfish thunder along bridge is indulged to parallel interval setting, each anti-device for hoisting of shellfish thunder includes one Bailey beam, and three groups of anti-device for hoisting in Bailey beam, three groups of anti-device for hoisting are respectively to connect Bailey beam and newly building bridge Outside binder one group of anti-device for hoisting, connect Bailey beam and old two binder of bowstring arch bridge to be removed two groups of anti-device for hoisting, respectively Anti- device for hoisting includes finish rolling screw thread sunpender, upper supporting beam and lower supporting beam, and upper supporting beam is set to Bailey beam top surface, lower supporting beam Set on binder bottom surface, finish rolling screw thread sunpender connects upper supporting beam and lower supporting beam.
Alternatively, be additionally provided with midfoot support beam between Bailey beam and two binders of newly building bridge, Bailey beam with it is to be removed There are gaps between old two binder of bowstring arch bridge.
The aforementioned main scheme of the utility model and its each further selection scheme can be freely combined to form multiple schemes, It can be used for the utility model and claimed scheme;And the utility model, (each non conflicting selection) selection between and and It can also be freely combined between other selections.Those skilled in the art after understanding the utility model according to the prior art and Common knowledge can be illustrated there are many combination, be the claimed technical solution of the utility model, do not do exhaustion herein.
The course of work are as follows: the shellfish thunder removed for bowstring arch bridge of the utility model is counter to hang combination boom device, and the device is suitable It should construct in reorganization and expansion, newly building bridge can be relied on to carry out removal of old bridge by the device.When arch bridge segmentation is removed, binder and arch rib Can not be individually from the device surely, can be set up on newly building bridge, which supports arch bridge binder, and then first arch is removed in segmentation Rib, then binder is removed, realize arch bridge without support removing.
When old bridge concrete arch arch rib is removed, the self weight of arch bridge binder part is transferred to beam end support by self structure, remaining Upper support that weight transmitting is to utility model device, route are as follows: is self-possessed binder part → lower supporting beam → finish rolling screw thread sunpender → Beam → Bailey beam → newly building bridge realizes old bridge without support removing.
The utility model has the beneficial effects that the Support Method dismounting technique that the device is more traditional, is carried out old using newly building bridge Bridge supports when removing, and effectively prevents setting up bracket within the scope of navigable, and avoiding, which influences navigation channel, normally opens the navigation or air flight, save the cost, It is convenient to improve construction efficiency, constructing operation.
Detailed description of the invention
Fig. 1 is the facade arragement construction schematic diagram of the utility model embodiment;
Fig. 2 is the side arrangement structural schematic diagram of the utility model embodiment;
Fig. 3 is the anti-device for hoisting of shellfish thunder of the utility model embodiment and the front arrangement knot that old bowstring arch bridge to be removed is connect Structure schematic diagram;
Fig. 4 is the side arrangement knot that the anti-device for hoisting of shellfish thunder of the utility model embodiment is connect with old bowstring arch bridge to be removed Structure schematic diagram;
1 it is wherein newly building bridge, 2 be the anti-device for hoisting of shellfish thunder, 3 be old bowstring arch bridge to be removed, 4 be Bailey beam, 5 is counter hang Device, 6 be binder, 7 be finish rolling screw thread sunpender, 8 be upper supporting beam, 9 be lower supporting beam, 10 be midfoot support beam, 11 be arch rib, 12 be sunpender.
Specific embodiment
Following non-limiting examples are for illustrating the utility model.
With reference to shown in Fig. 1-4, a kind of shellfish thunder removed for bowstring arch bridge is counter to hang combination boom device, including newly building bridge 1 If newly building bridge 1 is arranged side by side by old bowstring arch bridge 3 to be removed with dried scallop thunder anti-device for hoisting 2, if the anti-device for hoisting 2 of dried scallop thunder Two bridges are connected across newly building bridge 1 and old bowstring arch bridge 3 to be removed, each anti-device for hoisting 2 of shellfish thunder is arranged along vertical bridge to parallel interval, Each anti-device for hoisting 2 of shellfish thunder includes a Bailey beam 4, and three groups of anti-device for hoisting 5 in Bailey beam 4, three groups of anti-device for hoisting 5 Respectively connection Bailey beam 4 and newly building bridge 1 outside binder 6 one group of anti-device for hoisting 5, connection Bailey beam 4 with it is to be removed old The anti-device for hoisting 5 of two groups of 3 liang of binders 6 of bowstring arch bridge, each anti-device for hoisting 5 include finish rolling screw thread sunpender 7, upper supporting beam 8 and under Supporting beam 9, upper supporting beam 8 are set to 4 top surface of Bailey beam, and lower supporting beam 9 is set to 6 bottom surface of binder, props up in the connection of finish rolling screw thread sunpender 7 Support beam 8 and lower supporting beam 9.Be additionally provided with midfoot support beam 10 between Bailey beam 4 and two binders 6 of newly building bridge 1, Bailey beam 4 with There are gaps between 3 liang of binders 6 of old bowstring arch bridge to be removed.
Using the anti-bowstring arch bridge method for dismounting for hanging combination boom device of the shellfish thunder for being previously described for bowstring arch bridge dismounting, step Include:
1) newly building bridge 1 is built side by side by old bowstring arch bridge 3 to be removed;
If 2) set up the anti-device for hoisting connection newly building bridge 1 of dried scallop thunder and old bowstring arch bridge 3 to be removed on newly building bridge 1;
3) old bowstring arch bridge 3 to be removed is removed, first arch rib 11 is removed in segmentation, then removes binder 6.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (2)

1. a kind of shellfish thunder removed for bowstring arch bridge counter hangs combination boom device, it is characterised in that: including newly building bridge and several The anti-device for hoisting of shellfish thunder, newly building bridge are arranged side by side by old bowstring arch bridge to be removed, if the anti-device for hoisting of dried scallop thunder is across new bridge construction Beam connects two bridges with old bowstring arch bridge to be removed, and along bridge is indulged to parallel interval setting, each shellfish thunder is counter to be lifted each anti-device for hoisting of shellfish thunder Setting includes a Bailey beam, and three groups of anti-device for hoisting in Bailey beam, and three groups of anti-device for hoisting are respectively to connect Bailey beam With one group of anti-device for hoisting of the outside binder of newly building bridge, two groups for connecting Bailey beam with old two binder of bowstring arch bridge to be removed are anti- Device for hoisting, each anti-device for hoisting include finish rolling screw thread sunpender, upper supporting beam and lower supporting beam, and upper supporting beam is set to Bailey beam top Face, lower supporting beam are set to binder bottom surface, and finish rolling screw thread sunpender connects upper supporting beam and lower supporting beam.
2. the shellfish thunder for being used for bowstring arch bridge dismounting as described in claim 1 is counter to hang combination boom device, it is characterised in that: Bailey beam Midfoot support beam is additionally provided between two binders of newly building bridge, between Bailey beam and two binder of old bowstring arch bridge to be removed there are Gap.
CN201820818392.6U 2018-05-28 2018-05-28 The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device Expired - Fee Related CN208328727U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820818392.6U CN208328727U (en) 2018-05-28 2018-05-28 The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820818392.6U CN208328727U (en) 2018-05-28 2018-05-28 The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device

Publications (1)

Publication Number Publication Date
CN208328727U true CN208328727U (en) 2019-01-04

Family

ID=64775966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820818392.6U Expired - Fee Related CN208328727U (en) 2018-05-28 2018-05-28 The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device

Country Status (1)

Country Link
CN (1) CN208328727U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411804A (en) * 2018-05-28 2018-08-17 中交二航局第四工程有限公司 Counter hang of shellfish thunder removed for bowstring arch bridge combines boom device and its method for dismounting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411804A (en) * 2018-05-28 2018-08-17 中交二航局第四工程有限公司 Counter hang of shellfish thunder removed for bowstring arch bridge combines boom device and its method for dismounting
CN108411804B (en) * 2018-05-28 2023-09-29 中交二航局第四工程有限公司 Bailey back-hanging combined beam device for dismantling tied arch bridge and dismantling method thereof

Similar Documents

Publication Publication Date Title
CN103243658B (en) The spelling method of cable stayed bridge dragging suspension basket
CN103043526A (en) Integral hoisting device and method for super-long steel reinforcement cage of underground continuous wall
CN203173681U (en) Device for lifting whole ultra-long reinforcing cage of underground continuous wall
CN205348157U (en) Pedestal is transferred to drilling bored concrete pile steel reinforcement cage
CN208328727U (en) The shellfish thunder removed for bowstring arch bridge counter hangs combination boom device
CN108411804A (en) Counter hang of shellfish thunder removed for bowstring arch bridge combines boom device and its method for dismounting
CN103383104A (en) Hoisting installation method for quickly mounting economizer and super heater
CN208762892U (en) A kind of section spelling symmetrical integral Bridge Erector of bridge construction
CN103147406A (en) Small-curve cross-mountain tunnel box girder transporting and erecting integrated machine and head and tail hole box girder erection method thereof
CN202882376U (en) Elevator shaft template support platform
CN202220435U (en) Formwork decreasing device of top-down underground concrete structure
CN208516221U (en) High-rise building waste vertical transit system
CN208039060U (en) A kind of steel box arch rib bowstring arch bridge binder steel skeleton external wrapping concrete hangs die body system
CN207582325U (en) A kind of continuous traction system of bridge incremental launching construction
CN104746521B (en) The application of oversized cross-section slope cushion layer constructing structure
CN207194010U (en) Track panel shifting-out system in comprehensive pipe rack
CN206971702U (en) A kind of climbing frame with slide-in type protection network
CN104319707B (en) Reinforced cable bridge
CN107938496A (en) A kind of Recumbent tied arch helps and its construction technology
CN204941571U (en) A kind of railway tunnel supporting and protection structure of improvement
CN204212302U (en) A kind of hollowcore slab light pipe float Structure
CN204199509U (en) Thin-walled square chest float Structure
CN207619864U (en) Frame lookum
CN202926348U (en) U-shaped shed fixing device
CN203257080U (en) Adjustable overhang supporting device for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190104