CN104502167B - A kind of mould and method for preparing the artificial core with non-penetrating hole - Google Patents

A kind of mould and method for preparing the artificial core with non-penetrating hole Download PDF

Info

Publication number
CN104502167B
CN104502167B CN201410784940.4A CN201410784940A CN104502167B CN 104502167 B CN104502167 B CN 104502167B CN 201410784940 A CN201410784940 A CN 201410784940A CN 104502167 B CN104502167 B CN 104502167B
Authority
CN
China
Prior art keywords
test specimen
pressure head
rock core
core valve
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410784940.4A
Other languages
Chinese (zh)
Other versions
CN104502167A (en
Inventor
季明
张益东
金志远
郭红军
程亮
李忠
张猛
张明磊
崔满堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410784940.4A priority Critical patent/CN104502167B/en
Publication of CN104502167A publication Critical patent/CN104502167A/en
Application granted granted Critical
Publication of CN104502167B publication Critical patent/CN104502167B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a kind of mould and method for preparing the artificial core with non-penetrating hole, which includes test specimen pressure head, rock core valve, base and clip;Hollow cylindrical cavity is formed after the rock core valve alignment;The clip and rock core valve external adapter;Base holes, the base holes and rock core valve external adapter are provided with the base;The test specimen pressure head is adapted to cylindrical cavity, scale is provided with the test specimen pressure head, test specimen presses the center of first end face to be provided with threaded hole, and the threaded hole is supporting is provided with flat nut and hole post, and one end of the flat nut and hole post is both provided with and the matched screw thread of threaded hole.Material is weighed during preparation twice so that it is determined that single test specimen material requested weight and being pressed into accurate size using the scale on test specimen pressure head so that the density and size for the test specimen prepared are more unified.

Description

A kind of mould and method for preparing the artificial core with non-penetrating hole
Technical field
The present invention relates to the making mould and production method of mould, particularly a kind of cylindrical standard test specimen.
Background technology
The mechanical property parameters of material are that the basic data that must be provided is carried out in PHYSICAL MODELING OF IN work;In addition, It is also required to carry out material properties of rock parameter testing in material development development process.Therefore, standard specimen is quickly and easily made It is particularly important that with test material mechanical property parameters or studying the fracture seepage feature of test specimen.
In terms of manual manufacture standard specimen, there are the deficiency of following three aspects:First, test specimen is compacted using pressue device When, often terminated for a period of time for compacting in a certain numerical value so that pressure is constant, can not ensure that sample dimensions are sought unity of standard;Second: The material of configuration is poured into before grinding tool without secondary weighing is carried out, and can not ensure that the Sample density of making is identical;3rd, it is common artificial It is single that rock core test piece makes functional die, it is impossible to makes (non-penetrating) rock core test piece with holes.
The content of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of technical solution for the multifunctional mold for preparing artificial core.
A kind of multifunctional mold for preparing artificial core, including test specimen pressure head, rock core valve, base and clip;The rock core Hollow cylindrical cavity is formed after valve alignment;The clip and rock core valve external adapter;Base holes, institute are provided with the base State base holes and rock core valve external adapter;The test specimen pressure head is adapted to cylindrical cavity, and scale is provided with the test specimen pressure head, Test specimen presses the center of first end face to be provided with threaded hole, and the threaded hole is supporting is provided with flat nut and hole post, institute The one end for stating flat nut and hole post is both provided with and the matched screw thread of threaded hole.
A kind of method for preparing artificial core, including the following steps that order performs:
If the first step, prepare artificial core standard specimen, flat nut is installed in the threaded hole of test specimen pressure head bottom, And ensure that test specimen pressure head bottom surface is smooth;If preparing artificial core standard specimen with holes, hole post is installed on test specimen pressure head bottom Threaded hole in;
Second step, align rock core valve, fastens rock core valve with clip, then rock core valve is put into the base holes of base In;
The material mixture ratio that 3rd step, basis are set carries out material weighing, and stirs evenly;
The material of single test specimen weight is weighed in 4th step, the material obtained from step 3, by single test specimen weight Material is inserted in hollow cylindrical cavity, and is constantly compacted during inserting with compacting instrument;
5th step, after the material of single test specimen weight is put into hollow cylindrical cavity completely and is compacted, Rock core valve equipped with material is taken out from base and is placed on the platen of pressurization platform, pressue device is provided with above platen, Test specimen pressure head is put into the rock core valve equipped with material so that test specimen pressure head is pressed on the material in cylindrical cavity;
6th step, the pressue device opened on pressurization platform are acted on test specimen pressure head, and the material in rock core valve is filled Partial pressure is real, and observes the scale on test specimen pressure head surface;
7th step, when the graduation mark on test specimen pressure head surface reaches design load, stop pressurization, material is pressed into test specimen;
8th step, remove test specimen pressure head, treats that test specimen consolidation carries out the test specimen demoulding after a certain period of time;
After 9th step, the demoulding, test specimen is placed on shady place and is dried in the shade naturally.
Beneficial effect:
The artificial core standard specimen of the present invention, which makes mould, multiple functions, can making artificial rock core cylindrical standard Test specimen, to carry out uniaxial compressive, uniaxial tension and single shaft shearing resistance experiment, and can be used for the artificial core for making (not penetrating) with holes Cylindrical standard test specimen, to carry out the experiment of the uniaxial compressive of fracture seepage;
The test specimen prepared according to the method for the present invention, due to having carried out second weighing and having been prepared in strict accordance with scale, energy Enough overcome the shortcomings of to make mould and method in the past, ensure that the Sample density of making is identical with size, the production method is easy, easy In operation, there is wide applicability and generalization.
Brief description of the drawings
Fig. 1 is the structure diagram of the artificial core hole cylinder shape standard test specimen mold of the present invention;
Fig. 2 is the structure diagram of the artificial core cylindrical standard test piece mould of the present invention.
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.
As depicted in figs. 1 and 2, a kind of multifunctional mold of artificial core cylindrical standard test specimen, including test specimen pressure head 1, Rock core valve 2, base 3 and clip 4;
The rock core valve 2 has 2, and 2 height of rock core valve is 200mm, and the alignment splicing composition cylindrical outer diameter of rock core valve 2 is 60mm, forms a diameter of 50mm of hollow cylindrical cavity;
The clip 4 is made of two semicircular rings, and 4 internal diameter of clip of two semicircular rings composition is 60mm, just and rock core 2 external adapter of valve;There is threaded hole on clip 4, fasten clip with bolt and nut;
3 height of base is 50mm, and the middle part of base 3 is provided with internal diameter as 60mm, the base holes of height 30mm, described Base holes coordinate with 2 outer gap of rock core valve;
A diameter of 50mm, the height 200mm of the test specimen pressure head 1, test specimen pressure head 1 are adapted to cylindrical cavity, belong to gap Coordinate, be provided with scale on test specimen pressure head 1, the center of 1 one end faces of test specimen pressure head is provided with threaded hole 6;
With the threaded hole 6 is supporting is provided with yi word pattern flat nut and hole post 5, the yi word pattern flat nut and hole post 5 One end be both provided with 6 matched screw thread of threaded hole, wherein, 5 diameter of hole post and height can be decided according to the actual requirements, generally It is cylindrical for round platform, and the diameter of 5 threaded end of hole post is less than the diameter at non-threaded end, and hole post 5 is highly generally less than 70mm.
The preparation that artificial core is carried out using apparatus of the present invention is included the following steps:
If the first step, prepare artificial core standard specimen, flat nut is installed on to the threaded hole 6 of 1 bottom of test specimen pressure head It is interior, and ensure that 1 bottom surface of test specimen pressure head is smooth;If preparing artificial core standard specimen with holes, hole post 5 is installed on test specimen pressure head In the threaded hole 6 of 1 bottom;
Second step, align rock core valve 2, fastens rock core valve 2 with clip 4, then rock core valve 2 is put into the bottom of base 3 In bore;
The material mixture ratio that 3rd step, basis are set carries out material weighing, and stirs evenly;
The material of single test specimen weight is weighed in 4th step, the material obtained from step 3, by single test specimen weight Material is inserted in hollow cylindrical cavity, and is constantly compacted during inserting with compacting instrument;
5th step, after the material of single test specimen weight is put into hollow cylindrical cavity completely and is compacted, Rock core valve 2 equipped with material is taken out from base 3 and is placed on the platen of pressurization platform, pressurization dress is provided with above platen Put, test specimen pressure head 1 is put into the rock core valve 2 equipped with material so that test specimen pressure head 1 is pressed on the material in cylindrical cavity;
6th step, the pressue device opened on pressurization platform are acted on test specimen pressure head 1, and the material in rock core valve 2 is carried out Fully compacting, and observe the scale on 1 surface of test specimen pressure head;
7th step, when the graduation mark on 1 surface of test specimen pressure head reaches design load, stop pressurization, material is pressed into test specimen;
8th step, remove test specimen pressure head 1, treats that test specimen consolidation carries out the test specimen demoulding after a certain period of time;
After 9th step, the demoulding, test specimen is placed on shady place and is dried in the shade naturally.
The above is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (2)

  1. A kind of 1. mould for preparing the artificial core with non-penetrating hole, it is characterised in that:Including test specimen pressure head (1), rock core valve (2), base (3) and clip (4);Hollow cylindrical cavity is formed after rock core valve (2) alignment;The clip (4) and rock core Valve (2) external adapter;Base holes, the base holes and rock core valve (2) external adapter are provided with the base (3);The examination Part pressure head (1) is adapted to cylindrical cavity, and scale, the center of (1) end face of test specimen pressure head are provided with the test specimen pressure head (1) Position is provided with threaded hole (6), and the threaded hole (6) is supporting is provided with or hole post (5), one end of the hole post (5) are provided with With threaded hole (6) matched screw thread;Keep at a distance upper surface of the bottom surface of the hole post (5) all the time with base (3).
  2. 2. a kind of mould of artificial core of preparation using described in claim 1 with non-penetrating hole prepares the side of artificial core Method, it is characterised in that:The following steps performed including order:
    The first step, by hole post (5) be installed on test specimen pressure head (1) bottom threaded hole (6) in;
    Second step, by rock core valve (2) align, with clip (4) make rock core valve (2) fasten, rock core valve (2) is then put into base (3) in base holes;
    The material mixture ratio that 3rd step, basis are set carries out material weighing, and stirs evenly;
    The material of single test specimen weight is weighed in 4th step, the material obtained from step 3, by the material of single test specimen weight Insert in hollow cylindrical cavity, and be constantly compacted during inserting with compacting instrument;
    5th step, after the material of single test specimen weight is put into hollow cylindrical cavity completely and is compacted, will fill The rock core valve (2) for having material takes out from base (3) and is placed on the platen of pressurization platform, and pressurization dress is provided with above platen Put, test specimen pressure head (1) is put into the rock core valve (2) equipped with material Nei so that test specimen pressure head (1) is pressed in the material in cylindrical cavity On;
    6th step, the pressue device opened on pressurization platform are acted on test specimen pressure head (1), and the material in rock core valve (2) is carried out Fully compacting, and observe the scale on test specimen pressure head (1) surface;
    7th step, when the graduation mark on test specimen pressure head (1) surface reaches design load, stop pressurization, material is pressed into test specimen;
    8th step, remove test specimen pressure head (1), treats that test specimen consolidation carries out the test specimen demoulding after a certain period of time;
    After 9th step, the demoulding, test specimen is placed on shady place and is dried in the shade naturally.
CN201410784940.4A 2014-12-17 2014-12-17 A kind of mould and method for preparing the artificial core with non-penetrating hole Active CN104502167B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410784940.4A CN104502167B (en) 2014-12-17 2014-12-17 A kind of mould and method for preparing the artificial core with non-penetrating hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410784940.4A CN104502167B (en) 2014-12-17 2014-12-17 A kind of mould and method for preparing the artificial core with non-penetrating hole

Publications (2)

Publication Number Publication Date
CN104502167A CN104502167A (en) 2015-04-08
CN104502167B true CN104502167B (en) 2018-04-27

Family

ID=52943586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410784940.4A Active CN104502167B (en) 2014-12-17 2014-12-17 A kind of mould and method for preparing the artificial core with non-penetrating hole

Country Status (1)

Country Link
CN (1) CN104502167B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109374387A (en) * 2018-09-18 2019-02-22 中国石油大学(华东) Combined central axis, rock core mold and core preparing device and method including it

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105300771A (en) * 2015-11-27 2016-02-03 中国科学院武汉岩土力学研究所 Manufacturing die of low-intensity similar-material standard test pieces
CN108709783A (en) * 2018-05-17 2018-10-26 长江大学 Artificial cores preparation facilities and preparation method thereof
CN109459290B (en) * 2018-12-25 2021-01-26 重庆交通大学 NSCB sample preparation device for testing I-type fracture toughness of compacted clay and using method thereof
CN109443908B (en) * 2018-12-28 2020-12-11 机械工业勘察设计研究院有限公司 Indoor model test device and method for drilling shear test
CN109556936A (en) * 2018-12-29 2019-04-02 贵州省地质矿产勘查开发局五地质大队 Artificial rock core small-batch manufacturing device
CN114428006B (en) * 2021-12-31 2024-01-30 中国矿业大学 Weak cemented rock sample preparation device and preparation method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1281971A1 (en) * 1985-01-07 1987-01-07 Всесоюзный научно-исследовательский и проектно-конструкторский институт геофизических исследований геологоразведочных скважин Device for preparing block-shaped specimens from core
GB2184835A (en) * 1985-12-19 1987-07-01 Redwood Corex Core container
FR2953593A1 (en) * 2009-12-08 2011-06-10 Brgm PROCESS FOR PREPARING A CARROT OF CHARCOAL
CN202599725U (en) * 2012-04-25 2012-12-12 广西大学 Disturbed soil cutting ring sample-pressing device
CN102914458A (en) * 2012-10-16 2013-02-06 绍兴文理学院 Sample preparing device for remolded soil direct shear test sample and sample preparing method thereof
CN103543050A (en) * 2013-09-06 2014-01-29 中国石油大学(北京) Preparation mould for manual simulated rock core test piece with central hole
CN203705235U (en) * 2014-01-01 2014-07-09 浙江省建设工程质量检验站有限公司 Static shear sample part instrument

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8603157D0 (en) * 1986-02-08 1986-03-12 Edinburgh Petroleum Dev Servic Preparation of rock core samples

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1281971A1 (en) * 1985-01-07 1987-01-07 Всесоюзный научно-исследовательский и проектно-конструкторский институт геофизических исследований геологоразведочных скважин Device for preparing block-shaped specimens from core
GB2184835A (en) * 1985-12-19 1987-07-01 Redwood Corex Core container
FR2953593A1 (en) * 2009-12-08 2011-06-10 Brgm PROCESS FOR PREPARING A CARROT OF CHARCOAL
CN202599725U (en) * 2012-04-25 2012-12-12 广西大学 Disturbed soil cutting ring sample-pressing device
CN102914458A (en) * 2012-10-16 2013-02-06 绍兴文理学院 Sample preparing device for remolded soil direct shear test sample and sample preparing method thereof
CN103543050A (en) * 2013-09-06 2014-01-29 中国石油大学(北京) Preparation mould for manual simulated rock core test piece with central hole
CN203705235U (en) * 2014-01-01 2014-07-09 浙江省建设工程质量检验站有限公司 Static shear sample part instrument

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109374387A (en) * 2018-09-18 2019-02-22 中国石油大学(华东) Combined central axis, rock core mold and core preparing device and method including it

Also Published As

Publication number Publication date
CN104502167A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN104502167B (en) A kind of mould and method for preparing the artificial core with non-penetrating hole
CN104266887B (en) Electronic static(al) two-way remoulded sample sampling instrument
CN106442153B (en) The experimental rig and test method of simulation concrete Dam Heel of Gravity Dam hydraulic fracture
CN104198233B (en) Three axle remoulded sample forming method and devices thereof
CN110470522B (en) Method for prefabricating fracture network rock mass samples with different water saturation degrees
CN205719785U (en) A kind of actual triaxial testing apparatus for simulating crack propagation
CN110376039B (en) Device and method for manufacturing prefabricated cracks of standard rock-like sample
CN106324223B (en) A kind of high infiltration strip core model and production method and device
CN104374650A (en) Testing device and method for testing static force shear property between tubular pile and grouting soil body
CN103344468A (en) Stress control type soil engineering sample pressing apparatus
CN110567778B (en) Standard remolded soil sample bidirectional sample pressing device and method
RU2009129135A (en) METHOD FOR DETERMINING LOWER PLASTICITY (WP) OF CLAY SOILS BY PRESSING METHOD AND DEVICE FOR ITS IMPLEMENTATION
CN207066884U (en) A kind of concrete axial breaks experiment test block mould
CN109283113B (en) Concrete impermeability test device and test method for eliminating horizontal hoop pressure
CN203414321U (en) Molding mould of test piece for testing early strength of sprayed concrete
CN203738973U (en) Combined die for molding standard test piece for geotechnical test
CN207051076U (en) A kind of triaxial test sample preparation device
CN206223506U (en) A kind of hydraulic fracturing experiments device based on three-dimensional printing technology
CN203572696U (en) Stress control type geotechnical sample compactor
CN205749052U (en) A kind of ring type sample preparation device cutting experiment for ring
CN109709311A (en) A kind of indoor simulation device being molded into slurry research for vault band
CN205826379U (en) Cube preparation of soil sample device
KR200329959Y1 (en) Compaction Mold for Large Cyclic Triaxial Testing Apparatus
CN205607736U (en) A coal petrography sample making devices for mechanical properties and permeability test
CN210465061U (en) Standard rock sample prefabricated crack manufacturing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 221116 Jiangsu province Xuzhou City University Road Copper Mountain China University of Mining and Technology Research Institute

Applicant after: China University of Mining & Technology

Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China University of Mining & Technology

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ji Ming

Inventor after: Zhang Yidong

Inventor after: Jin Zhiyuan

Inventor after: Guo Hongjun

Inventor after: Cheng Liang

Inventor after: Li Zhong

Inventor after: Zhang Meng

Inventor after: Zhang Minglei

Inventor after: Cui Mantang

Inventor before: Jin Zhiyuan

Inventor before: Zhang Yidong

Inventor before: Ji Ming

Inventor before: Cheng Liang

Inventor before: Li Zhong

Inventor before: Zhang Meng

Inventor before: Zhang Minglei

Inventor before: Cui Mantang

GR01 Patent grant
GR01 Patent grant