CN104404883A - Inner working platform for rapid construction of bridge pier and construction method using inner working platform - Google Patents
Inner working platform for rapid construction of bridge pier and construction method using inner working platform Download PDFInfo
- Publication number
- CN104404883A CN104404883A CN201410668270.XA CN201410668270A CN104404883A CN 104404883 A CN104404883 A CN 104404883A CN 201410668270 A CN201410668270 A CN 201410668270A CN 104404883 A CN104404883 A CN 104404883A
- Authority
- CN
- China
- Prior art keywords
- steel structure
- working platform
- bridge pier
- structure framework
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 75
- 239000010959 steel Substances 0.000 claims abstract description 75
- 238000003466 welding Methods 0.000 claims abstract description 5
- 210000003205 muscle Anatomy 0.000 claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 8
- 238000000034 method Methods 0.000 claims description 8
- 238000003462 Bender reaction Methods 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 238000004140 cleaning Methods 0.000 claims description 3
- 230000008676 import Effects 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims description 3
- 229910000746 Structural steel Inorganic materials 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 235000019994 cava Nutrition 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410668270.XA CN104404883B (en) | 2014-11-19 | 2014-11-19 | Workbench and construction method in a kind of bridge pier rapid construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410668270.XA CN104404883B (en) | 2014-11-19 | 2014-11-19 | Workbench and construction method in a kind of bridge pier rapid construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104404883A true CN104404883A (en) | 2015-03-11 |
CN104404883B CN104404883B (en) | 2016-05-25 |
Family
ID=52642544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410668270.XA Expired - Fee Related CN104404883B (en) | 2014-11-19 | 2014-11-19 | Workbench and construction method in a kind of bridge pier rapid construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104404883B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672137A (en) * | 2016-03-22 | 2016-06-15 | 中国水利水电第八工程局有限公司 | Bridge pier body reinforcement construction method and reinforcement frameworks |
CN106988221A (en) * | 2017-03-15 | 2017-07-28 | 中铁上海工程局集团有限公司 | Unit construction bridge beam construction method based on BIM |
CN108547227A (en) * | 2018-06-07 | 2018-09-18 | 宁波交通工程建设集团有限公司 | Modularization bridge pier inclosure structure and construction method |
CN111472303A (en) * | 2018-12-07 | 2020-07-31 | 杭州江润科技有限公司 | Middle pier anti-collision system and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101126223A (en) * | 2007-09-17 | 2008-02-20 | 中铁二局股份有限公司 | Mobile integral construction platform, construction method thereof and special sling for the same |
JP2008240410A (en) * | 2007-03-28 | 2008-10-09 | Kawasaki Heavy Ind Ltd | Bridge construction method, steel structure, and bridge |
CN102227276A (en) * | 2008-11-27 | 2011-10-26 | 克莱斯博士玛帕精密仪器工厂两合公司 | Tool holder |
CN202227276U (en) * | 2011-09-08 | 2012-05-23 | 中铁上海工程局有限公司 | Mobile platform applied on bridge pier template |
CN103031812A (en) * | 2013-01-16 | 2013-04-10 | 中铁二局股份有限公司 | Construction method of bridge double-limb pier |
CN204298741U (en) * | 2014-11-19 | 2015-04-29 | 中交四航局第三工程有限公司 | Working platform in a kind of bridge pier rapid construction |
-
2014
- 2014-11-19 CN CN201410668270.XA patent/CN104404883B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008240410A (en) * | 2007-03-28 | 2008-10-09 | Kawasaki Heavy Ind Ltd | Bridge construction method, steel structure, and bridge |
CN101126223A (en) * | 2007-09-17 | 2008-02-20 | 中铁二局股份有限公司 | Mobile integral construction platform, construction method thereof and special sling for the same |
CN102227276A (en) * | 2008-11-27 | 2011-10-26 | 克莱斯博士玛帕精密仪器工厂两合公司 | Tool holder |
CN202227276U (en) * | 2011-09-08 | 2012-05-23 | 中铁上海工程局有限公司 | Mobile platform applied on bridge pier template |
CN103031812A (en) * | 2013-01-16 | 2013-04-10 | 中铁二局股份有限公司 | Construction method of bridge double-limb pier |
CN204298741U (en) * | 2014-11-19 | 2015-04-29 | 中交四航局第三工程有限公司 | Working platform in a kind of bridge pier rapid construction |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672137A (en) * | 2016-03-22 | 2016-06-15 | 中国水利水电第八工程局有限公司 | Bridge pier body reinforcement construction method and reinforcement frameworks |
CN105672137B (en) * | 2016-03-22 | 2018-04-13 | 中国水利水电第八工程局有限公司 | A kind of construction method and framework of steel reinforcement of bridge pier pier shaft reinforcing bar |
CN106988221A (en) * | 2017-03-15 | 2017-07-28 | 中铁上海工程局集团有限公司 | Unit construction bridge beam construction method based on BIM |
CN108547227A (en) * | 2018-06-07 | 2018-09-18 | 宁波交通工程建设集团有限公司 | Modularization bridge pier inclosure structure and construction method |
CN108547227B (en) * | 2018-06-07 | 2024-02-06 | 宁波交通工程建设集团有限公司 | Modular pier surrounding cage structure and construction method |
CN111472303A (en) * | 2018-12-07 | 2020-07-31 | 杭州江润科技有限公司 | Middle pier anti-collision system and construction method |
CN111472303B (en) * | 2018-12-07 | 2021-08-20 | 杭州江润科技有限公司 | Middle pier anti-collision system and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN104404883B (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103291076B (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN102900024B (en) | Using method for overturning die plate for large-scale concrete structure and | |
CN103255838A (en) | Construction method with adoption of large-tonnage long-stroke oil cylinder jacking mold frame | |
CN103352429A (en) | Bracket counter pull loading pre-pressing device and tensioning pre-pressing method thereof | |
CN104404883B (en) | Workbench and construction method in a kind of bridge pier rapid construction | |
CN111997342B (en) | Cantilever framework supporting structure protruding out of building and construction method thereof | |
CN204644884U (en) | High pier over-form construction reinforced bar installs mobile stock | |
CN105484164A (en) | Spanning type bailey beam bracket and construction method thereof | |
CN114059758A (en) | Assembled double-layer integral elevator shaft platform | |
CN104989111A (en) | Construction method for steel structure high-rise hoisting | |
CN205206284U (en) | Detachable assembly type elevator shaft operating platform | |
CN113833263A (en) | Integral lantern type support circulating hoisting construction method for frame column | |
CN204298741U (en) | Working platform in a kind of bridge pier rapid construction | |
CN102691267A (en) | High pier construction method for external whole operation platform | |
CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
CN201671062U (en) | D-type temporary beam for construction of dual-line portal type pier cap beam spanning existing line | |
CN203701549U (en) | High-altitude large-span cantilever formwork | |
CN202073303U (en) | Overhanging type main beam of unloading platform | |
CN206513003U (en) | A kind of steel-structure factory building installs auxiliary steel frame construction | |
CN205348731U (en) | Core section of thick bamboo reinforcing bar post is from promoting formula operation platform | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN204185146U (en) | Construction of Steel Structure overhang crane between skyscraper two tall buildings | |
CN102383376A (en) | Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Shovey Inventor after: Feng Guoyao Inventor after: Huang Xiaomiao Inventor after: Bi Lili Inventor after: Liao Shiqiang Inventor after: Mo Hongwu Inventor after: Wang Shenguang Inventor after: Chen Xin Inventor before: Shovey Inventor before: Ju Zhian Inventor before: Feng Guoyao Inventor before: Mo Hongwu Inventor before: Liao Shiqiang Inventor before: Bi Lili Inventor before: Huang Xiaomiao Inventor before: Wang Shenguang |
|
COR | Change of bibliographic data | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160525 |
|
CF01 | Termination of patent right due to non-payment of annual fee |