CN204298741U - Working platform in a kind of bridge pier rapid construction - Google Patents

Working platform in a kind of bridge pier rapid construction Download PDF

Info

Publication number
CN204298741U
CN204298741U CN201420697083.XU CN201420697083U CN204298741U CN 204298741 U CN204298741 U CN 204298741U CN 201420697083 U CN201420697083 U CN 201420697083U CN 204298741 U CN204298741 U CN 204298741U
Authority
CN
China
Prior art keywords
steel structure
structure framework
platform
movable
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420697083.XU
Other languages
Chinese (zh)
Inventor
居治安
肖维
冯国耀
黄小妙
毕莉莉
莫宏武
廖世强
欧毓浩
陈新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd
Original Assignee
Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd filed Critical Third Engineering Co Ltd Of Cccc Fourth Harbor Enginering Co ltd
Priority to CN201420697083.XU priority Critical patent/CN204298741U/en
Application granted granted Critical
Publication of CN204298741U publication Critical patent/CN204298741U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides working platform in a kind of bridge pier rapid construction, comprises the unit module of at least one vertical pile, and each unit module comprises steel structure framework, fixed platform, movable skeleton, movable platform, stair and guard rail; Steel structure framework adopts shaped steel to be welded, the steel structure framework of each unit module is set to double-layer structure, the top of steel structure framework and bottom respectively correspondence are provided with fixing hole, and the steel structure framework of the unit module that adjacent two layers stacks is connected through fixing hole by latch or bolt; Fixed platform is laid on every Rotating fields of steel structure framework; Movable skeleton is movably connected on the both sides of steel structure framework by latch, and the both sides of every Rotating fields are all connected with a movable skeleton; Movable platform is laid on movable skeleton; Stair are connected with between the double-layer structure of steel structure framework; Guard rail is provided with around stair.The utility model can effectively improve efficiency of construction and construction quality.

Description

Working platform in a kind of bridge pier rapid construction
Technical field
The utility model relates to Construction Technology field, is specifically related to working platform in a kind of bridge pier rapid construction.
Background technology
High-speed railway bridge engineering accounts for sizable proportion, structure many employings round end type bridge pier of bridge pier, bridge pier height from several meters to tens meters, even more than 20 meter.Simple supported box beam bridge pier adopts two-wire round ended pier, is made up of pinner, top cap and pier shaft, and from 6m ~ 20m not etc., vertical main muscle is Φ 16 screw-thread steel to bridge pier height, and stirrup is φ 10 round steel, the horizontal lacing wire φ 10 of pier shaft, top cap configuring multi-layer reinforced mesh.Such bridge pier structure is relatively simple, and during construction, repetitive operation is many, often can not cause the great attention of most personnel.Construction method of the prior art first sets up outside bridge pier or steel pipe scaffold in bridge pier, utilizes scaffold to carry out reinforcing bar binding and model sheetinstallat.
There is larger defect in said method.There is larger danger in the process of scaffold building, the danger that the existence of bad scaffold itself is caved in and scaffold building quality is checked on, have impact on the personal safety of operating personnel greatly.The working space that scaffold can provide is narrow, and reinforcing bar binding efficiency is low, and the time is long.Bridge pier main muscle diameter is little, and cage of reinforcement rigidity is little, is easily out of shape, and needs to increase a lot of bearing rod, adopts the method for scaffold construction greatly to affect the normal operation of constructor, reduces efficiency of construction and construction quality.After reinforcing bar binding completes, due to the impact of scaffold, the narrow space of installation form, affects the normal operation of model sheetinstallat, and cause model sheetinstallat efficiency low, the time is long.And the template collision scaffold easily sling in work progress, cause the danger that scaffold caves in.
Being not difficult to find out, also there is certain defect in prior art.
Utility model content
Technical problem to be solved in the utility model is to provide working platform in a kind of bridge pier rapid construction, replaces scaffold with working platform, effectively improves efficiency of construction and construction quality.
For achieving the above object, the utility model is by the following technical solutions:
Working platform in a kind of bridge pier rapid construction, comprise the unit module of at least one vertical pile, each unit module comprises steel structure framework, fixed platform, movable skeleton, movable platform, stair and guard rail; Steel structure framework adopts shaped steel to be welded, the steel structure framework of each unit module is set to double-layer structure, the top of steel structure framework and bottom respectively correspondence are provided with fixing hole, and the steel structure framework of the unit module that adjacent two layers stacks is connected through fixing hole by latch or bolt; Fixed platform is laid on every Rotating fields of steel structure framework; Movable skeleton is movably connected on the both sides of steel structure framework by latch, and the both sides of every Rotating fields are all connected with a movable skeleton; Movable platform is laid on movable skeleton; Stair are connected with between the double-layer structure of steel structure framework; Guard rail is provided with around stair.
Further, described fixed platform or movable platform are plank or steel plate.
Further, every Rotating fields of described steel structure framework is high 1.8 meters-2 meters.
Further, the bottom being positioned at the steel structure framework of bottom is fixed on concrete surface by expansion bolt.
Further, described movable skeleton is rectangular, trapezoidal or semicircle.
Working platform in a kind of bridge pier rapid construction provided by the utility model, has the following advantages:
Replace scaffold with working platform, significantly improve efficiency of construction and construction quality;
Ensure that the personal security of work high above the ground preferably, effectively improve the comfortableness of working environment, reduce the labour intensity of operating personnel, ensure the stability of bridge pier reinforcing bar;
Interior ramp moduleization design, install simple, reduce the mounting or dismounting cycle, stability is high;
The input of labour, plant equipment, template etc. can be reduced, save construction cost.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of steel structure framework.
Fig. 2 is the top view of unit module.
Description of reference numerals:
1, steel structure framework 2, stair
3, movable skeleton 4, fixed platform
5, movable platform 6, latch
Detailed description of the invention
For making the object of the utility model embodiment, technical scheme and advantage clearly, below in conjunction with the utility model embodiment and accompanying drawing, the technical scheme in the utility model embodiment is clearly and completely described.It should be noted that, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Embodiment one
Refer to Fig. 1 and Fig. 2, the utility model specifically discloses working platform in a kind of bridge pier rapid construction, comprise the unit module of at least one vertical pile, each unit module comprises steel structure framework 1, fixed platform 4, movable skeleton 3, movable platform 5, stair 2 and guard rail; Steel structure framework 1 adopts shaped steel to be welded, the steel structure framework 1 of each unit module is set to double-layer structure, the top of steel structure framework 1 and bottom respectively correspondence are provided with fixing hole, and the steel structure framework 1 of the unit module that adjacent two layers stacks is connected through fixing hole by latch 6 or bolt; Fixed platform 4 is laid on every Rotating fields of steel structure framework 1; Movable skeleton 3 is movably connected on the both sides of steel structure framework 1 by latch 6, and the both sides of every Rotating fields are all connected with a movable skeleton 3; Movable platform 5 is laid on movable skeleton 3; Stair 2 are connected with between the double-layer structure of steel structure framework 1; Guard rail is provided with around stair 2.
Be flexibly connected between movable skeleton 3 with fixing skeleton, allow to receive movable skeleton 3.Operating personnel carries out needing when constructing to stand in fixed platform 4 and movable platform 5.Fixing skeleton and movable skeleton 3 are all carry out welding production by shaped steel such as angle steel, channel-section steel, i iron beyond job location, preferably prefabricated in the place that the environment such as factory are comparatively superior, then the job location being transported to outfield is to be installed.Only to need in job location by loop wheel machine, unit module vertical pile to be connected and fixed by latch 6 or bolt, a complete interior working platform can be assembled.Similarly, after construction is complete, interior working platform can successively carry out dismantling and reclaiming, and waits until next construction usage.
Different from general scaffold, interior working platform is without the need to carrying out loaded down with trivial details and attached dangerously to build at every turn, and interior working platform can provide and stablizes broad plane of standing, and construction operation difficulty is reduced greatly, also effectively can improve construction quality.Every Rotating fields is equipped with stair 2 convenient working personnel and moves between different aspects, and guard rail then shields to operating personnel, the personal safety of effective guarantee operating personnel.
As preferably, described fixed platform 4 or movable platform 5 are plank or steel plate.The Main Function of fixed platform 4 and movable platform 5 is for operating personnel provides plane of standing, and is ensureing the plank or steel plate that preferably adopt lightweight under well-set prerequisite.
As preferably, every Rotating fields of described steel structure framework 1 is high 1.8 meters-2 meters.This highly meets the height of general job personnel, ensures again to save most space simultaneously, reduces and manufactures and cost of transportation.Meanwhile, ensure operating personnel can freely movable while reduce floor height as far as possible and help the convenience ensureing and construct, there will not be the region that to there is operating personnel between double-layer structure and cannot touch.
As preferably, the bottom being positioned at the steel structure framework 1 of bottom is fixed on concrete surface by expansion bolt.Apparently, the stability being positioned at the steel structure framework 1 of bottom is vital, has material impact to the stability of the steel structure framework 1 being positioned at upper strata.Firm in order to ensure the integral installation of interior working platform, need the steel structure framework 1 of external force to bottom by expansion bolt to be fixed, the steel structure framework 1 of bottom is taken root.
As preferably, described movable skeleton 3 is rectangular, trapezoidal or semicircle.Semicircular movable skeleton 3 is especially applicable to round ended pier, and its profile with round ended pier is the most identical, and the entire area of the movable platform 5 caused also is maximum, and thus most convenient operating personnel constructs.Trapezoidal and movable skeleton 3 that is rectangle is convenient to manufacture most.The type selecting of movable skeleton 3 should be chosen according to physical condition.
Working platform in a kind of bridge pier rapid construction that the utility model provides, replaces scaffold with working platform, significantly improves efficiency of construction and construction quality.Interior working platform can provide better working environment, ensure that the personal security of work high above the ground preferably, the comfortableness of effective raising working environment, carries out by interior working platform the labour intensity that bridge pier rapid construction effectively can reduce operating personnel, ensures the stability of bridge pier reinforcing bar.Interior ramp moduleization design, install simple, reduce the mounting or dismounting cycle, stability is high.In adopting, working platform carries out the input that Bridge Pier Construction can reduce labour, plant equipment, template etc., saves construction cost.
The above embodiment only have expressed a kind of embodiment of the present utility model, and it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that for the person of ordinary skill of the art, without departing from the concept of the premise utility, can also make some distortion and improvement, these all belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be as the criterion with claims.

Claims (5)

1. a working platform in bridge pier rapid construction, it is characterized in that: the unit module comprising at least one vertical pile, each unit module comprises steel structure framework, fixed platform, movable skeleton, movable platform, stair and guard rail; Steel structure framework adopts shaped steel to be welded, the steel structure framework of each unit module is set to double-layer structure, the top of steel structure framework and bottom respectively correspondence are provided with fixing hole, and the steel structure framework of the unit module that adjacent two layers stacks is connected through fixing hole by latch or bolt; Fixed platform is laid on every Rotating fields of steel structure framework; Movable skeleton is movably connected on the both sides of steel structure framework by latch, and the both sides of every Rotating fields are all connected with a movable skeleton; Movable platform is laid on movable skeleton; Stair are connected with between the double-layer structure of steel structure framework; Guard rail is provided with around stair.
2. working platform in bridge pier rapid construction according to claim 1, is characterized in that: described fixed platform or movable platform are plank or steel plate.
3. working platform in bridge pier rapid construction according to claim 1, is characterized in that: every Rotating fields of described steel structure framework is high 1.8 meters-2 meters.
4. working platform in bridge pier rapid construction according to claim 1, is characterized in that: the bottom being positioned at the steel structure framework of bottom is fixed on concrete surface by expansion bolt.
5. working platform in bridge pier rapid construction according to claim 1, is characterized in that: described movable skeleton is rectangular, trapezoidal or semicircle.
CN201420697083.XU 2014-11-19 2014-11-19 Working platform in a kind of bridge pier rapid construction Expired - Fee Related CN204298741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420697083.XU CN204298741U (en) 2014-11-19 2014-11-19 Working platform in a kind of bridge pier rapid construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420697083.XU CN204298741U (en) 2014-11-19 2014-11-19 Working platform in a kind of bridge pier rapid construction

Publications (1)

Publication Number Publication Date
CN204298741U true CN204298741U (en) 2015-04-29

Family

ID=53104296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420697083.XU Expired - Fee Related CN204298741U (en) 2014-11-19 2014-11-19 Working platform in a kind of bridge pier rapid construction

Country Status (1)

Country Link
CN (1) CN204298741U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404883A (en) * 2014-11-19 2015-03-11 中交四航局第三工程有限公司 Inner working platform for rapid construction of bridge pier and construction method using inner working platform
CN111472303A (en) * 2018-12-07 2020-07-31 杭州江润科技有限公司 Middle pier anti-collision system and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404883A (en) * 2014-11-19 2015-03-11 中交四航局第三工程有限公司 Inner working platform for rapid construction of bridge pier and construction method using inner working platform
CN111472303A (en) * 2018-12-07 2020-07-31 杭州江润科技有限公司 Middle pier anti-collision system and construction method

Similar Documents

Publication Publication Date Title
CN104074358A (en) Construction method of prefabricated assembled building
CN105780925A (en) Truss-hanging combined system installation construction method
CN103437563B (en) Mounting method for steel skeleton of large steel structure factory building
CN204019724U (en) Make the mold of prefabricated case beam framework of steel reinforcement
CN104612057A (en) Assembled rack and using method
CN103206075B (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN204185120U (en) Mobile unit dolly in place
CN104404883B (en) Workbench and construction method in a kind of bridge pier rapid construction
CN204298741U (en) Working platform in a kind of bridge pier rapid construction
CN105952239A (en) Reinforcement device for preventing flexural-torsional buckling of angle steel for iron towers
CN205688924U (en) Steel tower corner iron anti-bending unstability bracing means
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN103114754A (en) Alternative hoisting method for conjoined coal bunker top truss girder pre-placing
CN100476146C (en) High altitude placing steel pole inner concrete operating platform frame
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN201729631U (en) Truss type platform lifting device for constructing on top portions of tall and big spaces
CN202742511U (en) Assembling type girder manufacturing pedestal
CN206513003U (en) A kind of steel-structure factory building installs auxiliary steel frame construction
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN205348731U (en) Core section of thick bamboo reinforcing bar post is from promoting formula operation platform
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN203846841U (en) Power transmission line iron tower and rest platform thereof
CN203393721U (en) Inner support main purlin component
CN103388336B (en) Main purline part for inner support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20201119