CN104298706A - Transmission tower material actual strength computing method based on data mining - Google Patents

Transmission tower material actual strength computing method based on data mining Download PDF

Info

Publication number
CN104298706A
CN104298706A CN201410424393.9A CN201410424393A CN104298706A CN 104298706 A CN104298706 A CN 104298706A CN 201410424393 A CN201410424393 A CN 201410424393A CN 104298706 A CN104298706 A CN 104298706A
Authority
CN
China
Prior art keywords
theta
data
actual strength
factor
tower material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410424393.9A
Other languages
Chinese (zh)
Inventor
王晓东
张乐
葛乐
龚灯才
朱富云
徐剑峰
朱卫
鞠易
朱张蓓
孙玉玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nantong Power Supply Co of Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nantong Power Supply Co of Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510422985.1A priority Critical patent/CN105117969A/en
Priority to CN201510422850.5A priority patent/CN105184306A/en
Priority to CN201510423506.8A priority patent/CN105069027A/en
Priority to CN201410424393.9A priority patent/CN104298706A/en
Priority to CN201510422943.8A priority patent/CN105005661A/en
Publication of CN104298706A publication Critical patent/CN104298706A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/24Classification techniques
    • G06F18/241Classification techniques relating to the classification model, e.g. parametric or non-parametric approaches
    • G06F18/2413Classification techniques relating to the classification model, e.g. parametric or non-parametric approaches based on distances to training or reference patterns
    • G06F18/24133Distances to prototypes
    • G06F18/24143Distances to neighbourhood prototypes, e.g. restricted Coulomb energy networks [RCEN]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • G06F16/24564Applying rules; Deductive queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2465Query processing support for facilitating data mining operations in structured databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • General Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Computational Linguistics (AREA)
  • Marketing (AREA)
  • Water Supply & Treatment (AREA)
  • General Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Primary Health Care (AREA)
  • Human Resources & Organizations (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Software Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Biology (AREA)
  • Evolutionary Computation (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a transmission tower material actual strength computing method based on data mining. A rough set theory is used for reducing a pole and tower strength influence factor set; a data mining method is used for mining useful data from a large number of historical data to establish a learning set; and according to the learning set, a gradient descent method is used for constant iterative learning to determine factor set weight, and through the obtained weight value, the degeneration rate of the actual strength of tower materials is subjected to comprehensive evaluation and computing. The problems of typical uncertainty and nonlinearity that during an evolutionary process, the validity affecting tower material strength factors is not clear can be solved through the method. The method can provide an important scientific criterion for transmission tower structure safety evaluation.

Description

A kind of transmission tower tower material actual strength computing method based on data mining
Technical field
The present invention relates to electric power pylon safety appraisement of structure field, be specially adapted to the transmission tower safety appraisement of structure of long-time running under Complex Natural Environment.
Background technology
The essence of line construction safety is a uncertainty, nonlinear state space evolutionary process, shape State evolution (transfer) process has randomness, the characteristic information wherein characterizing shaft tower tower material actual machine intensity has inexactness, the effect validity of influence factor is also unintelligible, definition and the extension of running status have ambiguity, the expertise of state-evaluation has incompleteness, so be a complicated uncertain problem to the evaluation of circuit tower material intensity with calculating.
Data mining can disclose implicit, previously unknown and have the non-trivial process of the information of potential value from the mass data of database.Data mining is a kind of decision support processes, it is mainly based on artificial intelligence, machine learning, pattern-recognition, statistics, database, visualization technique etc., analyze data increasingly automatedly, make the reasoning of inductive, therefrom excavate potential pattern, aid decision making person's adjustable strategies, reduces risks, and makes correct decision-making.
Because the factor affecting tower material intensity is a lot, and traditional evaluation method needs to calculate whole evaluation index, so calculate more complicated, and the serious distortion phenomenon that may cause because each factor weight is little or multi-peak phenomenon.The present invention proposes one and first carries out yojan based on rough set theory to index set, adopts the method for data mining to carry out the method for tower material actual strength calculating after yojan.Institute's extracting method effectively can solve the transmission tower safety appraisement of structure problem of long-time running under Complex Natural Environment.
Summary of the invention
The object of the invention is to: propose a kind of transmission tower tower material actual strength computing method based on data mining, can be assessment electric power line tower structure and necessary criterion is provided safely.
Step 1: index set yojan;
Step 2: the structure of data mining study collection;
Step 3: set of factors weight is determined;
Step 4: actual strength is assessed.
Index set yojan in described step 1, mainly to the index set by meteorologic district condition, sub-strength damage, the stress of conductor and mechanical vibration three major types factors composition, three class influence factor set representations are U={U 1, U 2, U 3.Wherein: U 1={ u 11, u 12, u 13, u 14, u 15, u 11for wind speed (most strong wind), u 12for atmospheric temperature (lowest temperature), u 13for average temperature of the whole year, u 14for ice covering thickness (the thickest icing), u 15for number of days in thunderstorm day in year.U 2={ u 21, u 22, u 23, u 24, u 25, u 26, u 21for working time, u 22for bending reparation number of times, u 23for slight crack repairs number of times, u 24for thunder and lightning or fault current damage number of times, u 25to attach most importance to icing times of fatigue, u 26for on average running stress/maximum operation stress.U 3={ u 31, u 32, u 33, u 34, u 31for wire division number, u 32for wind direction and circuit angle, u 33for ground surface degree of roughness, u 34for steel corrosion amount.Use rough set to carry out index set yojan, Attribute Significance is defined as:
U/R={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 11})={{1,3,5,7,8},{2,4}}
U/(R-{u 12})={{1,2,4,5,7},{3,6,8}}
U/(R-{u 13})={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 14})={{1,5,7},{2,4},{3,6,8}}
U/(R-{u 15})={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 13,u 15})={{1,7},{2,4},{3,6,8},{5}}
U/R≠U/(R-{u 11})
U/R≠U/(R-{u 12})
U/R≠U/(R-{u 14})
U/R=U/(R-{u 13})=U/(R-{u 15})=U/(R-{u 13,u 15})
Wherein R is the set of the property value of factor.Known index u is calculated through Attribute Significance yojan 13, u 15be redundancy, in like manner, carry out Attribute Significance yojan to sub-strength damage factor and conductor galloping and aeolian vibration factor respectively, obtaining final evaluation index is: U={U 1, U 2, U 3, wherein U 1={ u 11, u 12, u 14, U 2={ u 21, u 22, u 23, u 24, u 25, U 3={ u 31, u 32, u 33, u 34.
The structure of the data mining study collection in described step 2, adopt K-VNN search strategy, in system existing N group data, find the most similar data (k<<N) of k group, the actual strength degradation ratio of the shaft tower tower material that the present invention proposes and influence factor collection U present nonlinear relationship:
η=f(U)+ε(t)
Wherein, η is degradation ratio, the white noise that ε (t) is zero-mean, and f () is unknown nonlinear function.For the data that there is N group influence factor and degradation ratio in current t, there is influence factor information U (t), adopt K-VNN search strategy, in system existing N group data, find the most similar data (k<<N) of k group, specific as follows:
1, as cos β (U (i), U (t)) <0, then think that this U (i) deviates from current input U (t), be unfavorable for modeling, abandon this data;
2 otherwise, with the index core of U (i) and U (t) and included angle cosine weighting sum selection criterion, namely
D(U(i),U(t))=α·e -d(U(i),U(t))+(1-α)·cosβ(U(i),U(t))
In formula:
cos &beta; ( U ( i ) , U ( t ) ) = U T ( i ) U ( t ) | | U ( i ) | | 2 &CenterDot; | | U ( t ) | | 2 d ( U ( i ) , U ( t ) ) = | | U ( i ) - U ( i ) | | 2 , &alpha; &Element; [ 0,1 ]
α is weighting factor.Weighting selection criterion D (U (i), U (t)) directly reflects the similarity of U (i) and U (t).If two information vectors the closer to, then d is less, and cos β is also larger, thus D (U (i), U (t)) is also larger.Like this, in existing data message, the k group data selecting D () value maximum, by descending sort, learning of structure collection:
{(U(1),η(1)),…,(U(k),η(k))}
D(U(1),U(t))>…>D(U(k),U(t)).
Set of factors weight in described step 3 is determined to obtain the influence degree of certain factor to shaft tower tower material actual strength degradation ratio, by probabilistic factor sharpening, actual strength degradation ratio and the influence factor collection U local linear relation of the shaft tower tower material of the present invention's proposition are as follows:
η=f θ(U)=U Tθ
Wherein: θ represents set of factors weighted value, and T represents transposition.Because current and data are in different working points, the packing density meeting present operating point U (t) may be different, data amount check for modeling is also indefinite, that is: modeling neighborhood value size is variable, in order to obtain best set of factors weight vectors θ, reduce calculated amount simultaneously, the variation range k ∈ [k of neighborhood can be preset m, k m] (k m<k m), calculating the set of factors weight vectors θ of neighbour k+1 k+1time, directly utilize the set of factors weight vectors θ of neighbour k k, first provide an error functions,
min &theta; J ( &theta; ) = 1 2 &Sigma; i = 1 m ( f &theta; ( U i ) - &eta; i ) 2
Adopt gradient descent method, calculate set of factors weight vectors as follows,
&PartialD; &PartialD; &theta; J ( &theta; ) = &PartialD; &PartialD; &theta; 1 2 &Sigma; i = 1 m ( f &theta; ( U i ) - &eta; i ) 2 = ( f &theta; ( U ) - &eta; ) U i
&theta; k + 1 = &theta; k - &alpha; &PartialD; &PartialD; &theta; J ( &theta; ) = &theta; i - &alpha; ( f &theta; ( U ) - &eta; ) U i
Obtaining is the model θ of neighbour k+1 k+1, meanwhile, what also can obtain neighbour k+1 goes a transposition error value:
e k + 1 , j loo = &eta; ( j ) - &alpha; &theta; k + 1 - j , j = 1,2 . . . , k + 1 .
In formula: represent in k+1 group data, with removing a jth model that data gained arrives; represent actual column material strength degradation rate η (j) and model error between the predicted value obtained.
Like this, what can obtain neighbour k+1 removes a transposition error collection all side and these ?
E loo ( k + 1 ) = &Sigma; j = 1 k + 1 w j ( e k + 1 , j loo ) 2 &Sigma; j = 1 k + 1 w j .
In formula: weighting factor the each U (j) of direct reflection go a transposition error to E loo(k+1) " contribution " size.The closer to the U (j) of U (t), its " contribution " is larger, otherwise less.Now, if
E loo(k+1)>E loo(k),k+1∈[k m,k M].
Then think and stop model " variation " returning calculating, and with model θ kas the best model of system current time.Otherwise, by the model adopting gradient descent method to obtain, concentrate from study and choose the information vector made new advances, continue iteration, until k=k mtill.Like this, the quality of partial model can be judged in time, obtain the best Local Linear Model meeting current time influence factor and degradation ratio relation.
Safety assessment in described step 4, according to the influence factor of foundation and the best Local Linear Model of degradation ratio relation, calculates the degradation ratio of tower material actual strength, and the degradation ratio of the calculating shaft tower tower material actual strength that the present invention proposes is as follows,
η(t)==U T(t)θ k
Technique effect of the present invention:
The application is compared to classic method, not only make index be simplified, and make the weight allocation of each factor utilize a large amount of history image data, the discrimination of its evaluation result is obvious, result gears to actual circumstances more, the reflected appraisal result making evaluation index more effective.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the actual strength computing method of long-time running power transmission line column material.
Fig. 2 is that degradation ratio calculates comparative evaluation result figure.
Embodiment
As shown in Figure 1, the method mainly comprises the steps: the mentality of designing of a kind of transmission tower tower material actual strength computing method based on data mining of the present invention
Step 1: index set yojan;
Step 2: the structure of data mining study collection;
Step 3: set of factors weight is determined;
Step 4: actual strength is assessed.
The implementation process of each step is as follows:
Electric power line pole tower tower material long-term field runs, and bear nature invasion and attack, electric discharge and artificial outside destroy, wire actual machine intensity relative theory value can decline.Consider intensity effect factor and pass judgment on knowledge to present nonlinear relationship, based on data digging method, shaft tower tower material actual strength is evaluated and calculated.
The K-VNN method of one of data mining is based on " similar input produces similar output " principle, implementation is generally by sample data memory in memory, then according to input point, in sample data, find data similarly, obtain the corresponding output of this input according to these sample datas.Therefore, it is also referred to as " based on mnemonic learning ".The criterion describing input data and the sample data degree of association generally adopts distance function, and those namely nearest with input point data have the degree of association higher with it.The basic process of intensity evaluation as shown in Figure 1.The present invention establishes local strength's evaluation model, comprises the foundation of set of factors, weight study collection, evaluation model.Hereafter for strain resistant shaft tower tower material, provide its actual strength calculation method.
1) tower material intensity evaluation set of factors index system is set up;
By in power supply enterprise's investigation, according to the evaluation index affecting the various factors of tower material intensity that person skilled provides, in conjunction with a large amount of real data, draw 110kV electric pressure line steel tower intensity evaluation basic index system.Basic index system is primarily of meteorologic district condition, sub-strength damage, the stress of conductor and mechanical vibration three major types factors composition.
Set of factors is: U={U 1, U 2, U 3, wherein U 1={ u 11, u 12, u 13, u 14, u 15, U 2={ u 21, u 22, u 23, u 24, u 25, u 26, U 3={ u 31, u 32, u 33, u 34.
1. meteorologic district condition U 1:
Wind speed (most strong wind) u 11, atmospheric temperature (lowest temperature) u 12, average temperature of the whole year u 13, ice covering thickness (the thickest icing) u 14, thunderstorm day in year number of days u 15.
2. sub-strength damage U 2:
Working time u 21, bending reparation number of times u 22, slight crack repairs number of times u 23, thunder and lightning or fault current damage number of times u 24, re-cover ice times of fatigue u 25, on average run stress/maximum operation stress u 26.
3. the stress of conductor and mechanical vibration U 3:
Wire division number u 31, wind direction and circuit angle u 32, ground surface degree of roughness u 33, steel corrosion amount u 34.
Because the value of each factor is different, and comparatively complicated, in order to the convenience that further evaluation calculates, at this, data normalization is carried out to basic index.Five grades are divided into according to the influence degree difference of factor of evaluation to tower material intensity, be respectively I, II, III, IV, V, grade I represents very little on the impact of tower material actual strength, grade II represents less on the impact of tower material actual strength, grade III represents medium on the impact of tower material actual strength, grade IV represents comparatively large on the impact of tower material actual strength, and grade V represents very large on the impact of tower material actual strength.Set up meteorologic district for meteorologic district below and evaluate quantitative criteria.
Set up the evaluation criterion of meteorologic district condition by national typical meteorological condition area storehouse, show that quantitative criteria is evaluated in meteorologic district, in table 1.
Quantitative criteria is evaluated in table 1 meteorologic district
2) rough set carries out attribute reduction
The many factors of basic index system, may the problem of existing factor redundancy, on the basis of not effect appraise result, in order to not allow evaluation procedure complicated, will carry out yojan to basic index system.Test sample data are as shown in table 2, and for the ease of computational short cut, the desired value using II is as the threshold values of each initial evaluation index, the desired value meeting II is then 1, otherwise is 0, then carry out Data Discretization by table 2 and table 3 data, just initial evaluation indication information can be drawn, in table 3.
Table 2 test sample data
Table 3 sample data discretize
According to rough set theory, his-and-hers watches 4 carry out Attribute Significance yojan:
U/R={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 11})={{1,3,5,7,8},{2,4}}
U/(R-{u 12})={{1,2,4,5,7},{3,6,8}}
U/(R-{u 13})={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 14})={{1,5,7},{2,4},{3,6,8}}
U/(R-{u 15})={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 13,u 15})={{1,7},{2,4},{3,6,8},{5}}
U/R≠U/(R-{u 11})
U/R≠U/(R-{u 12})
U/R≠U/(R-{u 14})
U/R=U/(R-{u 13})=U/(R-{u 15})=U/(R-{u 13,u 15})
Through Attribute Significance yojan, calculate known index u 13, u 15it is redundancy.In like manner, carry out Attribute Significance yojan to sub-strength damage factor and the stress of conductor and mechanical vibration factor respectively, obtaining final evaluation index is: U={U 1, U 2, U 3, wherein U 1={ u 11, u 12, u 14, U 2={ u 21, u 22, u 23, u 24, u 25, U 3={ u 31, u 32, u 33, u 34.
3) structure of study collection
Consider that unknown entering singly goes out Nonlinear Mapping f:R more n→ R, assuming that the observable inputoutput data of system can be obtained: and this group data existence function relation:
y i=h(x i)+ε
In formula: X ∈ R nit is independent variable; y i∈ R is dependent variable: ε i∈ R is zero-mean and variance is σ 2independent random distribution variable.Problem is any vectorial X for the input space q, according to the existing data set of system, a mapping can be set up, and by this mapping, the system that obtains is estimated to export accordingly this problem can be summed up as the optimization problem solved below
min &Sigma; ( X i , Y i ) &Element; &Omega; k ( y i - h ( X i , &theta; ) ) 2 w i
In formula: Ω kfor distance X kthe local space that k nearest sample is formed; H () is the nonlinear mapping function describing input and output vector; w ifor weights, the sample data in expression local space is to the influence degree of output vector, and the impact (or contribution degree) that sample datas different in local space exports system is different.Intuitively, the output vector value corresponding to vectorial those the nearest samples input of distance input can reflect the output of current input quantity, and this is in fact also the cardinal rule of Lazy learning method: similar input produces similar output.
Use above algorithm principle, adopt K-VNN search strategy, in system existing N group data, find the most similar data (k<<N) of k group, the actual strength degradation ratio of the shaft tower tower material that the present invention proposes and influence factor collection U present nonlinear relationship:
η=f(U)+ε(t)
Wherein, η is degradation ratio, the white noise that ε (t) is zero-mean, and f () is unknown nonlinear function.For the data that there is N group influence factor and degradation ratio in current t, there is influence factor information U (t), adopt K-VNN search strategy, in system existing N group data, find the most similar data (k<<N) of k group, specific as follows:
2, as cos β (U (i), U (t)) <0, then think that this U (i) deviates from current input U (t), be unfavorable for modeling, abandon this data;
2 otherwise, with the index core of U (i) and U (t) and included angle cosine weighting sum selection criterion, namely
D(U(i),U(t))=α·e -d(U(i),U(t))+(1-α)·cosβ(U(i),U(t))
In formula:
cos &beta; ( U ( i ) , U ( t ) ) = U T ( i ) U ( t ) | | U ( i ) | | 2 &CenterDot; | | U ( t ) | | 2 d ( U ( i ) , U ( t ) ) = | | U ( i ) - U ( i ) | | 2 , &alpha; &Element; [ 0,1 ]
α is weighting factor.Weighting selection criterion D (U (i), U (t)) directly reflects the similarity of U (i) and U (t).If two information vectors the closer to, then d is less, and cos β is also larger, thus D (U (i), U (t)) is also larger.Like this, in existing data message, the k group data selecting D () value maximum, by descending sort, learning of structure collection:
{(U(1),η(1)),…,(U(k),η(k))}
D(U(1),U(t))>…>D(U(k),U(t)).
4) set of factors weight is determined
Actual strength degradation ratio and the influence factor collection U local linear relation of shaft tower tower material are as follows:
η=f θ(U)=U Tθ
Wherein: θ represents set of factors weighted value, and T represents transposition.Because current and data are in different working points, the packing density meeting present operating point U (t) may be different, data amount check for modeling is also indefinite, that is: modeling neighborhood value size is variable, in order to obtain best set of factors weight vectors θ, reduce calculated amount simultaneously, the variation range k ∈ [k of neighborhood can be preset m, k m] (k m<k m), calculating the set of factors weight vectors θ of neighbour k+1 k+1time, directly utilize the set of factors weight vectors θ of neighbour k k, first provide an error functions,
min &theta; J ( &theta; ) = 1 2 &Sigma; i = 1 m ( f &theta; ( U i ) - &eta; i ) 2
Adopt gradient descent method, calculate set of factors weight vectors as follows,
&PartialD; &PartialD; &theta; J ( &theta; ) = &PartialD; &PartialD; &theta; 1 2 &Sigma; i = 1 m ( f &theta; ( U i ) - &eta; i ) 2 = ( f &theta; ( U ) - &eta; ) U i
&theta; k + 1 = &theta; k - &alpha; &PartialD; &PartialD; &theta; J ( &theta; ) = &theta; i - &alpha; ( f &theta; ( U ) - &eta; ) U i
Obtaining is the model θ of neighbour k+1 k+1, meanwhile, what also can obtain neighbour k+1 goes a transposition error value:
e k + 1 , j loo = &eta; ( j ) - &alpha; &theta; k + 1 - j , j = 1,2 . . . , k + 1 .
In formula: represent in k+1 group data, with removing a jth model that data gained arrives; represent actual column material strength degradation rate η (j) and model error between the predicted value obtained.
Like this, what can obtain neighbour k+1 removes a transposition error collection all side and these ?
E loo ( k + 1 ) = &Sigma; j = 1 k + 1 w j ( e k + 1 , j loo ) 2 &Sigma; j = 1 k + 1 w j .
In formula: weighting factor the each U (j) of direct reflection go a transposition error to E loo(k+1) " contribution " size.The closer to the U (j) of U (t), its " contribution " is larger, otherwise less.Now, if
E loo(k+1)>E loo(k),k+1∈[k m,k M].
Then think and stop model " variation " returning calculating, and with model θ kas the best model of system current time.Otherwise, by the model adopting gradient descent method to obtain, concentrate from study and choose the information vector made new advances, continue iteration, until k=k mtill.Like this, the quality of partial model can be judged in time, obtain the best Local Linear Model meeting current time influence factor and degradation ratio relation.So this Local Linear Model may be used for the degradation ratio calculating shaft tower tower material actual strength, i.e. η (t)==U t(t) θ k.
For the strain resistant steel tower of certain Utilities Electric Co., transfer the detailed weather data of nearly 5 years, and the detailed service data that steel tower puts into operation, through native system again inverse modeling, system security level is Failure risk state.In addition, can find out that the resultant error that the steel tower strength degradation rate that calculated by institute of the present invention extracting method and manual analysis obtain is less by emulation, may be used for replacing artificial calculating, its result of calculation as shown in Figure 2.
The content be not described in detail in this manual belongs to the known technology of those skilled in the art.

Claims (5)

1., based on transmission tower tower material actual strength computing method for data mining, it is characterized in that: comprise the steps:
Step 1: index set yojan;
Step 2: the structure of data mining study collection;
Step 3: set of factors weight is determined;
Step 4: actual strength is assessed.
2. a kind of transmission tower tower material actual strength computing method based on data mining according to claim 1, it is characterized in that: the index set yojan in described step 1, main to the index set by meteorologic district condition, sub-strength damage, the stress of conductor and mechanical vibration three major types factors composition, three class influence factor set representations are U={U 1, U 2, U 3.Wherein: U 1={ u 11, u 12, u 13, u 14, u 15, u 11for wind speed (most strong wind), u 12for atmospheric temperature (lowest temperature), u 13for average temperature of the whole year, u 14for ice covering thickness (the thickest icing), u 15for number of days in thunderstorm day in year.U 2={ u 21, u 22, u 23, u 24, u 25, u 26, u 21for working time, u 22for bending reparation number of times, u 23for slight crack repairs number of times, u 24for thunder and lightning or fault current damage number of times, u 25to attach most importance to icing times of fatigue, u 26for on average running stress/maximum operation stress.U 3={ u 31, u 32, u 33, u 34, u 31for wire division number, u 32for wind direction and circuit angle, u 33for ground surface degree of roughness, u 34for steel corrosion amount.Use rough set to carry out index set yojan, Attribute Significance is defined as:
U/R={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 11})={{1,3,5,7,8},{2,4}}
U/(R-{u 12})={{1,2,4,5,7},{3,6,8}}
U/(R-{u 13})={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 14})={{1,5,7},{2,4},{3,6,8}}
U/(R-{u 15})={{1,7},{2,4},{3,6,8},{5}}
U/(R-{u 13,u 15})={{1,7},{2,4},{3,6,8},{5}}
U/R≠U/(R-{u 11})
U/R≠U/(R-{u 12})
U/R≠U/(R-{u 14})
U/R=U/(R-{u 13})=U/(R-{u 15})=U/(R-{u 13,u 15})
Wherein R is the set of the property value of factor.Known index u is calculated through Attribute Significance yojan 13, u 15be redundancy, in like manner, carry out Attribute Significance yojan to sub-strength damage factor and conductor galloping and aeolian vibration factor respectively, obtaining final evaluation index is: U={U 1, U 2, U 3, wherein U 1={ u 11, u 12, u 14, U 2={ u 21, u 22, u 23, u 24, u 25, U 3={ u 31, u 32, u 33, u 34.
3. a kind of transmission tower tower material actual strength computing method based on data mining according to claim 1, it is characterized in that: the structure of the data mining study collection in described step 2, adopt K-VNN search strategy, in system existing N group data, find the most similar data k<<N of k group, actual strength degradation ratio and the influence factor collection U of shaft tower tower material present nonlinear relationship:
η=f(U)+ε(t)
Wherein, η is degradation ratio, the white noise that ε (t) is zero-mean, and f () is unknown nonlinear function.For the data that there is N group influence factor and degradation ratio in current t, there is influence factor information U (t), adopt K-VNN search strategy, in system existing N group data, find the most similar data (k<<N) of k group, specific as follows:
As cos β (U (i), U (t)) <0, then think that this U (i) deviates from current input U (t), be unfavorable for modeling, abandon this data;
Otherwise, with the index core of U (i) and U (t) and included angle cosine weighting sum selection criterion, namely
D(U(i),U(t))=α·e -d(U(i),U(t))+(1-α)·cosβ(U(i),U(t))
In formula:
cos &beta; ( U ( i ) , U ( t ) ) = U T ( i ) U ( t ) | | U ( i ) | | 2 &CenterDot; | | U ( t ) | | 2 d ( U ( i ) , U ( t ) ) = | | U ( i ) - U ( i ) | | 2 , &alpha; &Element; [ 0,1 ]
α is weighting factor.Weighting selection criterion D (U (i), U (t)) directly reflects the similarity of U (i) and U (t); If two information vectors the closer to, then d is less, and cos β is also larger, thus D (U (i), U (t)) is also larger.Like this, in existing data message, the k group data selecting D () value maximum, by descending sort, learning of structure collection:
{(U(1),η(1)),…,(U(k),η(k))}
D(U(1),U(t))>…>D(U(k),U(t)).。
4. a kind of transmission tower tower material actual strength computing method based on data mining according to claim 1, it is characterized in that: the set of factors weight in described step 3 is determined to obtain the influence degree of certain factor to shaft tower tower material actual strength degradation ratio, by probabilistic factor sharpening, actual strength degradation ratio and the influence factor collection U local linear relation of shaft tower tower material are as follows:
η=f θ(U)=U Tθ
Wherein: θ represents set of factors weighted value, and T represents transposition.Because current and data are in different working points, the packing density meeting present operating point U (t) may be different, data amount check for modeling is also indefinite, that is: modeling neighborhood value size is variable, in order to obtain best set of factors weight vectors θ, reduce calculated amount simultaneously, the variation range k ∈ [k of neighborhood can be preset m, k m] (k m<k m), calculating the set of factors weight vectors θ of neighbour k+1 k+1time, directly utilize the set of factors weight vectors θ of neighbour k k, first provide an error functions,
min &theta; J ( &theta; ) = 1 2 &Sigma; i = 1 m ( f &theta; ( U i ) - &eta; i ) 2
Adopt gradient descent method, calculate set of factors weight vectors as follows,
&PartialD; &PartialD; &theta; J ( &theta; ) = &PartialD; &PartialD; &theta; 1 2 &Sigma; i = 1 m ( f &theta; ( U i ) - &eta; i ) 2 = ( f &theta; ( U ) - &eta; ) U i
&theta; k + 1 = &theta; k - &alpha; &PartialD; &PartialD; &theta; J ( &theta; ) = &theta; i - &alpha; ( f &theta; ( U ) - &eta; ) U i
Obtaining is the model θ of neighbour k+1 k+1, meanwhile, what also can obtain neighbour k+1 goes a transposition error value:
e k + 1 , j loo = &eta; ( j ) - &alpha; &theta; k + 1 - j , j = 1,2 . . . , k + 1 .
In formula: represent in k+1 group data, with removing a jth model that data gained arrives; represent actual column material strength degradation rate η (j) and model error between the predicted value obtained;
Like this, what can obtain neighbour k+1 removes a transposition error collection all side and these ?
E loo ( k + 1 ) = &Sigma; j = 1 k + 1 w j ( e k + 1 , j loo ) 2 &Sigma; j = 1 k + 1 w j .
In formula: weighting factor the each U (j) of direct reflection go a transposition error to E loo(k+1) " contribution " size.The closer to the U (j) of U (t), its " contribution " is larger, otherwise less; Now, if
E loo(k+1)>E loo(k),k+1∈[k m,k M].
Then think and stop model " variation " returning calculating, and with model θ kas the best model of system current time.Otherwise, by the model adopting gradient descent method to obtain, concentrate from study and choose the information vector made new advances, continue iteration, until k=k mtill.Like this, the quality of partial model can be judged in time, obtain the best Local Linear Model meeting current time influence factor and degradation ratio relation.
5. a kind of transmission tower tower material actual strength computing method based on data mining according to claim 1, it is characterized in that: the safety assessment in described step 4, according to the influence factor of foundation and the best Local Linear Model of degradation ratio relation, calculate the degradation ratio of tower material actual strength, the degradation ratio calculating shaft tower tower material actual strength is as follows
η(t)==U T(t)θ k
CN201410424393.9A 2014-08-26 2014-08-26 Transmission tower material actual strength computing method based on data mining Pending CN104298706A (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201510422985.1A CN105117969A (en) 2014-08-26 2014-08-26 Actual strength calculation method of tower materials of power transmission tower having obvious evaluation result distinction degree
CN201510422850.5A CN105184306A (en) 2014-08-26 2014-08-26 Power transmission tower material actual strength calculation method enabling evaluation indexes to reflect evaluation results
CN201510423506.8A CN105069027A (en) 2014-08-26 2014-08-26 Method used for calculating actual tower material strength of power transmission pole tower and capable of simplifying indexes
CN201410424393.9A CN104298706A (en) 2014-08-26 2014-08-26 Transmission tower material actual strength computing method based on data mining
CN201510422943.8A CN105005661A (en) 2014-08-26 2014-08-26 Transmission tower material actual strength calculation method with practical result

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410424393.9A CN104298706A (en) 2014-08-26 2014-08-26 Transmission tower material actual strength computing method based on data mining

Related Child Applications (4)

Application Number Title Priority Date Filing Date
CN201510422850.5A Division CN105184306A (en) 2014-08-26 2014-08-26 Power transmission tower material actual strength calculation method enabling evaluation indexes to reflect evaluation results
CN201510422943.8A Division CN105005661A (en) 2014-08-26 2014-08-26 Transmission tower material actual strength calculation method with practical result
CN201510422985.1A Division CN105117969A (en) 2014-08-26 2014-08-26 Actual strength calculation method of tower materials of power transmission tower having obvious evaluation result distinction degree
CN201510423506.8A Division CN105069027A (en) 2014-08-26 2014-08-26 Method used for calculating actual tower material strength of power transmission pole tower and capable of simplifying indexes

Publications (1)

Publication Number Publication Date
CN104298706A true CN104298706A (en) 2015-01-21

Family

ID=52318433

Family Applications (5)

Application Number Title Priority Date Filing Date
CN201510422985.1A Pending CN105117969A (en) 2014-08-26 2014-08-26 Actual strength calculation method of tower materials of power transmission tower having obvious evaluation result distinction degree
CN201510422850.5A Pending CN105184306A (en) 2014-08-26 2014-08-26 Power transmission tower material actual strength calculation method enabling evaluation indexes to reflect evaluation results
CN201510423506.8A Pending CN105069027A (en) 2014-08-26 2014-08-26 Method used for calculating actual tower material strength of power transmission pole tower and capable of simplifying indexes
CN201510422943.8A Pending CN105005661A (en) 2014-08-26 2014-08-26 Transmission tower material actual strength calculation method with practical result
CN201410424393.9A Pending CN104298706A (en) 2014-08-26 2014-08-26 Transmission tower material actual strength computing method based on data mining

Family Applications Before (4)

Application Number Title Priority Date Filing Date
CN201510422985.1A Pending CN105117969A (en) 2014-08-26 2014-08-26 Actual strength calculation method of tower materials of power transmission tower having obvious evaluation result distinction degree
CN201510422850.5A Pending CN105184306A (en) 2014-08-26 2014-08-26 Power transmission tower material actual strength calculation method enabling evaluation indexes to reflect evaluation results
CN201510423506.8A Pending CN105069027A (en) 2014-08-26 2014-08-26 Method used for calculating actual tower material strength of power transmission pole tower and capable of simplifying indexes
CN201510422943.8A Pending CN105005661A (en) 2014-08-26 2014-08-26 Transmission tower material actual strength calculation method with practical result

Country Status (1)

Country Link
CN (5) CN105117969A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106326288A (en) * 2015-06-30 2017-01-11 阿里巴巴集团控股有限公司 Image search method and apparatus

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106920021B (en) * 2015-12-25 2020-08-18 中国电力科学研究院 Method for evaluating overall state of power transmission line iron tower
CN113762869B (en) * 2021-01-29 2024-06-18 北京京东振世信息技术有限公司 Transportation task processing method and device
CN113158484A (en) * 2021-05-07 2021-07-23 国网四川省电力公司电力科学研究院 Method and system for evaluating stability of transmission tower under geological disaster condition
CN117540008B (en) * 2024-01-09 2024-04-05 中国邮电器材集团有限公司 Contract abnormal data risk intelligent analysis method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110122776A (en) * 2010-04-30 2011-11-11 에스이테크놀로지(주) Method and system for evaluate consistency index of ahp
CN103700030A (en) * 2013-12-16 2014-04-02 国家电网公司 Grey rough set-based power grid construction project post-evaluation index weight assignment method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6321192B1 (en) * 1998-10-22 2001-11-20 International Business Machines Corporation Adaptive learning method and system that matches keywords using a parsed keyword data structure having a hash index based on an unicode value
KR101059988B1 (en) * 2009-07-30 2011-08-29 주식회사 바일테크놀러지 Stacked common mode filter with impedance matching
CN102970328B (en) * 2012-10-25 2015-03-11 国家电网公司 Data on-line migration method of typical production system in power industry

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110122776A (en) * 2010-04-30 2011-11-11 에스이테크놀로지(주) Method and system for evaluate consistency index of ahp
CN103700030A (en) * 2013-12-16 2014-04-02 国家电网公司 Grey rough set-based power grid construction project post-evaluation index weight assignment method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘宏杰等: ""粗糙集属性约简判别分析方法及其应用"", 《西安交通大学学报》 *
潘天红灯: ""基于即时学习的非线性***优化控制"", 《控制与决策》 *
葛乐等: ""面向复杂工况的输电线路本体结构安全评价"", 《电力***自动化》 *
钟嘉鸣等: ""粗糙集与层次分析法集成的综合评价模型"", 《武汉大学学报(工学版)》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106326288A (en) * 2015-06-30 2017-01-11 阿里巴巴集团控股有限公司 Image search method and apparatus
CN106326288B (en) * 2015-06-30 2019-12-03 阿里巴巴集团控股有限公司 Image search method and device

Also Published As

Publication number Publication date
CN105005661A (en) 2015-10-28
CN105117969A (en) 2015-12-02
CN105069027A (en) 2015-11-18
CN105184306A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
Wu et al. Study of decision framework of offshore wind power station site selection based on ELECTRE-III under intuitionistic fuzzy environment: A case of China
CN106650767B (en) Flood forecasting method based on cluster analysis and real-time correction
CN104732070B (en) A kind of rock burst grade prediction technique based on information vector machine
CN112749904B (en) Power distribution network fault risk early warning method and system based on deep learning
CN102722759B (en) Method for predicting power supply reliability of power grid based on BP neural network
CN104281773A (en) Method for estimating and calculating strength of power transmission pole tower material on basis of rough-fuzzy set
CN109146063B (en) Multi-segment short-term load prediction method based on important point segmentation
CN104298706A (en) Transmission tower material actual strength computing method based on data mining
CN107292478B (en) Method for acquiring influence situation of disaster on power distribution network
CN115063020B (en) Multi-dimensional safety scheduling device and method for cascade hydropower station based on risk monitoring fusion
CN111428942B (en) Line icing thickness prediction method for extracting micro-terrain factors based on variable grid technology
CN105160060A (en) Actual power curve fitting based theoretical power determination method for wind power plant
CN108133225A (en) A kind of icing flashover fault early warning method based on support vector machines
CN109492756B (en) Multi-element wire galloping early warning method based on deep learning and related device
CN103914792A (en) Integrated risk assessment method for calculating operation uncertainty of electric transmission line
CN105095668B (en) Electrical network icing Long-range Forecasting Methods based on whirlpool, pole, the Asia factor
CN103778305A (en) k-VNN- and LS-SVM-based modelling method for icing of electric transmission line
CN105279612A (en) Poisson distribution-based power transmission line tripping risk assessment method
CN104750976A (en) Establishment method of transmission line state evaluation parameter system
CN111695666A (en) Wind power ultra-short term conditional probability prediction method based on deep learning
CN106611243A (en) Residual correction method for wind speed prediction based on GARCH (Generalized ARCH) model
CN117009735A (en) High-strength forest fire occurrence probability calculation method combining BiLSTM and nuclear density estimation
CN113689053B (en) Strong convection weather overhead line power failure prediction method based on random forest
Hou et al. Spatial distribution assessment of power outage under typhoon disasters
CN115564288A (en) Power transmission line geological disaster risk assessment method and system based on data fusion

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150121