CN104234432B CN201410508942.0A CN201410508942A CN104234432B CN 104234432 B CN104234432 B CN 104234432B CN 201410508942 A CN201410508942 A CN 201410508942A CN 104234432 B CN104234432 B CN 104234432B
Authority
CN
China
Prior art keywords
membrane member
inner membrane
top board
inner membrance
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410508942.0A
Other languages
Chinese (zh)
Other versions
CN104234432A (en
Inventor
韩金涛
孙忠伟
李海泉
王国新
兹延君
齐建忠
刘修敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaocheng Jinxin Building Energy Saving Co Ltd
SHANDONG LIAOCHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
Liaocheng Jinxin Building Energy Saving Co Ltd
SHANDONG LIAOCHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaocheng Jinxin Building Energy Saving Co Ltd, SHANDONG LIAOCHENG CONSTRUCTION GROUP CO Ltd filed Critical Liaocheng Jinxin Building Energy Saving Co Ltd
Priority to CN201410508942.0A priority Critical patent/CN104234432B/en
Publication of CN104234432A publication Critical patent/CN104234432A/en
Application granted granted Critical
Publication of CN104234432B publication Critical patent/CN104234432B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

A kind of shed deckhead construction method, is characterized in that it comprises the steps: 1, lays base plate template;2, inner membrane member installation site is determined;3, inner membrane member is installed;4, colligation fixing Anti-floating reinforcing steel bar;5, concreting.Shed deckhead structure includes the upper strata top board being reinforced concrete structure, waffle beam and lower floor's top board the most successively, places concrete structural cavities inner membrance in upper strata top board, the closed cavity that lower floor's top board and waffle beam surround;Described concrete structural cavities inner membrance, it includes at least one piece of inner membrane member, has outer layer fireproof coating in inner membrane member surface configuration, and at least one PVC fixes housing;Described inner membrane member is that density is more than 15Kg/m3 The solid polystyrene foam block of flame retardant type.

Description

Shed deckhead construction method
The application is filing date December in 2012 13, Application No. 2012105365686, and entitled shed deckhead is tied The divisional application of the Chinese invention patent application of structure and construction method and concrete structural cavities inner membrance.
Technical field
The invention belongs to shed deckhead technical field of structures, particularly relate to a kind of solid polystyrene foam block at car Application technology in the concrete roof cavity structure of storehouse.
Background technology
At present shed deckhead xoncrete structure implant many employings Cavity structural member, work progress is very easy to destroy and Existing noggin piece weight is too big, needs hoisting transportation during installation, and waste machinery is artificial, and construction cost is high.As 00113549.X reinforced concrete cast-in-situs multihole and preparation method thereof.It is characterized in that the cast-in-situ reinforced concrete porous floor made The internal cavity containing core-drawing pore-creating of lid.Its manufacture method is;Prop up superstructure bed die, reinforcing bar binding;Pre-buried core before concrete is poured into a mould, Core coating release agent or cover sealing coat;Core is used fixing device accurate positioning, overcomes concrete core mould to float and construction displacement, protect The outer concrete thickness of card cavity;Pour concrete maintenance;Core is extracted out when concrete condenses and hardens to suitable intensity.The present invention has cost Low, from heavy and light, the advantages such as stress performance is more preferably, it is not necessary to loose core, easy construction, can be used for various industrial civil building.
Summary of the invention
The present invention provides a kind of concrete structural cavities inner membrance;The present invention also provides for a kind of garage using concrete structural cavities inner membrance Top board structure and shed deckhead construction method.
The invention provides a kind of shed deckhead structure using concrete structural cavities inner membrance, it includes all the most successively For the upper strata top board of reinforced concrete structure, waffle beam and lower floor's top board, at upper strata top board, lower floor's top board and waffle beam surround Concrete structural cavities inner membrance is placed in closed cavity;Described concrete structural cavities inner membrance, it includes at least one piece of inner membrane member, at inner membrance Assembly surface is provided with outer layer fireproof coating, and at least one PVC fixes housing;Described inner membrane member is that density is more than 15Kg/ m3 The solid polystyrene foam block of flame retardant type.
The concrete feature of this programme also has, and described inner membrane member is two pieces, and it is two that described PVC fixes housing.
Each PVC fixes housing side with rectangle baffle plate, baffle plate width 10cm ensure that inner membrane member install after two-by-two Spacing 10cm, will not occurred level displacement in work progress;Inner membrane member top is laid and is overlapped firm two at waffle beam Anti-floating reinforcing steel bar, Anti-floating reinforcing steel bar specification is the secondary screw-thread steel muscle that diameter is not less than 14mm, inner membrane member when preventing concreting There is vertical displacement;Gap equal placing concrete tamping between the gap of adjacent inner membrane member, inner membrane member and waffle beam.
The size of inner membrane member is long 950 × wide by 450 × high 430mm or long 750 × wide by 450 × high 430 mm;Inner membrance It is 25mm with waffle beam gap,
To ensure to meet thickness of concrete cover;The waffle beam arrangement corresponding with described inner membrane member is 1000 × 1000mm, the continuous groined type of 1000mm × 800mm pattern are arranged.
Present invention also offers a kind of concrete structural cavities inner membrance, it includes at least one piece of inner membrane member, at inner membrane member table Face is provided with outer layer fireproof coating, and at least one PVC fixes housing;Described inner membrane member is that density is more than 15Kg/m3 Fire-retardant The solid polystyrene foam block of type.
The concrete feature of this programme also has, and described inner membrane member is two pieces, and it is two that described PVC fixes housing.
Each PVC fixes housing side with rectangle baffle plate, baffle plate width 10cm ensure that inner membrane member install after two-by-two Spacing 10cm, will not occurred level displacement in work progress;Inner membrane member top is laid and is overlapped firm two at waffle beam Anti-floating reinforcing steel bar, inner membrane member generation vertical displacement when preventing concreting.
Inner membrane member basic size (length) is 950 × 450 × 430mm, 750 × 450 × 430 mm.
When concreting is vibrated, inner membrane member will not be destroyed, and solves in current cavity structure filling member work progress The problem being easily broken damage;Solid eps foam block outer layer arranges fireproof coating.
Present invention also offers a kind of shed deckhead construction method, it comprises the steps: 1, lays base plate template; 2, inner membrane member installation site is determined;3, inner membrane member is installed;4, colligation fixing Anti-floating reinforcing steel bar;5, concreting.
Present invention also offers a kind of shed deckhead construction method, it comprises the steps:
1, base plate template is laid;
1) template and support system should be designed calculating according to actual loading and construction height, and inner membrance load can be disregarded;
2) the full hall of end template is laid, and should individually should lay by design requirement arch camber, post-cast strip position template during support shuttering;
2, inner membrance installation site is determined;Base plate and girt strip reinforcing bar binding determine inner membrance installation site, according to construction after completing The axial dimension of drawing, ejects the position line outside girt strip sideline i.e. inner membrance, to ensure that inner membrance is the most in place;Must check before snap the line Engineering axis overall size, confirm errorless after can snap the line;
3, inner membrance is installed;
1) carefully comparison inner membrance arranges drawing, carries out mounting arrangements according to the inner membrance position line, prevents misplaced;
2) should conscientiously check before inner membrance is in place that base plate and girt strip cushion block of concrete bar protective layer the most all install;
3), after inner membrance is in place, should ensure that the size between inner membrance and girt strip, between inner membrance and inner membrance meets design requirement;
4, colligation fixing Anti-floating reinforcing steel bar;
1) Anti-floating reinforcing steel bar presses G-Design and layout;
2) Anti-floating reinforcing steel bar all should overlap at girt strip;
3) Anti-floating reinforcing steel bar is firm with falsework drawknot at girt strip and inner membrance gap location iron wire;
5, concreting;
1) concrete requires preparation according to design, stone and the medium sand that aggregate selects particle diameter to be 5~20mm, slump >= 180;
2), during casting concrete, first pour stigma and Vierendeel girder, then it is mixed to pour girt strip and floorslab concrete, girt strip and floor Solidifying soil is carried out in a direction simultaneously;Should first fill interior intermembrane space during casting concrete and fill girt strip again, to guarantee that inner membrance gap size accords with Close design requirement;Girt strip and two positions, inner membrance gap use two poker vibrators to vibrate simultaneously, it is ensured that base plate is closely knit.
The invention has the beneficial effects as follows:
1, inner membrance uses density more than 15Kg/m3 The solid polystyrene foam block of flame retardant type, its comprcssive strength meets coagulation Pressure requirements when soil pours, will not damage rupture in work progress, it is to avoid occur that concrete infiltration is filled into the sky ruptured Phenomenon in cavity configuration, reduces concrete amount, and cost of material of the present invention is low, reduces comprehensive cost.
2, flexible design is in addition to basic size, also can be nonstandard with on-site actual situations "one off" production different according to design drawing Type inner membrance, solves top board boundary dimensions very well and does not fixes and special-shaped border inner membrance filling problem, and the scope of application is wider.
3, sound insulation, heat insulation employing density are more than 15Kg/m3 The solid polystyrene foam block of flame retardant type has good guarantor Temperature, soundproof effect.
4, light weight inner membrance light weight, with 15Kg/m3 As a example by the solid polystyrene foam block of flame retardant type, single inner membrance group Part weight is at about 2.3 3.1Kg, and during template support design, load can be disregarded, and on-the-spot transport is installed light, saves machinery, people Expenses of labour is used.
5, construction is fast, duration short construction technology is simple, after floor bottom mould and reinforcing bar are completed, directly lays inner membrance, Rear colligation Anti-floating reinforcing steel bar.After concreting, inner membrance combines with concrete, need not tear inner membrance open, the reduction of erection time, Save material and labour cost.
Accompanying drawing explanation
Fig. 1 is shed deckhead structural representation;Fig. 2 is shed deckhead structural plan schematic diagram;Fig. 3 is inner membrane member structure Schematic diagram;Fig. 4 is shed deckhead construction method flow chart;Fig. 5 is that on inner membrane member, Anti-floating reinforcing steel bar arranges schematic diagram.
In figure: the top board of 1-upper strata;2-inner membrane member;3-lower floor top board;4-waffle beam;5-baffle plate;6-PVC fixes housing; 7-Anti-floating reinforcing steel bar.
Detailed description of the invention
Embodiment one:
As it is shown on figure 3, a kind of concrete structural cavities inner membrance, it includes at least one piece of inner membrane member 2, on inner membrane member 2 surface It is provided with outer layer fireproof coating, and at least one PVC fixes housing 6;Described inner membrane member 2 is more than 15Kg/m for density3 Fire-retardant The solid polystyrene foam block of type.Described inner membrane member 2 is two pieces, and it is two that described PVC fixes housing 6.Outside each PVC is fixing Frame 6 side with rectangle baffle plate 5, the wide 10cm of baffle plate 5 ensure that inner membrane member 2 install after spacing 10cm, work progress two-by-two In will not occurred level displacement;As it is shown in figure 5, inner membrane member 2 top is laid overlaps firm two anti-floating steel at waffle beam 4 Muscle 7, described Anti-floating reinforcing steel bar is two diameters secondary screw-thread steel muscle not less than 14mm, centrally arranged at inner membrane member upper surface, Two Anti-floating reinforcing steel bars interval 300mm, and inner membrane member outer rim distance 350mm, when preventing concreting, inner membrane member 2 occurs to erect To displacement.The size of inner membrane member is long 950 × wide by 450 × high 430mm or long 750 × wide by 450 × high 430 mm;Inner membrance with Waffle beam gap is 25mm.Use density more than 15Kg/m3 The solid polystyrene foam block of flame retardant type, when concreting is vibrated Inner membrane member will not be destroyed, and solves the problem being easily broken damage in current cavity structure filling member work progress;
Embodiment two:
The present embodiment repeats no more with embodiment one something in common, and difference is that it is a kind of use concrete structural cavities The shed deckhead structure of inner membrance, as shown in Figure 1-2, it includes the upper strata top board being reinforced concrete structure the most successively 1, waffle beam 4 and lower floor's top board 3, in upper strata top board 1, the closed cavity that lower floor's top board 3 and waffle beam 4 surround, place concrete structure Cavity inner membrance;Described concrete structural cavities inner membrance, it includes at least one piece of inner membrane member 2, has outer layer in inner membrane member 2 surface configuration Fireproof coating, and at least one PVC fixes housing 6;Described inner membrane member 2 is more than 15Kg/m for density3 The solid polyphenyl of flame retardant type Vinyl foam block, to ensure to meet thickness of concrete cover;The waffle beam arrangement corresponding with described inner membrane member is 1000 × 1000mm, the continuous groined type of 1000mm × 800mm pattern are arranged.
Embodiment three:
As shown in Figure 4, a kind of shed deckhead construction method, it comprises the steps:
1, base plate template is laid;
1) template and support system should be designed calculating according to actual loading and construction height, and inner membrance load can be disregarded;
2) the full hall of end template is laid, and should individually should lay by design requirement arch camber, post-cast strip position template during support shuttering;
2, inner membrance installation site is determined;Base plate and girt strip reinforcing bar binding determine inner membrance installation site, according to construction after completing The axial dimension of drawing, ejects the position line outside girt strip sideline i.e. inner membrance, to ensure that inner membrance is the most in place;Must check before snap the line Engineering axis overall size, confirm errorless after can snap the line;
3, inner membrance is installed;
1) carefully comparison inner membrance arranges drawing, carries out mounting arrangements according to the inner membrance position line, prevents misplaced;
2) should conscientiously check before inner membrance is in place that base plate and girt strip cushion block of concrete bar protective layer the most all install;
3), after inner membrance is in place, should ensure that the size between inner membrance and girt strip, between inner membrance and inner membrance meets design requirement;
4, colligation fixing Anti-floating reinforcing steel bar;
1) Anti-floating reinforcing steel bar presses G-Design and layout;
2) Anti-floating reinforcing steel bar all should overlap at girt strip;
3) Anti-floating reinforcing steel bar is firm with falsework drawknot at girt strip and inner membrance gap location iron wire;
5, concreting;
1) concrete requires preparation according to design, stone and the medium sand that aggregate selects particle diameter to be 5~20mm, slump >= 180;
2), during casting concrete, first pour stigma and Vierendeel girder, then it is mixed to pour girt strip and floorslab concrete, girt strip and floor Solidifying soil is carried out in a direction simultaneously;Should first fill interior intermembrane space during casting concrete and fill girt strip again, to guarantee that inner membrance gap size accords with Close design requirement;Girt strip and two positions, inner membrance gap use two poker vibrators to vibrate simultaneously, it is ensured that base plate is closely knit.

Claims (1)

1. a shed deckhead construction method, is characterized in that it comprises the steps: 1, lays base plate template;2, in determining Membrane module installation site;3, inner membrane member is installed;4, colligation fixing Anti-floating reinforcing steel bar;5, concreting;Described shed deckhead Structure includes being the upper strata top board of reinforced concrete structure, waffle beam and lower floor's top board the most successively, upper strata top board, Concrete structural cavities inner membrance is placed in the closed cavity that lower floor's top board and waffle beam surround;Described concrete structural cavities inner membrance includes two pieces Inner membrane member, has outer layer fireproof coating and at least one PVC to fix housing every piece of inner membrane member surface configuration;Described inner membrance group Part is that density is more than or equal to 15Kg/m3 The solid polystyrene foam block of flame retardant type;
Each PVC fixes housing side with rectangle baffle plate;Inner membrane member top is laid and is overlapped firm two at waffle beam Root Anti-floating reinforcing steel bar, inner membrane member generation vertical displacement when preventing concreting;The gap of adjacent inner membrane member, inner membrane member with Gap equal placing concrete tamping between waffle beam;
The size of inner membrane member is long 950 × wide by 450 × high 430mm or long 750 × wide by 450 × high 430 mm;Inner membrance is with close Girt strip gap is 25mm, to ensure to meet thickness of concrete cover;The waffle beam layout side corresponding with described inner membrane member Formula is 1000 × 1000mm, the continuous groined type of 1000mm × 800mm pattern is arranged.
CN201410508942.0A 2012-09-06 2012-12-13 Shed deckhead construction method Expired - Fee Related CN104234432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410508942.0A CN104234432B (en) 2012-09-06 2012-12-13 Shed deckhead construction method

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
CN201210326554.1 2012-09-06
CN201210326554 2012-09-06
CN2012103265541 2012-09-06
CN201210536568.6A CN102979233B (en) 2012-09-06 2012-12-13 Garage top slab structure and inner concrete structure cavity membrane thereof
CN201410508942.0A CN104234432B (en) 2012-09-06 2012-12-13 Shed deckhead construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201210536568.6A Division CN102979233B (en) 2012-09-06 2012-12-13 Garage top slab structure and inner concrete structure cavity membrane thereof

Publications (2)

Publication Number Publication Date
CN104234432A CN104234432A (en) 2014-12-24
CN104234432B true CN104234432B (en) 2016-09-14

Family

ID=47853556

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201410508942.0A Expired - Fee Related CN104234432B (en) 2012-09-06 2012-12-13 Shed deckhead construction method
CN201210536568.6A Expired - Fee Related CN102979233B (en) 2012-09-06 2012-12-13 Garage top slab structure and inner concrete structure cavity membrane thereof
CN201610181132.8A Expired - Fee Related CN105839824B (en) 2012-09-06 2012-12-13 Shed deckhead construction method

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201210536568.6A Expired - Fee Related CN102979233B (en) 2012-09-06 2012-12-13 Garage top slab structure and inner concrete structure cavity membrane thereof
CN201610181132.8A Expired - Fee Related CN105839824B (en) 2012-09-06 2012-12-13 Shed deckhead construction method

Country Status (1)

Country Link
CN (3) CN104234432B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351376B (en) * 2016-08-29 2019-07-05 中冶建工集团有限公司 Shed deckhead construction method
CN111520187B (en) * 2020-04-08 2021-06-04 中国矿业大学 Modified EPS module composite high-water-content sealing wall and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0455571A (en) * 1990-06-22 1992-02-24 Nippon Steel Corp Reinforcement construction joint method of reinforced concrete construction
CA2068449A1 (en) * 1992-05-12 1993-11-13 Antonio Pica Process for concrete building construction
JPH06146394A (en) * 1992-11-11 1994-05-27 Shimizu Corp Structure of reinforced concrete column and construction method thereof
CN101619602A (en) * 2009-07-14 2010-01-06 南通宏华建筑安装有限公司 Construction method of cast-in-place concrete cored slabs with self stationary high-strength thin-wall pipe internal mold
CN101761158A (en) * 2010-01-05 2010-06-30 中国建筑第八工程局有限公司 Method and structure for manufacturing shear wall
CN102182309A (en) * 2011-03-22 2011-09-14 中国十九冶集团有限公司 Construction method of steel reinforced concrete beam of large metallurgical industry factory building

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH658091A5 (en) * 1984-07-17 1986-10-15 Planchers Kaiser S A Prefabricated construction element for the construction of floors, terraces or roofs
CN101025000A (en) * 2006-02-18 2007-08-29 邱则有 Cast-in-situ hollow board
KR100806820B1 (en) * 2006-12-19 2008-02-22 삼성중공업 주식회사 Two-way hollow core slab and construction method thereof
CN201016191Y (en) * 2007-02-07 2008-02-06 张颖 Anti-floating PCM cast-in-situs reinforced bar concrete internal mold construction technique
WO2009071708A1 (en) * 2007-12-03 2009-06-11 Puentes Y Calzadas Grupo De Empresas, S.A. Prefabricated structural system for constructing two-way or waffle slabs
CN100575632C (en) * 2008-03-25 2009-12-30 新蒲建设集团有限公司 The job practices of cast-in-situ hollow building roof
KR100885865B1 (en) * 2008-08-13 2009-03-05 주식회사 반석티비에스 A light weight body integrated form for holllow concrete slab, construction method using the same and hollow concrete slab by the method
CN101498173A (en) * 2009-03-04 2009-08-05 吴建辉 Anti-floating construction method for cast-in-place concrete hollow building roof
CN101851956A (en) * 2009-03-31 2010-10-06 殷保卫 Cast-in-place concrete polystyrene foam combination platform construction method
CN201474152U (en) * 2009-07-16 2010-05-19 中建三局第三建设工程有限责任公司 LPM cast-in-situ concrete hollow slab
CN201771083U (en) * 2010-09-16 2011-03-23 何仁德 Positioning and anti-floating device of cast-in-situ reinforced concrete floor system inner mould
CN102409788A (en) * 2011-08-19 2012-04-11 北京建工博海建设有限公司 Phase change material (PCM) cast-in-place reinforced concrete large-size sandwiched floor and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0455571A (en) * 1990-06-22 1992-02-24 Nippon Steel Corp Reinforcement construction joint method of reinforced concrete construction
CA2068449A1 (en) * 1992-05-12 1993-11-13 Antonio Pica Process for concrete building construction
JPH06146394A (en) * 1992-11-11 1994-05-27 Shimizu Corp Structure of reinforced concrete column and construction method thereof
CN101619602A (en) * 2009-07-14 2010-01-06 南通宏华建筑安装有限公司 Construction method of cast-in-place concrete cored slabs with self stationary high-strength thin-wall pipe internal mold
CN101761158A (en) * 2010-01-05 2010-06-30 中国建筑第八工程局有限公司 Method and structure for manufacturing shear wall
CN102182309A (en) * 2011-03-22 2011-09-14 中国十九冶集团有限公司 Construction method of steel reinforced concrete beam of large metallurgical industry factory building

Also Published As

Publication number Publication date
CN102979233B (en) 2014-12-24
CN105839824B (en) 2018-05-15
CN102979233A (en) 2013-03-20
CN104234432A (en) 2014-12-24
CN105839824A (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN105317137B (en) Precast wall body, wallboard and its construction method and prefabricated panel production method
CN103590602B (en) The construction method of cast-in-place concrete hollow building roof
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN103806656A (en) Construction method of cast-in-place concrete flat slab built-in thin-wall hollow box body
CN104532754B (en) A kind of prestressed concrete box girder end-blocking template construction method
CN104631677A (en) Construction technology for hollow super-thick concrete terrace
CN105133768A (en) Cast-in-place hollow floor provided with large-section BDF box bodies and construction method of cast-in-place hollow floor
CN106545030B (en) Small-sized buried reservoir of one kind and preparation method thereof
CN105113706A (en) Reinforced truss gypsum plate with insulation layer, novel dismantling-free formwork and their construction method
CN102619330B (en) Hollow building roof system GBF pipe anti-floating positioning construction method
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN103161176A (en) Tower crane foundation construction method in main building connected garage
CN103821263A (en) Precast assembly self-heat preservation concrete shear wall system and construction method thereof
CN205224332U (en) Prefabricated wall body and prefabricated wallboard
CN202945741U (en) Non-vibrating concrete column of steel tube
CN104532990A (en) Truss steel bar double-layer gypsum fiberboard, disassembly-free formwork wall structure and construction method
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN104234432B (en) Shed deckhead construction method
CN103696437A (en) Construction method for cutting latticed column
CN205669283U (en) The cast-in-place Integral Steel frame wall filled with masonry system of the spacing connection of steel disc
CN107237448A (en) A kind of prefabricated interior fill concrete wallboard and its manufacture method
CN204435616U (en) Truss bars double layer fibre gypsum plank, non-dismantling formwork wall body structure
KR101826094B1 (en) Construction method for transfer mat and transfer mat using the same
CN114319410A (en) Wind power generation grid-connected power equipment assembly type foundation structure and installation construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Dongchang Road 252000 in Shandong province Liaocheng city Dongchangfu District No. 139

Applicant after: SHANDONG LIAOJIAN GROUP CO.,LTD.

Applicant after: LIAOCHENG JINXIN BUILDING ENERGY SAVING Co.,Ltd.

Address before: Dongchang Road 252000 in Shandong province Liaocheng city Dongchangfu District No. 139

Applicant before: SHANDONG LIAOJIAN GROUP CO.,LTD.

Applicant before: LIAOCHENG JINXIN LOW CARBON BUILDING ENERGY SAVING TECHNOLOGY Co.,Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160914