CN104034319A - 一种高层建筑测量控制点投射定位辅助装置及其使用方法 - Google Patents
一种高层建筑测量控制点投射定位辅助装置及其使用方法 Download PDFInfo
- Publication number
- CN104034319A CN104034319A CN201410229166.0A CN201410229166A CN104034319A CN 104034319 A CN104034319 A CN 104034319A CN 201410229166 A CN201410229166 A CN 201410229166A CN 104034319 A CN104034319 A CN 104034319A
- Authority
- CN
- China
- Prior art keywords
- laser
- cover plate
- upper cover
- lower cover
- target
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/02—Means for marking measuring points
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及一种高层建筑测量控制点投射定位辅助装置及其使用方法,由上、下盖板和激光接收靶组成,上盖板与下盖板通过连轴连接,上盖板盖于下盖板上,上盖板的上盖锁对准下底板的锁孔;下盖板内开有四个矩形洞,矩形洞的四边上设有定位调节螺杆,定位调节螺杆上设有螺栓;激光接收靶放置于下盖板与之匹配的凹槽上;下盖板的板框上设有高程点。本发明在高层建筑施工测量中,使用内控法时,当激光垂准仪进行底层控制点向上层施工层地板传递时,用于接收激光,并通过活动位于定位调节螺杆上的螺栓移动定位线,通过定位线的交点确定控制点位。该装置能够永久保存控制点位,保护投射孔,增强了施工安全性,同时该装置上设置有高程控制点,解决了施工过程中,高程控制点精度不高、控制点位不稳定问题。
Description
技术领域
本发明涉及一种高层建筑测量控制点投射定位辅助装置及其使用方法,属于建筑工程测量领域,为激光垂准仪与全站仪进行高层建筑施工测量中控制点位传递时的辅助部件。
背景技术
高层建筑建设过程中,高程低于基坑边坡的地下层结构施工测量一般采用在基坑外部设置控制点进行直接放样,此方法称为外控法;当建筑物建设到正一层时,一般在正一层地板上设置4个高程与平面控制点,4个控制点组成高程与平面控制网,以此控制网对正一层以上建筑物进行逐层测量控制,此方法称为内控法。
内控法中,底层控制点位向上层传递的过程可描述为:当上层地板混凝土初凝,能够进场施工时,必须进行底层控制点位向上层投射,此时在首层控制点上架设激光垂准仪,对中整平后,向上向下同时发射竖直激光,下激光精确对准底层某一控制点,上激光需要在上层地板孔洞处放置激光接收靶进行激光接收,确定传递到上层地板的控制点位。由于垂准仪有仪器误差,每点必须采用依次旋转仪器90度的方法投射4次,在接收靶上用细笔记录4次点位,确定点位误差在允许范围内后,取4次所标记点的对角线交点作为底层投射到上层的控制点位。
在现今施工过程中,一般采用在上层地板投射孔上直接放置激光接收靶,激光投射后,通过取4次所标记点的对角线交点确定为传递到上层的初步控制点位。然后将此点位按照某确定方向平移一定距离,避开投射孔洞,标记于地面,直接确定施工定位轴线,并用墨线记录于地板上。此方法在使用过程中存在较多问题:
1.投射到上层地板的控制点位无法长期稳定保存。下层控制点位传递到施工层后,原始点位由于位于投射孔中央附近,无法保存,只能通过平移,获得间接结果;
2.投射到上层地板的点位平移后,增加了测量次数,且加大了测量误差及产生测量错误的几率;
3. 4个控制点均投射到上层地板后,通过平移,其组成的控制网将产生较大的累积误差,且不易测量检核;
4.投射孔危险性较大。高层建筑控制点投射时,按照测量规范,架设仪器需控制高度60米以内的楼层,以减少测量误差。由于控制点投射孔上一般由小块木板覆盖,当下层控制点向上投射时,需逐层移开木板,打开激光上下通道。此时,若有微小物体掉落必将损坏仪器设备,甚至对施工人员身体造成损害。且在日常施工过程中,也可能造成施工人员身体损伤,故也存在巨大危险性;
5.在现今施工过程中,高程控制点位一般用油漆划在地板或建筑物墙壁上,由于施工场地变化迅速,此方法确定点位不稳定,点位容易在后续施工中损坏。
发明内容
本发明的目的在于提供一种高层建筑测量控制点投射定位辅助装置及其使用方法。
本发明提出的一种高层建筑测量控制点投射定位辅助装置,由上盖板、下盖板和激光接收靶组成,其中:上盖板包括上盖,上盖前侧设有上盖锁,另一侧设有连轴,下盖板一侧上设有连轴插孔,另一侧设有锁孔,上盖的连轴***下盖板的连轴插孔内,当上盖板盖于下盖板上时,上盖板的上盖锁对准下底板的锁孔;下盖板内开有矩形洞,矩形洞的四个角为倒圆弧角,矩形洞的四边上设有定位调节螺杆,每一定位调节螺杆上设有第一螺栓和第二螺栓;所述激光接收靶可放置于下盖板与之匹配的凹槽上;所述下盖板的板框上设有高程点。
本发明提出的一种高层建筑测量控制点投射定位辅助装置的使用方法,具体步骤如下:
当上层楼板混凝土可进场施工后,立即将所述辅助装置安装在施工层投射孔上,下盖板四角用螺钉固定,其中右下角螺钉为顶部凸起的十字花钉,同时作为高程控制点。打开上盖锁,翻开上盖,依次打开底层与施工层之间所有上盖,保证激光通道畅通。在底层控制点上架设激光垂准仪,打开上下激光,对中整平后,在施工层下盖板的板框凹槽上放置激光接收靶,接收激光垂准仪向上发出的激光束铅垂线24,用笔记录点位于激光接收靶上,此为第一次点位;完成记录后,顺时针转动激光垂准仪90°,继续观察点位变化,激光束稳定后,用细笔记录第二次点位,同理,记录下第三、第四点位;当四个点位任意连接长度小于仪器精度允许误差时,则将激光接收靶上记录的四点对角线的交点作为底层投递到施工层的控制点位。然后保证激光接收靶稳定,调节位于定位调节螺杆7上的第一螺栓8和第二螺栓9,移动定位线10,使得两根定位线10构成的双线交点6与激光接收靶上的四点对角线交点重合,并旋紧第一螺栓8和第二螺栓9,此时,移开激光接收靶,控制点位则以定位线交点的形式便永久确定;同理,可确定其他3个控制点,四个控制点都传递到施工层后即可组成平面与高程控制网,通过全站仪20测量四个控制点闭合差,与下层控制网做比较,在规范允许误差范围时,即可以此开展施工放样。
本发明为高层建筑施工测量中,使用内控法时,当激光垂准仪进行底层控制点向上层施工层地板传递时,用于接收激光,并通过活动位于定位调节螺杆上的螺栓移动定位线,通过定位线的交点确定控制点位的一种辅助装置。该装置能够永久保存控制点位,保护投射孔,增强了施工安全性,同时该装置上设置有高程控制点,解决了施工过程中,高程控制点精度不高、控制点位不稳定的问题。
本发明的有益效果在于:
本发明结构简单,易于制作,便于定位调节,提高了工作效率与施工安全性。其主要创新点有以下4个:
1.该装置为首次发明。在日常施工时,投射孔的使用过程中,均无盖保护,仅以小块木板覆盖,施工存在较大危险性。该装置上部设置有保护盖,在不使用时可简单锁定,并有警示标语,增强了施工及测量过程中的安全性;
2.该装置设置有控制点位确定部件。主要由定位线、定位调节螺杆、螺栓等构成,在施工过程中,配合激光接收靶,可即时调节定位,并将下层的控制点位永久保存,在该层之后的施工过程中可随时使用,保证了施工测量精度;
3.该装置设置有激光接收靶放置凹槽;
4.该装置设置有高程控制点。保证了该层之后施工中的高程控制测量精度。
附图说明
图1为上盖板结构示意图。
图2为下盖板结构示意图。
图3为激光接收靶示意图。
图4为上盖板示意图。
图5为上下盖板侧面图。
图6为实施例1本装置使用图示。
图中标号:1.上盖锁,2.上盖,3.连轴,4.连轴插孔,5.螺钉,6.双线交点,7.定位调节螺杆,8.第一螺栓,9.第二螺栓,10.定位线,11.盖板框,12.高程点,13.锁孔,14.激光接收靶,15.上盖锁眼,16.上盖外侧,17.连轴侧面,18.上盖侧面,19.底板侧面,20.全站仪,21.控制网,22.上层投射孔,23.控制点B,24.铅垂线,25.垂准仪,26.控制点A。
具体实施方式
下面通过实施例结合附图进一步说明本发明。
实施例1:如图1-图6所示,本发明由上盖板、下盖板和激光接收靶三部分组成,其中主要部件为下盖板。上盖板包括上盖2,上盖2前侧设有上盖锁1,另一侧设有连轴3,下盖板一侧上设有连轴插孔4,另一侧设有锁孔13,上盖板和下盖板通过连轴3、连轴插孔4相连,当上盖板盖于下盖板上时,上盖板可打开或关闭,起到保护下盖板、遮蔽投射孔的作用。下盖板内开有矩形洞,矩形洞的四个角为倒圆弧角,矩形洞的四边上分别设有定位调节螺杆7,每一定位调节螺杆7上设有第一螺栓8和第二螺栓9;所述激光接收靶可放置于下盖板与之匹配的凹槽上;所述下盖板的盖板框11上设有高程点12。上盖板和下盖板均为正方形,尺寸为30cm·30cm,定位调节螺杆7长度为14cm,激光接收靶14尺寸为20cm·20cm,激光接收靶14上有分划为1cm的方格网。
本发明为高层建筑施工测量中,使用内控法时,当激光垂准仪进行底层控制点向上层地板传递时,用于接收激光,通过多次接收激光点,确定点位,并通过活动位于定位调节螺杆上的螺栓,移动定位线,通过定位线的交点保存控制点位的一种辅助装置,该发明由三部分构成:上盖板、下盖板、激光接收靶。
实施时,将该装置安装在施工层投射孔22上,用螺钉5固定,打开上盖锁1,翻开上盖2,同时打开施工层至底层激光通道上的各个上盖,使激光通道畅通,在底层控制点A 26上架设激光垂准仪25,打开激光,对中底层控制点A 26,垂准仪整平后,在盖板框11的凹槽内放置激光接收靶14,接收激光束铅垂线24,用细签字笔记录点位于激光接收靶14上,此为第一次点位。完成记录后,顺时针转动垂准仪90°,继续观察激光点位变化,待点位稳定后,用签字笔记录第二次点位,同理,记录下第三四点位。四个点位任意连接长度小于仪器精度所允许的误差时,可将四点对角线交点作为计算控制点点位的原始数据。此时,调节位于定位调节螺杆7上的第一螺栓8和第二螺栓9,移动定位线10,使得双线交点6与接收靶上记录的四点对角线交点重合,并旋紧第一螺栓8和第二螺栓9,移开接收靶,控制点位B 23便永久确定。同理,可将其他3个控制点传递到此施工层。四个控制点组成平面与高程控制网21,用全站仪20测量其闭合差,与下层控制网做比较,在规范允许范围时,之后的施工放样便可据此展开。另外,该装置上设置有稳定的高程点12,极大地方便了施工与检测中的高程引测。测量完毕后,盖上上盖2,并将上盖锁1锁好,保证安全稳固。
以上操作的前提是所使用的激光垂准仪仪器误差、控制点传递高度均在仪器允许范围内。
Claims (2)
1.一种高层建筑测量控制点投射定位辅助装置,由上盖板、下盖板和激光接收靶组成,其特征在于:上盖板包括上盖,上盖前侧设有上盖锁,另一侧设有连轴,下盖板一侧上设有连轴插孔,另一侧设有锁孔,上盖的连轴***下盖板的连轴插孔内,当上盖板盖于下盖板上时,上盖板的上盖锁对准下底板的锁孔;下盖板内开有矩形洞,矩形洞的四个角为倒圆弧角,矩形洞的四边上设有定位调节螺杆,每一定位调节螺杆上设有第一螺栓和第二螺栓;所述激光接收靶可放置于下盖板与之匹配的凹槽上;所述下盖板的板框上设有高程点。
2.一种如权利要求1所述的高层建筑测量控制点投射定位辅助装置的使用方法,其特征在于具体步骤如下:
当上层楼板混凝土可进场施工后,立即将所述辅助装置安装在施工层投射孔上,下盖板四周用螺钉固定,其中右下角螺钉为顶部凸起的十字花钉,作为高程控制点;打开上盖锁,翻开上盖,依次打开底层与施工层之间所有上盖,保证激光通道畅通;在底层控制点上架设激光垂准仪,打开上下激光,对中整平后,在施工层下盖板的板框凹槽上放置激光接收靶,接收激光垂准仪向上发出的激光束铅垂线,用笔记录点位于激光接收靶上,此为第一次点位;完成记录后,顺时针转动激光垂准仪90°,继续观察点位变化,激光束稳定后,用细笔记录第二次点位,同理,记录下第三、第四点位;当四个点位任意连接长度小于仪器精度允许误差时,则将激光接收靶上记录的四点对角线交点作为底层投递到施工层的控制点位;然后保证激光接收靶稳定,调节位于定位调节螺杆上的第一螺栓和第二螺栓,移动定位线,使得两根定位线构成的双线交点与激光接收靶上的四点对角线交点重合,并旋紧第一螺栓和第二螺栓,此时,移开激光接收靶,控制点位则以定位线交点的形式便永久确定;同理,可确定其他3个控制点,四个控制点都传递到施工层后即可组成平面与高程控制网,通过全站仪测量四个控制点闭合差,与下层控制网做比较,在规范允许误差范围时,即可以此开展施工放样。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410229166.0A CN104034319B (zh) | 2014-05-28 | 2014-05-28 | 一种高层建筑测量控制点投射定位辅助装置及其使用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410229166.0A CN104034319B (zh) | 2014-05-28 | 2014-05-28 | 一种高层建筑测量控制点投射定位辅助装置及其使用方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104034319A true CN104034319A (zh) | 2014-09-10 |
CN104034319B CN104034319B (zh) | 2016-08-17 |
Family
ID=51465185
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410229166.0A Expired - Fee Related CN104034319B (zh) | 2014-05-28 | 2014-05-28 | 一种高层建筑测量控制点投射定位辅助装置及其使用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104034319B (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104390119A (zh) * | 2014-11-19 | 2015-03-04 | 河南省第二建设集团有限公司 | 一种建筑物测量仪器的支撑装置 |
CN105575249A (zh) * | 2016-03-10 | 2016-05-11 | 大连大学 | 高层建筑物轴线投测教学模型 |
CN105973215A (zh) * | 2016-08-03 | 2016-09-28 | 宝钢钢构有限公司 | 一种激光垂准仪进行铅锤定位测量的***及方法 |
CN107356237A (zh) * | 2017-07-12 | 2017-11-17 | 潍坊科技学院 | 一种新型高层建筑测量控制点投射定位辅助装置 |
CN110440118A (zh) * | 2019-08-28 | 2019-11-12 | 成都建工集团有限公司 | 盾构机工程精准定位脚架 |
CN111021727A (zh) * | 2019-12-06 | 2020-04-17 | 巨匠建设集团股份有限公司 | 一种高层建筑主楼测量的控制方法 |
CN111322983A (zh) * | 2020-04-04 | 2020-06-23 | 山西四建集团有限公司 | 一种全站仪建筑物高程传递的接收装置及方法 |
CN111337000A (zh) * | 2020-04-10 | 2020-06-26 | 中国三冶集团有限公司 | 一种旋转曲面建筑施工测量放样技术 |
CN111364786A (zh) * | 2020-03-24 | 2020-07-03 | 中国十七冶集团有限公司 | 一种坐标控制点保护装置及其制作和使用方法 |
CN113494184A (zh) * | 2021-07-28 | 2021-10-12 | 广州工程总承包集团有限公司 | 一种装配式控制点竖向投测洞口固定装置及其使用方法 |
CN113819891A (zh) * | 2021-08-30 | 2021-12-21 | 廊坊中油朗威工程项目管理有限公司 | 油气管道工程基坑实景三维测量***及方法 |
CN114714315A (zh) * | 2022-04-27 | 2022-07-08 | 东南大学 | 一种内控点竖向传递自动划线装置及其划线方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1163996A (ja) * | 1997-08-19 | 1999-03-05 | Alps Electric Co Ltd | レーザ表示器およびこのレーザ表示器の調整方法 |
JPH11281355A (ja) * | 1998-03-26 | 1999-10-15 | Taisei Corp | 基準墨の鉛直盛替え方法 |
JP2001074460A (ja) * | 1999-09-07 | 2001-03-23 | Dai-Dan Co Ltd | 位置決め装置 |
CN201740526U (zh) * | 2010-07-21 | 2011-02-09 | 四川省玉斧无杆自动钻井机有限公司 | 光电型工程测量仪用的测量光靶 |
CN202692985U (zh) * | 2012-07-25 | 2013-01-23 | 中国建筑第六工程局有限公司 | 中间楼层转点标记板结构 |
CN103557800A (zh) * | 2013-11-07 | 2014-02-05 | 大连市勘察测绘研究院有限公司 | 多层楼板分层水平位移监测方法 |
-
2014
- 2014-05-28 CN CN201410229166.0A patent/CN104034319B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1163996A (ja) * | 1997-08-19 | 1999-03-05 | Alps Electric Co Ltd | レーザ表示器およびこのレーザ表示器の調整方法 |
JPH11281355A (ja) * | 1998-03-26 | 1999-10-15 | Taisei Corp | 基準墨の鉛直盛替え方法 |
JP2001074460A (ja) * | 1999-09-07 | 2001-03-23 | Dai-Dan Co Ltd | 位置決め装置 |
CN201740526U (zh) * | 2010-07-21 | 2011-02-09 | 四川省玉斧无杆自动钻井机有限公司 | 光电型工程测量仪用的测量光靶 |
CN202692985U (zh) * | 2012-07-25 | 2013-01-23 | 中国建筑第六工程局有限公司 | 中间楼层转点标记板结构 |
CN103557800A (zh) * | 2013-11-07 | 2014-02-05 | 大连市勘察测绘研究院有限公司 | 多层楼板分层水平位移监测方法 |
Non-Patent Citations (3)
Title |
---|
庞宝根 等: "用内控外校法提高高层建筑竖向控制的可靠性", 《浙江科技学院学报》, 30 September 2002 (2002-09-30) * |
沈久泊: "浅谈建筑工程测量定位控制方法", 《水利科技与经济》, 31 May 2011 (2011-05-31) * |
王枝胜 等: "高层建筑激光竖向定位技术", 《山西建筑》, 31 March 2002 (2002-03-31) * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104390119B (zh) * | 2014-11-19 | 2016-06-08 | 河南省第二建设集团有限公司 | 一种建筑物测量仪器的支撑装置 |
CN104390119A (zh) * | 2014-11-19 | 2015-03-04 | 河南省第二建设集团有限公司 | 一种建筑物测量仪器的支撑装置 |
CN105575249A (zh) * | 2016-03-10 | 2016-05-11 | 大连大学 | 高层建筑物轴线投测教学模型 |
CN105973215A (zh) * | 2016-08-03 | 2016-09-28 | 宝钢钢构有限公司 | 一种激光垂准仪进行铅锤定位测量的***及方法 |
CN107356237A (zh) * | 2017-07-12 | 2017-11-17 | 潍坊科技学院 | 一种新型高层建筑测量控制点投射定位辅助装置 |
CN110440118B (zh) * | 2019-08-28 | 2024-05-31 | 成都建工集团有限公司 | 盾构机工程精准定位脚架 |
CN110440118A (zh) * | 2019-08-28 | 2019-11-12 | 成都建工集团有限公司 | 盾构机工程精准定位脚架 |
CN111021727A (zh) * | 2019-12-06 | 2020-04-17 | 巨匠建设集团股份有限公司 | 一种高层建筑主楼测量的控制方法 |
CN111364786A (zh) * | 2020-03-24 | 2020-07-03 | 中国十七冶集团有限公司 | 一种坐标控制点保护装置及其制作和使用方法 |
CN111322983A (zh) * | 2020-04-04 | 2020-06-23 | 山西四建集团有限公司 | 一种全站仪建筑物高程传递的接收装置及方法 |
CN111337000A (zh) * | 2020-04-10 | 2020-06-26 | 中国三冶集团有限公司 | 一种旋转曲面建筑施工测量放样技术 |
CN111337000B (zh) * | 2020-04-10 | 2021-11-30 | 中国三冶集团有限公司 | 一种旋转曲面建筑施工测量放样方法 |
CN113494184A (zh) * | 2021-07-28 | 2021-10-12 | 广州工程总承包集团有限公司 | 一种装配式控制点竖向投测洞口固定装置及其使用方法 |
CN113819891A (zh) * | 2021-08-30 | 2021-12-21 | 廊坊中油朗威工程项目管理有限公司 | 油气管道工程基坑实景三维测量***及方法 |
CN113819891B (zh) * | 2021-08-30 | 2023-12-08 | 廊坊中油朗威工程项目管理有限公司 | 油气管道工程基坑实景三维测量***及方法 |
CN114714315A (zh) * | 2022-04-27 | 2022-07-08 | 东南大学 | 一种内控点竖向传递自动划线装置及其划线方法 |
CN114714315B (zh) * | 2022-04-27 | 2023-08-29 | 东南大学 | 一种内控点竖向传递自动划线装置及其划线方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104034319B (zh) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104034319A (zh) | 一种高层建筑测量控制点投射定位辅助装置及其使用方法 | |
CN102890281B (zh) | 一种用于高层建筑的gps高精度定位测量方法 | |
CN104328799B (zh) | 一种盖挖逆作法地铁车站钢管柱精确定位方法 | |
CN109470222B (zh) | 一种超高层建筑工程测量的监理控制方法 | |
CN106320707A (zh) | 一种全投影放线方法 | |
CN102080960A (zh) | 基于gps的超高层建筑物垂直度测控方法 | |
CN206090317U (zh) | 高桥墩滑模施工垂直度控制装置 | |
CN102680942A (zh) | 一种基于全站仪的高炉框架测量定位方法 | |
WO2020088363A1 (zh) | 一种集电线路基础快速分坑放样方法 | |
CN105628000A (zh) | 一种矿山竖井坐标传递测量方法 | |
CN107238377B (zh) | 一种适用于大型地下洞室快速放样锚杆孔位的测量方法 | |
CN115387221A (zh) | 高海拔地区高墩线型控制方法 | |
CN101464146B (zh) | 将地面水准点高程精确传递到高架桥上的测量方法及其装置 | |
KR101177889B1 (ko) | 초고층 건물 수직도 측량관리 | |
CN210321605U (zh) | 一种多功能测量仪 | |
CN206943752U (zh) | 一种用于工程测绘的三脚架 | |
CN104634315A (zh) | 多层楼板分层水平位移监测*** | |
KR101234372B1 (ko) | 토털스테이션을 이용한 수직도 관리측량방법 | |
CN103487040B (zh) | 一种钢柱安装的测量方法 | |
CN102995899A (zh) | 一种建筑施工竖向构件尺寸的测量控制方法 | |
CN103628511A (zh) | 一种用于桩基护筒的放样投点方法 | |
CN203891086U (zh) | 一套用于直线重置法监测深基坑水平位移的测读工具 | |
CN204831200U (zh) | 一种路面宽度自动测量装置 | |
CN106184612B (zh) | 一种雷达桅水上吊装的定位方法 | |
CN109596093A (zh) | 用于盾构发射基座放样的测量装置及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20190528 |
|
CF01 | Termination of patent right due to non-payment of annual fee |