CN103867209A - Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro - Google Patents
Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro Download PDFInfo
- Publication number
- CN103867209A CN103867209A CN201410090973.9A CN201410090973A CN103867209A CN 103867209 A CN103867209 A CN 103867209A CN 201410090973 A CN201410090973 A CN 201410090973A CN 103867209 A CN103867209 A CN 103867209A
- Authority
- CN
- China
- Prior art keywords
- deck
- way
- transverse passage
- scaffold
- vertical shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a method of layered and segmental construction, excavation and holing of transverse passages of a vertical shaft of a metro. According to the method, the height of setting up a scaffold is effectively reduced in a process of carrying out construction, excavation and holing of the transverse passages through a layered and segmental holing manner, so that the set-up work amount of the scaffold and the loss of the scaffold due to muck burying are reduced, and the security risk caused by the height of setting up can be reduced.
Description
Technical field
The present invention relates to a kind of method of excavating into hole, be specifically related to the layering of a kind of subway vertical shaft, segmentation turns adit construction and excavates the method into hole.
Background technology
Tradition multilayer accessory channel vertical shaft enters hole and adopts and set up scaffold after vertical shaft back cover and abolish, as shown in Figure 1, because multilayer accessory channel is conventionally highly higher, the scaffold of setting up is thereupon also higher, the scaffold of high height is not only set up and need to be expended a large amount of human and material resources, and the dregs that accessory channel when construction produces can bury scaffold bottom, cause a large amount of losses of scaffold, also can cause the vertical shaft inconvenience of slagging tap; Because scaffold height is higher, staff's security risk also can increase.
Summary of the invention
The object of the invention is to overcome the shortcoming of above-mentioned prior art, provide the layering of a kind of subway vertical shaft, segmentation to turn adit construction and excavated the method into hole, the method adopts the mode of layering, segmentation to enter hole, can effectively reduce the height of scaffold, reduces the security risk of construction.
For achieving the above object, subway vertical shaft of the present invention layering, segmentation turn adit construction and excavate into the method in hole and comprise the following steps:
1) by To Construction of Silo to N rice under first floor transverse passage-way inverted arch, then lay the interim back cover of first floor in the bottom of vertical shaft, and on the interim back cover of first floor, set up the scaffold of first floor, carrying out the portal of first floor transverse passage-way abolishes and excavation construction again, and then the scaffold of dismounting first floor, the excavation that completes first floor transverse passage-way enters hole;
2) abolish the interim back cover of last layer, by To Construction of Silo to N rice under lower one deck transverse passage-way inverted arch, then the interim back cover of one deck under laying in the bottom of vertical shaft, and on the interim back cover of lower one deck, set up the scaffold of lower one deck, carrying out the portal of lower one deck transverse passage-way abolishes and excavation construction again, then the scaffold of removing lower one deck, the excavation that completes lower one deck transverse passage-way enters hole;
3) repeating step 2), the excavation that completes all transverse passage-ways except last one deck transverse passage-way enters hole, then abolish the interim back cover of layer second from the bottom, by N rice under extremely last To Construction of Silo one deck transverse passage-way inverted arch, then lay final back cover in the bottom of vertical shaft, and setting up the scaffold of last one deck on final back cover, then the portal that carries out last one deck transverse passage-way is abolished and excavation construction, then remove the scaffold of last one deck, complete all adit constructions and excavate into hole.
Step 1) in the time that the length of first floor adit construction supporting is greater than the diameter of first floor transverse passage-way of 3 times, remove the scaffold of first floor;
Step 2) in when the length of one deck adit construction supporting is greater than the diameter of lower one deck transverse passage-way of 3 times instantly, remove the scaffold of lower one deck;
Step 3) in the time that the length of last one deck adit construction supporting is greater than the diameter of last one deck transverse passage-way of 3 times, remove the scaffold of last one deck.
N >=in 2, and N≤3.
The present invention has following beneficial effect:
Subway vertical shaft of the present invention layering, segmentation turn adit construction and excavate into the method in hole carrying out in the process of adit construction, the interconnection of every one deck is excavated respectively into hole, simultaneously to excavating in the process in hole except other layer of later interconnection of last one deck, only need carry out interim back cover in the bottom of vertical shaft, then scaffolding erecting, thereby effectively shorten the height of scaffold, save the material of scaffold, reduce greatly constructor's security risk simultaneously, really accomplish safety construction.
Brief description of the drawings
Fig. 1 is the schematic diagram of scaffold building in traditional multilayer transverse passage-way vertical shaft 1;
Fig. 2 is the front view of multilayer transverse passage-way vertical shaft 1;
Fig. 3 is the lateral view of multilayer transverse passage-way vertical shaft 1;
Fig. 4 is that in the present invention, first floor transverse passage-way 2 excavates the schematic diagram of setting up into the scaffold 41 of first floor in the process of hole;
Fig. 5 is that in the present invention, lower one deck transverse passage-way excavates the schematic diagram of setting up into the scaffold 42 of lower one deck in the process of hole.
Wherein, 1 be vertical shaft, 2 for first floor transverse passage-way, 3 for last one deck transverse passage-way, 41 be the scaffolds of first floor, 42 be lower one deck scaffolds, 51 interim back covers for the interim back cover of first floor, 52 times one decks.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in further detail:
With reference to figure 2, Fig. 3, Fig. 4 and Fig. 5, subway vertical shaft of the present invention layering, segmentation turn adit construction and excavate into the method in hole and comprise the following steps:
1) vertical shaft 1 is constructed to N rice under first floor transverse passage-way 2 inverted arch, then lay the interim back cover 51 of first floor in the bottom of vertical shaft 1, and on the interim back cover 51 of first floor, set up the scaffold 41 of first floor, carrying out the portal of first floor transverse passage-way 2 abolishes and excavation construction again, and then the scaffold 41 of dismounting first floor, the excavation that completes first floor transverse passage-way 2 enters hole;
2) abolish the interim back cover of last layer, vertical shaft 1 is constructed to N rice under lower one deck transverse passage-way inverted arch, then the interim back cover 52 of one deck under laying in the bottom of vertical shaft 1, and on the interim back cover 52 of lower one deck, set up the scaffold 42 of lower one deck, carrying out the portal of lower one deck transverse passage-way abolishes and excavation construction again, then the scaffold 42 of removing lower one deck, the excavation that completes lower one deck transverse passage-way enters hole;
3) repeating step 2), the excavation that completes all transverse passage-ways except last one deck transverse passage-way 3 enters hole, then abolish the interim back cover of layer second from the bottom, vertical shaft 1 is constructed to N rice under last one deck transverse passage-way 3 inverted arch, then lay final back cover in the bottom of vertical shaft 1, and setting up the scaffold of last one deck on final back cover, then the portal that carries out last one deck transverse passage-way 3 is abolished and excavation construction, then remove the scaffold of last one deck, complete all adit constructions and excavate into hole.
Step 1) in the time that the length of first floor transverse passage-way 2 construction supportings is greater than the diameter of first floor transverse passage-way 2 of 3 times, remove the scaffold 41 of first floor;
Step 2) in when the length of one deck adit construction supporting is greater than the diameter of lower one deck transverse passage-way of 3 times instantly, remove the scaffold 42 of lower one deck;
Step 3) in the time that the length of last one deck transverse passage-way 3 construction supportings is greater than the diameter of last one deck transverse passage-way 3 of 3 times, remove the scaffold of last one deck.
N >=in 2, and N≤3.
It should be noted that, in the time that multilayer transverse passage-way vertical shaft 1 is constructed, first vertical shaft 1 is constructed to 2-3m left and right (as interim dregs groove) under the inverted arch of accessory channel, upper strata, interim back cover is carried out in the bottom of vertical shaft 1, the mode of interim back cover is depending on geological condition, in the time that interim back cover position country rock is stablized, as clay, decayed rock etc., adopt double steel bar net to add the thick sprayed mortar of 20cm; In the time that interim back cover position country rock is unstable, as drift sand, carry out interim back cover with reference to design drawing vertical shaft 1 back cover mode.
Claims (3)
1. the layering of subway vertical shaft, segmentation turn adit construction and excavate the method into hole, it is characterized in that, comprise the following steps:
1) vertical shaft (1) is constructed to N rice under first floor transverse passage-way (2) inverted arch, then lay the interim back cover of first floor (51) in the bottom of vertical shaft (1), and on the interim back cover of first floor (51), set up the scaffold (41) of first floor, carrying out the portal of first floor transverse passage-way (2) abolishes and excavation construction again, and then the scaffold (41) of dismounting first floor, the excavation that completes first floor transverse passage-way (2) enters hole;
2) abolish the interim back cover of last layer, by vertical shaft (1) construction to N rice under lower one deck transverse passage-way inverted arch, then the interim back cover (52) of one deck under laying in the bottom of vertical shaft (1), and on the interim back cover (52) of lower one deck, set up the scaffold (42) of lower one deck, carrying out the portal of lower one deck transverse passage-way abolishes and excavation construction again, then the scaffold (42) of removing lower one deck, the excavation that completes lower one deck transverse passage-way enters hole;
3) repeating step 2), the excavation that completes all transverse passage-ways except last one deck transverse passage-way (3) enters hole, then abolish the interim back cover of layer second from the bottom, by N rice under extremely last vertical shaft (1) construction one deck transverse passage-way (3) inverted arch, then lay final back cover in the bottom of vertical shaft (1), and on final back cover, set up the scaffold of last one deck, carrying out the portal of last one deck transverse passage-way (3) abolishes and excavation construction again, then remove the scaffold of last one deck, complete all adit constructions and excavate into hole.
2. subway vertical shaft according to claim 1 layering, segmentation turn adit construction and excavate the method into hole, it is characterized in that,
Step 1) in the time that the length of first floor transverse passage-way (2) construction supporting is greater than the diameter of first floor transverse passage-way (2) of 3 times, remove the scaffold (41) of first floor;
Step 2) in when the length of one deck adit construction supporting is greater than the diameter of lower one deck transverse passage-way of 3 times instantly, remove the scaffold (42) of lower one deck;
Step 3) in the time that the length of last one deck transverse passage-way (3) construction supporting is greater than the diameter of last one deck transverse passage-way (3) of 3 times, remove the scaffold of last one deck.
3. subway vertical shaft according to claim 1 layering, segmentation turn adit construction and excavate the method into hole, it is characterized in that, and N >=in 2, and N≤3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410090973.9A CN103867209A (en) | 2014-03-12 | 2014-03-12 | Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410090973.9A CN103867209A (en) | 2014-03-12 | 2014-03-12 | Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103867209A true CN103867209A (en) | 2014-06-18 |
Family
ID=50906170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410090973.9A Pending CN103867209A (en) | 2014-03-12 | 2014-03-12 | Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103867209A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104131816A (en) * | 2014-06-20 | 2014-11-05 | 上海建工五建集团有限公司 | Construction method for forming door opening in underground wall of subway tunnel in operation |
CN108361036A (en) * | 2018-03-14 | 2018-08-03 | 北京市政路桥股份有限公司 | A kind of construction method that subway station accessory structure is plug-in |
CN112081176A (en) * | 2020-09-11 | 2020-12-15 | 北京住总集团有限责任公司 | Pressure-bearing water layer vertical shaft construction method based on non-dewatering drainage |
CN112112657A (en) * | 2020-09-25 | 2020-12-22 | 中煤第三建设(集团)有限责任公司 | New construction method for digging and building inclined shaft of coal mine |
CN112282809A (en) * | 2020-10-27 | 2021-01-29 | 聊城大学 | Construction method and device for supporting multi-layer underground structure of building |
CN114320376A (en) * | 2022-03-17 | 2022-04-12 | 中国铁路设计集团有限公司 | Supporting structure for underground excavation station to enter main tunnel from cross channel and construction method |
CN117307176A (en) * | 2023-11-29 | 2023-12-29 | 中铁三局集团广东建设工程有限公司 | Transverse channel construction method based on formed pilot tunnel |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3831206C1 (en) * | 1988-09-14 | 1990-05-03 | Gewerkschaft Auguste Victoria, 4370 Marl, De | Method of winning reserves in the vicinity of a shaft and shaft lining for carrying out this method |
CN102953739A (en) * | 2012-10-26 | 2013-03-06 | 中铁二十二局集团第六工程有限公司 | Bidirectional punching method for underground excavation of subway station |
CN103114857A (en) * | 2013-02-26 | 2013-05-22 | 中铁十九局集团第二工程有限公司 | Shield tunnel construction method |
CN103452561A (en) * | 2013-08-20 | 2013-12-18 | 中铁二局股份有限公司 | Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side |
CN103517043A (en) * | 2013-10-22 | 2014-01-15 | 中铁隧道集团二处有限公司 | Safety control method for vertical shaft grab bucket hoisting system and control system of same |
-
2014
- 2014-03-12 CN CN201410090973.9A patent/CN103867209A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3831206C1 (en) * | 1988-09-14 | 1990-05-03 | Gewerkschaft Auguste Victoria, 4370 Marl, De | Method of winning reserves in the vicinity of a shaft and shaft lining for carrying out this method |
CN102953739A (en) * | 2012-10-26 | 2013-03-06 | 中铁二十二局集团第六工程有限公司 | Bidirectional punching method for underground excavation of subway station |
CN103114857A (en) * | 2013-02-26 | 2013-05-22 | 中铁十九局集团第二工程有限公司 | Shield tunnel construction method |
CN103452561A (en) * | 2013-08-20 | 2013-12-18 | 中铁二局股份有限公司 | Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side |
CN103517043A (en) * | 2013-10-22 | 2014-01-15 | 中铁隧道集团二处有限公司 | Safety control method for vertical shaft grab bucket hoisting system and control system of same |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104131816A (en) * | 2014-06-20 | 2014-11-05 | 上海建工五建集团有限公司 | Construction method for forming door opening in underground wall of subway tunnel in operation |
CN104131816B (en) * | 2014-06-20 | 2019-02-12 | 上海建工五建集团有限公司 | The construction method in subway tunnel subterranean wall enabling hole in a kind of operation |
CN108361036A (en) * | 2018-03-14 | 2018-08-03 | 北京市政路桥股份有限公司 | A kind of construction method that subway station accessory structure is plug-in |
CN112081176A (en) * | 2020-09-11 | 2020-12-15 | 北京住总集团有限责任公司 | Pressure-bearing water layer vertical shaft construction method based on non-dewatering drainage |
CN112081176B (en) * | 2020-09-11 | 2022-02-01 | 北京住总集团有限责任公司 | Pressure-bearing water layer vertical shaft construction method based on non-dewatering drainage |
CN112112657A (en) * | 2020-09-25 | 2020-12-22 | 中煤第三建设(集团)有限责任公司 | New construction method for digging and building inclined shaft of coal mine |
CN112112657B (en) * | 2020-09-25 | 2022-04-19 | 中煤第三建设(集团)有限责任公司 | New construction method for digging and building inclined shaft of coal mine |
CN112282809A (en) * | 2020-10-27 | 2021-01-29 | 聊城大学 | Construction method and device for supporting multi-layer underground structure of building |
CN114320376A (en) * | 2022-03-17 | 2022-04-12 | 中国铁路设计集团有限公司 | Supporting structure for underground excavation station to enter main tunnel from cross channel and construction method |
CN114320376B (en) * | 2022-03-17 | 2022-05-17 | 中国铁路设计集团有限公司 | Supporting structure for underground excavation station to enter main tunnel from cross channel and construction method |
CN117307176A (en) * | 2023-11-29 | 2023-12-29 | 中铁三局集团广东建设工程有限公司 | Transverse channel construction method based on formed pilot tunnel |
CN117307176B (en) * | 2023-11-29 | 2024-02-20 | 中铁三局集团广东建设工程有限公司 | Transverse channel construction method based on formed pilot tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103867209A (en) | Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro | |
CN104612698B (en) | A kind of shallow-depth-excavation tunnel top bar interval wall construction method | |
CN106869944B (en) | The extra small clear-distance tunnel construction method in underground interchange intersection under complex environment | |
CN104047623B (en) | A kind of big across cavern excavation construction method | |
CN203756182U (en) | Support structure applied to shallow road tunnel in weak rock area | |
CN102562099B (en) | Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits | |
CN104389610B (en) | A kind of ultrashort step construction method of traversing operation freeway tunnel | |
CN104632227B (en) | Subway station excavation technology of single-layer beam arch structure | |
CN103277106A (en) | Highway tunnel three-step five-procedure excavation construction method | |
CN104533446A (en) | Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel | |
CN104806251B (en) | Subsidiary inverted excavation construction method for urban subway station under complex environment | |
CN106194196B (en) | A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method | |
CN101725358A (en) | Excavation construction method of ultra-shallow buried uneven weathered stratum of tunnel | |
CN103628887A (en) | Large-section water-rich saturated fine sand railway tunnel excavation method | |
CN207177933U (en) | A kind of advanced plugging structure of high-pressure high-flow underground water | |
CN106246192A (en) | Large-scale karst cave treatment under a kind of tunnel basis and base plate and tunnel excavation method | |
CN107091101A (en) | Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site | |
CN107288642A (en) | PBA construction technologies | |
CN107023300A (en) | A kind of use canopy, which is defended the doctrine, builds the construction method of subway station | |
CN103362513A (en) | Transformation and construction method for existing cavity in underground excavation region | |
CN104563147B (en) | Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation | |
CN104831733A (en) | Arch bridge abutment tunnel type large-angle inclined pile construction method | |
CN105909256A (en) | Large-span weak surrounding rock tunnel construction method adopting face pre-reinforcement core soil reserving three-step temporary inverted arch technology | |
CN207033463U (en) | Mine shield handing-over tunnel folded type joint design in the middle part of marine site | |
CN105909262B (en) | A kind of bored tunnel driving method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140618 |