CN103517043A - Safety control method for vertical shaft grab bucket hoisting system and control system of same - Google Patents

Safety control method for vertical shaft grab bucket hoisting system and control system of same Download PDF

Info

Publication number
CN103517043A
CN103517043A CN201310498611.9A CN201310498611A CN103517043A CN 103517043 A CN103517043 A CN 103517043A CN 201310498611 A CN201310498611 A CN 201310498611A CN 103517043 A CN103517043 A CN 103517043A
Authority
CN
China
Prior art keywords
grab bucket
elevator system
bucket elevator
vertical shaft
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310498611.9A
Other languages
Chinese (zh)
Other versions
CN103517043B (en
Inventor
张兆军
张绍宽
刘智华
宋龙
郭小龙
邢宇
杨振鹏
刘振汉
马帅锋
杨艳玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201310498611.9A priority Critical patent/CN103517043B/en
Publication of CN103517043A publication Critical patent/CN103517043A/en
Application granted granted Critical
Publication of CN103517043B publication Critical patent/CN103517043B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

The invention relates to a safety control method for a vertical shaft grab bucket hoisting system and a control system of the safety control method. The method comprises the following steps: transmitting construction site images of the grab bucket hoisting system through a video monitoring device; in the video monitoring device, recording the construction site images through a video camera which operates together with a crown block by which the grab bucket hoisting system is driven, and transmitting the construction site images recorded by the video camera to a synview and a monitor sequentially through a video cable. Compared with the prior art, the safety control method and the control system thereof effectively solve the problem of safety hazard in the operation of a conventional grab bucket hoisting system, are low in manufacturing cost, are recyclable, are easy to maintain, provide adequate security for safe operation of the grab bucket hoisting system, effectively prevent accident, and guarantee safe and reliable operation of hoisting equipment, thereby being suitable for popularization and application in the fields of crane machinery in urban subway construction and other relative fields.

Description

Control method and the control system thereof of vertical shaft grab bucket elevator system safety
Technical field
The present invention relates to ensure the equipment technical field of hoisting machinery handling safety, relate in particular to a kind of control method and control system thereof for Urban Metro Construction vertical shaft grab bucket elevator system safety.
Background technology
At present, Urban Metro Construction tunneling vertical shaft is slagged tap, lifting operation equipment generally adopts bridge crane, and standard span is 10.4m, and post and intercolumniation are 7m, altogether 21m.Hoisting machinery is as the very high special equipment of security requirement, if poor in machine condition, maintain construction operation in the illegal situations such as improper or operation driver awareness of safety is not strong, personnel's injury accident all very easily occurs.
The problem taking place frequently for hoisting machinery security incident is mainly due to the following defect of ubiquity in operating process: (one) is because of signalman and operation driver links up improper or ditch messenger does not cause slagging tap by force and lifting operation is obstructed; (2) in the shaft excavation stage, machinery can cause while cutting the earth and stir up a cloud of dust and the retaining wall spray anchor stage, spray anchor can cause serious mud particle thing, in addition the tail gas that in tunnel, electric welding field, the operation of excavator excavation produce, under the High Pressure of tunnel fan, vertical shaft well head can produce a certain amount of airborne dust, the sight line that operates driver is had a strong impact on, thereby very easily damage security incident; (3) hoisting and hanging operation or work standard is indefinite, and it is coarse that workmen bundlees technology.Generally, in vertical shaft, the safety-critical of hoisting machinery operation is guarantee grab bucket, links up with the handling safety of these elevator system, thereby just can make the job safety of hoisting machinery system be protected.
Therefore, in order to prevent that hoisting machinery accident from occurring, ensure the safe and reliable use of hoisting machinery, need badly research and develop can effective guarantee vertical shaft the technology of hook, grab bucket elevator system safety, the job safety that is used in the hoisting machinery system in the association areas such as Urban Metro Construction is fully ensured.
Summary of the invention
The object of the invention is for the problems referred to above, a kind of control method and control system thereof of vertical shaft grab bucket elevator system safety are provided, with the setting of simple optimizing, method easily, by lower economic input, the efficient guarantee of realization to vertical shaft grab bucket elevator system safety, and then the abundant safety that guarantees relevant hoisting machinery operation.
The technical scheme that the present invention deals with problems is: a kind of control method of vertical shaft grab bucket elevator system safety, by video monitoring apparatus, transmit the job site image of grab bucket elevator system, so that control the driver of grab bucket elevator system, can observe in time job site situation; In described video monitoring apparatus, the camera record job site image by with driving the overhead traveling crane operation of grab bucket elevator system, is transferred to image splitter and monitor by video line successively by the job site image of described camera record; Described monitor is positioned at the driver's who controls grab bucket elevator system horizontal vision coverage area.
Further, by direction of travel and the walking safety prompt function of grab bucket elevator system direction of travel and safety reminding device indication grab bucket elevator system.
Preferably, by described communication and command device command control post, state video monitoring apparatus and described grab bucket elevator system direction of travel and safety reminding device.
Preferably, described communication and command device comprises intercom, is convenient to control between the driver of grab bucket elevator system and signal command personnel gets in touch with communication by intercom.
The control method that the present invention is directed to above-mentioned vertical shaft grab bucket elevator system safety also provides a kind of control system of vertical shaft grab bucket elevator system safety, described vertical shaft grab bucket elevator system is the grab bucket elevator system of the hoisting equipment of operation in vertical shaft, described grab bucket elevator system comprises the overhead traveling crane of operating room and lifting, wherein: described control system comprises video monitoring apparatus, described video monitoring apparatus comprises video camera, image splitter and the monitor being connected by video line; Described video camera is fixed on by bracket on the borehole wall of vertical shaft, and described bracket and described video camera are bolted connection; Described monitor is installed in operating room, is arranged in being oppositely arranged with operating room driver driving seat of operating room just above; Described image splitter is connected with video camera with described monitor respectively by video line.
Further, described control system also comprises communication and command device and grab bucket elevator system direction of travel and safety reminding device; Described communication and command device is used for commanding controls described video monitoring apparatus and grab bucket elevator system direction of travel and safety reminding device.
Preferably, described communication and command device comprises the intercom of getting in touch with between the grab bucket driver of elevator system and signal command personnel for controlling; Described grab bucket elevator system direction of travel and safety reminding device comprise operating grip switch and by display lamp and alarm bell and the Alarm bell's switch of its control, described operating grip switch is along shaft wall cable installation in pipe, described Alarm bell's switch is arranged in operating room, be positioned at driver driving seat one side, be preferably arranged on driver's the right hand one side; Described display lamp and alarm bell are arranged on vertical shaft, are positioned at the offside of operating room; Described operating grip switch and Alarm bell's switch are controlled by communication and command device commander, or, by operating grip switch described in signal command personnel control, by the driver who controls grab bucket elevator system, control described Alarm bell's switch.
Further, described bracket is fixed on shaft wall by expansion bolt; Described monitor is fixedly installed in operating room with bolt.
Further, described video line association is distributed on overhead traveling crane below and shaft wall, by pvc pipe, lays, and by U-shaped pipe clamp, is fixed on shaft wall, along shaft wall, lays to video camera place, is connected with video camera; Described video line by operating room bore a hole into, with trunking plate, lay, be connected with described monitor, centre installs described image splitter additional; Steel wire rope is set up at two ends at overhead traveling crane walking track, and on described steel wire rope, interval hangs stainless steel pulley, and described video line passes and is added in the pulley hole place of described stainless steel pulley, and is fastened with insulating tape.It is mainly based on overhead traveling crane lifting that this kind arranges, and when slagging tap operation walking, need repeat to move at pit mouth and slag field, village, for controlling at any time job site situation, need make video line move with overhead traveling crane; In addition, when mounted, preferably, at overhead traveling crane walking track two ends, weld 25mm I-steel or add steel wire rope wire fastening device, middle connecting steel wire ropes, preferred 6mm steel wire rope, the 2m of being often separated by steel wire rope hangs a stainless steel pulley, passes and adds video line, and be fastened with insulating tape at pulley hole place, so both guarantee the mobility of video line, also avoided the wear and rupture of video line.
Further, the corresponding setting of transverse passage-way of described image splitter and vertical shaft, preferably, when the transverse passage-way of vertical shaft is 4 layers, described image splitter is 4 image splitters; Picture segmentation implement body arranges according to the quantity of transverse passage-way to be determined.
Further, be provided with voice signal emission key on described intercom, driver and signal command personnel are adjusted to same channel, by pinning emission key, talk, and the distance of speech is preferably mouth 2-5 centimetre, talk to completely by unclamping emission key, finishing voice communication.
Further, in grab bucket elevator system direction of travel and safety reminding device, described display lamp is included in the color lamp of the different colours of different directions setting, and described alarm bell is arranged on the centre of each color lamp; Preferably be set to, along East, West, South, North four direction, the color lamp that four kinds of color Yi Yinqi drivers note is set.
Further, described monitor is LCD monitor, and preferably, described LCD monitor is 15 cun of LCD monitors, in concrete application, and can be according to the concrete specification of determining monitor of operating room size.
In the present invention, described grab bucket elevator system is the important component part of hoisting equipment, applicable too for the elevator system of the formations such as hook with grab bucket identical function.
Apply before the control method and control system thereof of vertical shaft grab bucket elevator system safety of the present invention, relevant construction project department equipment portion should specifically formulate according to the present invention hoisting and hanging job standardization administrative manual, define job site all article lifting operations standard and requirement, operation driver, signal command personnel, give training after study, then carry out execute-in-place and application.By the control method of vertical shaft grab bucket elevator system safety of the present invention and the application of control system thereof, can make the man-machine cooperation that is more prone to reach, can fully stop any hoisting and hanging operation in job site and operate against regulations and commander; Wherein, the application of communication and command device can effectively avoid that improper or ditch messenger does not cause slagging tap by force and lifting operation is obstructed because signalman and operation driver link up; Effective application of video monitoring apparatus can avoid driver to judge by accident, especially at shaft excavation stage, machinery, cut the earth, when the stage such as retaining wall spray anchor is caused airborne dust and serious mud particle thing, tail gas etc. have a strong impact on operation driver sight line phenomenon, thereby fully improve processing safety, effectively avoid injuring security incident and occur; Also can find in time the problems such as hoisting and hanging workmen binding, by communication and command device, inform commanding in time, avoid having an accident; And related each part device can repeat along with the transfer of hoisting equipment to install and use in the control system of elevator system safety of the present invention, when improving coefficient of safety, also saved cost, avoided building the wasting of resources of fixture.
Compared with prior art, the invention has the beneficial effects as follows: novel structure, method is reasonable in design, easy and simple to handle, structural design optimization, easy operating and commanding grasp and skilled use fast, have effectively solved the security hidden trouble that existing grab bucket elevator system operation exists, and cost is low, can repeat to recycle, be easy to maintenance, for the safety work of grab bucket elevator system provides abundant guarantee; The accident that effectively prevented occurs, and guarantees the safe and reliable operation of hoisting equipment, is suitable for applying in the field of the association area application hoisting machinery systems such as Urban Metro Construction.
Accompanying drawing explanation
Fig. 1 gets in touch with communication schematic diagram up and down for operating driver and signal command librarian use intercom;
Fig. 2 is the structural representation of installation video monitoring apparatus of the control system of vertical shaft grab bucket elevator system safety;
Fig. 3 is the part-structure schematic diagram of installation video camera of the control system of vertical shaft grab bucket elevator system safety;
Fig. 4 is the structural representation of the control system of vertical shaft grab bucket elevator system safety;
Fig. 5 is driver and signal command personnel's Operating Guideline flow chart.
Shown in figure: the 1-elevator system of grabbing bucket, 2-vertical shaft, 3-driver, 4-contact ditch messenger transmission signal route, 5-signal command personnel, 6-steel wire rope wire fastening device, 7-steel wire rope, 8-pulley, 9-monitor, 10-PVC pipe, 11-bracket, 12-video camera.
Embodiment
Below in conjunction with accompanying drawing, describe the present invention in detail.
As shown in Figures 1 to 5, the control method of a kind of vertical shaft grab bucket elevator system safety of the present invention, by video monitoring apparatus, transmit the job site image of grab bucket elevator system 1, so that control the driver 3 of grab bucket elevator system 1, can grasp in time job site situation; In described video monitoring apparatus, by with driving the video camera 12 of the overhead traveling crane operation of grab bucket elevator system 1 to record job site image, by video line, the job site image of described video camera 12 records is transferred to image splitter and monitor 9 successively; Described monitor 9 is positioned at horizontal vision coverage area of the driver 3.
As shown in Figure 1 and Figure 5, in the control method of above-mentioned vertical shaft grab bucket elevator system safety, for further improving safety guarantee, by direction of travel and the walking safety prompt function of grab bucket elevator system direction of travel and safety reminding device indication grab bucket elevator system 1; For strengthening linking up in time operating mode and adjust Job Operations scheme, by described communication and command device command control post, state video monitoring apparatus and described grab bucket elevator system direction of travel and safety reminding device, wherein, described communication and command device comprises intercom, by intercom, is convenient to get in touch with communication between driver 3 and signal command personnel 5.
In the application of the control method of above-mentioned vertical shaft grab bucket elevator system safety, effective application of video monitoring apparatus can avoid driver to judge by accident, especially at shaft excavation stage, machinery, cut the earth, when the stage such as retaining wall spray anchor is caused airborne dust and serious mud particle thing, tail gas etc. have a strong impact on operation driver sight line phenomenon, thereby fully improve processing safety, effectively avoid injuring security incident and occur; The application of communication and command device can effectively avoid because of signalman and operation driver links up improper or ditch messenger does not cause slagging tap by force and lifting operation is obstructed, also can be to finding in time that by scene and video monitoring apparatus the problems such as hoisting and hanging workmen binding process in time, by communication and command device, inform commanding and driver in time, avoid having an accident.In addition, because of the important component part that described grab bucket elevator system 1 is hoisting equipment, applicable too for the elevator system said method of the formations such as hook with grab bucket identical function.
Control method for above-mentioned vertical shaft grab bucket elevator system safety, can realize by following control system.Particularly, as shown in Figures 1 to 4, a kind of control system of vertical shaft grab bucket elevator system safety, described vertical shaft grab bucket elevator system 1 is the grab bucket elevator system of the hoisting equipment of operation in vertical shaft 2, described grab bucket elevator system 1 comprises the overhead traveling crane of operating room and lifting, wherein: described control system comprises video monitoring apparatus, described video monitoring apparatus comprises video camera 12, image splitter and the monitor 9 being connected by video line; Video camera 12 is fixed on by bracket 11 on the borehole wall of vertical shaft 2, and bracket 11 is bolted connection with video camera 12; Bracket 11 is fixed on the borehole wall of vertical shaft 2 by expansion bolt; Described monitor 9 use bolts are fixedly installed in operating room, are arranged in being oppositely arranged with operating room driver driving seat of operating room just above; Described image splitter is connected with video camera 12 with monitor 9 respectively by video line.Wherein, described monitor 9 is LCD monitor, is conventionally preferably 15 cun of LCD monitors, specifically according to the specification of the selected monitor 9 of operating room size.
As shown in Figures 1 to 4, when the control system of above-mentioned vertical shaft grab bucket elevator system safety specifically arranges, based on overhead traveling crane lifting, when slagging tap operation walking, need repeat to move at pit mouth and slag field, village, for controlling at any time job site situation, need make video line move with overhead traveling crane, described video line association is distributed on the borehole wall of overhead traveling crane below and vertical shaft 2, by pvc pipe 10, lays, by U-shaped pipe clamp, be fixed on the borehole wall of vertical shaft 2, along shaft wall, lay to video camera place, be connected with video camera; Described video line by operating room bore a hole into, with trunking plate, lay, be connected with monitor 9, centre installs described image splitter additional; Steel wire rope 7 is set up at two ends at overhead traveling crane walking track, and on described steel wire rope 7, interval hangs stainless steel pulley 8, and described video line passes and is added in the pulley hole place of described stainless steel pulley 8, and is fastened with insulating tape.In addition, when mounted, for strengthening steadiness, at overhead traveling crane walking track two ends, weld 25mm I-steel or add steel wire rope wire fastening device 6, middle connecting steel wire ropes 7, preferred 6mm steel wire rope, the 2m of being often separated by steel wire rope 7 hangs a stainless steel pulley 8, passes and adds video line, and be fastened with insulating tape at pulley hole place, can guarantee the mobility of video line like this, also can avoid the wear and rupture of video line.
In the control system of above-mentioned vertical shaft grab bucket elevator system safety, in the arranging of video monitoring apparatus, the corresponding setting of transverse passage-way of described image splitter and vertical shaft 2, picture segmentation implement body arranges according to the quantity of transverse passage-way to be determined, select to be preferably, when the transverse passage-way of vertical shaft 2 is 4 layers, described image splitter is 4 image splitters.
In the control system of above-mentioned vertical shaft grab bucket elevator system safety, be the efficient operation of safeguards system, described control system is also provided with communication and command device and grab bucket elevator system direction of travel and safety reminding device; Described communication and command device is used for commanding controls described video monitoring apparatus and grab bucket elevator system direction of travel and safety reminding device, and described communication and command device comprises the intercom of getting in touch with between driver 3 and signal command personnel 5; On described intercom, be provided with voice signal emission key, during application, driver and signal command personnel are adjusted to same channel, by pinning emission key, talk, and the distance of speech is preferably mouth 2-5 centimetre, talk to completely by unclamping emission key, finishing voice communication.
In the control system of above-mentioned vertical shaft grab bucket elevator system safety, described grab bucket elevator system direction of travel and safety reminding device comprise operating grip switch and by display lamp and alarm bell and the Alarm bell's switch of its control, described operating grip switch is along shaft wall cable installation in pipe, described Alarm bell's switch is arranged in operating room, be positioned at driver driving seat one side, be preferably arranged on driver's the right hand one side; Described display lamp and alarm bell are arranged on vertical shaft 2, are positioned at the offside of operating room; Described operating grip switch and Alarm bell's switch are controlled by communication and command device commander, or, by operating grip switch described in signal command personnel control, by the driver who controls grab bucket elevator system, control described Alarm bell's switch.Wherein, described display lamp is included in the color lamp of the different colours of different directions setting, and described alarm bell is arranged on the centre of each color lamp, and alarm bell can be electric bell; Preferably be set to, along East, West, South, North four direction, the color lamp that four kinds of color Yi Yinqi drivers note is set.In concrete operations, driver and signal command personnel's Operating Guideline flow process as shown in Figure 5, the tinkle of bells when first clear and definite signal command personnel (being signalman) and driver operation is set to stop, on two sound, under three sound, click and represent that grab bucket elevator system stops operation, double click and represent that grab bucket elevator system starts to promote operation, by three times, represent that grab bucket elevator system starts to fall grab bucket or auxiliary hook operation, grab bucket or auxiliary hook enter after the bias internal job position of quarrel storehouse, shaft bottom, signal command personnel press and arrow button corresponding on operating grip, grab bucket elevator system direction of travel and safety reminding device can send the pilot light of corresponding direction, now the tinkle of bells does not ring, under above-mentioned rule instructs, concrete operations flow process as shown in Figure 5: if signalman clicks bell button, in aboveground quarrel storehouse, electric bell sends, and driver stops operation after hearing bell ring, if signalman double clicks bell button, in aboveground quarrel storehouse, electric bell sends two sound, and driver starts to promote operation after hearing two sound bell rings, if signalman is by three times bell buttons, in aboveground quarrel storehouse, electric bell sends three sound, driver hears and starts to fall grab bucket or auxiliary hook operation after three sound bell rings (in operation, if pressing two traffic lights simultaneously, signalman represents with auxiliary hook), then, grab bucket or auxiliary hook enter operation in Cun Cha storehouse, grab bucket or auxiliary hook job position occur in skew job area (if grab bucket driver sees when two lamps are simultaneously bright, represent to use auxiliary hook operation), signalman is in conjunction with scene grab bucket or auxiliary hook offset direction, press corresponding east on operating grip, west, south, north indicates (if move still by the tinkle of bells and light operation upper and lower and four corners of the world during auxiliary hook operation), wherein: as signalman presses, indicate northern power knob, driver sees that in driver's cabin opposite indicates the blue indicator light bright (the tinkle of bells does not ring) on the north, start dolly, northwards edge point is moving travels, as signalman presses, indicate southern power knob, driver sees that in driver's cabin opposite indicates the green indicating lamp bright (the tinkle of bells does not ring) in south, starts dolly, and edge point to the south is moving to travel, as signalman presses, indicate eastern power knob, driver sees that in driver's cabin opposite indicates yellow indicator lamp in the east bright (the tinkle of bells does not ring), starts dolly, and edge point is moving eastwards travels.
Apply before the control method and control system thereof of vertical shaft grab bucket elevator system safety of the present invention, relevant construction project department equipment portion answers the method according to this invention and system and device specifically to formulate hoisting and hanging job standardization administrative manual, define job site and need lifting operation standard and the requirement of all kinds of article and the material of lifting operation, operation driver, signal command personnel, give training after study, then carry out execute-in-place and application; For example, for ease of getting in touch with up and down communication signal, construction project department is according to the intercom of on-the-spot actual demand configuration dimension model, give respectively hoisting equipment operation driver, signal command personnel configure each of intercom, each of charger, the secondary operation driver of adapted battery 2, signalman are responsible for keeping, after project is completed, give back construction project department.By the control method of vertical shaft grab bucket elevator system safety of the present invention and the application of control system thereof, can make the man-machine cooperation that is more prone to reach, can fully stop any hoisting and hanging operation in job site and operate against regulations and commander; And related each part device can repeat along with the transfer of hoisting equipment to install and use in the control system of elevator system safety of the present invention, when improving coefficient of safety, also saved cost, avoided building the wasting of resources of fixture; Easy operating and commanding grasp and skilled use fast, effectively solved the security hidden trouble that existing grab bucket elevator system operation exists, and cost is low, can repeat to recycle, be easy to maintenance, for the safety work of grab bucket elevator system provides abundant guarantee; The accident that effectively prevented occurs, and guarantees the safe and reliable operation of hoisting equipment, is suitable for applying in the field of the association area application hoisting machinery systems such as Urban Metro Construction.
The invention is not restricted to above-mentioned execution mode, those of ordinary skills make to any apparent improvement of above-mentioned execution mode or change, can not exceed the protection range of design of the present invention and claims.

Claims (10)

1. a control method for vertical shaft grab bucket elevator system safety, is characterized in that: the job site image that transmits grab bucket elevator system by video monitoring apparatus; In described video monitoring apparatus, the camera record job site image by with driving the overhead traveling crane operation of grab bucket elevator system, is transferred to image splitter and monitor by video line successively by the job site image of described camera record.
2. the control method of vertical shaft grab bucket elevator system safety as claimed in claim 1, is characterized in that: by direction of travel and the walking safety prompt function of grab bucket elevator system direction of travel and safety reminding device indication grab bucket elevator system.
3. the control method of vertical shaft grab bucket elevator system safety as claimed in claim 2, is characterized in that: by described communication and command device command control post, state video monitoring apparatus and described grab bucket elevator system direction of travel and safety reminding device.
4. the control method of vertical shaft grab bucket elevator system safety as claimed in claim 3, is characterized in that: described communication and command device comprises intercom.
5. an application is as the control system of the control method of arbitrary vertical shaft grab bucket elevator system safety in claim 1 to 4, described vertical shaft grab bucket elevator system is the grab bucket elevator system of the hoisting equipment of operation in vertical shaft, described grab bucket elevator system comprises the overhead traveling crane of operating room and lifting, it is characterized in that: described control system comprises video monitoring apparatus, described video monitoring apparatus comprises video camera, image splitter and the monitor being connected by video line; Described video camera is fixed on by bracket on the borehole wall of vertical shaft, and described bracket and described video camera are bolted connection; Described monitor is installed in operating room, be arranged in operating room just above and be oppositely arranged with operating room driver driving seat; Described image splitter is connected with video camera with described monitor respectively by video line.
6. the control system of vertical shaft grab bucket elevator system safety as claimed in claim 5, is characterized in that: described control system also comprises communication and command device and grab bucket elevator system direction of travel and safety reminding device; Described communication and command device is used for commanding controls described video monitoring apparatus and grab bucket elevator system direction of travel and safety reminding device.
7. the control system of vertical shaft as claimed in claim 6 grab bucket elevator system safety, it is characterized in that: described grab bucket elevator system direction of travel and safety reminding device comprise operating grip switch and by display lamp and alarm bell and the Alarm bell's switch of its control, described operating grip switch is along shaft wall cable installation in pipe, described Alarm bell's switch is arranged in operating room, is positioned at driver driving seat one side; Described display lamp and alarm bell are arranged on vertical shaft, are positioned at the offside of operating room; Described operating grip switch and Alarm bell's switch are controlled by described communication and command device commander.
8. the control system of vertical shaft grab bucket elevator system safety as claimed in claim 5, is characterized in that: described bracket is fixed on shaft wall by expansion bolt; Monitor is fixedly installed in operating room with bolt.
9. the control system of vertical shaft as claimed in claim 5 grab bucket elevator system safety, it is characterized in that: described video line association is distributed on overhead traveling crane below and shaft wall, by pvc pipe, lay, by U-shaped pipe clamp, be fixed on shaft wall, along shaft wall, lay to video camera place, be connected with video camera;
Described video line by operating room bore a hole into, with trunking plate, lay, be connected with described monitor, centre installs described image splitter additional;
Steel wire rope is set up at two ends at overhead traveling crane walking track, and on described steel wire rope, interval hangs stainless steel pulley, and described video line passes and is added in the pulley hole place of described stainless steel pulley, and is fastened with insulating tape.
10. the control system of vertical shaft grab bucket elevator system safety as claimed in claim 5, is characterized in that: when the transverse passage-way of vertical shaft is 4 layers, described image splitter is 4 image splitters.
CN201310498611.9A 2013-10-22 2013-10-22 The control method and its control system of vertical shaft grab bucket lifting system safety Expired - Fee Related CN103517043B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310498611.9A CN103517043B (en) 2013-10-22 2013-10-22 The control method and its control system of vertical shaft grab bucket lifting system safety

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310498611.9A CN103517043B (en) 2013-10-22 2013-10-22 The control method and its control system of vertical shaft grab bucket lifting system safety

Publications (2)

Publication Number Publication Date
CN103517043A true CN103517043A (en) 2014-01-15
CN103517043B CN103517043B (en) 2017-12-26

Family

ID=49898968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310498611.9A Expired - Fee Related CN103517043B (en) 2013-10-22 2013-10-22 The control method and its control system of vertical shaft grab bucket lifting system safety

Country Status (1)

Country Link
CN (1) CN103517043B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867209A (en) * 2014-03-12 2014-06-18 西安建筑科技大学 Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro
CN105858189A (en) * 2016-05-03 2016-08-17 西安科技大学 Vertical claw elevating type mechanical cleaning leak coal system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2296602Y (en) * 1997-01-02 1998-11-04 南京第一建筑工程机械厂 Radio intercommunication remote controller for tower crane
CN1463909A (en) * 2002-06-20 2003-12-31 柳州市建筑机械总厂 Primary and second follow-up control hydraulic lifting system and construction method for lifting thereof
CN1648029A (en) * 2005-01-19 2005-08-03 深圳市拓发实业有限公司 Monitoring system for tower crane
CN201686410U (en) * 2010-03-18 2010-12-29 中国葛洲坝集团股份有限公司 Wireless video monitoring device for hoisting processes of cable crane
CN203492152U (en) * 2013-10-22 2014-03-19 中铁隧道集团二处有限公司 Control system for vertical shaft grab bucket lifting system safety

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2296602Y (en) * 1997-01-02 1998-11-04 南京第一建筑工程机械厂 Radio intercommunication remote controller for tower crane
CN1463909A (en) * 2002-06-20 2003-12-31 柳州市建筑机械总厂 Primary and second follow-up control hydraulic lifting system and construction method for lifting thereof
CN1648029A (en) * 2005-01-19 2005-08-03 深圳市拓发实业有限公司 Monitoring system for tower crane
CN201686410U (en) * 2010-03-18 2010-12-29 中国葛洲坝集团股份有限公司 Wireless video monitoring device for hoisting processes of cable crane
CN203492152U (en) * 2013-10-22 2014-03-19 中铁隧道集团二处有限公司 Control system for vertical shaft grab bucket lifting system safety

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103867209A (en) * 2014-03-12 2014-06-18 西安建筑科技大学 Method of layered and segmental construction, excavation and holing of transverse passages of vertical shaft of metro
CN105858189A (en) * 2016-05-03 2016-08-17 西安科技大学 Vertical claw elevating type mechanical cleaning leak coal system
CN105858189B (en) * 2016-05-03 2018-11-09 西安科技大学 Vertical pawl hoisting type mechanical chipping spreads coal measures system

Also Published As

Publication number Publication date
CN103517043B (en) 2017-12-26

Similar Documents

Publication Publication Date Title
CN103266192B (en) Hoisting method for replacing cooling wall in overhauling of blast furnace
CN107604941A (en) A kind of new and old subway station connectivity part diaphragm wall and side wall restructuring bankrupt
CN105971603A (en) Coal cutter visual wireless remote automatic control system based on IP framework
CN108639111A (en) Road junction controls alarm system
CN103517043A (en) Safety control method for vertical shaft grab bucket hoisting system and control system of same
CN110080794A (en) A kind of present low gas tunnel large-diameter shield fission is gone into the well construction method
CN203492152U (en) Control system for vertical shaft grab bucket lifting system safety
CN101913366A (en) Normally closed type intelligent catcher
CN109162721B (en) Unmanned tunneling system and method for coal mine tunnel
CN206308626U (en) Operating platform for installing hanging basket at top of pier body of pier
CN112477914A (en) Roadster protection device and method for mixed transportation roadway
CN209923368U (en) Automatic slag grabbing system based on travelling crane
CN216311046U (en) Mining rock drilling equipment removes remote control device
CN203581898U (en) Rubber belt conveyor scramming device
CN203373053U (en) Winch speed monitoring device
CN115182704A (en) Emergency rescue device for blowout of oil and gas well and use method
CN102296610B (en) Device for removing square pile and construction method thereof
CN103979415B (en) A kind of mine Jing Lou driving more layer lifting method of controlling security
CN206579650U (en) A kind of coal mine sloping lane lifting of winch steel wire rope modified line transition apparatus
WO2014112672A1 (en) Swing lock device for construction equipment
CN218439450U (en) Remote control dragging device of cable monorail crane for coal mine
CN109987501A (en) A kind of device threaded off in Quick air in steel structure hoisting and tripping method
CN117432361B (en) Cantilever type wellhead resetting device and method
CN217102783U (en) Large-tonnage crane cart operation interlocking alarm system
CN216343582U (en) Emergency braking safety protection device for oil drilling racking platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Song Long

Inventor after: Chen Zhanglin

Inventor after: Li Yujiang

Inventor after: Liu Yang

Inventor after: Jiang Weiqiang

Inventor after: Li Xiaoqi

Inventor after: Han Jiankun

Inventor after: Zhou Zhaoyong

Inventor after: Zhang Shaokuan

Inventor after: Zhang Zhaojun

Inventor after: Liu Zhihua

Inventor after: Xing Yu

Inventor after: Huang Wei

Inventor after: Niu Rui

Inventor before: Zhang Zhaojun

Inventor before: Yang Yanling

Inventor before: Zhang Shaokuan

Inventor before: Liu Zhihua

Inventor before: Song Long

Inventor before: Guo Xiaolong

Inventor before: Xing Yu

Inventor before: Yang Zhenpeng

Inventor before: Liu Zhenhan

Inventor before: Ma Shuaifeng

GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

Termination date: 20191022