CN106194196B - A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method - Google Patents

A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method Download PDF

Info

Publication number
CN106194196B
CN106194196B CN201610698815.0A CN201610698815A CN106194196B CN 106194196 B CN106194196 B CN 106194196B CN 201610698815 A CN201610698815 A CN 201610698815A CN 106194196 B CN106194196 B CN 106194196B
Authority
CN
China
Prior art keywords
tunnel
solution cavity
excavation
steelframe
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610698815.0A
Other languages
Chinese (zh)
Other versions
CN106194196A (en
Inventor
马瑞
石银峰
周世生
蔡玮
翟相飞
梁红忠
张春发
王怀雄
王涛
王翰春
叶锦华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Administration Road And Bridge Ltd Co
Original Assignee
Beijing Municipal Administration Road And Bridge Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Administration Road And Bridge Ltd Co filed Critical Beijing Municipal Administration Road And Bridge Ltd Co
Priority to CN201610698815.0A priority Critical patent/CN106194196B/en
Publication of CN106194196A publication Critical patent/CN106194196A/en
Application granted granted Critical
Publication of CN106194196B publication Critical patent/CN106194196B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method including karst cave treatment, pre-pouring grout, excavate upper arcuate base tunnel, step in excavation, three steps, seven footwork for excavating three layers of step in the middle part of getting out of a predicament or an embarrassing situation and excavating.Construction space of the invention is big, facilitates mechanized construction, can more work surface parallel operations, work efficiency is higher;It is convenient when geological conditions changes, convenient for flexibly, convert working procedure in time, adjust construction method;It adapts to different spans and a variety of form of fracture, preliminary bracing process operations is convenient;On the basis of benching tunnelling method excavates, remaining core soil in advance controls the excavation that is staggered, and is conducive to excavated surface and stablizes;When surrouding rock deformation is larger or mutation, under the premise of guaranteeing safety and meeting Clearance requirement, closing time can be adjusted as early as possible, it is widely used on the stratum of the special geologic condition of solution cavity, it needs quick, the safe and effective tunnel excavation by the geological conditions to construct, guarantees the safety of construction with tunnel.

Description

A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method
Technical field
The present invention relates to constructing tunnel field, especially a kind of tunnelling encounters hole body and dredges deeply, fills plentiful large size Karst cave treatment and tunnel excavation method when solution cavity.
Background technique
The formation of solution cavity is the long-term corrosion of In Limestone Area underground water as a result, insoluble calcium carbonate is by water in limestone The calcium bicarbonate of microsolubility can be converted into the effect of carbon dioxide.The geological phenomenon will affect its peripheral rock stability and Mechanics distribution situation influences the engineering construction quality on periphery.
In engineering construction, part construction technology is affected to surrouding rock stress distribution, encounters unavoidable solution cavity, work The dangerous and unstable factor of journey structure increases, and construction technology becomes many and diverse, and the uncertainty and risk of entire engineering also exist It is continuously increased.
In the construction process, it is commonplace to appear in the case near tunnel for solution cavity, especially super-large span Karst Tunnel I.e. 18 meters of span or more, when large-scale solution cavity is crossed under tunnel sidewalls and bottom plate, generally use side heading method, interval wall approach and friendship The method that fork interval wall approach etc. needs to remove gib and stress check calculation causes insecurity factor, there are the construction time it is longer, It is unfavorable for adjusting the various problems of closing time, inconvenient mechanical execution and working procedure frequent transitions in time.
Summary of the invention
The object of the present invention is to provide a kind of large-scale karst cave treatment for crossing tunnel trunk and excavation methods, to solve existing There are the construction time is longer when Tunnel Passing solution cavity, exists and be unfavorable for adjusting closing time, inconvenient mechanical execution, construction in time The technical issues of process frequent transitions.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method, the tunnel are Karst Tunnel, construction procedure It is as follows:
Step 1, large-scale solution cavity cross when the side wall of tunneling and bottom plate position, in side wall and floor level position Two sides and bottom plate on the downside of set up template and formed by integrally casting there are two concrete bearing, the cross sections of the concrete bearing Size is greater than the height of large-scale solution cavity, which need to be embedded to country rock and solution cavity downside on the upside of solution cavity respectively Within country rock, the longitudinal length of the concrete bearing is greater than the depth of solution cavity, has also installed one group in the concrete bearing The support drain cavern template longitudinally disposed along support, and support drain cavern, the support drain cavern are formed after concreting Size and spacing need to be designed according to actual loading, guarantee that solution cavity cannot be blocked in the case where top tunnel load safety;
Step 2, applies the country rock drain cavern of large-scale solution cavity on the downside of the solution cavity in country rock, and two of the country rock drain cavern Opening is connected to the large-scale solution cavity of support two sides respectively;
Step 3, tunnel use tunneling boring curtain pre-pouring grout or tunneling boring periphery pre-pouring grout;
Step 4 excavates upper arcuate base tunnel: the arch circumferential direction in tunnel excavates upper arcuate base tunnel, and reserved core Soil, circumferential direction excavate cyclic advance amount and are equipped with according to the steelframe spacing of preliminary bracing, are no more than 1.5m, sprayed after excavation, Anchor, net system supporting, while being reinforced using slip casting ductule radial grouting, the steelframe of preliminary bracing is set up, in the arch springing of steelframe At the above 30cm height, the two sides for being close to steelframe set up lock foot anchoring stock along 30 ° of angle of declination, and lock foot anchoring stock and steelframe weld, multiple Pneumatically placed concrete to design thickness forms just branch arch;
Step 5 excavates in left side step in step and right side: excavating drilling depth amount and matched according to the steelframe spacing of preliminary bracing It closes setting, be no more than 1.5m, excavation height 3-3.5m, left and right sides step is staggered 2-3m, and just spray 3-5cm is thick immediately after excavation Then concrete is sprayed, anchor, net system supporting, along tunnel excavation direction spreading steelframe, in the above 30cm high of the arch springing of steelframe At degree, the two sides for being close to steelframe set up lock foot anchoring stock along 30 ° of angle of declination, and lock foot anchoring stock and steelframe weld, and multiple pneumatically placed concrete is extremely Design thickness forms just branch side wall top;
Step 6 continues to get out of a predicament or an embarrassing situation on the left of excavation and get out of a predicament or an embarrassing situation with right side using the method in step 5, forms just branch side wall Lower part and tunnel floor edge;
Step 7, the position remaining core soil in advance that step and middle part are got out of a predicament or an embarrassing situation in middle part top bar, middle part, each bench excavation Afterwards, it applies in the middle part of tunnel floor, will be laid in armored concrete bridge in the middle part of tunnel floor.
In the step 1, the large size solution cavity crosses left side wall lower part and entire bottom plate from tunnel right-side wall, described Concrete bearing is respectively that left side support and right side support, the bottom of the left side support are stepped along tunnel cross section direction It is embedded on the downside of solution cavity in country rock, the inside of the left side support and first branch side wall lower outside and the baseplate underside company of fitting It connects, on the upside of the top embedment solution cavity of the left side support in country rock, on the downside of the bottom embedment solution cavity of the right side support in country rock, It is fitted and connected on the inside of the inside of right side support and first branch side wall, country rock on the upside of the top braces solution cavity of the right side support.
In the step 3, pre-grouting advance support be all made of diameter be 108mm steel tube shed, steel tube shed be arranged ring away from for 50cm。
In the step 4, the length of remaining core soil in advance is 3-5m, and width is the 1/3-1/2 of tunnel excavation width.
Compared with prior art the invention has the characteristics that and the utility model has the advantages that
Construction method of the invention pre-processes the large-scale solution cavity disease under tunnel basis and bottom plate, is endangering Position is provided with the armored concrete support of one-piece casting, and the safety during Tunnel Passing large size solution cavity and tunnel has been effectively ensured The stabilization of road operation, while using the excavation of three seven footworks progress tunnel tunnel faces, it ensure that and applied under unfavorable geological condition The safety of work, the sedimentation for reducing the non-homogeneous stress and tunnel of surrounding formation restrains, while ensure that construction to greatest extent Progress, large-scale solution cavity is passed through to constructing tunnel and is had highly application value.
Three step of construction method, seven step excavating load of the invention has evaded side heading method, interval wall approach and has intersected median septum Method etc. needs to remove gib and stress check calculation causes unsafe factor, by shortening length of bench, it is ensured that preliminary bracing Closure cyclization as early as possible, while inverted arch and arch wall lining cutting are followed up in time, form stable support system as early as possible, and there is adjustment in time to close The time is closed, mechanical execution is facilitated, conducive to the advantage of working procedure conversion.
Construction method construction space of the invention is big, facilitates mechanized construction, can more work surface parallel operations, part is soft Rock or soil property location can directly be excavated using excavator, and work efficiency is higher;Conveniently when geological conditions changes, convenient for spirit It lives, convert working procedure in time, adjust construction method;Adapt to different spans and a variety of form of fracture, preliminary bracing process behaviour It is convenient to make;On the basis of benching tunnelling method excavates, remaining core soil in advance controls the excavation that is staggered, and is conducive to excavated surface and stablizes;Work as country rock When deforming larger or mutation, under the premise of guaranteeing safety and meeting Clearance requirement, closing time can be adjusted as early as possible.
The present invention is widely used in needing quick, safe and effective by this on the stratum of the special geologic condition of solution cavity The tunnel excavation of geological conditions is constructed, and guarantees the safety of construction with tunnel.
Detailed description of the invention
The present invention will be further described in detail with reference to the accompanying drawing.
Fig. 1 is the schematic cross section of karst cave treatment and benching tunnelling method construction.
Fig. 2 is the vertical section schematic diagram of benching tunnelling method construction.
Appended drawing reference: support, the right side 2- support, 3- solution cavity downside country rock, 4- slip casting ductule, 5- are molten on the left of 1- Country rock on the upside of hole, 6- upper arcuate base tunnel, on the left of 7- in step, on the right side of 8- in step, get out of a predicament or an embarrassing situation, on the right side of 10- on the left of 9- Get out of a predicament or an embarrassing situation, top bar in the middle part of 11.1-, in the middle part of 11.2- in step, get out of a predicament or an embarrassing situation in the middle part of 11.3-, 12- is just at the beginning of branch arch, 13- Branch side wall top, the first branch side wall lower part 14- and tunnel floor edge, 15- tunnel floor middle part, 16- steel tube shed, 17- are big Type solution cavity, 18- country rock drain cavern, 19- support drain cavern.
Specific embodiment
Embodiment is referring to tunnel to be excavated shown in Fig. 1-2, and the tunnel is Karst Tunnel, and maximum span is up to 18 Rice, large-scale solution cavity 17 cross left side wall lower part and entire bottom plate from tunnel right-side wall, and this large size for crossing tunnel trunk is molten Hole processing is as follows with the construction procedure of excavation method:
Step 1, large-scale solution cavity 17 cross when the side wall of tunneling and bottom plate position, in side wall and floor level position The two sides set and template and formed by integrally casting are set up on the downside of bottom plate there are two concrete bearing, the concrete bearing it is transversal Face size is greater than the height of large-scale solution cavity, which need to be embedded to country rock 5 and solution cavity on the upside of solution cavity respectively Within downside country rock 3, the longitudinal length of the concrete bearing is greater than the depth of solution cavity, has also installed in the concrete bearing One group of support drain cavern template longitudinally disposed along support, and support drain cavern 19, the support are formed after concreting Drain cavern size and spacing need to be designed according to actual loading, guarantee to block in the case where top tunnel load safety molten Hole;
The concrete bearing is respectively left side support 1 and right side support 2, the left side support along tunnel cross section direction On the downside of the stepped embedment solution cavity in 1 bottom in country rock 3, the inside of the left side support 1 and first branch side wall lower outside and Baseplate underside is fitted and connected, on the upside of the top embedment solution cavity of the left side support 1 in country rock 5, the bottom of the right side support 2 It is embedded on the downside of solution cavity in country rock, is fitted and connected on the inside of the inside of right side support 2 and first branch side wall, the top of the right side support 2 Portion supports country rock 5 on the upside of solution cavity.
Step 2, applies the country rock drain cavern 18 of large-scale solution cavity on the downside of the solution cavity in country rock 3, and the two of the country rock drain cavern A opening is connected to the large-scale solution cavity 17 of support two sides respectively.
Step 3, tunnel use tunneling boring curtain pre-pouring grout or tunneling boring periphery pre-pouring grout;Pre-grouting advance support is adopted Ring is arranged away from for 50cm in the steel tube shed 16 for being 108mm with diameter, steel tube shed.
Step 4 excavates upper arcuate base tunnel 6: the arch circumferential direction in tunnel excavates upper arcuate base tunnel 6, and reserved core Soil, the length of remaining core soil in advance are 3-5m, and width is the 1/3-1/2 of tunnel excavation width, and circumferential direction excavates cyclic advance amount root It is equipped with according to the steelframe spacing of preliminary bracing, is no more than 1.5m, sprayed after excavation, anchor, net system supporting, while using note It starches 4 radial grouting of ductule to reinforce, sets up the steelframe of preliminary bracing, at the above 30cm height of arch springing of steelframe, be close to steelframe Two sides set up lock foot anchoring stock along 30 ° of angle of declination, lock foot anchoring stock and steelframe weld, and multiple pneumatically placed concrete to design thickness is formed just Branch arch 12;
Step 5 excavates in left side step 8 in step 7 and right side: excavating drilling depth amount according to the steelframe spacing of preliminary bracing It is equipped with, is no more than 1.5m, excavation height 3-3.5m, left and right sides step is staggered 2-3m, and just spray 3-5cm is thick immediately after excavation Concrete, then sprayed, anchor, net system supporting, along tunnel excavation direction spreading steelframe, in the above 30cm of the arch springing of steelframe At height, the two sides for being close to steelframe set up lock foot anchoring stock along 30 ° of angle of declination, and lock foot anchoring stock and steelframe weld, multiple pneumatically placed concrete Just branch side wall top 13 is formed to design thickness;
Step 6, using the method in step 5 continue to excavate left side get out of a predicament or an embarrassing situation 9 and right side get out of a predicament or an embarrassing situation 10, form just branch side Wall lower part and tunnel floor edge 14;
Step 7, step 11.2 and middle part are got out of a predicament or an embarrassing situation 11.3 position remaining core soil in advance in middle part top bar 11.1, middle part, After each bench excavation, applies 15 in the middle part of tunnel floor, in the middle part of tunnel floor 15 are laid in armored concrete bridge.
System supporting in this method, steelframe I-steel spacing 0.8m, uses diameter for the double layer bar of 6.5mm, note The diameter for starching ductule is 42mm, and ring is away from 0.8m, and more than spring line by transverse arch across design, thickness is not less than 65m.Preliminary bracing In first quasi- C20 gunite concrete ± 25cm, 22B(C25 armored concrete), spring line abutment wall below and bottom plate press longitudinal beam slab Design, bottom plate thinnest part are not less than 60cm(C30 armored concrete).
It is 100~180m that three steps, seven step excavating load, which is suitable for excavated section,2, have centainly from steady condition IV, V grades enclose The construction in rock location tunnel.Main performance includes: loess, strongly weathered sand-rock (intense weathering munstone, severely-weathered argillaceous siltstoue etc.). Not being suitable for wall rock geology is liquid-plastic state, hole Shallow-buried section (but by back-pressure processing or can after performing super-front large pipe shed Using).In the present invention big cross section pass through solution cavity geological conditions combine three steps plurality of advantages and solution cavity area have one The two is combined together by the characteristics of determining self-stable ability well by other additional reinforcement measures, so that in solution cavity area tunnel Safety, construction rapidity and the economical three that road excavates reach a balance.

Claims (3)

1. a kind of large-scale karst cave treatment for crossing tunnel trunk and excavation method, the tunnel is Karst Tunnel, which is characterized in that Construction procedure is as follows:
Step 1, large-scale solution cavity (17) is crossed when the side wall of tunneling and bottom plate position, in side wall and floor level position Two sides and bottom plate on the downside of set up template and formed by integrally casting there are two concrete bearing, the cross sections of the concrete bearing Size is greater than the height of large-scale solution cavity, which need to be embedded to country rock (5) and solution cavity on the upside of solution cavity respectively Within downside country rock (3), the longitudinal length of the concrete bearing is greater than the depth of solution cavity, also installs in the concrete bearing There is one group of support drain cavern template longitudinally disposed along support, and forms support drain cavern (19) after concreting, it is described Support drain cavern size and spacing need to be designed according to actual loading, guarantee to hinder in the case where top tunnel load safety Fill in solution cavity;
The large size solution cavity (17) crosses left side wall lower part and entire bottom plate from tunnel right-side wall, and the concrete bearing is along tunnel Road cross-sectional direction is respectively left side support (1) and right side support (2), the stepped embedment in bottom of the left side support (1) On the downside of solution cavity in country rock (3), the inside of the left side support (1) and first branch side wall lower outside and the baseplate underside company of fitting It connects, on the upside of the top embedment solution cavity of the left side support (1) in country rock (5), under the bottom embedment solution cavity of the right side support (2) In side wall rock, it is fitted and connected on the inside of the inside of right side support (2) and first branch side wall, the top braces of the right side support (2) Country rock (5) on the upside of solution cavity;
Step 2, the interior country rock drain cavern (18) for applying large-scale solution cavity of country rock (3) on the downside of solution cavity, the two of the country rock drain cavern A opening is connected to the large-scale solution cavity (17) of support two sides respectively;
Step 3, tunnel use tunneling boring curtain pre-pouring grout or tunneling boring periphery pre-pouring grout;
Step 4 is excavated upper arcuate base tunnel (6): the arch circumferential direction in tunnel excavates upper arcuate base tunnel (6), and reserved core Soil, circumferential direction excavate cyclic advance amount and are equipped with according to the steelframe spacing of preliminary bracing, are no more than 1.5m, sprayed after excavation, Anchor, net system supporting, while being reinforced using slip casting ductule (4) radial grouting, the steelframe of preliminary bracing is set up, in the arch of steelframe At the above 30cm height of foot, the two sides for being close to steelframe set up lock foot anchoring stock along 30 ° of angle of declination, and lock foot anchoring stock and steelframe weld, Multiple pneumatically placed concrete to design thickness forms just branch arch (12);
Step 5, excavates in left side step (8) in step (7) and right side: excavation drilling depth amount is according to the steelframe spacing of preliminary bracing It is equipped with, is no more than 1.5m, excavation height 3-3.5m, left and right sides step is staggered 2-3m, and just spray 3-5cm is thick immediately after excavation Concrete, then sprayed, anchor, net system supporting, along tunnel excavation direction spreading steelframe, in the above 30cm of the arch springing of steelframe At height, the two sides for being close to steelframe set up lock foot anchoring stock along 30 ° of angle of declination, and lock foot anchoring stock and steelframe weld, multiple pneumatically placed concrete Just branch side wall top (13) is formed to design thickness;
Step 6 continues to get out of a predicament or an embarrassing situation (9) on the left of excavation and right side is got out of a predicament or an embarrassing situation (10) using the method in step 5, forms just branch side Wall lower part and tunnel floor edge (14);
Step 7, core is reserved in the get out of a predicament or an embarrassing situation position of (11.3) of step (11.2) and middle part in middle part top bar (11.1), middle part Soil after each bench excavation, applies in the middle part of tunnel floor (15), and (15) in the middle part of tunnel floor are laid in armored concrete bridge On.
2. the large-scale karst cave treatment according to claim 1 for crossing tunnel trunk and excavation method, it is characterised in that: described In step 3, pre-grouting advance support is all made of the steel tube shed (16) that diameter is 108mm, and ring is arranged away from for 50cm in steel tube shed.
3. the large-scale karst cave treatment according to claim 1 for crossing tunnel trunk and excavation method, it is characterised in that: described In step 4, the length of remaining core soil in advance is 3-5m, and width is the 1/3-1/2 of tunnel excavation width.
CN201610698815.0A 2016-08-22 2016-08-22 A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method Active CN106194196B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610698815.0A CN106194196B (en) 2016-08-22 2016-08-22 A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610698815.0A CN106194196B (en) 2016-08-22 2016-08-22 A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method

Publications (2)

Publication Number Publication Date
CN106194196A CN106194196A (en) 2016-12-07
CN106194196B true CN106194196B (en) 2019-01-29

Family

ID=57522167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610698815.0A Active CN106194196B (en) 2016-08-22 2016-08-22 A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method

Country Status (1)

Country Link
CN (1) CN106194196B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060840B (en) * 2017-05-07 2019-04-30 中铁十八局集团有限公司 A kind of construction method of large cross-section tunnel V grades of country rock excavation supportings
CN106988758B (en) * 2017-05-08 2023-09-01 中铁五局集团第五工程有限责任公司 Construction method for crossing large-scale vertical karst cave group tunnel
CN107630710A (en) * 2017-11-09 2018-01-26 河南工程学院 A kind of super large Varied section tunnel support structure
CN107701193B (en) * 2017-11-28 2019-04-05 中铁十二局集团有限公司 A kind of breaking surrounding rock separate tunnel intersection gradual change section constructing method
CN108931822B (en) * 2018-09-17 2020-08-28 贵州省水利水电勘测设计研究院有限公司 Underground full-filling karst cave exploration method
CN110714771B (en) * 2019-11-21 2021-03-16 中铁四局集团有限公司 Tunnel entering construction method with hidden karst cave at tunnel portal
CN111119904B (en) * 2019-12-18 2021-03-30 浙江大学城市学院 Construction method of soft surrounding rock karst section tunnel
CN111119938B (en) * 2019-12-30 2022-02-11 中交路桥华南工程有限公司 Method for processing karst cave at upper part of tunnel
CN113266372B (en) * 2021-06-16 2021-11-30 交通运输部公路科学研究所 Construction method for soft rock super-large section tunnel step in karst cave development stratum

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922303A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Method for treating tunnel passing through underground river karst hall
CN101985883A (en) * 2010-08-30 2011-03-16 中铁第四勘察设计院集团有限公司 Cavern protection method
CN201771516U (en) * 2010-08-30 2011-03-23 中铁第四勘察设计院集团有限公司 Supporting structure of district passing through cavern and underground river for tunnel
CN104100279A (en) * 2014-07-16 2014-10-15 中铁西北科学研究院有限公司 Tunnel floor supporting frame penetrating cave and construction method thereof
CN104532821A (en) * 2014-10-29 2015-04-22 中铁三局集团有限公司 Extra-large karst cave bottom treatment construction method
CN105178979A (en) * 2015-08-28 2015-12-23 中铁二十五局集团第四工程有限公司 Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN205154179U (en) * 2015-11-26 2016-04-13 王道远 Stabilize shallow protective structure who buries bias voltage tunnel portal

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2963357B2 (en) * 1994-10-26 1999-10-18 謙三 村上 Concrete wall structure and its manufacturing method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922303A (en) * 2010-08-30 2010-12-22 中铁第四勘察设计院集团有限公司 Method for treating tunnel passing through underground river karst hall
CN101985883A (en) * 2010-08-30 2011-03-16 中铁第四勘察设计院集团有限公司 Cavern protection method
CN201771516U (en) * 2010-08-30 2011-03-23 中铁第四勘察设计院集团有限公司 Supporting structure of district passing through cavern and underground river for tunnel
CN104100279A (en) * 2014-07-16 2014-10-15 中铁西北科学研究院有限公司 Tunnel floor supporting frame penetrating cave and construction method thereof
CN104532821A (en) * 2014-10-29 2015-04-22 中铁三局集团有限公司 Extra-large karst cave bottom treatment construction method
CN105178979A (en) * 2015-08-28 2015-12-23 中铁二十五局集团第四工程有限公司 Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN205154179U (en) * 2015-11-26 2016-04-13 王道远 Stabilize shallow protective structure who buries bias voltage tunnel portal

Also Published As

Publication number Publication date
CN106194196A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN106194196B (en) A kind of large-scale karst cave treatment crossing tunnel trunk and excavation method
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN100451295C (en) Tunnel dredging method suitable for railway large section IV, V class rock tunnel
CN102606162B (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN106246201A (en) The excavation in tunnel and karst cave treatment method when small-sized solution cavity is positioned at tunneling surrounding
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN106246192A (en) Large-scale karst cave treatment under a kind of tunnel basis and base plate and tunnel excavation method
CN106121675A (en) Small-sized solution cavity is positioned at tunnel excavation and karst cave treatment method time at the bottom of tunneling inverted arch
CN104653187B (en) Water-rich sand layer geology large cross-section tunnel excavation method
CN106246191B (en) A kind of hole body is dredged, fills plentiful large-scale karst cave treatment and tunnel excavation method deeply
CN110017144B (en) Loess tunnel three-step construction method considering substrate reinforcement treatment
CN105443132A (en) Construction method of shallow-buried subsurface-excavated cross-shaped cross-strut tunnel
CN104405399A (en) Construction method for excavating support body in tunnel by crossing quicksand stratum
CN103244133B (en) The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN108487911A (en) The compound crossing method construction method of longspan tunnel bilateral wall under complex geological condition
CN104074524B (en) A kind of construction method of shallow embedding underpass of freeways large cross-section tunnel
CN201991017U (en) Subway large-span station body structure based on arch cover method construction forming
CN102031736A (en) Construction technology for under-passing existing line under complicated geological condition
CN102748040A (en) Main structure for metro long-span station and pillar arching construction method thereof
CN104389610A (en) Construction method of ultrashort steps crossing operational expressway tunnel
CN103603679A (en) Vault steel frame for support tunnel arch and tunnel construction method
CN110242305A (en) A kind of inclined shaft applies the construction technique in main hole into single side heading method
CN205895242U (en) Low -angle crossing tunnel structure
CN107191206B (en) A kind of six step construction method of Shallow-buried Large-span Tunnel Unit two
CN104141500A (en) Hardened sand gravel stratum cavern construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant