CN103850513A - Outdoor rod body construction method - Google Patents
Outdoor rod body construction method Download PDFInfo
- Publication number
- CN103850513A CN103850513A CN201410117625.6A CN201410117625A CN103850513A CN 103850513 A CN103850513 A CN 103850513A CN 201410117625 A CN201410117625 A CN 201410117625A CN 103850513 A CN103850513 A CN 103850513A
- Authority
- CN
- China
- Prior art keywords
- rod
- stone bolt
- nut
- base board
- flange dish
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Foundations (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410117625.6A CN103850513B (en) | 2014-03-26 | 2014-03-26 | A kind of outdoor body of rod construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410117625.6A CN103850513B (en) | 2014-03-26 | 2014-03-26 | A kind of outdoor body of rod construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103850513A true CN103850513A (en) | 2014-06-11 |
CN103850513B CN103850513B (en) | 2016-05-18 |
Family
ID=50858620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410117625.6A Active CN103850513B (en) | 2014-03-26 | 2014-03-26 | A kind of outdoor body of rod construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103850513B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104264674A (en) * | 2014-09-23 | 2015-01-07 | 国家电网公司 | Vibrating method for preventing vibrating rod in concrete from bumping formwork |
CN105661953A (en) * | 2016-03-16 | 2016-06-15 | 深圳市丰巢科技有限公司 | Express delivery cabinet installing ground foot and express delivery cabinet fixing device |
CN105661954A (en) * | 2016-03-16 | 2016-06-15 | 深圳市丰巢科技有限公司 | Express delivery cabinet fixing method |
CN106965134A (en) * | 2017-05-16 | 2017-07-21 | 四川钰萌光电科技有限公司 | Workbench and assembly method for assembling street lamp post flange chassis and pedestal |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009033951A (en) * | 2007-07-30 | 2009-02-12 | Daewon Electric Co Ltd | Method of construction work of circular arc shape aerial line electric pole under bracing member using expansion excavation unit for auger crane |
CN101487355A (en) * | 2009-02-23 | 2009-07-22 | 廖力锋 | Telegraph pole and its mounting and fixing method |
CN102296872A (en) * | 2011-05-24 | 2011-12-28 | 天津市银龙预应力钢材集团有限公司 | Method for connecting prestressed electric poles |
US20120124919A1 (en) * | 2009-05-05 | 2012-05-24 | Aloys Wobben | Method for erecting a tower, and tower |
CN102733640A (en) * | 2012-06-28 | 2012-10-17 | 芜湖中泰新能源有限公司 | Base used for fixedly installing light pole, telegraph pole and high-tension wire tower and installation method thereof |
-
2014
- 2014-03-26 CN CN201410117625.6A patent/CN103850513B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009033951A (en) * | 2007-07-30 | 2009-02-12 | Daewon Electric Co Ltd | Method of construction work of circular arc shape aerial line electric pole under bracing member using expansion excavation unit for auger crane |
CN101487355A (en) * | 2009-02-23 | 2009-07-22 | 廖力锋 | Telegraph pole and its mounting and fixing method |
US20120124919A1 (en) * | 2009-05-05 | 2012-05-24 | Aloys Wobben | Method for erecting a tower, and tower |
CN102296872A (en) * | 2011-05-24 | 2011-12-28 | 天津市银龙预应力钢材集团有限公司 | Method for connecting prestressed electric poles |
CN102733640A (en) * | 2012-06-28 | 2012-10-17 | 芜湖中泰新能源有限公司 | Base used for fixedly installing light pole, telegraph pole and high-tension wire tower and installation method thereof |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104264674A (en) * | 2014-09-23 | 2015-01-07 | 国家电网公司 | Vibrating method for preventing vibrating rod in concrete from bumping formwork |
CN104264674B (en) * | 2014-09-23 | 2016-05-04 | 国家电网公司 | A kind of method that inside concrete vibrating spear anti-collision template is vibrated |
CN105661953A (en) * | 2016-03-16 | 2016-06-15 | 深圳市丰巢科技有限公司 | Express delivery cabinet installing ground foot and express delivery cabinet fixing device |
CN105661954A (en) * | 2016-03-16 | 2016-06-15 | 深圳市丰巢科技有限公司 | Express delivery cabinet fixing method |
CN106965134A (en) * | 2017-05-16 | 2017-07-21 | 四川钰萌光电科技有限公司 | Workbench and assembly method for assembling street lamp post flange chassis and pedestal |
CN106965134B (en) * | 2017-05-16 | 2023-08-18 | 四川钰萌光电科技有限公司 | Working platform for assembling flange chassis and base of street lamp post and assembling method |
Also Published As
Publication number | Publication date |
---|---|
CN103850513B (en) | 2016-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102061746B (en) | Steel structure assembled embedded part and construction method thereof | |
CN101250881B (en) | Method for installation of seat slurry method construction packing plate | |
CN103850513A (en) | Outdoor rod body construction method | |
CN204385905U (en) | For the replaceable bolt embedment device of large equipment base | |
CN104895318A (en) | Aluminum alloy template system and construction method of same | |
CN205676785U (en) | Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam | |
CN102926538A (en) | Reaction box and construction method of reaction wall | |
CN103397729A (en) | NZ internal mold anti-floating construction method | |
CN105908887A (en) | Airbag core mold component cast hollow floor construction method | |
CN106320715A (en) | Method for mounting and constructing large I-shaped cant pre-embedded parts | |
CN104032969A (en) | Precise positioning and process regulation and control device for vibration isolation support embedded plate | |
CN104179191B (en) | Nuclear power plant's main equipment basement construction method | |
CN109179222B (en) | Construction method for controlling inclination and levelness of embedded joint of tower crane | |
JP2001059343A (en) | Concrete placement method for forming slab, and support tool for guide rail used therefor | |
JP4903294B1 (en) | Pipe support bracket | |
CN203924103U (en) | The outdoor GIS post-install of a kind of assembled height-adjustable | |
CN204343319U (en) | Cableway pipe patten pre-embedded anchoring bolts jig | |
CN105696796A (en) | Cantilever scaffold steel girder anchoring method | |
CN208167781U (en) | A kind of levelling mounting structure of backing plate | |
CN203834507U (en) | Large tower locating device | |
CN106836198A (en) | Positioner combined steel formwork bored concrete pile and construction method | |
CN203346897U (en) | Foundation raft embedded steel column positioning support | |
CN209339179U (en) | Levelling pre-buried structure for large scale equipment installation | |
CN204944936U (en) | A kind of Multifunctional self-leveling weighing apparatus formula continuous beam test counter-force loading frame | |
CN203160707U (en) | Adjustable t-shaped controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: TIANJIN SANYUAN ELECTRIC POWER EQUIPMENT MANUFACTURING CO., LTD. Effective date: 20141203 Owner name: TIANJIN SANYUAN ELECTRIC POWER EQUIPMENT MANUFACTU Effective date: 20141203 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 300409 BEICHEN, TIANJIN TO: 100031 XICHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20141203 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: Tianjin Sanyuan Power Equipment Manufacturing Co., Ltd. Address before: 300409 Tianjin City, Beichen science and Technology Park North Road No. 8 in Liaohe Applicant before: Tianjin Sanyuan Power Equipment Manufacturing Co., Ltd. |
|
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 300010 Tianjin city Hebei District Wujing Road No. 39 Applicant after: State Grid Corporation of China Applicant after: Tianjin Sanyuan Power Equipment Manufacturing Co., Ltd. Address before: 100031 West Chang'an Avenue, Beijing, No. 86 Applicant before: State Grid Corporation of China Applicant before: Tianjin Sanyuan Power Equipment Manufacturing Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |