CN203924103U - The outdoor GIS post-install of a kind of assembled height-adjustable - Google Patents

The outdoor GIS post-install of a kind of assembled height-adjustable Download PDF

Info

Publication number
CN203924103U
CN203924103U CN201420358330.3U CN201420358330U CN203924103U CN 203924103 U CN203924103 U CN 203924103U CN 201420358330 U CN201420358330 U CN 201420358330U CN 203924103 U CN203924103 U CN 203924103U
Authority
CN
China
Prior art keywords
bolt
crab
embedded part
self
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420358330.3U
Other languages
Chinese (zh)
Inventor
刘建秋
魏珍中
刘勇
商文念
黄萍
韩文庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Electric Power Engineering Consulting Institute Corp Ltd
Original Assignee
Shandong Electric Power Engineering Consulting Institute Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Electric Power Engineering Consulting Institute Corp Ltd filed Critical Shandong Electric Power Engineering Consulting Institute Corp Ltd
Priority to CN201420358330.3U priority Critical patent/CN203924103U/en
Application granted granted Critical
Publication of CN203924103U publication Critical patent/CN203924103U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses the outdoor GIS post-install of a kind of assembled height-adjustable, comprise: the crab-bolt sleeve that is placed in basic prebored hole inside, self-locking crab-bolt through embedded part steel plate, between embedded part steel plate and infrastructure, be provided with the support nut being connected with self-locking crab-bolt, on embedded part steel plate, be provided with the conehead nut being connected with self-locking crab-bolt, above conehead nut, be provided with and nut equipment is installed is mated the securing member using, for adjusting the height of embedded part steel plate and embedded part steel plate being fixed on and being supported between nut and conehead nut; The utility model beneficial effect: be specially adapted to emergent or the construction of improvement project and the constructure scheme of assembling embedded part; Solved equipment manufacturer and submitted to after embedded part data, the problem that affects design drawing and construction speed that modification data is brought; In electric power extension project, the utility model can shorten power off time; Solve embedded part and buried the problem high to planeness, rigidity and required precision underground.

Description

The outdoor GIS post-install of a kind of assembled height-adjustable
Technical field
The utility model relates to generating and power transformation field, relates in particular to the outdoor GIS post-install of a kind of assembled height-adjustable.
Background technology
In traditional outdoor GIS (gas-insulating and fully-enclosed combined electrical apparatus) equipment Foundations work progress, equipment embedded part is together cast in basis during with GIS foundation construction, therefore, the design and construction of equipment embedded part must be waited until after equipment manufacturer submits embedded part data to and just can carry out, if the later stage, equipment data was revised by producer, can have influence on design and construction progress, in addition, equipment is installed conventionally according to demand by stages, but embedded part at a specified future date is also buried underground conventionally in first stage of the project, may cause like this early stage embedded part not meet the requirement of new equipment.
Therefore for first stage of the project, may there is following problem:
1, owing to burying embedded part underground, designed or constructed, producer's equipment data changes, and embedded part and outdoor GIS basis embedded part must rearrange, and cause design or construction to do over again, and time and effort consuming, affects the duration.
2, embedded part is in design or when construction buried mistake underground or leakage is buried.
3, embedded part is buried underground planeness, rigidity and required precision are high, and traditional construction method can not meet the demands.
4, the duration urgent, cast-in-situ concrete curing time is not enough.And for occurring following problem in distant view engineering: due to technological progress, original equipment is superseded, or because producer is different, early stage, embedded part did not meet the requirement of new equipment, must rearrange embedded part.
Utility model content
The purpose of this utility model is exactly in order to address the above problem, and from angle that can accurate adjustment embedded part height, proposes a kind ofly can to meet that plurality of devices basis requires, highly adjustable post-install and construction method thereof.This structure makes the construction of equipment Foundations embedded part not be subject to the restriction of model and the size of equipment, and for flexible selection equipment provides support, this is significant to saving the construction period.
For achieving the above object, the utility model adopts following technical scheme:
The outdoor GIS post-install of a kind of assembled height-adjustable, comprise: the crab-bolt sleeve that is placed in basic prebored hole inside, crab-bolt sleeve is for clogging the space between self-locking crab-bolt and basic prebored hole, self-locking crab-bolt through embedded part steel plate, between embedded part steel plate and infrastructure, be provided with the support nut being connected with self-locking crab-bolt, on embedded part steel plate, be provided with the conehead nut being connected with self-locking crab-bolt, above conehead nut, be provided with and nut equipment is installed is mated the securing member using, for adjusting the height of embedded part steel plate and embedded part steel plate being fixed on and being supported between nut and conehead nut.
Described crab-bolt sleeve is plastics crab-bolt sleeve, and plastics adopt polyethylene, and the volume of polyethylene padding is to fill the space between infrastructure and self-locking crab-bolt after the compression of polyethylene plasticity.
Described self-locking crab-bolt is for electroplating sill anchor, and described embedded part steel plate is galvanized steel plain sheet.
Described installation nut equipment is circular nut spanner.
The screw flight of described self-locking crab-bolt adopts tapping screw thread forms, and screw rod adopts full thread form, and crab-bolt top is without crab-bolt head, and top is provided with the draw-in groove of cruciate flower shape.
The diameter transition of the top layer one circle screw thread of described self-locking crab-bolt is greater than the key diameter of thread, guarantees to screw after end, and self-locking crab-bolt top is concordant with steel plate embedded part top, and crab-bolt can realize self-locking simultaneously.
The shape that described conehead nut is cone table, described securing member is double card hole, the hole clipping of circular nut spanner aligning conehead nut regulates and screws.
The thickness of described embedded part steel plate is 15mm-20mm; Described embedded part steel plate is provided with at least one boring, and the centre distance between boring is 150mm-250mm; The length of described self-locking crab-bolt is L=45d+L1+L2, and d is the diameter of self-locking crab-bolt, and L1 is the self-locking crab-bolt drift that leaks outside, and L2 is the non-anchoring screw segment length of self tapping.
Beneficial effect
1, solve equipment manufacturer and submitted the embedded part data lagging influence problem of design duration to, be specially adapted to emergent or the construction of improvement project and the constructure scheme of assembling embedded part.
2, solved equipment manufacturer and submitted to after embedded part data, the problem that affects design drawing and construction speed that modification data is brought.In electric power extension project, the utility model can shorten power off time.
3, solved the problem of distant view engineering equipment type selecting uniqueness, for distant view flexibly selection equipment provide and provide powerful support for.
4, efficiently solve the high-precision requirement to embedded part planeness and rigidity in embedded part burial and construction process.
5, solved due to technological progress, original equipment was superseded, and early stage, embedded part did not meet new equipment requirement or embedded part is buried mistake underground, must rearrange the problem of embedded part.
6, all members of the adjustable embedded part of assembling are processed in factory, and the construction period is compared traditional basic embedded part construction method and greatly shortens, and thoroughly realize basic embedded part " batch production processing, assembling construction ", effectively shorten the construction period.
Accompanying drawing explanation
Fig. 1 is the electric layout plan of outdoor GIS.
Fig. 2 is the utility model outdoor GIS basis and post-install layout plan.
Fig. 3 is top view and the elevation after the construction of the utility model embedded part.
Fig. 4 is self-locking crab-bolt top view and elevation.
Fig. 5 is plastics crab-bolt sleeve schematic diagram.
Fig. 6 is annular conehead nut runner top view and elevation.
Fig. 7 is conehead nut top view and elevation.
Fig. 8 is that the concrete link position of each ingredient of post-install is related to schematic diagram.
Wherein, 1. outdoor GIS is basic, 2. post-install, 3. embedded part steel plate, 4. self-locking crab-bolt, 5. supports nut, 6. conehead nut, 7. conehead nut hole clipping, 8. plastics crab-bolt sleeve, 9. circular nut spanner, 10. dry pea gravel concreten, 11. have built sclerosis GIS concrete foundation, and 12, basic prebored hole.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further:
Fig. 1 is the electric layout plan of certain engineering GIS, basis 1 and post-install 2 shown in this electrical arrangement substantive requirements of form civil Engineering Design Fig. 2, because outdoor GIS equipment may be subject to the effect of the loads such as switch dynamic load, temperature load, wind load, need to be fixed on above concrete foundation, by the GIS electric fixtures strong point the pre-buried embedded part of Fig. 2 and Fig. 1, weld, realize the fixing of GIS electric fixtures in Fig. 1.Traditional construction method requires embedded part pre-buried in advance, because the requirement of GIS construction accuracy is very high, will cause foundation construction complex procedures like this, and the accuracy of embedded part height is also not easy to guarantee.The post-install the utility model proposes and construction method thereof just can address the above problem, and can meet plurality of devices basis requirement, and the height of embedded part can be adjusted, accuracy easily guarantees, working procedure is simple, does not need curing concrete, shortens the duration of construction.Figure 3 shows that top view and elevation after the construction of the utility model embedded part, load reasonably passes on ground by the approach of equipment embedded part steel plate-Mao Shuan – equipment Foundations, and form of structure is reasonable.
As shown in Fig. 4~6, the rearmounted basic embedded part of a kind of assembled height-adjustable, comprising: embedded part steel plate 3, self-locking crab-bolt 4, support nut 5 and conehead nut 6.Manufacturer accurately determines after the model and size of equipment, and quantity, crab-bolt center to center distance and the crab-bolt anchorage length of crab-bolt, within the scope of infrastructure device layout, calculated in the load providing according to manufacturer and embedded part position, selects suitable crab-bolt; According to the position of crab-bolt, to be holed in basis 11 and embedded part steel plate 3, plastics crab-bolt polyethylene sleeve 8 is placed on basic prebored hole 12 inside in advance.According to the requirement of Fig. 3, to crab-bolt and embedded part steel plate, carry out assembled, assembled position relationship schematic diagram as shown in Figure 8, evenly the crab-bolt of whole embedded part is anchored into, with supporting nut 5 and 6 pairs of embedded part steel plates of conehead nut 3, carry out leveling, with level gauge, by designing requirement, adjust the height of each steel plate, evenly screw in crab-bolt until crab-bolt flushes with embedded part steel plate, for requirement attractive in appearance, the bottom filling dry pea gravel concreten 10 to post-install.
The size of A, embedded part steel plate 1
The Main Function of embedded part steel plate is the tie point as equipment.Embedded part steel plate is selected galvanized steel plain sheet, and its length and width meet the Area of bearing that equipment welding can be provided, and it is control that thickness should be take the force request that meets armor plate strength and rigidity, and the thickness of steel plate is advisable with 15mm~20mm.
The spacing of B, anchor hole and boring
The spacing that crab-bolt arranges, unsuitable excessive, if spacing is excessive, may cause the planeness of steel plate influenced, affect attractive in appearance and use; Same spacing is also unsuitable too small, and too small meeting causes the waste of crab-bolt, and according to previous experiences, selecting anchor hole spacing is that 150mm-250mm is advisable.
Determining of C, self-locking crab-bolt length and diameter
Self-locking crab-bolt mainly plays anchoring and fastening, the length of crab-bolt will meet crab-bolt, PE and concrete and form whole anchoring force request, under pulled condition, total length L=45d+L1+L2, d is the diameter of crab-bolt, L1 is the crab-bolt drift that leaks outside, and L2 is the non-anchoring screw segment length of self tapping.By calculating above, choose the finished product crab-bolt of corresponding modulus.Crab-bolt will meet the intensity of tension or pressurized and the requirement of Compression Stability, specific formula for calculation is with reference to the requirement of < < Code for design of steel structures GB50017-2003 > > 5.2.5, the diameter that the diameter of boring is equal to crab-bolt adds 1mm, and the length of boring will meet the requirement that meets crab-bolt anchoring.
D, structure requirement
The concrete minimum intensity grade of former base surface is C25, otherwise should adjust the anchorage length of crab-bolt, and anchorage length really normal root is determined according to field trial.The distance of crab-bolt centre distance edge of foundation is not less than 6d and 70mm.
The equipment data providing in conjunction with producer, determines after the information such as size-spacing of embedded part, crab-bolt and boring, according to the position of crab-bolt, is holed in basis 11 and embedded part steel plate 3, and it is inner that plastics crab-bolt sleeve is placed on infrastructure prebored hole in advance.According to the requirement of Fig. 3, to crab-bolt and embedded part steel plate, carry out assembled, assembled position relationship schematic diagram as shown in Figure 8, evenly the crab-bolt of whole embedded part is anchored into, with supporting nut and conehead nut, embedded part steel plate is carried out to leveling, with level gauge, by designing requirement, adjust the height of embedded part steel plate, evenly screw in crab-bolt until crab-bolt end face flushes with the end face of embedded part steel plate.
The embodiment flow process of basis embedded part is:
1) load providing according to manufacturer and embedded part position, Deng manufacturer, accurately determine after the model and size of equipment, embedded part steel plate 3 sizes that design scheme combining is definite, quantity, crab-bolt center to center distance and the crab-bolt anchorage length of calculating crab-bolt, select suitable crab-bolt;
2) in conjunction with the scheme of design, determine embedded part scope, according to the position of crab-bolt, holed in basis and embedded part steel plate, plastics crab-bolt sleeve is placed on infrastructure prebored hole 12 inside in advance.
3) according to the requirement of Fig. 3, to crab-bolt and embedded part steel plate, carry out assembled, assembled position relationship schematic diagram as shown in Figure 8, evenly the crab-bolt of whole embedded part is anchored into, with supporting nut 5 and 6 pairs of embedded part steel plates of conehead nut 3, carry out leveling, concrete leveling step is as follows: first with spanner, regulate all support nut height above steel plate, coarse regulation steel plate embedded part is to design elevation; Then with annular conehead nut runner 9 aligning 7 pairs, hole of conehead nut double card conehead nuts 6, regulate and screw, to support nut 5 and conehead nut 6, block embedded part steel plate 3, with level gauge, by designing requirement, evenly inching is up and down carried out in the position of all support nuts 5 and conehead nut 6, the height of fine setting embedded part steel plate 3 is until design elevation; Finally evenly screw in crab-bolt until the end face of crab-bolt is concordant with the end face of embedded part steel plate, and realize the self-locking of self-locking crab-bolt.If the height of embedded part steel plate is improper, the height that can support nut and conehead nut by adjusting just can be realized the inching up and down of embedded part steel plate height.
4) for requirement attractive in appearance, at the bottom of post-install filling dry pea gravel concreten 10, exposed parts press polish, the height of filling dry pea gravel concreten is the height between embedded part and former base surface.
The working procedure such as design and installation embedded part needn't wait equipment manufacturer's working drawing data like this, does not affect the duration of whole engineering construction, is also conducive to first phase and distant view engineering is selected equipment flexibly.
Although above-mentioned, by reference to the accompanying drawings the specific embodiment of the present utility model is described; but the not restriction to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various modifications that creative work can make or distortion still in protection domain of the present utility model.

Claims (8)

1. the outdoor GIS post-install of an assembled height-adjustable, it is characterized in that, comprise: the crab-bolt sleeve that is placed in basic prebored hole inside, crab-bolt sleeve is for clogging the space between self-locking crab-bolt and basic prebored hole, self-locking crab-bolt through embedded part steel plate, between embedded part steel plate and infrastructure, be provided with the support nut being connected with self-locking crab-bolt, on embedded part steel plate, be provided with the conehead nut being connected with self-locking crab-bolt, above conehead nut, be provided with and nut equipment is installed is mated the securing member using, for adjusting the height of embedded part steel plate and embedded part steel plate being fixed on and being supported between nut and conehead nut.
2. the outdoor GIS post-install of a kind of assembled height-adjustable as claimed in claim 1, it is characterized in that, described crab-bolt sleeve is plastics crab-bolt sleeve, and plastics adopt polyethylene, and the volume of polyethylene padding is to fill the space between infrastructure and self-locking crab-bolt after the compression of polyethylene plasticity.
3. the outdoor GIS post-install of a kind of assembled height-adjustable as claimed in claim 1, is characterized in that, described self-locking crab-bolt is for electroplating sill anchor, and described embedded part steel plate is galvanized steel plain sheet.
4. the outdoor GIS post-install of a kind of assembled height-adjustable as claimed in claim 1, is characterized in that, described installation nut equipment is circular nut spanner.
5. the outdoor GIS post-install of a kind of assembled height-adjustable as claimed in claim 1, it is characterized in that, the screw flight of described self-locking crab-bolt adopts tapping screw thread forms, and screw rod adopts full thread form, crab-bolt top is without crab-bolt head, and top is provided with the draw-in groove of cruciate flower shape.
6. the outdoor GIS post-install of a kind of assembled height-adjustable as claimed in claim 1, it is characterized in that, the diameter transition of the top layer one circle screw thread of described self-locking crab-bolt is greater than the key diameter of thread, assurance screws after end, self-locking crab-bolt top is concordant with steel plate embedded part top, and crab-bolt can realize self-locking simultaneously.
7. the outdoor GIS post-install of a kind of assembled height-adjustable as claimed in claim 1, is characterized in that, the shape that described conehead nut is cone table, and described securing member is double card hole, the hole clipping of circular nut spanner aligning conehead nut regulates and screws.
8. GIS post-install as outdoor in a kind of assembled height-adjustable as described in arbitrary in claim 1-7, is characterized in that, the thickness of described embedded part steel plate is 15mm-20mm; Described embedded part steel plate is provided with at least one boring, and the centre distance between boring is 150mm-250mm; The length of described self-locking crab-bolt is L=45d+L1+L2, and d is the diameter of self-locking crab-bolt, and L1 is the self-locking crab-bolt drift that leaks outside, and L2 is the non-anchoring screw segment length of self tapping.
CN201420358330.3U 2014-06-30 2014-06-30 The outdoor GIS post-install of a kind of assembled height-adjustable Expired - Fee Related CN203924103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420358330.3U CN203924103U (en) 2014-06-30 2014-06-30 The outdoor GIS post-install of a kind of assembled height-adjustable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420358330.3U CN203924103U (en) 2014-06-30 2014-06-30 The outdoor GIS post-install of a kind of assembled height-adjustable

Publications (1)

Publication Number Publication Date
CN203924103U true CN203924103U (en) 2014-11-05

Family

ID=51819957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420358330.3U Expired - Fee Related CN203924103U (en) 2014-06-30 2014-06-30 The outdoor GIS post-install of a kind of assembled height-adjustable

Country Status (1)

Country Link
CN (1) CN203924103U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088293A (en) * 2014-06-30 2014-10-08 山东电力工程咨询院有限公司 Assembly type height-adjustable outdoor GIS postposition embedded part and construction method thereof
CN106677203A (en) * 2016-12-30 2017-05-17 西安建筑科技大学 Prefabricated anchoring base for frozen soil foundation and installation method
CN108071120A (en) * 2016-11-15 2018-05-25 刘伟华 The building method of prefabricated adjustable G IS general basics
CN115324221A (en) * 2022-08-08 2022-11-11 中国建筑第八工程局有限公司 Rear damper connecting piece based on reinforced concrete column and mounting method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088293A (en) * 2014-06-30 2014-10-08 山东电力工程咨询院有限公司 Assembly type height-adjustable outdoor GIS postposition embedded part and construction method thereof
CN104088293B (en) * 2014-06-30 2016-02-10 山东电力工程咨询院有限公司 The outdoor GIS post-install of a kind of assembled height-adjustable and construction method thereof
CN108071120A (en) * 2016-11-15 2018-05-25 刘伟华 The building method of prefabricated adjustable G IS general basics
CN106677203A (en) * 2016-12-30 2017-05-17 西安建筑科技大学 Prefabricated anchoring base for frozen soil foundation and installation method
CN115324221A (en) * 2022-08-08 2022-11-11 中国建筑第八工程局有限公司 Rear damper connecting piece based on reinforced concrete column and mounting method thereof

Similar Documents

Publication Publication Date Title
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN203924103U (en) The outdoor GIS post-install of a kind of assembled height-adjustable
CN101871265B (en) Flat shim plate-adjustable grouting installation method
CN207331736U (en) A kind of foundation bolt once grouting fixture
CN203960895U (en) Anchor slab bolt assembly and tower foundation assembly
CN201896365U (en) Installing and fixing device for flat plate pre-embedded piece on surface of concrete
CN203452266U (en) Fixing and leveling structure of H section steel column
CN104179191B (en) Nuclear power plant&#39;s main equipment basement construction method
CN207392771U (en) A kind of guide type steel column locator
CN104120802B (en) Simple method for mounting and locating seismic isolation support
CN204151813U (en) A kind of adjustable basis for correcting electric power pylon foundation settlement
CN107386316A (en) A kind of foundation bolt once grouting fixture and its construction method
CN202099880U (en) Foundation bolt
CN104088293B (en) The outdoor GIS post-install of a kind of assembled height-adjustable and construction method thereof
CN203881339U (en) Detachable monitoring pier
CN205822792U (en) A kind of regulation support for masonry direct-burried
CN202280074U (en) Foundation bolt positioning sleeve
CN107882056A (en) A kind of foundation bolt positioning device and installation method
CN105484282B (en) Levelling device and its application method in a kind of rim of a cup basis of pipeline steel bracket
CN103850513A (en) Outdoor rod body construction method
CN203639934U (en) Pre-buried positioning device for equipment foundation bolt
CN207538326U (en) A kind of steel structure column with micromatic setting
CN105442868A (en) Adjustable steel-structure reticulated shell spliced scaffold
CN202381269U (en) Adjusting device of mounting levelness of basic ring of wind driven generator
CN206385560U (en) A kind of foundation module and the house using the foundation module

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20160630

CF01 Termination of patent right due to non-payment of annual fee