CN103803024A - 半浮式海上风力发电机组整体运输安装一体船及施工方法 - Google Patents

半浮式海上风力发电机组整体运输安装一体船及施工方法 Download PDF

Info

Publication number
CN103803024A
CN103803024A CN201410044720.8A CN201410044720A CN103803024A CN 103803024 A CN103803024 A CN 103803024A CN 201410044720 A CN201410044720 A CN 201410044720A CN 103803024 A CN103803024 A CN 103803024A
Authority
CN
China
Prior art keywords
ship
installation
wind turbine
semi
latching device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410044720.8A
Other languages
English (en)
Inventor
刘德进
曲俐俐
徐善忠
冯甲鑫
杨瑞亮
陆连洲
张学俊
李振国
冯海暴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201410044720.8A priority Critical patent/CN103803024A/zh
Publication of CN103803024A publication Critical patent/CN103803024A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

本发明涉及一种半浮式海上风力发电机组整体运输安装一体船,包括风电安装船,风电安装船上设置支撑装置,风电安装船的一头还设置安装装置。支撑装置为安装在风电安装船上的带桩靴支腿。安装装置包括风机提拉安装装置,风机提拉安装装置包括固定安装在风机固定架顶部的提升装置,提升装置连接钢丝绳,钢丝绳连接可沿固定架滑动的底部锁紧装置。采用这样的结构后,本发明的风机安装船稳定性好,施工方便,风机装船、运输、安装速度快,对周围环境影响小,工程造价低。

Description

半浮式海上风力发电机组整体运输安装一体船及施工方法
技术领域
本发明涉及一种半浮式海上风力发电机组整体运输安装一体船及施工方法。
背景技术
一般海上风力发电机多采用平台式安装方式,船舶就位后将安装船顶升脱离水面,再进行风机的安装,施工条件比较复杂,强风、急流、波浪等建设条件更加复杂,导致风机的安装造价较大,且在平台式支撑装置下,动载可能会引起“穿刺”现象,形成事故,且受水深的影响条件较多。
发明内容
本发明要解决的技术问题是提供一种半浮式海上风力发电机组整体运输安装一体船及施工方法。
为解决上述技术问题,本发明的半浮式海上风力发电机组整体运输安装一体船,包括风电安装船,风电安装船上设置支撑装置,风电安装船的一头还设置安装装置。
所述支撑装置为安装在风电安装船上的带桩靴支腿。
所述安装装置包括风机提拉安装装置,风机提拉安装装置包括固定安装在风机固定架顶部的提升装置,提升装置连接钢丝绳,钢丝绳连接可沿固定架滑动的底部锁紧装置。
一种使用上述海上风力发电机组拉索千斤顶提升安装装置的施工方法,包括下列步骤,风机在岸边组装完毕,采用支撑装置实现精确安装时的定位功能,在拖航状态下支撑装置抬起,工作状态时支撑装置支撑于基床上,船体不脱离水面处于漂浮状态,支撑装置主要承受风机安装时船舶所受外界的竖向力和辅助承受部分水平力,水平受力主要由缆系承担,安装一体船靠泊,风机装船依靠上抱箍和下抱箍紧固,风力发电机组整体装船,使用拖轮拖航到施工区域,顶部锁紧装置和底部锁紧装置保持锁紧状态,到达安装现场后,顶部锁紧装置松开,止动装置松开,底部锁紧装置保持锁紧状态,启动提升装置,通过钢丝绳拉动底部锁紧装置,提升整体风机装置至一定高度后,顶部锁紧装置锁定,安装船移位,使风机基础与风机对准,启动提升装置,松开止动装置,下放风机实现精确安装。
采用这样的结构后,本发明的风机安装船稳定性好,施工方便,风机装船、运输、安装速度快,对周围环境影响小,工程造价低。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细的说明。
图1是本发明的半浮式海上风力发电机组整体运输安装一体船的主视图。
图2是本发明的半浮式海上风力发电机组整体运输安装一体船的俯视图。
图3是本发明的半浮式海上风力发电机组整体运输安装一体船的停泊或拖航状态时的左视图。
图4是本发明的半浮式海上风力发电机组整体运输安装一体船的在浅水区时的左视图。
图5是本发明的半浮式海上风力发电机组整体运输安装一体船的在深水区时的左视图。
图6是本发明海上风力发电机组拉索千斤顶提升安装装置的结构示意图。
图7是本发明海上风力发电机组拉索千斤顶提升安装装置的俯视图。
图8是本发明海上风力发电机组拉索千斤顶提升安装装置锁紧装置的结构示意图。
附图标记:风机固定架1,提升装置2,钢丝绳3,底部锁紧装置4,顶部锁紧装置5,第一层底部锁紧装置41,第二层底部锁紧装置42,导轨6,压紧千斤顶7,浮体助力装置8,止动压紧千斤顶9,塔筒12,拉索千斤顶13,定位销14,风机基础15,锁紧装置框架16,风电安装船17,带桩靴支腿18,安装装置19。
具体实施方式
如图1至图3所示,
本发明的半浮式海上风力发电机组整体运输安装一体船,包括风电安装船17,风电安装船17上设置支撑装置,风电安装船的一头还设置安装装置19。支撑装置为安装在风电安装船17上的带桩靴支腿18。
安装装置19包括固定安装在风机安装船上的风机固定架1,风机固定架1的顶部固定安装提升装置2,提升装置2使用拉索千斤顶10,拉索千斤顶13连接钢丝绳3,钢丝绳3连接可沿固定架1滑动的底部锁紧装置4,提升装置2上设置顶部锁紧装置5,底部锁紧装置设置两层,第一层底部锁紧装置41和第二层底部锁紧装置42固定连接或通过钢丝绳连接。风机固定架1上设置可供底部锁紧装置4上下滑动的导轨6。底部锁紧装置4与导轨接触的位置设置止动装置,止动装置为压紧千斤顶7,止动装置也可选为定位销,固定架1底部安装浮体助力装置8,顶部锁紧装置5和底部锁紧装置4都是在锁紧装置框架14上安装朝向塔筒的止动压紧千斤顶9。塔筒底部设有定位销14,风机基础15上设有定位孔。
一种使用上述海上风力发电机组拉索千斤顶提升安装装置的施工方法,包括下列步骤,风机在岸边组装完毕,采用支撑装置实现精确安装时的定位功能,在拖航状态下支撑装置抬起,工作状态时支撑装置支撑于基床上,船体不脱离水面处于漂浮状态,支撑装置主要承受风机安装时船舶所受外界的竖向力和辅助承受部分水平力,水平受力主要由缆系承担,安装一体船靠泊,风机装船依靠上抱箍和下抱箍紧固,风力发电机组整体装船,使用拖轮拖航到施工区域,顶部锁紧装置和底部锁紧装置保持锁紧状态,到达安装现场后,顶部锁紧装置松开,止动装置松开,底部锁紧装置保持锁紧状态,启动提升装置,通过钢丝绳拉动底部锁紧装置,提升整体风机装置至一定高度后,顶部锁紧装置锁定,安装船移位,使风机基础与风机对准,启动提升装置,松开止动装置,下放风机实现精确安装。
采用四根(3根)带桩靴支腿实现精确安装时的定位功能。在拖航状态下支腿抬起,工作状态时带桩靴支腿支撑于基床上,船体不脱离水面处于漂浮状态,支腿主要承受风机安装时船舶所受外界的竖向力和辅助承受部分水平力,水平受力主要由缆系承担。施工方法,包括下列步骤,风机在岸边组装完毕,浮式海上风力发电机组整体运输安装一体船靠泊,风机装船依靠上抱箍和下抱箍紧固,船舶调平,风力发电机组整体装船,船组拖航,使用拖轮拖航到施工区域,系泊初定位,绞锚移位,风机安装包括首先中抱箍抱紧,上抱箍松开,提升装置将风机提升至一定高度,然后船舶抛锚,依靠绞缆使船舶慢慢靠近桩基础并用卡箍装置卡紧风机基础。本发明的风机安装船稳定性好,施工方便,风机装船、运输、安装速度快,对周围环境影响小,工程造价低。
以上所述,仅是对本发明的较佳实施例而已,并非对本发明做其他形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为同等变化的等效实施例。凡是未脱离本发明方案内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化与改型,均落在本发明的保护范围内。

Claims (4)

1.一种半浮式海上风力发电机组整体运输安装一体船,其特征在于:包括风电安装船,风电安装船上设置支撑装置,风电安装船的一头还设置安装装置。
2.按照权利要求1所述的半浮式海上风力发电机组整体运输安装一体船,其特征在于:所述支撑装置为安装在风电安装船上的带桩靴支腿。
3.按照权利要求1所述的半浮式海上风力发电机组整体运输安装一体船,其特征在于:所述安装装置包括风机提拉安装装置,风机提拉安装装置包括固定安装在风机固定架顶部的提升装置,提升装置连接钢丝绳,钢丝绳连接可沿固定架滑动的底部锁紧装置。
4.一种使用上述海上风力发电机组拉索千斤顶提升安装装置的施工方法,其特征在于:包括下列步骤,风机在岸边组装完毕,采用支撑装置实现精确安装时的定位功能,在拖航状态下支撑装置抬起,工作状态时支撑装置支撑于基床上,船体不脱离水面处于漂浮状态,支撑装置主要承受风机安装时船舶所受外界的竖向力和辅助承受部分水平力,水平受力主要由缆系承担,安装一体船靠泊,风机装船依靠上抱箍和下抱箍紧固,风力发电机组整体装船,使用拖轮拖航到施工区域,顶部锁紧装置和底部锁紧装置保持锁紧状态,到达安装现场后,顶部锁紧装置松开,止动装置松开,底部锁紧装置保持锁紧状态,启动提升装置,通过钢丝绳拉动底部锁紧装置,提升整体风机装置至一定高度后,顶部锁紧装置锁定,安装船移位,使风机基础与风机对准,启动提升装置,松开止动装置,下放风机实现精确安装。
CN201410044720.8A 2014-01-31 2014-01-31 半浮式海上风力发电机组整体运输安装一体船及施工方法 Pending CN103803024A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410044720.8A CN103803024A (zh) 2014-01-31 2014-01-31 半浮式海上风力发电机组整体运输安装一体船及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410044720.8A CN103803024A (zh) 2014-01-31 2014-01-31 半浮式海上风力发电机组整体运输安装一体船及施工方法

Publications (1)

Publication Number Publication Date
CN103803024A true CN103803024A (zh) 2014-05-21

Family

ID=50700518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410044720.8A Pending CN103803024A (zh) 2014-01-31 2014-01-31 半浮式海上风力发电机组整体运输安装一体船及施工方法

Country Status (1)

Country Link
CN (1) CN103803024A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104192272A (zh) * 2014-08-11 2014-12-10 中国石油大学(华东) 自航自升式风电运输安装船及风电机组的安装方法
CN107685835A (zh) * 2017-03-21 2018-02-13 南通蓝岛海洋工程有限公司 一种风电钢管桩吊装运输工艺
CN109790823A (zh) * 2016-05-13 2019-05-21 埃斯特科股份公司 用于海上结构的安装和/或运输的辅助浮动***及包括该***的方法
CN111301619A (zh) * 2018-12-10 2020-06-19 烟台铁中宝钢铁加工有限公司 海上浮式储油平台喇叭口锁钩的安装装置及安装方法
CN113606095A (zh) * 2021-06-16 2021-11-05 海洋石油工程股份有限公司 一种海上整体风机流水线式自安装方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11208576A (ja) * 1998-01-26 1999-08-03 Yukio Kajino 浮台型水力発電装置
CN201236117Y (zh) * 2008-07-17 2009-05-13 上海振华港口机械(集团)股份有限公司 水上起重机
CN201647088U (zh) * 2010-04-13 2010-11-24 武昌船舶重工有限责任公司 海上风机安装船
CN102079477A (zh) * 2009-11-27 2011-06-01 三一电气有限责任公司 一种风机抱举装置及移动式水上作业平台
CN202864750U (zh) * 2012-10-23 2013-04-10 上海航盛船舶设计有限公司 一种海上风机整体运输和安装装置
KR20130054056A (ko) * 2011-11-16 2013-05-24 현대중공업 주식회사 4래그 풍력발전용 상부구조물의 시공방법
CN103183109A (zh) * 2011-12-30 2013-07-03 上海振华重工(集团)股份有限公司 海洋风电安装平台
KR101323755B1 (ko) * 2011-12-12 2013-10-31 삼성중공업 주식회사 풍력 발전기 설치 선박의 스퍼드 구조
CN203844963U (zh) * 2014-01-31 2014-09-24 中交一航局第二工程有限公司 半浮式海上风力发电机组整体运输安装一体船

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11208576A (ja) * 1998-01-26 1999-08-03 Yukio Kajino 浮台型水力発電装置
CN201236117Y (zh) * 2008-07-17 2009-05-13 上海振华港口机械(集团)股份有限公司 水上起重机
CN102079477A (zh) * 2009-11-27 2011-06-01 三一电气有限责任公司 一种风机抱举装置及移动式水上作业平台
CN201647088U (zh) * 2010-04-13 2010-11-24 武昌船舶重工有限责任公司 海上风机安装船
KR20130054056A (ko) * 2011-11-16 2013-05-24 현대중공업 주식회사 4래그 풍력발전용 상부구조물의 시공방법
KR101323755B1 (ko) * 2011-12-12 2013-10-31 삼성중공업 주식회사 풍력 발전기 설치 선박의 스퍼드 구조
CN103183109A (zh) * 2011-12-30 2013-07-03 上海振华重工(集团)股份有限公司 海洋风电安装平台
CN202864750U (zh) * 2012-10-23 2013-04-10 上海航盛船舶设计有限公司 一种海上风机整体运输和安装装置
CN203844963U (zh) * 2014-01-31 2014-09-24 中交一航局第二工程有限公司 半浮式海上风力发电机组整体运输安装一体船

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104192272A (zh) * 2014-08-11 2014-12-10 中国石油大学(华东) 自航自升式风电运输安装船及风电机组的安装方法
CN104192272B (zh) * 2014-08-11 2016-06-29 中国石油大学(华东) 自航自升式风电运输安装船及风电机组的安装方法
CN109790823A (zh) * 2016-05-13 2019-05-21 埃斯特科股份公司 用于海上结构的安装和/或运输的辅助浮动***及包括该***的方法
CN107685835A (zh) * 2017-03-21 2018-02-13 南通蓝岛海洋工程有限公司 一种风电钢管桩吊装运输工艺
CN111301619A (zh) * 2018-12-10 2020-06-19 烟台铁中宝钢铁加工有限公司 海上浮式储油平台喇叭口锁钩的安装装置及安装方法
CN111301619B (zh) * 2018-12-10 2023-10-24 烟台铁中宝钢铁加工有限公司 海上浮式储油平台喇叭口锁钩的安装装置及安装方法
CN113606095A (zh) * 2021-06-16 2021-11-05 海洋石油工程股份有限公司 一种海上整体风机流水线式自安装方法
CN113606095B (zh) * 2021-06-16 2024-03-22 海洋石油工程股份有限公司 一种海上整体风机流水线式自安装方法

Similar Documents

Publication Publication Date Title
JP2019509217A (ja) 浮体式風力タービン及びこのような浮体式風力タービンの設置方法
DK2436593T3 (en) Ship and method of transport and installation of offshore structures
KR101439520B1 (ko) 해상 풍력발전기 설치용 작업선
CN103803024A (zh) 半浮式海上风力发电机组整体运输安装一体船及施工方法
EP1101935A2 (en) Method and vessel for installation of off-shore windmills
US9022691B2 (en) Method of installing an offshore wind turbine and a transport vessel thereof
JP6334416B2 (ja) 洋上風力タービン
CN102277878A (zh) 一种可浮运的浮式基础及其施工方法
CN101837929A (zh) 一种在滩涂区域驳船吊装风机的作业方法
US20150071779A1 (en) Wind turbine on a floating support stabilized by a raised anchoring system
CN103193163A (zh) 船厂龙门式起重机的坞口安装方法
WO2014205603A1 (en) Platform for tidal turbines
CN103807114A (zh) 海上风力发电机组水平组装整体翻转竖立安装***及方法
CN203844964U (zh) 母子双浮体海上风力发电机组整体运输安装一体船
WO2012066790A1 (ja) 洋上風車設置用船舶およびこれを用いた洋上風車設置方法
CN114179983A (zh) 一种浮式风机平台安装方法
CN103921900B (zh) 母子双浮体海上风力发电机组整体运输安装一体船的施工方法
CN103807115A (zh) 海上风力发电机组水平组装整体翻转竖立装置及施工方法
CN103807116A (zh) 海上风力发电机组拉索千斤顶提升安装装置及施工方法
KR20230113736A (ko) 풍력 터빈 해양 지지 구조
CN203844963U (zh) 半浮式海上风力发电机组整体运输安装一体船
CN203822557U (zh) 海上风力发电机组拉索千斤顶提升安装装置
JP2012112370A (ja) 洋上風車設置用船舶およびこれを用いた洋上風車設置方法
WO2015147647A1 (en) Method for lowering a subsea structure having a substantially flat support base into the water through the splash zone
KR20230104400A (ko) 부유식 해상풍력설비의 앵커 파지력 확보방법

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140521