CN103669884B - A kind of special-shaped roof purlin location and installation construction - Google Patents

A kind of special-shaped roof purlin location and installation construction Download PDF

Info

Publication number
CN103669884B
CN103669884B CN201310625117.4A CN201310625117A CN103669884B CN 103669884 B CN103669884 B CN 103669884B CN 201310625117 A CN201310625117 A CN 201310625117A CN 103669884 B CN103669884 B CN 103669884B
Authority
CN
China
Prior art keywords
support plate
rod member
purlin
installation
branch pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310625117.4A
Other languages
Chinese (zh)
Other versions
CN103669884A (en
Inventor
赖亮金
王龙
陈庆禄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENGYI GROUP Co Ltd
Original Assignee
HENGYI GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENGYI GROUP Co Ltd filed Critical HENGYI GROUP Co Ltd
Priority to CN201310625117.4A priority Critical patent/CN103669884B/en
Publication of CN103669884A publication Critical patent/CN103669884A/en
Application granted granted Critical
Publication of CN103669884B publication Critical patent/CN103669884B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of special-shaped roof purlin location and installation construction, space support structure is formed by rationally designing and being made according to certain method, installed by rack, adjustable rest, section steel purlin and aluminum veneer, roof permanent load, live load is born and passes to wall column agent structure.By the combination of various components, the distinctive roof shape of tool is formed, purlin location and installation uses adjustable rest easy construction, and technological process is clearly understandable, operator is easy to grasp.

Description

A kind of special-shaped roof purlin location and installation construction
Technical field
The present invention relates to technical field of building construction, the engineering method that more particularly to a kind of purlin location and installation is constructed, specifically Say it is a kind of special-shaped roof purlin location and installation construction.
Background technology
With the raising of construction material and processing technology, the wisdom crystallization of numerous architects, various building roofs are added Moulding is arisen at the historic moment;Wherein irregular building roof is exactly one of moulding for often being selected by architects in numerous roofing moulding. I take charge of undertake the construction of special-shaped roof load-carrying members in the emigrant's sound grand theater engineering of Longyan using grid structure and branch bracket purlin system- Aluminum veneer facing, but how in special-shaped Roof Latticed Truss Structure, easily location and installation purlin, is allowed to have with rack, decoration panel Machine is combined, to realize the wish on architect's design irregular building roof, the key as construction.For this, we improve tradition admittedly Fixed pattern purlin rest, gives purlin location and installation with the adjustable rest of 3-dimensional, is successfully applied in this engineering.For to follow-up similar Engineering is than method like this to improve construction speed and product quality.
The content of the invention
The basic ideas of the present invention:By rack, adjustable rest, section steel purlin and aluminum veneer by rationally design and according to Certain method makes, installation forms space support structure, bears roof permanent load, live load and passes to wall column body junction Structure.By the combination of various components, the distinctive roof shape of tool is formed.
The present invention solves the following technical scheme that above-mentioned technical problem is used:
A kind of special-shaped roof purlin location and installation construction, it is characterised in that:Specific method step is as follows:
(1)Connecting branch is positioned to be installed with support plate
Three-dimensional adjustable rest, bearing hole positioning becomes simply, the rest branch pipe that will have installation to number, in rack bolt Sequentially checked the number on tumbler bearing and be attached to plumb position, locking branch pipe bolt and bolt sphere ball seat, i.e. positioning are completed;Bolt sphere ball seat After the completion of the positioning check and correction of bearing connecting branch, three-dimensional adjustable support plate is placed on branch pipe adsorbed respectively, be connected as rest whole Body, the bearing as roof building enclosure load-bearing.
(2)Purlin system location and installation
Purlin rod member is shaped steel(Steel square tube, steel rectangular tube), by taking east elevation as an example, inclined plane section(4~8 axles)Positioning peace Dress, and inclined plane section, are converted to bevel phase fold-line-shaped with arc handing-over and steadily join transition processing.Wherein bevel phase broken line purlin I.e. main joist rod member, makes rod member angle of inclination location and installation with computer CAD simulations auxiliary and constructs;
A bevel phases(4~8 axles)Broken line rod member installs positioning:Installed using computer CAD simulation broken line purlin arcs, with Arc midpoint demarcates as flex point, and respectively segmental arc turns into several sections of broken lines, balance broken line rod member and support plate inclined plane Supporting surface relation, rightly makes the gradient angle α of support plate inclined plane and branch pipe axis.Laser orientation instru-ment is used at the scene Guide, C points support plate surrounds horizontal member axis, and rotation tilt adjustments are to angle α, and BC rod members are shelved on B, C supporting plate center line, Respectively symmetrically the contact site of support plate and branch pipe, support plate and rod member is fixed in spot welding;Guided at the scene with laser orientation instru-ment, D points support plate surrounds horizontal member axis, and rotation is adjusted to angle α, and CD rod members are shelved on C, D supporting plate center line, respectively symmetrically The contact site of support plate and branch pipe, support plate and rod member is fixed in spot welding;... method installs all broken line rod members according to this, Until all positioning is finished, then slope level rod member is installed, arc handing-over is converted to bevel phase fold-line-shaped Steady handing-over transition processing;
B bevel phases horizontal bars install positioning:Two horizontal bars are placed in inclined rest plate face level respectively On heart line, broken line rod member both sides, symmetric points, which are welded, fixes the contact site of support plate and rod member, in order to ensure the peace of decoration panel Precision is filled, measurement primary and secondary skeletal frame center line, surface level need to be checked with theodolite, to ensure that installation site is accurate.
(3)Welding
Between purlin support plate and branch pipe and rod member and purlin support plate, purlin is fixed on the serial welding rod full welds of E50 On support plate;Between Rod end and supporting plate plane, the use steel plate pad filling for having angle to stitch is welded;Each section of rod member interface For "eight" shape, between interface also should whole full welds, welding quality all should meet design requirement;Anti-corrosion is integrally carried out after Member Welding Processing.
The beneficial effects of the invention are as follows:1st, purlin location and installation uses adjustable rest easy construction, and technological process is clearly easy Understand, operator is easy to grasp.2nd, aerial rack bolt sphere bearing is positioned using CAD and site operation is measured It is combined, improves the accuracy that special-shaped roof framework location is installed, so as to improve efficiency of construction, make technique more ripe.3rd, it is general Logical section steel purlin is positioned by using broken line arc installation using CAD, realizes the profile on special-shaped roof Construction.
Brief description of the drawings
The present invention is described further with embodiment below in conjunction with the accompanying drawings
Accompanying drawing 1 is a kind of location and installation schematic diagram of special-shaped roof purlin location and installation construction of the present invention.
Embodiment
A kind of special-shaped roof purlin location and installation construction of the present invention is made with specific embodiment below in conjunction with the accompanying drawings Further description.
A kind of special-shaped roof purlin location and installation construction, it is characterised in that:Specific method step is as follows:
(1)Connecting branch is positioned to be installed with support plate
Three-dimensional adjustable rest, bearing hole positioning becomes simply, the rest branch pipe that will have installation to number, in rack bolt Sequentially checked the number on tumbler bearing and be attached to plumb position, locking branch pipe bolt and bolt sphere ball seat, i.e. positioning are completed;Bolt sphere ball seat After the completion of the positioning check and correction of bearing connecting branch, three-dimensional adjustable support plate is placed on branch pipe adsorbed respectively, be connected as rest whole Body, the bearing as roof building enclosure load-bearing.
(2)Purlin system location and installation
Purlin rod member is shaped steel(Steel square tube, steel rectangular tube), by taking east elevation as an example, inclined plane section(4~8 axles)Positioning peace Dress, and inclined plane section, are converted to bevel phase fold-line-shaped with arc handing-over and steadily join transition processing.Wherein bevel phase broken line purlin I.e. main joist rod member, makes rod member angle of inclination location and installation with computer CAD simulations auxiliary and constructs;
A bevel phases(4~8 axles)Broken line rod member installs positioning:Installed using computer CAD simulation broken line purlin arcs, with Arc midpoint demarcates as flex point, and respectively segmental arc turns into several sections of broken lines, balance broken line rod member and support plate inclined plane Supporting surface relation, rightly makes the gradient angle α of support plate inclined plane and branch pipe axis(I)(Fig. 5 .2.4-1).Existing Field is guided with laser orientation instru-ment, and C points support plate surrounds horizontal member axis, and rotation tilt adjustments are to angle α 1, and BC rod members are shelved On B, C supporting plate center line, the contact site of support plate and branch pipe, support plate and rod member is fixed in respectively symmetrically spot welding;At the scene Guided with laser orientation instru-ment, D points support plate surrounds horizontal member axis, rotation is adjusted to angle α 2, CD rod members are shelved on C, D support On plate center line, the contact site of support plate and branch pipe, support plate and rod member is fixed in respectively symmetrically spot welding;... method is pacified according to this All broken line rod members are filled, until all positioning is finished, then slope level rod member is installed, arc handing-over can thus turned It is changed to bevel phase fold-line-shaped and steadily joins transition processing;
B bevel phases horizontal bars install positioning:Two horizontal bars are placed in inclined rest plate face level respectively On heart line, broken line rod member both sides, symmetric points, which are welded, fixes the contact site of support plate and rod member, in order to ensure the peace of decoration panel Precision is filled, measurement primary and secondary skeletal frame center line, surface level need to be checked with theodolite, to ensure that installation site is accurate.
(3)Welding
Between purlin support plate and branch pipe and rod member and purlin support plate, purlin is fixed on the serial welding rod full welds of E50 On support plate;Between Rod end and supporting plate plane, the use steel plate pad filling for having angle to stitch is welded;Each section of rod member interface For "eight" shape, between interface also should whole full welds, welding quality all should meet design requirement;Anti-corrosion is integrally carried out after Member Welding Processing.
One kind of embodiment described above, simply more preferably embodiment of the invention, those skilled in the art The usual variations and alternatives that member is carried out in the range of technical solution of the present invention all should be comprising within the scope of the present invention.

Claims (1)

1. a kind of special-shaped roof purlin location and installation construction, it is characterised in that:Specific method step is as follows:
(1) connecting branch positioning is installed with rest
Three-dimensional adjustable rest, the branch pipe that will have installation to number sequentially is checked the number on rack bolt tumbler bearing and is attached to plumb position, Branch pipe bolt and bolt sphere ball seat are locked, i.e. positioning is completed;After the completion of the positioning check and correction of bolt sphere ball seat bearing connecting branch, respectively Three-dimensional adjustable support plate is placed on branch pipe and adsorbed, rest entirety, the bearing as roof building enclosure load-bearing is connected as;
(2) purlin system location and installation
Purlin rod member be shaped steel, inclined plane section location and installation, and inclined plane section, with arc handing-over be converted to bevel phase fold-line-shaped put down Steady handing-over transition processing, wherein bevel phase broken line purlin is main joist rod member, and making rod member with computer CAD simulations auxiliary tilts Angle location and installation is constructed;
A bevel phase broken lines rod member installs positioning:Installed using computer CAD simulation broken line purlin arcs, using arc midpoint as Flex point is demarcated, and respectively segmental arc turns into several sections of broken lines, balance broken line rod member and the supporting surface relation of support plate inclined plane, just The gradient angle α of support plate inclined plane and branch pipe axis is made in locality, and B points are set below with D points respectively the two of C points Side, is guided with laser orientation instru-ment at the scene, and C points support plate surrounds horizontal member axis, rotation tilt adjustments to angle α, BC bars Part is shelved on B, C support plate center line, and the contact site of support plate and branch pipe, support plate and rod member is fixed in respectively symmetrically spot welding Position;Guided at the scene with laser orientation instru-ment, D points support plate surrounds horizontal member axis, rotation is adjusted to angle α, and CD rod members are put Put on C, D support plate center line, the contact site of support plate and branch pipe, support plate and rod member is fixed in respectively symmetrically spot welding Position;... method installs all broken line rod members according to this, until all positioning is finished, then installs slope level rod member, so It arc handing-over is converted to bevel phase fold-line-shaped and steadily join transition processing;
B bevel phases horizontal bars install positioning:By two horizontal bars, inclined rest plate face horizontal center line is placed in respectively Upper, broken line rod member both sides, symmetric points weld the contact site for fixing support plate and rod member, in order to ensure the installation essence of decoration panel Degree, need to check measurement primary and secondary skeletal frame center line, surface level, to ensure that installation site is accurate with theodolite;
(3) weld
Between purlin support plate and branch pipe and rod member and purlin support plate, fixed with the serial welding rod full welds of E50;Rod end with Between support plate plane, the use steel plate pad filling for having angle to stitch is welded;Each section of rod member interface is between "eight" shape, interface Also whole full welds are answered, welding quality all should meet design requirement;Preservative treatment is integrally carried out after Member Welding.
CN201310625117.4A 2013-11-28 2013-11-28 A kind of special-shaped roof purlin location and installation construction Active CN103669884B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310625117.4A CN103669884B (en) 2013-11-28 2013-11-28 A kind of special-shaped roof purlin location and installation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310625117.4A CN103669884B (en) 2013-11-28 2013-11-28 A kind of special-shaped roof purlin location and installation construction

Publications (2)

Publication Number Publication Date
CN103669884A CN103669884A (en) 2014-03-26
CN103669884B true CN103669884B (en) 2017-09-08

Family

ID=50308593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310625117.4A Active CN103669884B (en) 2013-11-28 2013-11-28 A kind of special-shaped roof purlin location and installation construction

Country Status (1)

Country Link
CN (1) CN103669884B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736434B (en) * 2018-12-28 2021-10-01 深圳广田集团股份有限公司 Method for installing large-size purline on large-span special-shaped roof and construction process
CN109469339A (en) * 2018-12-30 2019-03-15 北京首钢建设集团有限公司 A kind of roof purline installs and uses bolt and temporarily positions fixed construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268652A (en) * 1996-03-29 1997-10-14 Hitachi Metals Ltd Column base metal for round steel pipe column
JP2001303679A (en) * 2000-04-24 2001-10-31 Nkk Corp Branch part structure of steel pipe truss
CN201455642U (en) * 2009-03-25 2010-05-12 上海西重所重型机械成套有限公司 Angle modulation mechanical device for working surface
CN201459932U (en) * 2009-04-13 2010-05-12 上海亚泽太阳能金属屋面工程有限公司 Roofing round tube purline adjustable connecting device
CN202073186U (en) * 2011-05-06 2011-12-14 管凯华 Purline connecting mechanism for steel structure
CN102587590A (en) * 2012-03-14 2012-07-18 哈尔滨工业大学空间钢结构幕墙有限公司 Waterproof heat-insulating fireproof metal roof system
CN202359671U (en) * 2011-12-19 2012-08-01 陆春燕 Wind-resistant column and roof purlin mechanism for steel structure
CN102660996A (en) * 2012-05-29 2012-09-12 广西建工集团第五建筑工程有限责任公司 Multilevel multi-curve single-layer welding ball steel structure net rack and construction method thereof
CN102797314A (en) * 2012-08-24 2012-11-28 中建三局装饰有限公司 Three-dimensional adjusting suspended ceiling system for space structure and construction method of system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268652A (en) * 1996-03-29 1997-10-14 Hitachi Metals Ltd Column base metal for round steel pipe column
JP2001303679A (en) * 2000-04-24 2001-10-31 Nkk Corp Branch part structure of steel pipe truss
CN201455642U (en) * 2009-03-25 2010-05-12 上海西重所重型机械成套有限公司 Angle modulation mechanical device for working surface
CN201459932U (en) * 2009-04-13 2010-05-12 上海亚泽太阳能金属屋面工程有限公司 Roofing round tube purline adjustable connecting device
CN202073186U (en) * 2011-05-06 2011-12-14 管凯华 Purline connecting mechanism for steel structure
CN202359671U (en) * 2011-12-19 2012-08-01 陆春燕 Wind-resistant column and roof purlin mechanism for steel structure
CN102587590A (en) * 2012-03-14 2012-07-18 哈尔滨工业大学空间钢结构幕墙有限公司 Waterproof heat-insulating fireproof metal roof system
CN102660996A (en) * 2012-05-29 2012-09-12 广西建工集团第五建筑工程有限责任公司 Multilevel multi-curve single-layer welding ball steel structure net rack and construction method thereof
CN102797314A (en) * 2012-08-24 2012-11-28 中建三局装饰有限公司 Three-dimensional adjusting suspended ceiling system for space structure and construction method of system

Also Published As

Publication number Publication date
CN103669884A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN114086669B (en) Modularized rapid construction method for large-scale space special-shaped curved surface steel net rack
CN102561712B (en) Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN103114732B (en) Cast steel penetration pipe node space positioning method
CN104110140B (en) Net rack node location adjusting device and location adjusting method
CN102635209A (en) Cornice steel skeleton and bracket steel skeleton for large-span big roof of pseudo-classic architecture and construction method of cornice steel skeleton and bracket steel skeleton
CN103556836A (en) Method for assembling and constructing spherical reticulated shell under limited spatial condition
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN109577543A (en) Large-size net rack lower edge abnormity aluminum veneer ceiling construction method
CN111691681A (en) Method for mounting outer frame cylinder structure of diagonal steel pipe grid column
CN107090775A (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN103669884B (en) A kind of special-shaped roof purlin location and installation construction
CN105133881A (en) Modular construction method for high temperature gas cooled reactor nuclear power plant containment bracket section wall
CN106760275A (en) The construction method of stainless steel spiral stairses is installed using sectional shelf-unit
CN112096090B (en) Large-span space pipe truss single-point support butt joint step-by-step unloading device and construction method
CN104264781B (en) Latticed cylindrical surface steel structure latticed shell and construction method thereof
CN202577802U (en) Large-roof and large-span cornice bucket arch steel skeleton of archaized architecture
CN206646817U (en) The form bracing system of the cast-in-place decorative panel of staged Arc Stand
CN206604539U (en) It is a kind of to place stable chemical experiment test tube holding frame
CN104389348A (en) Installing method of arch structure with skin
CN104499435A (en) Bracket used for mounting self-anchored suspension bridge splay saddle base
CN209323691U (en) A kind of huge diagonal brace of overlength superelevation
CN204418027U (en) A kind of bracket of the cable saddle floor installation that falls apart for self-anchored suspension bridge
CN114250689A (en) Construction method of inclined steel box stacked arch rib of steel arch bridge
CN103572870B (en) A kind of overlength high obliquity curtain wall batter post and mounting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant