CN103485716B - Karst-geology rotary-drill guide-hole construction method - Google Patents

Karst-geology rotary-drill guide-hole construction method Download PDF

Info

Publication number
CN103485716B
CN103485716B CN201310446002.9A CN201310446002A CN103485716B CN 103485716 B CN103485716 B CN 103485716B CN 201310446002 A CN201310446002 A CN 201310446002A CN 103485716 B CN103485716 B CN 103485716B
Authority
CN
China
Prior art keywords
hole
drilling
karst
construction method
geology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310446002.9A
Other languages
Chinese (zh)
Other versions
CN103485716A (en
Inventor
苏振渊
郑礼旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN CHENGSEN CONSTRUCTION GROUP Co Ltd
Original Assignee
FUJIAN CHENGSEN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN CHENGSEN CONSTRUCTION GROUP Co Ltd filed Critical FUJIAN CHENGSEN CONSTRUCTION GROUP Co Ltd
Priority to CN201310446002.9A priority Critical patent/CN103485716B/en
Publication of CN103485716A publication Critical patent/CN103485716A/en
Application granted granted Critical
Publication of CN103485716B publication Critical patent/CN103485716B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a Karst-geology rotary-drill guide-hole construction method. The Karst-geology rotary-drill guide-hole construction method is characterized in that a specific progress includes: before hole-by-hole drilling, performing geological drilling first to obtain a geological column graph; according to prompt of the geological column graph, distinguishing normal driving and guide-hole construction method, and drilling according to a designed hole diameter under the normal drilling condition; designing safe thickness on the upper side of a Karst cave opening, and designing the safe thickness with the safe distance aiming at preventing collapse of sections according to geology; switching to a drilling bucket small in diameter to drill in a guide hole drilling area; lifting a drilling tool, observing mud loss in a pile and mud filled in the cave and judging size of a cavity of the Karst cave after drilling of the guide hole penetrating a crustal layer to enter the Karst cave; according to the size of the Karst cave, adopting different processing methods. The method is simple and effect in exploration technology, a geological structure can be grasped rapidly, safety during an exploration process can be guaranteed, and accordingly double benefits can be achieved.

Description

Karst-geology rotary-drill guide-hole construction method
Technical field
The present invention relates to a kind of Karst-geology rotary-drill guide-hole construction method, be applied to the employing of Karst Geological Landscape section and dig drilling machine construction bored pile.
Background technology
Existing Karst Geological Landscape carries out in exploration process, mainly utilize the single larger-diameter drill bit of ratio to spud in, when solution cavity situation is unknown, major diameter drill bit is when creeping into solution cavity, the security incident such as easily cause that solution cavity caves in, brings great potential safety hazard to exploration process.Therefore, are objects that the present invention studies for the problems referred to above.
Summary of the invention
The object of the present invention is to provide a kind of Karst-geology rotary-drill guide-hole construction method, contribute to solving in current solution cavity exploration process and there is the problems such as very big potential safety hazard.
The invention is characterized in: a kind of Karst-geology rotary-drill guide-hole construction method, is characterized in that, specifically carry out according to the following procedure:
1) before hole-specifically creeping into, first carry out geotechnical boring, draw geologic column;
2) according to the prompting of geologic column, normal driving and guide hole construction method are distinguished, under normal driving state, carry out churning driven by design aperture and creep into;
3) design safety thickness above the solution cavity mouth of prompting, its safe distance caves in for target to prevent its fragment according to geology, design safety thickness;
4) at guide hole drilling area, use minor diameter drilling bucket instead and creep into;
5) after guide hole creeps into, can crust layer be passed, enter solution cavity, now promote drilling tool, observe the damaed cordition of mud in stake, fill up the mud situation in hole, judge the size in the cavity of solution cavity;
According to the size of solution cavity, take different processing methods.
Advantage of the present invention: the present invention explores that technique is simple, effectively, can not only understand geologic structure fast, and can also ensure the safety of exploration process, be kill two birds with one stone.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of embodiment of the present invention process.
Detailed description of the invention
With reference to figure 1, the present invention relates to a kind of Karst-geology rotary-drill guide-hole construction method, specifically carry out according to the following procedure:
1) before hole-specifically creeping into, first carry out geotechnical boring, draw geologic column;
2) according to the prompting of geologic column, normal driving and guide hole construction method are distinguished, under normal driving state, carry out churning driven by design aperture and creep into;
3) design safety thickness above the solution cavity mouth of prompting, its safe distance caves in for target to prevent its fragment according to geology, design safety thickness;
4) at guide hole drilling area, use minor diameter drilling bucket instead and creep into;
5) after guide hole creeps into, can crust layer be passed, enter solution cavity, now promote drilling tool, observe the damaed cordition of mud in stake, fill up the mud situation in hole, judge the size in the cavity of solution cavity;
6) according to the size of solution cavity, different processing methods is taked.
Specific implementation process is as follows:
1, before hole-specifically creeping into, first carry out geotechnical boring, draw geologic column;
2, according to the prompting of geologic column, normal driving and guide hole construction method are distinguished, under normal driving state, carry out churning driven by design aperture and creep into, normally creep into district 1 as illustrated;
3, certain safe distance (safe distance according to geology, to prevent its fragment from caving in for target, design safety thickness) above the solution cavity mouth of prompting, as illustrated reserved anti-collapse height 2;
4, at guide hole drilling area, use minor diameter drilling bucket instead and creep into, as figure guide hole creeps into 3;
5, after guide hole creeps into, can crust layer be passed, enter solution cavity, now promote drilling tool, observe the damaed cordition of mud in stake, fill up the mud situation in hole, judge the size in the cavity of solution cavity;
6, according to the size of solution cavity, different processing methods is taked.
The foregoing is only preferred embodiment of the present invention, all equalizations done according to the present patent application the scope of the claims change and modify, and all should belong to covering scope of the present invention.

Claims (1)

1. a Karst-geology rotary-drill guide-hole construction method, is characterized in that, specifically carries out according to the following procedure:
1) before hole-specifically creeping into, first carry out geotechnical boring, draw geologic column;
2) according to the prompting of geologic column, normal driving and guide hole construction method are distinguished, under normal driving state, carry out churning driven by design aperture and creep into;
3) design safety thickness above the solution cavity mouth of prompting, its safe distance caves in for target to prevent its fragment according to geology, design safety thickness;
4) at guide hole drilling area, use minor diameter drilling bucket instead and creep into;
5) after guide hole creeps into, can crust layer be passed, enter solution cavity, now promote drilling tool, observe the damaed cordition of mud in stake, fill up the mud situation in hole, judge the size in the cavity of solution cavity;
6) according to the size of solution cavity, different processing methods is taked.
CN201310446002.9A 2013-09-27 2013-09-27 Karst-geology rotary-drill guide-hole construction method Active CN103485716B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310446002.9A CN103485716B (en) 2013-09-27 2013-09-27 Karst-geology rotary-drill guide-hole construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310446002.9A CN103485716B (en) 2013-09-27 2013-09-27 Karst-geology rotary-drill guide-hole construction method

Publications (2)

Publication Number Publication Date
CN103485716A CN103485716A (en) 2014-01-01
CN103485716B true CN103485716B (en) 2015-06-10

Family

ID=49826265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310446002.9A Active CN103485716B (en) 2013-09-27 2013-09-27 Karst-geology rotary-drill guide-hole construction method

Country Status (1)

Country Link
CN (1) CN103485716B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153352B (en) * 2014-07-31 2017-02-15 广西科技大学 Karst geology rotary-drilling bored concrete pile hole forming process
CN104809312B (en) * 2015-05-15 2017-12-05 中铁第四勘察设计院集团有限公司 Pile In Karst Area supporting course safe thickness computational methods
CN105064985B (en) * 2015-07-20 2018-02-16 中铁十七局集团第四工程有限公司 The decision method for carrying out the dynamic adjustment of vertical shaft drilling process is analyzed based on slag charge
CN108411928A (en) * 2018-03-22 2018-08-17 中建桥梁有限公司 One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method
CN113981958A (en) * 2021-11-26 2022-01-28 中铁十六局集团第四工程有限公司 Method for plugging karst cave of mechanical pore-forming cast-in-place pile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2215109C2 (en) * 2001-11-05 2003-10-27 Иркутский государственный технический университет Method of well rotary drilling
CN102536250B (en) * 2010-12-31 2014-10-08 中铁二局股份有限公司 Construction method for tunnels with karst and gas simultaneously
CN102322294B (en) * 2011-05-31 2014-06-18 中铁二十局集团第一工程有限公司 Comprehensive geological prediction method for karst tunnel construction
CN102817619B (en) * 2012-09-03 2014-12-10 中铁第四勘察设计院集团有限公司 Combined advanced drilling exploration method for detecting water-free dissolving cavity and water dissolving cavity in tunnel
CN102888795A (en) * 2012-10-25 2013-01-23 中铁十九局集团有限公司 Karst roadbed grouting process

Also Published As

Publication number Publication date
CN103485716A (en) 2014-01-01

Similar Documents

Publication Publication Date Title
CN103485716B (en) Karst-geology rotary-drill guide-hole construction method
JP5932178B1 (en) Pile hole excavation apparatus and pile construction management method
CN104481587B (en) The comprehensive coal working face top plate sandstone fissure water of putting of large mining depth, large span visits anti-method
CN102587380A (en) Construction method for wholly removing drilling pile head
CN108331573A (en) The abandoned well administering method of bank
CN107237323A (en) Major diameter super thick boulder bed forming hole method
KR101559962B1 (en) Construction method for underground wall using pile
WO2012008833A3 (en) Method and device for introducing an electrical cable at a depth in a seabed
CN108180035A (en) Gas extraction method for combined operation of drilling and permeability increasing of high-gas low-permeability coal seam
JP2014156706A (en) Sediment sampling device, sediment sampling system and sediment sampling method
CN203129199U (en) Pile hole mud sampler
CN107964940A (en) A kind of construction method of continuous wall trench underground
CN106193076B (en) The Groundwater Control method of the compound water-bearing structure of deep basal pit
CN104806256A (en) In-tunnel processing method for unexpected dissolving cavity meeting during shield tunneling
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN107938660B (en) Construction method for large-diameter cast-in-situ bored pile casing
CN202881941U (en) Embedded pipe for sampling grouting pile end
CN202706971U (en) Bit fisher
KR101287456B1 (en) Apparatus for withdrawing excavating bit in excavation hole
CN110273413A (en) A kind of efficient construction method of prefabricated pile
CN206503149U (en) A kind of ultra-deep steel pipe concrete continuous underground wall structure
RU2010136183A (en) METHOD OF DEVELOPING DEPOSITS OF USEFUL FOSSILS BY DRILLING A CORE OF A LARGE DIAMETER
CN205532276U (en) Novel fried punching in irregularity ground device
CN105863629B (en) A kind of geology sampling apparatus
CN108005065A (en) The constructing structure and construction method of PHC static pressure pipe piles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant