CN103352427A - 现浇箱梁侧模滑移施工装置及方法 - Google Patents

现浇箱梁侧模滑移施工装置及方法 Download PDF

Info

Publication number
CN103352427A
CN103352427A CN2013102785223A CN201310278522A CN103352427A CN 103352427 A CN103352427 A CN 103352427A CN 2013102785223 A CN2013102785223 A CN 2013102785223A CN 201310278522 A CN201310278522 A CN 201310278522A CN 103352427 A CN103352427 A CN 103352427A
Authority
CN
China
Prior art keywords
side form
cast
sliding rail
lateral die
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102785223A
Other languages
English (en)
Inventor
王勇
崔淑斌
黄建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority to CN2013102785223A priority Critical patent/CN103352427A/zh
Publication of CN103352427A publication Critical patent/CN103352427A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种现浇箱梁侧模滑移施工装置,其特征在于:由可移动侧模、滑移轨道及千斤顶构成,可移动侧模由侧模及固装与侧模底部的走行滑轮构成,在支架上固装所述滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间安装千斤顶。本发明涉及一种现浇箱梁侧模滑移施工方法。采用本发明的滑移施工装置及方法,有效减少了传统现浇梁施工过程中需要大量吊装设备、运输车辆对侧模进行拆卸、倒运、吊装,经济实用、操作简单,可有效节省经费及缩短工时,具有明显的经济效益和社会效益。

Description

现浇箱梁侧模滑移施工装置及方法
技术领域
本发明属于桥梁施工技术领域,特别是一种现浇箱梁侧模滑移施工装置及方法。
背景技术
随国民经济发展,城市立交、高速公路高架桥、高速铁路高架桥的规模越来越大,出现大量的现浇箱梁施工。传统施工方法为:搭设支架→安装侧模→铺装底模→绑扎底、腹板钢筋→安装内模→绑扎顶板钢筋安装预埋件→浇筑混凝土→混凝土养护→拆模。一般情况下浇筑完一孔箱梁后,需拆除侧模后利用吊车和板车倒运至下一孔箱梁,再利用吊车安装侧模。可见,现有的现浇梁施工方法极为复杂,费时费力。
发明内容
本发明的目的在于克服现有技术的不足,提供一种现浇箱梁侧模滑移施工装置,其可有效降低施工难度,操作简单,提供施工效率。
本发明解决其技术问题是采取以下技术方案实现的:
一种现浇箱梁侧模滑移施工装置,其特征在于:由可移动侧模、滑移轨道及千斤顶构成,可移动侧模由侧模、侧模桁架及固装与侧模桁架底部的走行滑轮构成,在支架上固装所述滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间安装千斤顶。
2、一种现浇箱梁侧模滑移施工方法,其特征在于:其包括如下步骤:
⑴、施工第一孔箱梁时,采用千斤顶将侧模调整至设计标高,并锁死千斤顶;
⑵、浇筑完第一孔箱梁的混凝土,待混凝土达到拆模强度后,将同侧的千斤顶同步、缓慢落下;
⑶、将可移动侧模的走行滑轮落在滑移轨道上;
⑷、安装与第一孔箱梁连续的第二孔箱梁支架,并在支架上安装好滑移轨道,并保证第一、第二孔箱梁支架上的滑移轨道连接平顺;
⑸、利用安装在前端墩顶的卷扬机拖拉侧模,可移动侧模沿着轨道向前移动,移动至设计位置后,停止拖拉,对可移动侧模位置进行微调,并利用千斤顶将可移动侧模顶至设计标高、锁死;
⑹、重复上述步骤,实现现浇梁侧模的滑移施工。
本发明的优点和积极效果是:
1.本现浇箱梁侧模滑移施工装置及施工方法,利用现浇梁如下两个特点:连续多孔采用现浇施工方法进行施工,且连续浇筑的箱梁支架方式相同,采用滑移施工方法,有效减少了传统现浇梁施工过程中需要大量吊装设备、运输车辆对侧模进行拆卸、倒运、吊装,经济实用、操作简单。
2.本现浇箱梁侧模滑移施工装置及施工方法,可有效节省经费及缩短工时,如在沈丹客专一座连续8孔现浇梁施工中,节约机械费用约16万元,节约工期16天,具有明显的经济效益和社会效益。
附图说明
图1为本发明的结构示意图;
图2为图1的A部放大图。
附图标记:
1-侧模、2-侧模桁架、3-走行滑轮、4-千斤顶、5-滑移轨道、6-支架。
具体实施方式
下面结合附图、通过具体实施例对本发明作进一步详述。以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种现浇箱梁侧模滑移施工装置,由可移动侧模、滑移轨道5及千斤顶4构成,可移动侧模由侧模1、侧模桁架2及固装与侧模桁架底部的两排走行滑轮3构成,在支架6上固装并排的滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间对称安装千斤顶。千斤顶位置卡靠近于行走滑轮的位置。上述可移动侧模、滑移轨道是位于箱梁两侧的相同结构。
一种现浇箱梁侧模滑移施工方法,其包括如下步骤:
⑴、施工第一孔箱梁时,采用千斤顶将侧模调整至设计标高,并锁死千斤顶。
⑵、浇筑完第一孔箱梁的混凝土,待混凝土达到拆模强度后,将同侧的千斤顶同步、缓慢落下。
⑶、将可移动侧模的走行滑轮落在滑移轨道上;轨道采用工16工字钢。
⑷、安装与第一孔箱梁连续的第二孔箱梁支架,并在支架上安装好滑移轨道,并保证第一、第二孔箱梁支架上的滑移轨道连接平顺。
⑸、利用安装在前端墩顶的卷扬机拖拉侧模,可移动侧模沿着轨道向前移动,移动至设计位置后,停止拖拉,对可移动侧模位置进行微调,并利用千斤顶将侧模顶至设计标高、锁死。
⑹、重复上述步骤,实现现浇梁侧模的滑移施工。
尽管为说明目的公开了本发明的实施例和附图,但是本领域的技术人员可以理解:在不脱离本发明及所附权利要求的精神和范围内,各种替换、变化和修改都是可能的,因此,本发明的范围不局限于实施例和附图所公开的内容。

Claims (2)

1.一种现浇箱梁侧模滑移施工装置,其特征在于:由可移动侧模、滑移轨道及千斤顶构成,可移动侧模由侧模、侧模桁架及固装与侧模桁架底部的走行滑轮构成,在支架上固装所述滑移轨道,可移动侧模移动安装在该滑移轨道上,在支架上部与侧模底部之间安装千斤顶。
2.一种现浇箱梁侧模滑移施工方法,其特征在于:其包括如下步骤:
⑴、施工第一孔箱梁时,采用千斤顶将侧模调整至设计标高,并锁死千斤顶;
⑵、浇筑完第一孔箱梁的混凝土,待混凝土达到拆模强度后,将同侧的千斤顶同步、缓慢落下;
⑶、将可移动侧模的走行滑轮落在滑移轨道上;
⑷、安装与第一孔箱梁连续的第二孔箱梁支架,并在支架上安装好滑移轨道,并保证第一、第二孔箱梁支架上的滑移轨道连接平顺;
⑸、利用安装在前端墩顶的卷扬机拖拉侧模,可移动侧模沿着轨道向前移动,移动至设计位置后,停止拖拉,对可移动侧模位置进行微调,并利用千斤顶将可移动侧模顶至设计标高、锁死;
⑹、重复上述步骤,实现现浇梁侧模的滑移施工。
CN2013102785223A 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置及方法 Pending CN103352427A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102785223A CN103352427A (zh) 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102785223A CN103352427A (zh) 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置及方法

Publications (1)

Publication Number Publication Date
CN103352427A true CN103352427A (zh) 2013-10-16

Family

ID=49308835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102785223A Pending CN103352427A (zh) 2013-07-04 2013-07-04 现浇箱梁侧模滑移施工装置及方法

Country Status (1)

Country Link
CN (1) CN103352427A (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669215A (zh) * 2013-11-19 2014-03-26 中建三局建设工程股份有限公司 一种少支点支架纵横向整体滑移式侧模
CN105464000A (zh) * 2016-01-10 2016-04-06 中铁十一局集团第一工程有限公司 一种现浇箱梁移动模板
CN105735141A (zh) * 2016-05-05 2016-07-06 中铁上海工程局集团有限公司 一种箱梁侧模滑移装置及其施工方法
CN107245955A (zh) * 2017-08-06 2017-10-13 中国水利水电第七工程局成都水电建设工程有限公司 一种带平移滑模螺旋式落架支撑装置的现浇梁模板
CN107268448A (zh) * 2017-07-28 2017-10-20 中铁十局集团第四工程有限公司 一种支架现浇混凝土连续梁的模板拆除及安装装置
CN107542037A (zh) * 2017-09-28 2018-01-05 谢晓燕 一种新型的桥梁施工支撑托架
CN107724250A (zh) * 2017-11-28 2018-02-23 中交公局第三工程有限公司 现浇箱梁模板连接机构及现浇箱梁用支撑模板
CN112281664A (zh) * 2020-10-22 2021-01-29 中铁八局集团第一工程有限公司 一种用于大跨度简支梁现浇的滑模施工方法
CN112482781A (zh) * 2020-10-21 2021-03-12 中铁大桥局第七工程有限公司 一种侧模排架***及其使用方法
CN113585736A (zh) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 一种多向可调式现浇箱梁整体滑动式侧模
CN113756191A (zh) * 2021-08-12 2021-12-07 中铁上海工程局集团有限公司 一种钢侧模自动滑移安装施工方法
CN114438887A (zh) * 2021-12-28 2022-05-06 中铁二十局集团有限公司 模板移动方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000017883A (ko) * 1999-12-27 2000-04-06 김근택 아이엘엠용 피씨박스거더 교량제작 거푸집 시스템 및 이를이용한 세그멘트 제작방법
KR20060008453A (ko) * 2004-07-20 2006-01-27 김근택 교량 시공방법
JP2010018975A (ja) * 2008-07-09 2010-01-28 Nippon Steel & Sumikin Metal Products Co Ltd 型枠支保工および型枠支保工用水平力処理部材
CN101922142A (zh) * 2009-10-10 2010-12-22 中交二公局第二工程有限公司 现浇箱梁支架模板整体滑移施工方法
CN102140779A (zh) * 2011-01-14 2011-08-03 中铁大桥局集团第六工程有限公司 一种移动式现浇支架及箱梁现浇支架移动施工方法
CN202180523U (zh) * 2011-08-23 2012-04-04 湖南中铁五新钢模有限责任公司 外侧模行走机构
CN202220327U (zh) * 2011-07-20 2012-05-16 中铁十四局集团有限公司 满堂支架现浇箱梁边腹板移动滑车
CN203320425U (zh) * 2013-07-04 2013-12-04 中铁十三局集团电务工程有限公司 现浇箱梁侧模滑移施工装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000017883A (ko) * 1999-12-27 2000-04-06 김근택 아이엘엠용 피씨박스거더 교량제작 거푸집 시스템 및 이를이용한 세그멘트 제작방법
KR20060008453A (ko) * 2004-07-20 2006-01-27 김근택 교량 시공방법
JP2010018975A (ja) * 2008-07-09 2010-01-28 Nippon Steel & Sumikin Metal Products Co Ltd 型枠支保工および型枠支保工用水平力処理部材
CN101922142A (zh) * 2009-10-10 2010-12-22 中交二公局第二工程有限公司 现浇箱梁支架模板整体滑移施工方法
CN102140779A (zh) * 2011-01-14 2011-08-03 中铁大桥局集团第六工程有限公司 一种移动式现浇支架及箱梁现浇支架移动施工方法
CN202220327U (zh) * 2011-07-20 2012-05-16 中铁十四局集团有限公司 满堂支架现浇箱梁边腹板移动滑车
CN202180523U (zh) * 2011-08-23 2012-04-04 湖南中铁五新钢模有限责任公司 外侧模行走机构
CN203320425U (zh) * 2013-07-04 2013-12-04 中铁十三局集团电务工程有限公司 现浇箱梁侧模滑移施工装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陆国清: "侧模滑移在膺架现浇施工中的应用", 《黑龙江科技信息》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669215A (zh) * 2013-11-19 2014-03-26 中建三局建设工程股份有限公司 一种少支点支架纵横向整体滑移式侧模
CN105464000A (zh) * 2016-01-10 2016-04-06 中铁十一局集团第一工程有限公司 一种现浇箱梁移动模板
CN105735141A (zh) * 2016-05-05 2016-07-06 中铁上海工程局集团有限公司 一种箱梁侧模滑移装置及其施工方法
CN107268448A (zh) * 2017-07-28 2017-10-20 中铁十局集团第四工程有限公司 一种支架现浇混凝土连续梁的模板拆除及安装装置
CN107245955A (zh) * 2017-08-06 2017-10-13 中国水利水电第七工程局成都水电建设工程有限公司 一种带平移滑模螺旋式落架支撑装置的现浇梁模板
CN107542037B (zh) * 2017-09-28 2018-12-04 谢志坚 一种桥梁施工支撑托架
CN107542037A (zh) * 2017-09-28 2018-01-05 谢晓燕 一种新型的桥梁施工支撑托架
CN107724250A (zh) * 2017-11-28 2018-02-23 中交公局第三工程有限公司 现浇箱梁模板连接机构及现浇箱梁用支撑模板
CN112482781A (zh) * 2020-10-21 2021-03-12 中铁大桥局第七工程有限公司 一种侧模排架***及其使用方法
CN112281664A (zh) * 2020-10-22 2021-01-29 中铁八局集团第一工程有限公司 一种用于大跨度简支梁现浇的滑模施工方法
CN113585736A (zh) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 一种多向可调式现浇箱梁整体滑动式侧模
CN113756191A (zh) * 2021-08-12 2021-12-07 中铁上海工程局集团有限公司 一种钢侧模自动滑移安装施工方法
CN113756191B (zh) * 2021-08-12 2024-05-17 中铁上海工程局集团有限公司 一种钢侧模自动滑移安装施工方法
CN114438887A (zh) * 2021-12-28 2022-05-06 中铁二十局集团有限公司 模板移动方法

Similar Documents

Publication Publication Date Title
CN103352427A (zh) 现浇箱梁侧模滑移施工装置及方法
CN203320425U (zh) 现浇箱梁侧模滑移施工装置
CN103334381B (zh) 安装钢箱梁的全支架轨道台车驮移装置及施工方法
CN100547225C (zh) 一种具有浮动式行车底架的隧道仰拱模板台车
CN204662279U (zh) 带防护体系的滚动式砼箱梁桥转体施工合拢吊架装置
CN103669215B (zh) 一种少支点支架纵横向整体滑移式侧模
CN102094392A (zh) 桥梁施工中的下承式挂篮及其应用
CN202707081U (zh) 穿行式暗渠浇筑模板台车
CN102134832B (zh) 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架
CN103194977B (zh) 运架一体式架桥机架设首孔箱梁前导梁机就位方法
CN101885206B (zh) 高速铁路预制箱梁液压内模桁架式行走轨***
CN201080597Y (zh) 多功能现浇悬臂板施工支架
CN106192761B (zh) 一种在桥隧狭短过渡段拆解移动模架的方法
CN106285019A (zh) 一种局限空间下的天车安装方法
CN201776835U (zh) 高速铁路预制箱梁液压内模销装液压机构
CN201972099U (zh) 桥梁施工中的下承式挂篮
CN203769791U (zh) 一种盾构台车设备小曲率半径转向滑移装置
CN209178828U (zh) 一种现浇箱梁外侧钢模板安装装置
CN209836697U (zh) 一种长钢轨跨股道拨移装置
CN103194978B (zh) 用于铁路架桥中最后三孔箱梁架设方法
CN204266129U (zh) 钢箱梁安装辅助鼻梁
CN202595630U (zh) 跨营业线刚架桥模板施工台车
CN205189885U (zh) 一种简易出土垫板
CN207108292U (zh) 新型u型梁架设设备
CN201460908U (zh) 隧道高边墙混凝土衬砌台车

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 300150 Tianjin city Hebei District Zhicheng Daocheng of No. 41

Applicant after: CR13G ELECTRIC ENGINEERING CO., LTD.

Address before: 300150 Tianjin city Hebei District Zhicheng Daocheng of No. 41

Applicant before: CR13G Electric Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHINA RAILWAY 13TH BUREAU GROUP ELECTRICAL SERVICE ENGINEERING CO., LTD. TO: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING GROUP ELECTRIFICAYTION ENGINEERING CO., LTD.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131016