CN103306205A - 一种预制t梁或箱梁纵向湿接缝模板施工方法 - Google Patents

一种预制t梁或箱梁纵向湿接缝模板施工方法 Download PDF

Info

Publication number
CN103306205A
CN103306205A CN2013102299475A CN201310229947A CN103306205A CN 103306205 A CN103306205 A CN 103306205A CN 2013102299475 A CN2013102299475 A CN 2013102299475A CN 201310229947 A CN201310229947 A CN 201310229947A CN 103306205 A CN103306205 A CN 103306205A
Authority
CN
China
Prior art keywords
bed die
wire rope
wet joint
precast
wet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102299475A
Other languages
English (en)
Inventor
王福明
赵宏庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2013102299475A priority Critical patent/CN103306205A/zh
Publication of CN103306205A publication Critical patent/CN103306205A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

一种预制T梁或箱梁纵向湿接缝模板施工方法,车架和车轮组成在可沿湿接缝上表面移动的小车,小车与底模将湿接缝夹持在中间,车架上设置电动提升机与钢丝绳,钢丝绳处于湿接缝中心位置,通过穿过湿接缝的钢丝绳与螺杆和底模连接,再运用小型提升机升降,实现模板顺利的提升安装、模板的拆除吊落;被提升底模与梁板下表面接触后,在拉杆上外套PVC管,然后通过支垫钢筋、搭桥钢筋、山形卡扣、螺母,用活动扳手把底模牢固安装在梁板下表面。发明以便于消除高空作业,模板安装拆除方便,提高操作安全性,降低劳动强度,有效提高模板的安装与吊落的工作效率,且每套模板皆可循环利用,降低了成本。

Description

一种预制T梁或箱梁纵向湿接缝模板施工方法
技术领域
本发明属于公路、城市道路、铁路中桥梁模板安装技术领域,特别是一种预制T梁或箱梁纵向湿接缝模板施工方法。
背景技术
目前,桥梁上部结构中预制T梁或箱梁在安装完成后要进行纵向湿接缝连接,一般采用现浇混凝土浇筑。而湿接缝底部模板安装,以往多采用的是在湿接缝下面搭设脚手架或挂篮,用以支撑湿接缝处的模板,如果地基承载低,还要进行处理,不仅安全性、稳定性差,而且钢管和型钢需求量较大,施工成本高;在搭设和拆卸脚手架以及挂篮的过程中又需要大量的时间和人力,而且模板提升多采用人工或辘轳摇架,因此施工繁琐,浪费工程时间,劳动强度大,工作效率底。
发明内容
本发明的目的就是要解决以上问题,提供一种预制T梁或箱梁纵向湿接缝模板施工方法,不仅施工简单,模板安装拆除方便,不用搭架子和安装挂篮,而且消除了高空作业工序,保证施工安全,可连续进行作业,提高操作安全性,降低劳动强度,有效提高模板的安装与吊落的工作效率,同时模板和手推小车以及小型卷扬机结构简单,加工方便,可在工地加工,材料获取方便,每套模板皆可循环利用,成本低。
本发明的技术方案是这样得以实现的,一种预制T梁或箱梁纵向湿接缝模板施工方法,其特点是:车架和车轮组成在可沿湿接缝上表面移动的小车,小车与底模将湿接缝夹持在中间,车架上设置电动提升机与钢丝绳,钢丝绳处于湿接缝中心位置,通过穿过湿接缝的钢丝绳与螺杆和底模连接,再运用小型提升机升降,实现模板顺利的提升安装、模板的拆除吊落;被提升底模与梁板下表面接触后,在拉杆上外套PVC管,然后通过支垫钢筋、搭桥钢筋、山形卡扣、螺母,用活动扳手把底模牢固安装在梁板下表面;本发明包括以下步骤:⑴先将竹胶板底模钻拉杆孔,拉杆穿过拉杆孔与底模牢靠固定,放在桥梁下面;⑵T梁或箱梁上的手推小车钢丝绳,穿过湿接缝将吊环与拉杆扣紧,再通过提升机,实现底模顺利的提升安装;⑶将底模体系安提升就位,再用螺纹钢筋做支垫、搭桥,配合使用山型卡扣,用螺母将套上PVC管拉杆与山形卡扣拧紧,并与T梁或箱梁上的支垫、搭桥钢筋形成稳定体系,使底模牢固安装在湿接缝下表面;⑷卸掉钢丝绳上的吊环,移动小车,进行下一块底模安装,底模与梁板缝隙用施工棉塞堵,防止漏浆,底模安装完后浇筑湿接缝混凝土,等混凝土达到一定强度后,拆除和吊落底模。
本发明不仅施工简单,模板安装拆除方便,而且消除了高空作业工序,节省大量钢材,降低对工程成本投入,同时还保证施工安全,提高操作安全性和工作效率,降低劳动强度,每套模板皆可循环利用,降低了成本。
现结合附图和实例对本发明进一步说明。
附图说明
图1是本发明的竹胶板平面图。
图2是本发明的竹胶板安装立面图。
图3是本发明的竹胶板安装图。
图中:1——竹胶板;2——拉杆孔;3——加劲方木;4——PVC管;5——支垫钢筋;6——搭桥钢筋;7——拉杆;8——电动提升机;9——吊环;10——手推小车;11——山形卡扣。
具体实施方式
从图1、图2、图3中可以看出:本发明的施工工器具和材料包括:手推小车车架、车轮、车轴、小型电动提升机、钢丝绳、吊环、湿接缝底模、拉杆、搭桥钢筋、支垫钢筋、卡扣、螺帽、PVC管、活动扳手。
底模采用竹胶板1(厚≥1.5cm);在中线位置钻一排拉杆孔2,长度和宽度根据湿接缝而定,在竹胶板1底部设有加劲方木3;手推小车10的车架用Φ28~32螺纹钢筋焊接;车轮和车轴为板车车轮和车轴,载重300kg左右;小型电动提升机8的功率为3~6kw;手推小车钢丝绳采用Φ6~14起重钢丝绳,拉杆7采用Φ12~16螺纹钢筋,拉杆7外套有PVC管4,支垫钢筋5、搭桥钢筋6用Φ28~32螺纹钢筋;卡扣为山形卡扣11;螺帽用Q235圆钢制成。
车架和车轮组成在可沿湿接缝上表面移动的小车,小车与底模将湿接缝夹持在中间,车架上设置电动提升机与钢丝绳,钢丝绳处于湿接缝中心位置,通过穿过湿接缝的钢丝绳与螺杆和底模连接,再运用小型提升机升降,实现模板顺利的提升安装、模板的拆除吊落;被提升底模与梁板下表面接触后,在拉杆上外套PVC管,然后通过支垫钢筋、搭桥钢筋、山形卡扣、螺母,用活动扳手把底模牢固安装在梁板下表面;
本发明包括以下步骤:⑴先将竹胶板底模钻拉杆孔,拉杆穿过拉杆孔与底模牢靠固定,放在桥梁下面;⑵T梁或箱梁上的手推小车钢丝绳,穿过湿接缝将吊环与拉杆扣紧,再通过提升机,实现底模顺利的提升安装;⑶将底模体系安提升就位,再用螺纹钢筋做支垫、搭桥,配合使用山型卡扣,用螺母将套上PVC管拉杆与山形卡扣拧紧,并与T梁或箱梁上的支垫、搭桥钢筋形成稳定体系,使底模牢固安装在湿接缝下表面;⑷卸掉钢丝绳上的吊环,移动小车,进行下一块底模安装,底模与梁板缝隙用施工棉塞堵,防止漏浆,底模安装完后浇筑湿接缝混凝土,等混凝土达到一定强度后,拆除和吊落底模。

Claims (7)

1.一种预制T梁或箱梁纵向湿接缝模板施工方法,其特征在于:车架和车轮组成在可沿湿接缝上表面移动的小车,小车与底模将湿接缝夹持在中间,车架上设置电动提升机与钢丝绳,钢丝绳处于湿接缝中心位置,通过穿过湿接缝的钢丝绳与螺杆和底模连接,再运用小型提升机升降,实现模板顺利的提升安装、模板的拆除吊落;被提升底模与梁板下表面接触后,在拉杆上外套PVC管,然后通过支垫钢筋、搭桥钢筋、山形卡扣、螺母,用活动扳手把底模牢固安装在梁板下表面;本发明包括以下步骤:
⑴先将竹胶板底模钻拉杆孔,拉杆穿过拉杆孔与底模牢靠固定,放在桥梁下面;
⑵T梁或箱梁上的手推小车钢丝绳,穿过湿接缝将吊环与拉杆扣紧,再通过提升机,实现底模顺利的提升安装;
⑶将底模体系安提升就位,再用螺纹钢筋做支垫、搭桥,配合使用山型卡扣,用螺母将套上PVC管拉杆与山形卡扣拧紧,并与T梁或箱梁上的支垫、搭桥钢筋形成稳定体系,使底模牢固安装在湿接缝下表面;
⑷卸掉钢丝绳上的吊环,移动小车,进行下一块底模安装,底模与梁板缝隙用施工棉塞堵,防止漏浆,底模安装完后浇筑湿接缝混凝土,等混凝土达到一定强度后,拆除和吊落底模。
2.根据权利要求1所述的一种预制T梁或箱梁纵向湿接缝模板施工方法,其特征在于:手推小车的车架用Φ28~32螺纹钢筋焊接而成。
3.根据权利要求1或2所述的一种预制T梁或箱梁纵向湿接缝模板施工方法,其特征在于:车轮和车轴为板车车轮和车轴,载重300kg左右。
4.根据权利要求3所述的一种预制T梁或箱梁纵向湿接缝模板施工方法,其特征在于:小型提升机采用功率为3~6kw的小型电动提升机。
5.根据权利要求4所述的一种预制T梁或箱梁纵向湿接缝模板施工方法,其特征在于:手推小车钢丝绳采用Φ6~14起重钢丝绳。
6.根据权利要求4所述的一种预制T梁或箱梁纵向湿接缝模板施工方法,其特征在于:拉杆采用Φ12~16螺纹钢筋。
7.根据权利要求4所述的一种预制T梁或箱梁纵向湿接缝模板施工方法,其特征在于:支垫钢筋、搭桥钢筋采用Φ28~32螺纹钢筋。
CN2013102299475A 2013-06-09 2013-06-09 一种预制t梁或箱梁纵向湿接缝模板施工方法 Pending CN103306205A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102299475A CN103306205A (zh) 2013-06-09 2013-06-09 一种预制t梁或箱梁纵向湿接缝模板施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102299475A CN103306205A (zh) 2013-06-09 2013-06-09 一种预制t梁或箱梁纵向湿接缝模板施工方法

Publications (1)

Publication Number Publication Date
CN103306205A true CN103306205A (zh) 2013-09-18

Family

ID=49131892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102299475A Pending CN103306205A (zh) 2013-06-09 2013-06-09 一种预制t梁或箱梁纵向湿接缝模板施工方法

Country Status (1)

Country Link
CN (1) CN103306205A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510466A (zh) * 2013-10-11 2014-01-15 中铁十九局集团有限公司 T形梁桥面系湿接缝施工方法
CN103758045A (zh) * 2014-02-20 2014-04-30 中铁十局集团第三建设有限公司 空间限制条件下箱梁湿接缝模板施工方法
CN104018422A (zh) * 2014-06-18 2014-09-03 上海市城市建设设计研究总院 用于预制拼装桥墩立柱与盖梁连接部位的湿接缝构造
CN104164934A (zh) * 2014-08-21 2014-11-26 云南工程建设总承包公司 简易式nz内置管模抗浮拉钩装置及其施工方法
CN105525569A (zh) * 2014-10-22 2016-04-27 五冶集团上海有限公司 桥梁翼缘板湿接缝吊模施工方法
CN110331667A (zh) * 2019-07-02 2019-10-15 中交二公局东萌工程有限公司 边通车边施工条件下桥梁的拼接方法
CN111731988A (zh) * 2020-07-07 2020-10-02 中国建筑第四工程局有限公司 一种t梁湿接缝模板的提升安装方法及装置
CN112660993A (zh) * 2020-12-30 2021-04-16 中国建筑土木建设有限公司 一种箱梁防落梁挡块安装***及施工方法
CN112921821A (zh) * 2021-03-25 2021-06-08 成都城投建筑工程有限公司 盖梁分节预制拼装湿接缝施工结构及其施工方法
CN113481852A (zh) * 2021-06-16 2021-10-08 五冶集团上海有限公司 一种可连续施工的桥梁湿接缝模板***
CN113668403A (zh) * 2021-08-31 2021-11-19 上海市基础工程集团有限公司 用于现浇主梁湿接缝的可移动式吊模装置及施工方法
CN113846562A (zh) * 2021-09-22 2021-12-28 中建一局集团第五建筑有限公司 一种自动浇筑湿接缝装置
CN114370003A (zh) * 2022-01-07 2022-04-19 中国十七冶集团有限公司 一种高架桥湿接缝翻模施工的方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01322064A (ja) * 1988-06-25 1989-12-27 Toki Eng:Kk 足場用鋼管を用いて一括上架仮設を行なう建設工事用足場架設工法
JP2012117217A (ja) * 2010-11-29 2012-06-21 Railway Technical Research Institute 複合高架橋の構築構造およびその複合高架橋の施工方法
CN202390773U (zh) * 2011-12-07 2012-08-22 中铁二局集团新运工程有限公司 分体悬臂式t梁现浇翼缘板模型
CN202416184U (zh) * 2011-12-29 2012-09-05 中建七局第一建筑有限公司 箱梁纵向湿接缝模板施工装置
CN102900021A (zh) * 2012-09-28 2013-01-30 中铁四局集团第一工程有限公司 一种拼装式桥梁湿接缝施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01322064A (ja) * 1988-06-25 1989-12-27 Toki Eng:Kk 足場用鋼管を用いて一括上架仮設を行なう建設工事用足場架設工法
JP2012117217A (ja) * 2010-11-29 2012-06-21 Railway Technical Research Institute 複合高架橋の構築構造およびその複合高架橋の施工方法
CN202390773U (zh) * 2011-12-07 2012-08-22 中铁二局集团新运工程有限公司 分体悬臂式t梁现浇翼缘板模型
CN202416184U (zh) * 2011-12-29 2012-09-05 中建七局第一建筑有限公司 箱梁纵向湿接缝模板施工装置
CN102900021A (zh) * 2012-09-28 2013-01-30 中铁四局集团第一工程有限公司 一种拼装式桥梁湿接缝施工方法

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510466B (zh) * 2013-10-11 2015-07-01 中铁十九局集团有限公司 T形梁桥面系湿接缝施工方法
CN103510466A (zh) * 2013-10-11 2014-01-15 中铁十九局集团有限公司 T形梁桥面系湿接缝施工方法
CN103758045B (zh) * 2014-02-20 2016-06-08 中铁十局集团第三建设有限公司 空间限制条件下箱梁湿接缝模板施工方法
CN103758045A (zh) * 2014-02-20 2014-04-30 中铁十局集团第三建设有限公司 空间限制条件下箱梁湿接缝模板施工方法
CN104018422A (zh) * 2014-06-18 2014-09-03 上海市城市建设设计研究总院 用于预制拼装桥墩立柱与盖梁连接部位的湿接缝构造
CN104018422B (zh) * 2014-06-18 2015-11-18 上海市城市建设设计研究总院 用于预制拼装桥墩立柱与盖梁连接部位的湿接缝构造
CN104164934A (zh) * 2014-08-21 2014-11-26 云南工程建设总承包公司 简易式nz内置管模抗浮拉钩装置及其施工方法
CN105525569B (zh) * 2014-10-22 2017-04-19 五冶集团上海有限公司 桥梁翼缘板湿接缝吊模施工方法
CN105525569A (zh) * 2014-10-22 2016-04-27 五冶集团上海有限公司 桥梁翼缘板湿接缝吊模施工方法
CN110331667A (zh) * 2019-07-02 2019-10-15 中交二公局东萌工程有限公司 边通车边施工条件下桥梁的拼接方法
CN111731988A (zh) * 2020-07-07 2020-10-02 中国建筑第四工程局有限公司 一种t梁湿接缝模板的提升安装方法及装置
CN112660993A (zh) * 2020-12-30 2021-04-16 中国建筑土木建设有限公司 一种箱梁防落梁挡块安装***及施工方法
CN112660993B (zh) * 2020-12-30 2022-11-18 中国建筑土木建设有限公司 一种箱梁防落梁挡块安装***及施工方法
CN112921821A (zh) * 2021-03-25 2021-06-08 成都城投建筑工程有限公司 盖梁分节预制拼装湿接缝施工结构及其施工方法
CN112921821B (zh) * 2021-03-25 2022-08-16 成都城投建筑工程有限公司 盖梁分节预制拼装湿接缝施工结构及其施工方法
CN113481852A (zh) * 2021-06-16 2021-10-08 五冶集团上海有限公司 一种可连续施工的桥梁湿接缝模板***
CN113668403A (zh) * 2021-08-31 2021-11-19 上海市基础工程集团有限公司 用于现浇主梁湿接缝的可移动式吊模装置及施工方法
CN113846562A (zh) * 2021-09-22 2021-12-28 中建一局集团第五建筑有限公司 一种自动浇筑湿接缝装置
CN114370003A (zh) * 2022-01-07 2022-04-19 中国十七冶集团有限公司 一种高架桥湿接缝翻模施工的方法

Similar Documents

Publication Publication Date Title
CN103306205A (zh) 一种预制t梁或箱梁纵向湿接缝模板施工方法
CN203188121U (zh) 中承式及下承式拱桥现浇桥面吊模
CN203334730U (zh) 施工现场用拼装式钢结构移动厂房
CN108979131B (zh) 一种高层建筑施工钢模板及操作架整体提升平台装置
CN107524284A (zh) 一种定型化外挂架防护体系及安装方法
CN102877637A (zh) 一种解决悬挑梁底部墙面施工操作平台的方法
CN107165056B (zh) 用于悬臂盖梁混凝土浇筑的抗倾覆钢棒支架及其安装方法
CN113279582A (zh) 一种用于悬挑并下挂式现浇板的吊挂施工方法
CN106930315B (zh) 一种移动塔吊基础结构及施工方法
CN110468743B (zh) 一种用于旧桥墩帽改造的移动式吊架及施工方法
CN103993739B (zh) 造粒塔喷淋层劲性梁的施工方法
CN112854757A (zh) 一种大型筒仓滑模整体拖带锥形桁架支撑施工方法
CN206051351U (zh) 一种用于桥梁防撞墙模板装拆施工的桁吊
CN111648597A (zh) 一种筒仓悬支式钢桁架牛腿支撑结构
CN103982046A (zh) 一种屈曲约束支撑的吊装和安装方法
CN203855898U (zh) 组装式超重箱梁横梁张拉千斤顶安装吊具
CN206346500U (zh) 小型简易伸臂式龙门吊
CN207062787U (zh) 可快速安装拆除的检修施工平台
CN212101770U (zh) 一种便于快速安拆的用于幕墙单元板块吊装的双轨道装置
CN209779468U (zh) 桥梁维修升降式桁架工作平台
CN209816682U (zh) 桥梁钢箱梁高空作业操作平台
CN209942078U (zh) 大跨度连跨厂房屋面板安装小车
CN208732480U (zh) 预制梁张拉辅助吊装装置
CN102733612B (zh) 电动葫芦轨道安装方法
CN206529699U (zh) 桥梁护栏外挂式多功能装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130918