CN204626411U - A kind of pile foundation steel bar cage erecting device - Google Patents
A kind of pile foundation steel bar cage erecting device Download PDFInfo
- Publication number
- CN204626411U CN204626411U CN201520317997.3U CN201520317997U CN204626411U CN 204626411 U CN204626411 U CN 204626411U CN 201520317997 U CN201520317997 U CN 201520317997U CN 204626411 U CN204626411 U CN 204626411U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- platform legs
- top rail
- steel bar
- stull
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
A kind of pile foundation steel bar cage erecting device, comprise support and hanging apparatus, be provided with stull above support, stull is provided with hanging apparatus.Support comprises platform legs, and platform legs top and bottom are respectively equipped with top rail and lower transverse beam, are also provided with diagonal brace between platform legs and top rail.Platform legs adopts i iron, and platform legs to be welded with the link position of top rail, lower transverse beam at it and is provided with fixed block, top rail, is bolted between lower transverse beam and fixed block.Bolt is all adopted to be fixedly connected with between platform legs with diagonal brace, between top rail with diagonal brace.Stull is also provided with anti-skid support gear.Stull is welded back-to-back by two channel-section steels, is provided with multiple contiguous block between two channel-section steels.By adopting said structure, overcome the problem of the construction delay caused because space enrironment complexity causes lifting appliance to march into the arena.Device volume provided by the utility model is little, convenient disassembly, good stability, can be applied in the site environment of various complexity.
Description
Technical field
The utility model relates to pile foundation construction engineering, particularly a kind of pile foundation steel bar cage erecting device.
Background technology
In existing pile foundation construction process, the installation of reinforcing cage mainly relies on crane to lift, and for the more complicated construction environment of alpine terrain, when crane cannot be marched into the arena, the installation of reinforcing cage is comparatively difficult.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of pile foundation steel bar cage erecting device, can adapt to comparatively complicated site environment, avoids because the hanging device situation causing reinforcing cage normally to lift of cannot marching into the arena occurs.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of pile foundation steel bar cage erecting device, comprise support and hanging apparatus, be provided with stull above support, stull is provided with hanging apparatus.
Preferably, described support comprises platform legs, and platform legs top and bottom are respectively equipped with top rail and lower transverse beam, are also provided with diagonal brace between platform legs and top rail.
Preferably, described platform legs adopts i iron, and platform legs to be welded with the link position of top rail, lower transverse beam at it and is provided with fixed block, top rail, is bolted between lower transverse beam and fixed block.
In preferred scheme, described platform legs is fixedly connected with all adopting bolt between diagonal brace, between top rail with diagonal brace.
In preferred scheme, described hanging apparatus is electric block, and electric block is provided with lifting rope.
In preferred scheme, described electric block is controlled by controller.
In preferred scheme, described stull is also provided with anti-skid support gear.
In preferred scheme, described stull is welded back-to-back by two channel-section steels, is provided with multiple contiguous block between two channel-section steels.
In preferred scheme, hanging apparatus timbering material thickness is determined according to the selection that varies in weight of pile foundation steel bar cage, selects and processes with the material of its weight-matched.
In preferred scheme, the height of support should exceed 30 to 50cm than the often joint reinforcing cage height of design.
In preferred scheme, lower transverse beam length 20cm longer than pile foundation aperture diameter dimension.
In preferred scheme, the length 1m longer than top rail of stull.
A kind of pile foundation steel bar cage erecting device that the utility model provides, by mode with bolts, enables whole support installing/dismounting, avoids because of job site circumstance complication, and lifting appliance cannot be marched into the arena the delay to construction speed caused.Relative to lifting appliance, the cost of this device is lower.Adopt the structure of lower and upper cross-member and stull, make the stability of support higher, larger reinforcing cage of can slinging.Between stull, gap is set by contiguous block, facilitates the installation of electric block.By adopting said structure, overcome the problem of the construction delay caused because space enrironment complexity causes lifting appliance to march into the arena.This novel provided device volume is little, convenient disassembly, good stability, can be applied in the site environment of various complexity.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is overall structure schematic diagram of the present utility model.
Fig. 2 is plan structure schematic diagram of the present utility model.
Fig. 3 is crossbeam of the present utility model and supporting leg link position structural representation.
In figure: support 1, hanging apparatus 2, platform legs 3, diagonal brace 4, top rail 5, lower transverse beam 6, stull 7, electric block 8, controller 9, lifting rope 10, fixed block 11, contiguous block 12, a gear 13.
Detailed description of the invention
One, the size of support is determined:
First, support 1 size is determined according to scene is actual: the height of support should exceed 30 to 50cm than the often joint reinforcing cage height of design.Lower transverse beam length 20cm longer than pile foundation aperture diameter dimension.The length 1m longer than top rail of stull.Overlooking direction suitable for reading is square with end opening, and vertical apparent direction is trapezoidal.
Two, the installation of support:
Each welding two pieces of fixed blocks 11 in every root platform legs 3, again fixed block 11 is firmly connected to form dismountable pile foundation steel bar cage mounting platform device frame by bolt and top rail 5, lower transverse beam 6, diagonal brace 4 is utilized to be pinned at eight angles between platform legs 3 and top rail 5 by bolt, play a part to strengthen support stability, namely assembled a firmly pile foundation steel bar cage erecting device support.
Three, the installation of hanging apparatus:
Weld four anti-skid support gears 13 in the middle part of support 1 top rail 5, in order to fixing stull 7, prevent stull 7 from sliding.Electric block 8 is fixedly connected integrally by bolt and stull 7, namely forms the pile foundation steel bar cage erecting device of complete set, and controller 9, in order to control the lifting upper-lower position of reinforcing cage, realizes the lifting work of reinforcing cage.
It is little that the utility model has volume through practical test, is easy to install, safe and reliable, can improve work efficiency, cost-saving advantage.Be worthy to be popularized in Road Bridge Pile Foundation plinth technical field of construction.
Claims (8)
1. a pile foundation steel bar cage erecting device, comprises support (1) and hanging apparatus (2), it is characterized in that: support (1) top is provided with stull (7), and stull (7) is provided with hanging apparatus (2).
2. a kind of pile foundation steel bar cage erecting device according to claim 1, it is characterized in that: described support (1) comprises platform legs (3), platform legs (3) top and bottom are respectively equipped with top rail (5) and lower transverse beam (6), are also provided with diagonal brace (4) between platform legs (3) and top rail (5).
3. a kind of pile foundation steel bar cage erecting device according to claim 2, it is characterized in that: described platform legs (3) adopts i iron, platform legs (3) to be welded with the link position of top rail (5), lower transverse beam (6) at it and is provided with fixed block (11), top rail (5), is bolted between lower transverse beam (6) and fixed block (11).
4. a kind of pile foundation steel bar cage erecting device according to claim 3, is characterized in that: described platform legs (3) with between diagonal brace (4), top rail (5) and diagonal brace (4), between also adopt bolt to be fixedly connected with.
5. a kind of pile foundation steel bar cage erecting device according to claim 1, is characterized in that: described hanging apparatus (2) is electric block (8), and electric block (8) is provided with lifting rope (10).
6. a kind of pile foundation steel bar cage erecting device according to claim 5, is characterized in that: described electric block (8) is controlled by controller (9).
7. a kind of pile foundation steel bar cage erecting device according to claim 1, is characterized in that: described stull (7) is also provided with anti-skid support gear (13).
8. a kind of pile foundation steel bar cage erecting device according to claim 1, is characterized in that: described stull (7) is welded back-to-back by two channel-section steels, is provided with multiple contiguous block (12) between two channel-section steels.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520317997.3U CN204626411U (en) | 2015-05-18 | 2015-05-18 | A kind of pile foundation steel bar cage erecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520317997.3U CN204626411U (en) | 2015-05-18 | 2015-05-18 | A kind of pile foundation steel bar cage erecting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204626411U true CN204626411U (en) | 2015-09-09 |
Family
ID=54045455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520317997.3U Expired - Fee Related CN204626411U (en) | 2015-05-18 | 2015-05-18 | A kind of pile foundation steel bar cage erecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204626411U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926628A (en) * | 2016-06-12 | 2016-09-07 | 中交公局第三工程有限公司 | Device for underwater pile foundation construction platform convertible in floating and fixing |
CN106522207A (en) * | 2016-11-22 | 2017-03-22 | 中交公局海威工程建设有限公司 | Reinforcement cage bracket and reinforcement cage mounting device |
CN108487237A (en) * | 2018-04-02 | 2018-09-04 | 中建四局第五建筑工程有限公司 | A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred |
CN108797626A (en) * | 2018-06-29 | 2018-11-13 | 芜湖等莱智能科技有限公司 | A kind of building pile foundation anti-deflection device |
CN109469083A (en) * | 2018-10-31 | 2019-03-15 | 中建三局第建设工程有限责任公司 | Foundation beam steel reinforcement cage assembly system and its construction method |
-
2015
- 2015-05-18 CN CN201520317997.3U patent/CN204626411U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926628A (en) * | 2016-06-12 | 2016-09-07 | 中交公局第三工程有限公司 | Device for underwater pile foundation construction platform convertible in floating and fixing |
CN106522207A (en) * | 2016-11-22 | 2017-03-22 | 中交公局海威工程建设有限公司 | Reinforcement cage bracket and reinforcement cage mounting device |
CN108487237A (en) * | 2018-04-02 | 2018-09-04 | 中建四局第五建筑工程有限公司 | A kind of no auxiliary tool lifting machinery appointed condition descending reinforcing cage processing and transferred |
CN108797626A (en) * | 2018-06-29 | 2018-11-13 | 芜湖等莱智能科技有限公司 | A kind of building pile foundation anti-deflection device |
CN109469083A (en) * | 2018-10-31 | 2019-03-15 | 中建三局第建设工程有限责任公司 | Foundation beam steel reinforcement cage assembly system and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204626411U (en) | A kind of pile foundation steel bar cage erecting device | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN203904851U (en) | Continuous beam side span straight section hanger support system | |
CN105484162B (en) | Suspension bridge construction stiff girder secondary on the bank swings moving device and method | |
CN201574359U (en) | Hanging basket equivalent preloading device used in high-pier large-span bridge construction | |
CN103243649B (en) | The system and method for a kind of cable saddle Fast Installation, location | |
CN208995928U (en) | A kind of multi-functional erection crane suitable for composite beam construction | |
CN203199913U (en) | Assembling and disassembling type hoisting truss | |
CN103939875B (en) | A kind of vertical exhaust-heat boiler module hoisting construction method | |
CN103774841A (en) | Track type sliding formwork device | |
CN201649668U (en) | Lattice column lifting frame | |
CN202658590U (en) | Integral assembled drilling platform | |
CN203795315U (en) | High pier cable-stayed bridge No.0 block non-bracket construction structure | |
CN102995560B (en) | Thin-wall hollow pier lifting frame and use method thereof | |
CN201908429U (en) | Assembly integral building overhanging discharging platform | |
CN104233961A (en) | Triangular supporting bracket of suspended cast bridge block 0 | |
CN103835238A (en) | High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process | |
CN104018680A (en) | Lifting method of large-span solid-web type arc beam | |
CN201545649U (en) | Equipment transportation device in small space | |
CN203429556U (en) | System for quickly installing and positioning cable saddle | |
CN203159027U (en) | A prefabricated iron tower foundation spreader | |
CN202260191U (en) | Mobile mounting rack for cabinet-type equipment | |
CN201052950Y (en) | Crane | |
CN108439266A (en) | A kind of jacking apparatus on crane | |
CN212532065U (en) | Gantry crane capable of being used in different height difference places |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20190518 |