CN103225389A - 混凝土筒壁施工顶升平台吊模机装置 - Google Patents
混凝土筒壁施工顶升平台吊模机装置 Download PDFInfo
- Publication number
- CN103225389A CN103225389A CN2013101267208A CN201310126720A CN103225389A CN 103225389 A CN103225389 A CN 103225389A CN 2013101267208 A CN2013101267208 A CN 2013101267208A CN 201310126720 A CN201310126720 A CN 201310126720A CN 103225389 A CN103225389 A CN 103225389A
- Authority
- CN
- China
- Prior art keywords
- steel frame
- operation platform
- main steel
- mould
- tube wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310126720.8A CN103225389B (zh) | 2013-04-12 | 2013-04-12 | 混凝土筒壁施工顶升平台吊模机装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310126720.8A CN103225389B (zh) | 2013-04-12 | 2013-04-12 | 混凝土筒壁施工顶升平台吊模机装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103225389A true CN103225389A (zh) | 2013-07-31 |
CN103225389B CN103225389B (zh) | 2015-04-01 |
Family
ID=48836011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310126720.8A Active CN103225389B (zh) | 2013-04-12 | 2013-04-12 | 混凝土筒壁施工顶升平台吊模机装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103225389B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105776092A (zh) * | 2016-04-21 | 2016-07-20 | 江河创建集团股份有限公司 | 一种伸展式吊篮装置及其施工方法 |
CN109025257A (zh) * | 2018-08-03 | 2018-12-18 | 四川省第六建筑有限公司 | 一种建筑用模架*** |
CN109424503A (zh) * | 2017-09-01 | 2019-03-05 | 赵晓军 | 中心塔架的安装方法及塔筒的施工方法 |
CN109424504A (zh) * | 2017-09-01 | 2019-03-05 | 赵晓军 | 塔筒的施工方法 |
CN110821150A (zh) * | 2018-08-08 | 2020-02-21 | 李宜君 | 一种房屋滑模成型装置及成型方法 |
CN110821149A (zh) * | 2018-08-08 | 2020-02-21 | 李宜君 | 一种应用于房屋滑模成型装置的取模装置及取模方法 |
CN114109014A (zh) * | 2021-12-24 | 2022-03-01 | 中建八局南方建设有限公司 | 一种超高小直径筒体幕墙环形吊篮及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB988400A (en) * | 1962-05-16 | 1965-04-07 | Josef Bossner | Improvements in or relating to formwork, particularly for casting towers |
CN101225708A (zh) * | 2007-01-19 | 2008-07-23 | 兖州煤业榆林能化有限公司 | 一种烟囱的上滑下砌无井架液压滑动模板安装方法 |
CN201224993Y (zh) * | 2007-11-27 | 2009-04-22 | 吴杰 | 烟囱、井道内壁施工用升降架体 |
CN101566005A (zh) * | 2009-05-21 | 2009-10-28 | 山东丰汇设备技术有限公司 | 烟囱液压提模装置 |
RU2476653C1 (ru) * | 2011-09-15 | 2013-02-27 | Закрытое Акционерное Общество "Спецжелезобетонстрой" | Способ строительства высотных железобетонных сооружений, например промышленных труб и башен |
CN203160664U (zh) * | 2013-04-12 | 2013-08-28 | 山东电力建设第二工程公司 | 混凝土筒壁施工顶升平台吊模机装置 |
-
2013
- 2013-04-12 CN CN201310126720.8A patent/CN103225389B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB988400A (en) * | 1962-05-16 | 1965-04-07 | Josef Bossner | Improvements in or relating to formwork, particularly for casting towers |
CN101225708A (zh) * | 2007-01-19 | 2008-07-23 | 兖州煤业榆林能化有限公司 | 一种烟囱的上滑下砌无井架液压滑动模板安装方法 |
CN201224993Y (zh) * | 2007-11-27 | 2009-04-22 | 吴杰 | 烟囱、井道内壁施工用升降架体 |
CN101566005A (zh) * | 2009-05-21 | 2009-10-28 | 山东丰汇设备技术有限公司 | 烟囱液压提模装置 |
RU2476653C1 (ru) * | 2011-09-15 | 2013-02-27 | Закрытое Акционерное Общество "Спецжелезобетонстрой" | Способ строительства высотных железобетонных сооружений, например промышленных труб и башен |
CN203160664U (zh) * | 2013-04-12 | 2013-08-28 | 山东电力建设第二工程公司 | 混凝土筒壁施工顶升平台吊模机装置 |
Non-Patent Citations (2)
Title |
---|
史春城: "无井架液压提模装置施工钢筋混凝土烟囱", 《建筑机械化》 * |
陈荣: "电动提升模技术在烟囱施工中的应用", 《大众科技》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105776092A (zh) * | 2016-04-21 | 2016-07-20 | 江河创建集团股份有限公司 | 一种伸展式吊篮装置及其施工方法 |
CN105776092B (zh) * | 2016-04-21 | 2017-12-29 | 江河创建集团股份有限公司 | 一种伸展式吊篮装置 |
CN109424503A (zh) * | 2017-09-01 | 2019-03-05 | 赵晓军 | 中心塔架的安装方法及塔筒的施工方法 |
CN109424504A (zh) * | 2017-09-01 | 2019-03-05 | 赵晓军 | 塔筒的施工方法 |
CN109424504B (zh) * | 2017-09-01 | 2020-04-14 | 赵晓军 | 塔筒的施工方法 |
CN109424503B (zh) * | 2017-09-01 | 2020-07-14 | 赵晓军 | 中心塔架的安装方法及塔筒的施工方法 |
CN109025257A (zh) * | 2018-08-03 | 2018-12-18 | 四川省第六建筑有限公司 | 一种建筑用模架*** |
CN110821150A (zh) * | 2018-08-08 | 2020-02-21 | 李宜君 | 一种房屋滑模成型装置及成型方法 |
CN110821149A (zh) * | 2018-08-08 | 2020-02-21 | 李宜君 | 一种应用于房屋滑模成型装置的取模装置及取模方法 |
CN114109014A (zh) * | 2021-12-24 | 2022-03-01 | 中建八局南方建设有限公司 | 一种超高小直径筒体幕墙环形吊篮及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103225389B (zh) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103225389B (zh) | 混凝土筒壁施工顶升平台吊模机装置 | |
CN203160664U (zh) | 混凝土筒壁施工顶升平台吊模机装置 | |
CN101748799B (zh) | 烟囱钢筋混凝土筒壁液压提升翻模施工方法 | |
CN205777425U (zh) | 一种可伸缩吊篮支撑装置 | |
CN105384035A (zh) | 导轨安装装置和用于安装导轨的方法 | |
CN202689495U (zh) | 自升式烟囱水塔施工塔架 | |
CN104727545A (zh) | 大型水塔筒身液压滑模垂直运输***及方法 | |
CN206233600U (zh) | 超长超大混凝土梁安装钢筋的可升降装置 | |
CN201703776U (zh) | 储罐倒装提升装置 | |
CN209397452U (zh) | 一种盾构法施工隧道的轨道运载装置 | |
CN205241084U (zh) | 一种吊运机 | |
RU140819U1 (ru) | Козловой кран | |
CN201411334Y (zh) | 一种简易行车 | |
CN103498551B (zh) | 电梯井道型钢施工操作平台 | |
CN203702188U (zh) | 隧道工程衬砌钢筋安装支架 | |
CN102108801A (zh) | 一种用于直升机组立输电线路铁塔横担端部的导轨*** | |
RU160618U1 (ru) | Грузоподъёмное приспособление для перемещения груза | |
CN201264878Y (zh) | 易于拆装的吊装组合架 | |
CN203654707U (zh) | 可拆式龙门安装架 | |
CN209601999U (zh) | 一种可移动式助力管道起吊装置 | |
CN201526154U (zh) | 圆柱形建筑用升降设备 | |
CN207844956U (zh) | 升降搬运车 | |
CN207347124U (zh) | 一种吊机杠杆 | |
CN105401699A (zh) | 轻质屋顶面板安装行走车及屋顶面板安装的方法 | |
CN211572485U (zh) | 一种建筑施工用升降一体的脚手架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd. Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee before: POWERCHINA NUCLEAR ENGINEERING Co. Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee after: POWERCHINA NUCLEAR ENGINEERING Co. Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee before: SHANDONG ELECTRIC POWER CONSTRUCTION NO.2 Co. |