CN103147387A - Double-spliced type combining bridge structure - Google Patents

Double-spliced type combining bridge structure Download PDF

Info

Publication number
CN103147387A
CN103147387A CN2013101020794A CN201310102079A CN103147387A CN 103147387 A CN103147387 A CN 103147387A CN 2013101020794 A CN2013101020794 A CN 2013101020794A CN 201310102079 A CN201310102079 A CN 201310102079A CN 103147387 A CN103147387 A CN 103147387A
Authority
CN
China
Prior art keywords
bridge section
bridge
described left
wing plate
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101020794A
Other languages
Chinese (zh)
Other versions
CN103147387B (en
Inventor
李荣生
巩立辉
张文山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU DAFANG INDUSTRY Co Ltd
Original Assignee
ZHENGZHOU DAFANG INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU DAFANG INDUSTRY Co Ltd filed Critical ZHENGZHOU DAFANG INDUSTRY Co Ltd
Priority to CN201310102079.4A priority Critical patent/CN103147387B/en
Publication of CN103147387A publication Critical patent/CN103147387A/en
Application granted granted Critical
Publication of CN103147387B publication Critical patent/CN103147387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a double-spliced type combining bridge structure which comprises at least one section of left bridge section and right bridge section connected in turn along front-and-rear direction, wherein a bridge surface, through which vehicles can pass, is formed by the upper parts of the left bridge section and the right bridge section; the lower parts of the left bridge section and the right bridge section are supported by bridge piers; a left connecting part is arranged on the right lateral part of the left bridge section; a right connecting part is arranged on the left lateral part of the right bridge section; and the left bridge section and the right bridge section are integrally spliced through the left connecting part and the right connecting part. According to the invention, the double-spliced type combining bridge structure is formed by respectively manufacturing, transporting and splicing the left and right sections; a bridge component is maximized and industrialized as much as possible, so that the construction time for bridge location is shortened; the conversion of bridge engineering from constructing to manufacturing is realized; the structure is optimized; the splicing is simple and convenient; and the quick mounting of the bridge is really realized.

Description

A kind of double combined combined bridge structure
Technical field
The present invention relates to a kind of double combined combined bridge structure.
Background technology
Be accompanied by the high speed development of China's economic, domestic each big and medium-sized cities population, vehicle rapid growth cause the road traffic flow to increase severely, and the road imbalance between supply and demand is more sharp-pointed.Increase city existing road autos only ability and mainly change the measures such as grade separation, overhead and tunnel multilevel traffic by existing road widening upgrading, level crossing, elevated bridge is a kind of common solution, there is long construction period in conventional elevated bridge construction method, floor space is large, traffic and surrounding enviroment are affected the series of problems such as large, the structure of bridge is also had higher requirement.
Summary of the invention
The purpose of this invention is to provide a kind of double combined combined bridge structure that realizes that the large-scale component batch production produces, adopts special-purpose integration of transporting and building car transportation to install.
For achieving the above object, the technical solution used in the present invention is:
A kind of double combined combined bridge structure, be included at least one section left bridge section that can connect successively on fore-and-aft direction, right bridge section, bridge floor for vehicle pass-through is formed at the top of described left bridge section, right bridge section, the bottom of described left bridge section, right bridge section is supported by bridge pier, the right side of described left bridge section has left connecting portion, the left side of described right bridge section has right connecting portion, and described left bridge section, right bridge section are spliced into one by described left connecting portion, right connecting portion.
Preferably, offer left shear connector/groove on described left connecting portion, on described right connecting portion, corresponding described left shear connector/groove offers right shearing groove/key, and when described left connecting portion, when right connecting portion splices mutually, described left shear connector/groove, right shearing groove/key match.
Preferably, described left connecting portion, when right connecting portion splices mutually, both are fastened by positioning bolt.
Preferably, be provided with the prestressing with bond bundle between the inside of described left bridge section, right bridge section; Be provided with external pre-stress bundle between the outside of described left bridge section, right bridge section.
Preferably, the upper left quarter that the upper right quarter of described left bridge section is provided with left anti-collision wall/guardrail, described right bridge section is provided with right anti-collision wall/guardrail, when described left bridge section, right bridge section, described left anti-collision wall/guardrail, right anti-collision wall/guardrail are fastened by positioning bolt.
Preferably, the left side of described left bridge section is connected with left wing plate, and described left wing plate can be to the upper right side upset of described left bridge section; The right side of described right bridge section is connected with right wing plate, described right wing plate can be to the upper left side upset of described right bridge section, when described left wing plate, when right wing plate launches, the upper surface of described left wing plate, right wing plate upper surface and described left bridge section, right bridge section flushes, and the common bridge floor that forms for vehicle pass-through.
Further preferably, the left side of described left wing plate is provided with left guardrail; The right side of described right wing plate is provided with right guardrail.
Further preferably, the right of described left wing plate is connected along rotating with the left margin of described left bridge section; The left margin of described right wing plate is connected along rotating with the right of described right bridge section.
Preferably, described left bridge section, the symmetrical setting of right bridge section.
Because technique scheme is used, the present invention compared with prior art has following advantages:
The present invention makes respectively by bridge construction being divided into left and right two sections, transportation respectively, splicing is completed, bridge member maximizes as much as possible, batch production, to shorten the bridge location engineering time, realized that bridge engineering is by " construction " transformation to " manufacturing ", its structure optimization, assembly unit is easy, realizes that truly the installation of bridge is rapid.
Description of drawings
Accompanying drawing 1 splits schematic diagram for the left bridge section of the present invention, right bridge section;
Accompanying drawing 2 is the schematic side view of the left bridge section of the present invention or right bridge section;
Accompanying drawing 3 is the left bridge section of the present invention, right bridge section assembly unit schematic diagram;
Accompanying drawing 4 is application schematic diagram of the present invention.
Wherein: 1, left bridge section; 10, left connecting portion; 11, left shear connector/groove; 12, left anti-collision wall/guardrail; 13, left wing plate; 14, left guardrail; 2, right bridge section; 20, right connecting portion; 21, right shearing groove/key; 22, right anti-collision wall/guardrail; 23, right wing plate; 24, right guardrail; 3, bridge floor; 4, prestressing with bond bundle; 5, external pre-stress bundle; 6, vehicle.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples:
A kind of double combined combined bridge structure as shown in the figure, be included at least one section left bridge section 1, the right bridge section 2 that can connect successively on fore-and-aft direction, the top of left bridge section 1, right bridge section 2 forms for the current bridge floor 3 of vehicle 6, and the bottom of left bridge section 1, right bridge section 2 is supported by bridge pier.
As shown in Figure 1, 2: the right side of left bridge section 1 has left connecting portion 10, the left side of right bridge section 2 has right connecting portion 20, specifically: offer left shear connector/groove 11 on left connecting portion 10, on right connecting portion 20, corresponding left shear connector/groove 11 offers right shearing groove/key 21;
The upper left quarter that the upper right quarter of left bridge section 1 is provided with left anti-collision wall/guardrail 12, right bridge section 2 is provided with right anti-collision wall/guardrail 22.When left bridge section 1, when right bridge section 2 splices mutually, first left shear connector/groove 11, right shearing groove/key 21 are coordinated, to be undertaken fastening by a plurality of positioning bolts 4 between left connecting portion 10, right connecting portion 20 again, simultaneously, also be fastened by positioning bolt 4 between left anti-collision wall/guardrail 12, right anti-collision wall/guardrail 22.Carry out the installation stretch-draw of prestressing with bond bundle 4 between the inside of left bridge section 1, right bridge section 2; Carry out again the installation stretch-draw of external pre-stress bundle 5 between the outside of left bridge section 1, right bridge section 2.Like this, left bridge section 1, right bridge section 2 namely are spliced into one, as shown in Figure 3.
The left wing plate 13 that the left side of left bridge section 1 connects, left wing plate 13 be the upper right side upset of bridge section 1 left; The right wing plate 23 that the right side of right bridge section 2 connects, right wing plate 23 be the upper left side upset of bridge section 2 to the right.In the present embodiment: the right of left wing plate 13 is connected along rotating with the left margin of left bridge section 1 by rotating shaft; The left margin of right wing plate 23 and right bridge section 2 by rotating shaft with the right be connected along rotating.In addition, the left side of left wing plate 13 is provided with left guardrail 14; The right side of right wing plate 23 is provided with right guardrail 24, and in the present embodiment, left guardrail 14, right guardrail 24 vertically are arranged on left wing plate 13, right wing plate 23.
The wing plate structure has folded state, deployed condition: when being in deployed condition: the upper surface of the upper surface of left wing plate 13, right wing plate 23 and left bridge section 1, right bridge section 2 flushes, and the common bridge floor 3 that forms for vehicle pass-through, as shown in Figure 3; When being in folded state: left wing plate 13 is the upper right side upset of bridge section 1 left, and left wing plate 13 is shelved on left bridge section 1; Right wing plate 23 is the upper left side upset of bridge section 2 to the right, and right wing plate 23 is shelved on right bridge section 2, as shown in Figure 1.Wing plate can be folded convenient transportation when transportation; Complete and wing plate is launched after exterior, increase the width on road surface.
In the present embodiment, for stability stressed after the batch making of convenient left bridge section 1, right bridge section 2, assembly unit etc., both are arranged to symmetrical structure.
Above-described embodiment only is explanation technical conceive of the present invention and characteristics, and its purpose is to allow person skilled in the art scholar can understand content of the present invention and implement according to this, can not limit protection scope of the present invention with this.All equivalences that Spirit Essence is done according to the present invention change or modify, within all should being encompassed in protection scope of the present invention

Claims (9)

1. double combined combined bridge structure, it is characterized in that: be included at least one section left bridge section that can connect successively on fore-and-aft direction, right bridge section, bridge floor for vehicle pass-through is formed at the top of described left bridge section, right bridge section, the bottom of described left bridge section, right bridge section is supported by bridge pier, the right side of described left bridge section has left connecting portion, the left side of described right bridge section has right connecting portion, and described left bridge section, right bridge section are spliced into one by described left connecting portion, right connecting portion.
2. a kind of double combined combined bridge structure according to claim 1, it is characterized in that: offer left shear connector/groove on described left connecting portion, on described right connecting portion, corresponding described left shear connector/groove offers right shearing groove/key, when described left connecting portion, when right connecting portion splices mutually, described left shear connector/groove, right shearing groove/key match.
3. a kind of double combined combined bridge structure according to claim 1 and 2 is characterized in that: described left connecting portion, when right connecting portion splices mutually, both are fastened by positioning bolt.
4. a kind of double combined combined bridge structure according to claim 1, is characterized in that: be provided with the prestressing with bond bundle between the inside of described left bridge section, right bridge section; Be provided with external pre-stress bundle between the outside of described left bridge section, right bridge section.
5. a kind of double combined combined bridge structure according to claim 1, it is characterized in that: the upper left quarter that the upper right quarter of described left bridge section is provided with left anti-collision wall/guardrail, described right bridge section is provided with right anti-collision wall/guardrail, when described left bridge section, right bridge section, described left anti-collision wall/guardrail, right anti-collision wall/guardrail are fastened by positioning bolt.
6. a kind of double combined combined bridge structure according to claim 1, it is characterized in that: the left side of described left bridge section is connected with left wing plate, and described left wing plate can be to the upper right side upset of described left bridge section; The right side of described right bridge section is connected with right wing plate, described right wing plate can be to the upper left side upset of described right bridge section, when described left wing plate, when right wing plate launches, the upper surface of described left wing plate, right wing plate upper surface and described left bridge section, right bridge section flushes, and the common bridge floor that forms for vehicle pass-through.
7. a kind of double combined combined bridge structure according to claim 6, it is characterized in that: the left side of described left wing plate is provided with left guardrail; The right side of described right wing plate is provided with right guardrail.
8. a kind of double combined combined bridge structure according to claim 6 is characterized in that: the right of described left wing plate is connected along rotating with the left margin of described left bridge section; The left margin of described right wing plate is connected along rotating with the right of described right bridge section.
9. a kind of double combined combined bridge structure according to claim 1, is characterized in that: described left bridge section, the symmetrical setting of right bridge section.
CN201310102079.4A 2013-03-27 2013-03-27 A kind of double combined combined bridge structure Active CN103147387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310102079.4A CN103147387B (en) 2013-03-27 2013-03-27 A kind of double combined combined bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310102079.4A CN103147387B (en) 2013-03-27 2013-03-27 A kind of double combined combined bridge structure

Publications (2)

Publication Number Publication Date
CN103147387A true CN103147387A (en) 2013-06-12
CN103147387B CN103147387B (en) 2016-12-07

Family

ID=48545680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310102079.4A Active CN103147387B (en) 2013-03-27 2013-03-27 A kind of double combined combined bridge structure

Country Status (1)

Country Link
CN (1) CN103147387B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695320A (en) * 2015-02-15 2015-06-10 中铁第四勘察设计院集团有限公司 Rotary flange plate concrete box beam and construction method thereof
CN106948258A (en) * 2017-05-10 2017-07-14 安徽省交通控股集团有限公司 A kind of property regulation device and its construction method for the girder great cantilever concrete edge of a wing
CN108589508A (en) * 2018-05-16 2018-09-28 李明 A kind of double combined combined bridge structure

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB779411A (en) * 1954-10-05 1957-07-17 Thomas Harley Haddow Improvements in joints or coupling devices for structural members
DE4305098A1 (en) * 1993-02-19 1994-08-25 Krupp Industrietech Device for unfolding and folding a pontoon unit
US5603134A (en) * 1995-06-27 1997-02-18 Coastal Lumber Company Portable bridge system
GB2351750A (en) * 1999-07-07 2001-01-10 Mabey & Johnson Ltd Lattice panel bridge
CN1936184A (en) * 2006-10-23 2007-03-28 钟宝驹 Frame type combined structure man-vehicle passage
CN201268827Y (en) * 2008-09-18 2009-07-08 钟宝驹 Frame component for changing road traffic structure
CN201305119Y (en) * 2008-11-25 2009-09-09 湖北华舟重工有限责任公司 Fixed washplate for four-fold pontoon bridge
CN102286921A (en) * 2011-05-25 2011-12-21 河南省九建工程有限公司 bridge widening splicing structure and construction method thereof
DE102010055574A1 (en) * 2010-12-21 2012-06-21 General Dynamics European Land Systems-Germany Gmbh Modular bridge element
CN202672021U (en) * 2011-11-03 2013-01-16 上海同济城市规划设计研究院 Combination type bridge
CN203200643U (en) * 2013-03-27 2013-09-18 郑州市大方实业有限公司 Double-splicing mode combined bridge structure

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB779411A (en) * 1954-10-05 1957-07-17 Thomas Harley Haddow Improvements in joints or coupling devices for structural members
DE4305098A1 (en) * 1993-02-19 1994-08-25 Krupp Industrietech Device for unfolding and folding a pontoon unit
US5603134A (en) * 1995-06-27 1997-02-18 Coastal Lumber Company Portable bridge system
GB2351750A (en) * 1999-07-07 2001-01-10 Mabey & Johnson Ltd Lattice panel bridge
CN1936184A (en) * 2006-10-23 2007-03-28 钟宝驹 Frame type combined structure man-vehicle passage
CN201268827Y (en) * 2008-09-18 2009-07-08 钟宝驹 Frame component for changing road traffic structure
CN201305119Y (en) * 2008-11-25 2009-09-09 湖北华舟重工有限责任公司 Fixed washplate for four-fold pontoon bridge
DE102010055574A1 (en) * 2010-12-21 2012-06-21 General Dynamics European Land Systems-Germany Gmbh Modular bridge element
CN102286921A (en) * 2011-05-25 2011-12-21 河南省九建工程有限公司 bridge widening splicing structure and construction method thereof
CN202672021U (en) * 2011-11-03 2013-01-16 上海同济城市规划设计研究院 Combination type bridge
CN203200643U (en) * 2013-03-27 2013-09-18 郑州市大方实业有限公司 Double-splicing mode combined bridge structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695320A (en) * 2015-02-15 2015-06-10 中铁第四勘察设计院集团有限公司 Rotary flange plate concrete box beam and construction method thereof
CN106948258A (en) * 2017-05-10 2017-07-14 安徽省交通控股集团有限公司 A kind of property regulation device and its construction method for the girder great cantilever concrete edge of a wing
CN108589508A (en) * 2018-05-16 2018-09-28 李明 A kind of double combined combined bridge structure

Also Published As

Publication number Publication date
CN103147387B (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN102966016A (en) Internal double-layer prefabricated traffic lane structure of shield tunnel
CN101858053A (en) Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower
CN105568786B (en) Overhanging combination box track roof beam suspension system of suspension type monorail transit bottom plate
CN103147387A (en) Double-spliced type combining bridge structure
CN204417983U (en) A kind of prefabricated units on-site consolidation compound beam for rushing to repair concrete box girder
CN203768785U (en) Corrugated steel web combined bridge allowing passing through on double layers
CN202559816U (en) External prestress embedded anchor bolt connection type concrete wind-power tower
CN203200643U (en) Double-splicing mode combined bridge structure
CN203741691U (en) Assembled type temporary steel bridge
CN106758741B (en) Modular box type plate beam structure and pontic erection method based on box type plate beam structure
CN205276115U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN103147386A (en) Approach bridge vehicle
CN203654194U (en) Quick construction structure for bridge
CN105714625B (en) Suspension system of suspension type monorail traffic concrete structure
CN202181504U (en) Box beam
CN108824484B (en) Vehicle section covered steel frame and covered reinforced concrete frame mixed structure
CN203782547U (en) Reinforced concrete variable cross-section rectangular hollow large-frame pier
CN205276076U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN216739203U (en) Semi-sinking self-balancing reinforced concrete shuttle-shaped double-arch assembly type overpass
CN203174516U (en) Suspension bridge closure segment construction beam segment traction pre-deflection device
CN203654193U (en) Quick bridge construction structure
CN205329437U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN103696370B (en) A kind of Quick bridge construction method and structure
CN104612063A (en) Concrete box beam first-aid repair method with prefabricated part on-site assembling combination beam
CN103194960B (en) Without pier rigid frame bridge system implementation method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant