CN101761096A - Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate - Google Patents
Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate Download PDFInfo
- Publication number
- CN101761096A CN101761096A CN200910231024A CN200910231024A CN101761096A CN 101761096 A CN101761096 A CN 101761096A CN 200910231024 A CN200910231024 A CN 200910231024A CN 200910231024 A CN200910231024 A CN 200910231024A CN 101761096 A CN101761096 A CN 101761096A
- Authority
- CN
- China
- Prior art keywords
- tower crane
- waterproof
- crane foundation
- leak
- crack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The invention provides an anti-crack and anti-leak construction method of arranging a tower crane foundation below a waterproof baseplate, which is characterized in that the anti-crack and anti-leak construction method adopts the following steps: 1) constructing the tower crane foundation; 2) mounting a tower crane, and then constructing a flexible mat layer, a concrete mat layer, a waterproof layer, a waterproof protective layer and the waterproof baseplate from top to bottom around the tower crane foundation, wherein the bottom surface of the flexible mat layer is leveled with the top surface of the tower crane foundation; 3) adopting pure soil for tamping and filling in the range of the tower crane foundation, then using C20 anti-leak concrete for sealing from the center of the tower crane to the periphery, carrying out calendering and anti-leak treatment, and making a 1-5% drainage slope; 4) arranging stress inducing joints of extruded polystyrene boards on the edge outside the drainage slope and the periphery of the tower crane, and further using a weather-proofing silicone sealant for tight caulking; and 5) dismantling the tower crane after completing the construction of a building, and using two layers of coiled materials for making an reinforcing waterproof layer in the range of the tower crane foundation. The anti-crack and anti-leak construction method can effectively solve the different settlement problem between the tower crane foundation and the waterproof baseplate, the problem of producing negative bending moment above the tower crane foundation, the waterproofing failure problem and the water accumulation settlement problem of the tower crane foundation.
Description
Technical field
The invention provides a kind of arranging tower crane foundation below waterproof baseplate anti-crack and anti-leak construction method, belong to technical field of building construction.
Technical background
It is that tower crane directly is located in the waterproof base plate that tower crane is set in traditional waterproof base plate, can produce tower crane and waterproof base plate settlement difference, tower crane in the tower crane running to problems such as antiseepage base plate generation hogging moments, the waterproof coiled material of tower crane and the fracture of waterproof back plate connections and tower crane and waterproof base plate is broken, cause the waterproof base plate leakage, directly influence the waterproof effect of waterproof base plate.
Summary of the invention
The purpose of this invention is to provide and a kind ofly can overcome above-mentioned defective, prevent that tower crane is placed on the arranging tower crane foundation below waterproof baseplate anti-crack and anti-leak construction method of the leakage problems in the sole plate.Its technical scheme is for adopting following steps:
1) tower crane construction;
2) tower crane is installed, carry out the construction of flexible cushion, concrete cushion, waterproofing course, fish tail and waterproof layer, waterproof base plate then from bottom to top around tower crane, wherein probe into tower crane 200~300mm around flexible cushion, concrete cushion, the waterproofing course, and the bottom surface of flexible cushion is concordant with the end face of tower crane;
3) adopt plain earth rammer to fill out in the tower crane scope, plain earth rammer is filled to the following 80~120mm of waterproof plate top surface, in tower crane, seal and the press polish antiseepage with the C20 impervious concrete around the mind-set then, do 1~5% weathering, wherein the water reducing agent of admixture cement consumption 1~3% in the C20 impervious concrete;
4) weathering outward flange and tower crane outer periphery 20~30mm is thick, 80~100mm the is high stress induced seam of extruded polystyrene board, and iron into 20~30mm deeply with electric iron, it is tight to fill out embedding with weather-proof silicone adhesive again;
5) after architecture construction finishes, remove tower crane, cut off foundation bolt, do the reinforcement waterproofing course with two layers of coiled materials in the tower crane scope, all the other each regional structure layer ways are identical with the waterproof base plate.
The present invention compared with prior art, its advantage is:
1, the designing technique measure that breaks away from by tower crane and underground garage base plate has solved tower crane and waterproof base plate settlement difference problem;
2, the tower crane end face is concordant with the flexible cushion bottom surface, absorbs negative flexure stress with flexible cushion, solves tower crane produces hogging moment to the waterproof base plate after sealing problem;
3, stress induced seam can be in case the tower crane vibration causes the infiltration of temporary joint cracking.
Description of drawings
Fig. 1 is the structural representation that tower crane is set under the waterproof base plate of the present invention;
Fig. 2 is the basic schematic behind the dismounting tower crane.
Among the figure: 1, tower crane 2, flexible cushion 3, concrete cushion 4, waterproofing course 5, waterproof base plate 6, stress induced seam 7, weathering 8, plain soil 9, tower crane 10, reinforcement waterproofing course 11, steel plate for sealing water 12, fish tail and waterproof layer
The specific embodiment
As the described embodiment of Fig. 1-2, adopt following steps:
1) tower crane 1 construction;
2) tower crane 9 is installed, carry out the construction of flexible cushion 2, concrete cushion 3, waterproofing course 4, fish tail and waterproof layer 12, waterproof base plate 5 then from bottom to top around tower crane 1, wherein probe into tower crane 1 apart from 200mm around flexible cushion 2, concrete cushion 3, the waterproofing course 4, and the bottom surface of flexible cushion 2 is concordant with the end face of tower crane 1;
3) adopting plain soil 8 to ram in tower crane 1 scope fills out, plain soil 8 rams and is filled to the following 100mm of waterproof base plate 5 end faces, in tower crane 9, seal and the press polish antiseepage with the C20 impervious concrete around the mind-set then, do 2% weathering 7, wherein the water reducing agent of admixture cement consumption 2% in the C20 impervious concrete;
4) the stress induced seam 6 of weathering 7 outward flanges and tower crane 9 outer periphery 30mm extruded polystyrene board thick, that 100mm is high, and iron into 30mm deeply with electric iron, it is tight to fill out embedding with weather-proof silicone adhesive again;
5) after architecture construction finishes, remove tower crane 9, cut off foundation bolt, do reinforcement waterproofing course 10 with two layers of coiled materials in tower crane 1 scope, all the other each regional structure layer ways are identical with waterproof base plate 5.
Claims (1)
1. arranging tower crane foundation below waterproof baseplate anti-crack and anti-leak construction method is characterized in that adopting following steps:
1) tower crane (1) construction;
2) tower crane (9) is installed, carry out the construction of flexible cushion (2), concrete cushion (3), waterproofing course (4), fish tail and waterproof layer (12), waterproof base plate (5) then from bottom to top around tower crane (1), wherein flexible cushion (2), concrete cushion (3), waterproofing course (4) probe into tower crane (1) 200~300mm all around, and the bottom surface of flexible cushion (2) is concordant with the end face of tower crane (1);
3) adopting plain soil (8) to ram in tower crane (1) scope fills out, plain soil (8) rams and is filled to the following 80~120mm of waterproof base plate (5) end face, in tower crane (9), seal and the press polish antiseepage with the C20 impervious concrete around the mind-set then, do 1~5% weathering (7), wherein the water reducing agent of admixture cement consumption 1~3% in the C20 impervious concrete;
4) weathering (7) outward flange and tower crane (9) outer periphery 20~30mm stress induced seam of extruded polystyrene board thick, that 80~100mm is high (6), and iron into 20~30mm deeply with electric iron, it is tight to fill out embedding with weather-proof silicone adhesive again;
5) after architecture construction finishes, remove tower crane (9), cut off foundation bolt, do reinforcement waterproofing course (10) with two layers of coiled materials in tower crane (1) scope, all the other each regional structure layer ways are identical with waterproof base plate (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102310247A CN101761096B (en) | 2009-12-14 | 2009-12-14 | Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009102310247A CN101761096B (en) | 2009-12-14 | 2009-12-14 | Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101761096A true CN101761096A (en) | 2010-06-30 |
CN101761096B CN101761096B (en) | 2011-03-16 |
Family
ID=42492466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009102310247A Expired - Fee Related CN101761096B (en) | 2009-12-14 | 2009-12-14 | Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101761096B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677675A (en) * | 2011-03-11 | 2012-09-19 | 中国建筑第四工程局有限公司 | Tower crane foundation in building basement and manufacturing method of tower crane foundation |
CN102912720A (en) * | 2012-10-16 | 2013-02-06 | 中铁十局集团有限公司 | Induced crack structure of frame bridge |
CN102912810A (en) * | 2012-11-22 | 2013-02-06 | 北京城乡建设集团有限责任公司 | Tower crane base structure in range of base bottom plate and construction method thereof |
CN103031849A (en) * | 2012-12-27 | 2013-04-10 | 山东万鑫建设有限公司 | Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well |
CN103669419A (en) * | 2012-09-21 | 2014-03-26 | 贵阳铝镁设计研究院有限公司 | Connecting structure of red mud storage yard anti-seepage film and concrete column and construction method |
CN105178365A (en) * | 2015-08-10 | 2015-12-23 | 北京城建北方建设有限责任公司 | Deformation-resisting construction method for underground waterproof plate |
CN106193092A (en) * | 2016-08-17 | 2016-12-07 | 中国能源建设集团江苏省电力设计院有限公司 | A kind of blower fan discharge structure and water discharge method thereof and manufacture method |
CN109610518A (en) * | 2018-12-24 | 2019-04-12 | 北京高能时代环境技术股份有限公司 | A kind of pollution barrier structure and seepage control system |
CN109667278A (en) * | 2018-12-29 | 2019-04-23 | 山东开拓建设有限公司 | Tower crane anti-cracking and seepage control construction method is set under underground garage isolated footing |
CN112279038A (en) * | 2020-11-26 | 2021-01-29 | 江西省丰和泰重工科技有限公司 | Windproof construction elevator base |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4877350A (en) * | 1988-10-26 | 1989-10-31 | Difiore Dante | Foundation waterproofing method |
CN201351315Y (en) * | 2008-09-25 | 2009-11-25 | 中建三局建设工程股份有限公司 | Post-pouring band waterproof structure |
CN201326185Y (en) * | 2008-12-15 | 2009-10-14 | 上海市第二建筑有限公司 | Connection joint structure of subway station bottom plates on sealing wall |
-
2009
- 2009-12-14 CN CN2009102310247A patent/CN101761096B/en not_active Expired - Fee Related
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677675A (en) * | 2011-03-11 | 2012-09-19 | 中国建筑第四工程局有限公司 | Tower crane foundation in building basement and manufacturing method of tower crane foundation |
CN102677675B (en) * | 2011-03-11 | 2015-03-04 | 中国建筑第四工程局有限公司 | Tower crane foundation in building basement and manufacturing method of tower crane foundation |
CN103669419A (en) * | 2012-09-21 | 2014-03-26 | 贵阳铝镁设计研究院有限公司 | Connecting structure of red mud storage yard anti-seepage film and concrete column and construction method |
CN103669419B (en) * | 2012-09-21 | 2015-12-09 | 贵阳铝镁设计研究院有限公司 | The syndeton of red mud dump antiseepage film and concrete column and construction method |
CN102912720B (en) * | 2012-10-16 | 2015-08-26 | 中铁十局集团有限公司 | A kind of frame bridge attractive joint structure |
CN102912720A (en) * | 2012-10-16 | 2013-02-06 | 中铁十局集团有限公司 | Induced crack structure of frame bridge |
CN102912810B (en) * | 2012-11-22 | 2014-10-22 | 北京城乡建设集团有限责任公司 | Tower crane base structure in range of base bottom plate and construction method thereof |
CN102912810A (en) * | 2012-11-22 | 2013-02-06 | 北京城乡建设集团有限责任公司 | Tower crane base structure in range of base bottom plate and construction method thereof |
CN103031849B (en) * | 2012-12-27 | 2014-11-26 | 山东万鑫建设有限公司 | Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well |
CN103031849A (en) * | 2012-12-27 | 2013-04-10 | 山东万鑫建设有限公司 | Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well |
CN105178365A (en) * | 2015-08-10 | 2015-12-23 | 北京城建北方建设有限责任公司 | Deformation-resisting construction method for underground waterproof plate |
CN106193092A (en) * | 2016-08-17 | 2016-12-07 | 中国能源建设集团江苏省电力设计院有限公司 | A kind of blower fan discharge structure and water discharge method thereof and manufacture method |
CN109610518A (en) * | 2018-12-24 | 2019-04-12 | 北京高能时代环境技术股份有限公司 | A kind of pollution barrier structure and seepage control system |
CN109667278A (en) * | 2018-12-29 | 2019-04-23 | 山东开拓建设有限公司 | Tower crane anti-cracking and seepage control construction method is set under underground garage isolated footing |
CN109667278B (en) * | 2018-12-29 | 2021-01-01 | 山东开拓建设有限公司 | Anti-cracking and anti-seepage construction method for arranging tower crane foundation under independent foundation of underground garage |
CN112279038A (en) * | 2020-11-26 | 2021-01-29 | 江西省丰和泰重工科技有限公司 | Windproof construction elevator base |
Also Published As
Publication number | Publication date |
---|---|
CN101761096B (en) | 2011-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101761096B (en) | Anti-crack and anti-leak construction method of arranging tower crane foundation below waterproof baseplate | |
WO2017152674A1 (en) | Underground engineering waterproofing structure | |
CN102383443B (en) | Connection structures between foundation pit support piles and outer walls of basement and construction method | |
CN107542115B (en) | Underground engineering waterproof structure and construction method thereof | |
CN203222815U (en) | Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall | |
CN202945622U (en) | Composite repaired structure of reinforced concrete base plate cracks in basement | |
CN211037072U (en) | Piping lane bottom plate waterproof construction | |
CN110185135B (en) | Basement bottom plate and outer wall waterproof structure and construction method | |
CN109914474A (en) | A kind of pipe gallery U-type groove, which is excavated, presses push construction method | |
CN104763127B (en) | A kind of resistance to heavy duty acid-proof terrace and its construction method | |
CN104060590B (en) | The reinforcement leakage preventing structure of a kind of pressure diversion tunnel and construction method thereof | |
CN106948502A (en) | A kind of water-proof top cover and its construction method | |
CN111663953B (en) | Waterproof structure for sewage tunnel thin-wall two-lining deformation joint and construction method | |
CN110080796B (en) | Tunnel segment repairing process | |
CN109706925A (en) | Novel fiber rib anti-floating anchor rod anchoring method | |
CN107152034A (en) | A kind of pipe gallery and its construction method | |
CN114321494B (en) | Municipal pipeline protection structure and construction method thereof | |
CN107288141B (en) | A kind of seamless flexible water construction technology of contrary sequence method | |
CN214532977U (en) | Novel box culvert crack deformation control reinforced structure | |
CN205399499U (en) | Waterproofing membrane basic unit | |
CN102493595A (en) | Cast-in-place concrete core column ring beam house manufactured by light composite board and assembling method | |
CN206545284U (en) | A kind of subsided rest room | |
CN112942148A (en) | Method for reinforcing bridge by corrugated steel arch structure | |
CN104975623A (en) | Non-excavation leaking inspection well repairing method and repairing structure | |
CN217352441U (en) | Anti-floating anchor pile of large underground structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |