CN102995632A - 钻孔灌注桩技术 - Google Patents

钻孔灌注桩技术 Download PDF

Info

Publication number
CN102995632A
CN102995632A CN2012104755891A CN201210475589A CN102995632A CN 102995632 A CN102995632 A CN 102995632A CN 2012104755891 A CN2012104755891 A CN 2012104755891A CN 201210475589 A CN201210475589 A CN 201210475589A CN 102995632 A CN102995632 A CN 102995632A
Authority
CN
China
Prior art keywords
concrete
hole
conduit
stake
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104755891A
Other languages
English (en)
Inventor
霍刚
赵明波
张国军
陈晓霞
白增怀
佟海滨
汪澜
刘晓鹏
李德明
李文彬
耿家晨
郭文勇
杨浩
朱传辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Liaohe Petroleum Exploration Bureau
Original Assignee
China National Petroleum Corp
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, Liaohe Petroleum Exploration Bureau filed Critical China National Petroleum Corp
Priority to CN2012104755891A priority Critical patent/CN102995632A/zh
Publication of CN102995632A publication Critical patent/CN102995632A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种地基处理技术领域,特别涉及一种钻孔灌注桩技术。该技术步骤如下:一、桩位放点;二、钻孔机就位;三、桩位复点;四、护筒设置及成孔;五、第一次清孔;六、钢筋笼及混凝土导管放置;七、第二次清孔;八、混凝土浇捣;九、卸导管;十、补浇混凝土;十一、桩顶保护。本发明实现了装车棚下有限空间内地基处理,满足钻孔桩桩身砼质量及承载力要求,保证装车棚下地面的稳定性与安全性。克服了现有地基处理方法都难以在装车棚下有限空间内实现地基处理目标的不足。

Description

钻孔灌注桩技术
技术领域:
本发明涉及一种地基处理技术领域,特别涉及一种钻孔灌注桩技术。
背景技术:
由于中山民众油库地质条件软弱,装车棚下未进行地基处理的行车场地出现大面积沉降,需要对其进行地基处理。由于受棚内净高(5.8米)的限制,并且各个加油岛设备已安装完成,大型的桩机设备不能进入,由于地基淤泥层平均23米深,采用地质钻机正常钻孔是无法达到施工要求,淤泥层内钻孔可导致孔洞出现缩孔、塌孔等,因而现有的地基处理方法都难以在装车棚下有限空间内实现地基处理目标。
发明内容:
本发明要解决的技术问题是提供一种钻孔灌注桩技术,该技术实现了装车棚下有限空间内地基处理,满足钻孔桩桩身砼质量及承载力要求,保证装车棚下地面的稳定性与安全性。克服了现有地基处理方法都难以在装车棚下有限空间内实现地基处理目标的不足。
本发明所采取的技术方案是:一种钻孔灌注桩技术,该技术步骤如下:
一、桩位放点:可根据桩位坐标用全站仪直接放出所有桩心坐标,打上木桩,经复核后方可进行一下步施工;
二、钻孔机就位:钻机采用地质钻机,钻机就位时,必须保持平稳,不发生倾斜、位移,钻机在就位前应先试机,保证机器能正常工作后再就位;
三、桩位复点:钻机就位后开始钻孔前,应再一次复核桩位点,保证桩位准确;
四、护筒设置及成孔:成孔过程采用全护筒护壁,护筒规格为ф426×7,每节长4米,采用绑焊方式搭接,为保证设备施工平台的平整密实,施工前应先平整工地现场,并根据现场要求采用合适的钻头;全护筒成孔施工顺序为:(1)钻进至预定深度,(2)护筒内钻进至预定深度,(3)设置护筒,并把护筒压进至护筒高出地面约30cm位置,重复(1)、(2)、(3)步直至设计孔深,成孔完成;
五、第一次清孔:当钻孔到设计深度后,应对孔深、孔位、孔形、孔径等进行检查,利用泥浆泵及导管把自然泥浆注入孔口内,反复冲洗,最后对孔底清理沉渣,并利用空压机往孔底注入空气,利用其在孔内和泥浆混合产生的水压,把沉砂和沉渣一齐冲洗出来,终孔孔底沉渣厚度不得超过50mm;
六、钢筋笼及混凝土导管放置:钢筋笼分段制作完成后,由于本工程钻孔桩孔径小,桩径400mm,桩长46~48m,钢筋笼进行分节吊装,孔口接长,钢筋笼安放时要求其垂直度允许偏差桩径的5%,钢筋笼全部下至孔底后,再下混凝土钢导管;DN125混凝土钢导管采用丝扣连接,为了保证导管在混凝土浇捣完成后能提管,在最后一节导管尾部用钢筋焊接一个U型吊环,使下入孔内的钢丝绳连接到吊环上;
七、第二次清孔:钢筋笼和导管下入后,即进行第二次清孔,要求清孔至孔底沉渣不大于50mm,清孔至泥浆比重达到设计要求止;
八、混凝土浇捣:在混凝土浇筑前,将钢导管连接到地泵上,利用地泵提供的压力将混凝土源源不断的送入桩底,在灌注砼过程中,灌注水下砼要连续进行,不得中断,保证桩身砼质量,直到孔口返浆,以保证桩身砼质量;
九、卸导管:孔口返出混凝土后停止混凝土浇筑,将混凝土导管振捣提出,边提边分段拆卸导管,直到只剩最后一节导管止,如混凝土浇捣完成后导管无法拔出,则将导管留在桩内;
十、补浇混凝土:导管卸到只剩最后一节时应及时对孔内混凝土进行补浇,砼补灌注应超出设计桩顶标高0.80米,以保证桩头砼质量,补浇完成后拆除最后一节导管;
十一、桩顶保护:混凝土浇筑完成后,要注意桩顶保护。
本发明的有益效果是:本发明的钻孔灌注桩设备小,因而具有工艺相对简单,施工不受场地限制的优点,施工时钻机对周围已有的设备及建筑物影响小;由于采用了ф426×7的钢护筒,因而可以保证桩径尺寸,不塌孔、不缩孔,确保成孔质量;由于采用泥浆泵与移动式空压机配合使用,可以有效地把孔内沉渣清扫干净,达到浇筑条件;由于采用DN125的混凝土浇筑导管,因而可以源源不断的把C30水下混凝土送入孔底,使桩身砼质量成型效果良好;本发明达到了地基处理目标,缩短了施工工期,增加了经济效益。
具体实施方式:
由于钻孔灌注桩在装车棚下作业,装车棚距地面高度为5.8米,不能保证施工机械吊装护筒(每节3-4米)所需的整体高度要求,所以对装车棚下地面整体往下挖深1.4米,保证地质钻机就位至桩位。
钻孔灌注桩技术的步骤如下:
一、桩位放点:可根据桩位坐标用全站仪直接放出所有桩心坐标,打上木桩,经复核后方可进行一下步施工;
二、钻孔机就位:钻机采用地质钻机,钻机就位时,必须保持平稳,不发生倾斜、位移,钻机在就位前应先试机,保证机器能正常工作后再就位;
三、桩位复点:钻机就位后开始钻孔前,应再一次复核桩位点,保证桩位准确;
四、护筒设置及成孔:成孔过程采用全护筒护壁,护筒规格为ф426×7,每节长4米,采用绑焊方式搭接,为保证设备施工平台的平整密实,施工前应先平整工地现场,并根据现场要求采用合适的钻头;全护筒成孔施工顺序为:(1)钻进至预定深度,(2)护筒内钻进至预定深度,(3)设置护筒,并把护筒压进至护筒高出地面约30cm位置,重复(1)、(2)、(3)步直至设计孔深,成孔完成;
五、第一次清孔:当钻孔到设计深度后,应对孔深、孔位、孔形、孔径等进行检查,利用泥浆泵及导管把自然泥浆注入孔口内,反复冲洗,最后对孔底清理沉渣,并利用空压机往孔底注入空气,利用其在孔内和泥浆混合产生的水压,把沉砂和沉渣一齐冲洗出来,终孔孔底沉渣厚度不得超过50mm;
六、钢筋笼及混凝土导管放置:钢筋笼分段制作完成后,由于本工程钻孔桩孔径小,桩径400mm,桩长46~48m,钢筋笼进行分节吊装,孔口接长,钢筋笼安放时要求其垂直度允许偏差桩径的5%,钢筋笼全部下至孔底后,再下混凝土钢导管;DN125混凝土钢导管采用丝扣连接,为了保证导管在混凝土浇捣完成后能提管,在最后一节导管尾部用钢筋焊接一个U型吊环,使下入孔内的钢丝绳连接到吊环上;
七、第二次清孔:钢筋笼和导管下入后,即进行第二次清孔,要求清孔至孔底沉渣不大于50mm,清孔至泥浆比重达到设计要求止;
八、混凝土浇捣:由于本工程桩长较长,混凝土浇筑时按常规的浇捣方法很难保证桩身砼密实度,还可能出现断桩、缩径、夹泥和蜂窝结构等质量问题。在混凝土浇筑前,将钢导管连接到地泵上,利用地泵提供的压力将混凝土源源不断的送入桩底,在灌注砼过程中,灌注水下砼要连续进行,不得中断,保证桩身砼质量,直到孔口返浆,以保证桩身砼质量;
九、卸导管:孔口返出混凝土后停止混凝土浇筑,将混凝土导管振捣提出,边提边分段拆卸导管,直到只剩最后一节导管止,如混凝土浇捣完成后导管无法拔出,则将导管留在桩内;
十、补浇混凝土:导管卸到只剩最后一节时应及时对孔内混凝土进行补浇,砼补灌注应超出设计桩顶标高0.80米,以保证桩头砼质量,补浇完成后拆除最后一节导管;
十一、桩顶保护:混凝土浇筑完成后,要注意桩顶保护。
可以理解的是,以上关于本发明的具体描述,仅用于说明本发明而并非受限于本发明实施例所描述的技术方案,本领域的普通技术人员应当理解,仍然可以对本发明进行修改或等同替换,以达到相同的技术效果;只要满足使用需要,都在本发明的保护范围之内。

Claims (1)

1.一种钻孔灌注桩技术,其特征在于:该技术步骤如下:
一、桩位放点:可根据桩位坐标用全站仪直接放出所有桩心坐标,打上木桩,经复核后方可进行一下步施工;
二、钻孔机就位:钻机采用地质钻机,钻机就位时,必须保持平稳,不发生倾斜、位移,钻机在就位前应先试机,保证机器能正常工作后再就位;
三、桩位复点:钻机就位后开始钻孔前,应再一次复核桩位点,保证桩位准确;
四、护筒设置及成孔:成孔过程采用全护筒护壁,护筒规格为ф426×7,每节长4米,采用绑焊方式搭接,为保证设备施工平台的平整密实,施工前应先平整工地现场,并根据现场要求采用合适的钻头;全护筒成孔施工顺序为:(1)钻进至预定深度,(2)护筒内钻进至预定深度,(3)设置护筒,并把护筒压进至护筒高出地面约30cm位置,重复(1)、(2)、(3)步直至设计孔深,成孔完成;
五、第一次清孔:当钻孔到设计深度后,应对孔深、孔位、孔形、孔径等进行检查,利用泥浆泵及导管把自然泥浆注入孔口内,反复冲洗,最后对孔底清理沉渣,并利用空压机往孔底注入空气,利用其在孔内和泥浆混合产生的水压,把沉砂和沉渣一齐冲洗出来,终孔孔底沉渣厚度不得超过50mm;
六、钢筋笼及混凝土导管放置:钢筋笼分段制作完成后,由于本工程钻孔桩孔径小,桩径400mm,桩长46~48m,钢筋笼进行分节吊装,孔口接长,钢筋笼安放时要求其垂直度允许偏差桩径的5%,钢筋笼全部下至孔底后,再下混凝土钢导管;DN125混凝土钢导管采用丝扣连接,为了保证导管在混凝土浇捣完成后能提管,在最后一节导管尾部用钢筋焊接一个U型吊环,使下入孔内的钢丝绳连接到吊环上;
七、第二次清孔:钢筋笼和导管下入后,即进行第二次清孔,要求清孔至孔底沉渣不大于50mm,清孔至泥浆比重达到设计要求止;
八、混凝土浇捣:在混凝土浇筑前,将钢导管连接到地泵上,利用地泵提供的压力将混凝土源源不断的送入桩底,在灌注砼过程中,灌注水下砼要连续进行,不得中断,保证桩身砼质量,直到孔口返浆,以保证桩身砼质量;
九、卸导管:孔口返出混凝土后停止混凝土浇筑,将混凝土导管振捣提出,边提边分段拆卸导管,直到只剩最后一节导管止,如混凝土浇捣完成后导管无法拔出,则将导管留在桩内;
十、补浇混凝土:导管卸到只剩最后一节时应及时对孔内混凝土进行补浇,砼补灌注应超出设计桩顶标高0.80米,以保证桩头砼质量,补浇完成后拆除最后一节导管;
十一、桩顶保护:混凝土浇筑完成后,要注意桩顶保护。
CN2012104755891A 2012-11-21 2012-11-21 钻孔灌注桩技术 Pending CN102995632A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104755891A CN102995632A (zh) 2012-11-21 2012-11-21 钻孔灌注桩技术

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104755891A CN102995632A (zh) 2012-11-21 2012-11-21 钻孔灌注桩技术

Publications (1)

Publication Number Publication Date
CN102995632A true CN102995632A (zh) 2013-03-27

Family

ID=47924688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104755891A Pending CN102995632A (zh) 2012-11-21 2012-11-21 钻孔灌注桩技术

Country Status (1)

Country Link
CN (1) CN102995632A (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510513A (zh) * 2013-10-16 2014-01-15 中铁十九局集团有限公司 冲击钻用钻孔灌注桩桩基组合护筒
CN103615001A (zh) * 2013-11-27 2014-03-05 宁波盛宏建设工程有限公司 一种钢筋笼骨架分层安装的钻孔灌注桩施工方法
CN103711119A (zh) * 2013-12-18 2014-04-09 中铁大桥局集团第四工程有限公司 一种钻孔桩泥浆风动防沉循环***及使用方法
CN104153352A (zh) * 2014-07-31 2014-11-19 广西科技大学 一种岩溶地质旋挖灌注桩成孔工艺
CN104612134A (zh) * 2014-12-16 2015-05-13 中铁建大桥工程局集团第五工程有限公司 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN106087995A (zh) * 2016-06-08 2016-11-09 深圳市宏业基基础工程有限公司 一种钻孔筑桩的方法
CN106351575A (zh) * 2016-11-07 2017-01-25 赵宽学 一种护孔钻桩方法
CN106759288A (zh) * 2016-11-29 2017-05-31 昆山顶牛市政建设有限公司 一种建筑钻孔灌注桩施工方法
CN106939595A (zh) * 2017-02-14 2017-07-11 中建二局第三建筑工程有限公司 一种旋挖扩底灌注桩施工工艺
CN107524142A (zh) * 2017-09-20 2017-12-29 中国二十冶集团有限公司 一种泥浆护壁钻孔灌注桩施工方法
CN107653878A (zh) * 2016-07-23 2018-02-02 安吉正源塑木装饰材料有限公司 钻孔灌注桩可重复使用纵向分离式钢护筒施工工法
CN108166483A (zh) * 2017-12-31 2018-06-15 中铁十九局集团第二工程有限公司 钻孔灌注桩施工方法
CN108797569A (zh) * 2018-06-26 2018-11-13 江苏地基工程有限公司 一种钻孔桩新型节能桩头超灌的控制方法
CN110004992A (zh) * 2019-04-19 2019-07-12 贵州省交通规划勘察设计研究院股份有限公司 一种能实时监测钻孔灌注桩施工用装置及其使用方法
CN110016911A (zh) * 2019-05-05 2019-07-16 中国建筑一局(集团)有限公司 一种深护筒机械成孔成桩施工工艺
CN111851562A (zh) * 2020-07-22 2020-10-30 重庆交通建设(集团)有限责任公司 一种移动式钻孔灌注桩施工平台及方法
CN112144512A (zh) * 2020-09-11 2020-12-29 中建六局水利水电建设集团有限公司 一种混凝土灌注桩的施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4327638B2 (ja) * 2004-03-26 2009-09-09 株式会社奥村組 場所打ちコンクリート杭の造成方法
CN101638891A (zh) * 2009-08-18 2010-02-03 上海市第二建筑有限公司 全套管旋进隔离桩施工方法
JP2011137318A (ja) * 2009-12-28 2011-07-14 Daiho Constr Co Ltd 場所打ち杭築造方法及びその装置
CN102720186A (zh) * 2012-07-10 2012-10-10 上海港务工程公司 变截面钻孔灌注桩水下一次成型浇筑法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4327638B2 (ja) * 2004-03-26 2009-09-09 株式会社奥村組 場所打ちコンクリート杭の造成方法
CN101638891A (zh) * 2009-08-18 2010-02-03 上海市第二建筑有限公司 全套管旋进隔离桩施工方法
JP2011137318A (ja) * 2009-12-28 2011-07-14 Daiho Constr Co Ltd 場所打ち杭築造方法及びその装置
CN102720186A (zh) * 2012-07-10 2012-10-10 上海港务工程公司 变截面钻孔灌注桩水下一次成型浇筑法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510513A (zh) * 2013-10-16 2014-01-15 中铁十九局集团有限公司 冲击钻用钻孔灌注桩桩基组合护筒
CN103615001A (zh) * 2013-11-27 2014-03-05 宁波盛宏建设工程有限公司 一种钢筋笼骨架分层安装的钻孔灌注桩施工方法
CN103711119A (zh) * 2013-12-18 2014-04-09 中铁大桥局集团第四工程有限公司 一种钻孔桩泥浆风动防沉循环***及使用方法
CN103711119B (zh) * 2013-12-18 2015-10-28 中铁大桥局集团第四工程有限公司 一种钻孔桩泥浆风动防沉循环***及使用方法
CN104153352A (zh) * 2014-07-31 2014-11-19 广西科技大学 一种岩溶地质旋挖灌注桩成孔工艺
CN104612134A (zh) * 2014-12-16 2015-05-13 中铁建大桥工程局集团第五工程有限公司 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN106087995A (zh) * 2016-06-08 2016-11-09 深圳市宏业基基础工程有限公司 一种钻孔筑桩的方法
CN107653878A (zh) * 2016-07-23 2018-02-02 安吉正源塑木装饰材料有限公司 钻孔灌注桩可重复使用纵向分离式钢护筒施工工法
CN106351575A (zh) * 2016-11-07 2017-01-25 赵宽学 一种护孔钻桩方法
CN106759288A (zh) * 2016-11-29 2017-05-31 昆山顶牛市政建设有限公司 一种建筑钻孔灌注桩施工方法
CN106939595A (zh) * 2017-02-14 2017-07-11 中建二局第三建筑工程有限公司 一种旋挖扩底灌注桩施工工艺
CN107524142A (zh) * 2017-09-20 2017-12-29 中国二十冶集团有限公司 一种泥浆护壁钻孔灌注桩施工方法
CN108166483A (zh) * 2017-12-31 2018-06-15 中铁十九局集团第二工程有限公司 钻孔灌注桩施工方法
CN108797569A (zh) * 2018-06-26 2018-11-13 江苏地基工程有限公司 一种钻孔桩新型节能桩头超灌的控制方法
CN110004992A (zh) * 2019-04-19 2019-07-12 贵州省交通规划勘察设计研究院股份有限公司 一种能实时监测钻孔灌注桩施工用装置及其使用方法
CN110016911A (zh) * 2019-05-05 2019-07-16 中国建筑一局(集团)有限公司 一种深护筒机械成孔成桩施工工艺
CN111851562A (zh) * 2020-07-22 2020-10-30 重庆交通建设(集团)有限责任公司 一种移动式钻孔灌注桩施工平台及方法
CN112144512A (zh) * 2020-09-11 2020-12-29 中建六局水利水电建设集团有限公司 一种混凝土灌注桩的施工方法

Similar Documents

Publication Publication Date Title
CN102995632A (zh) 钻孔灌注桩技术
CN107524142A (zh) 一种泥浆护壁钻孔灌注桩施工方法
CN202337976U (zh) 潜孔冲击高压旋喷注浆设备
CN102691294B (zh) 一种地下连续墙的施工方法
CN105386408B (zh) 深水桥梁桩基施工方法
CN101139838B (zh) 高承压水地区超深基坑的施工方法
CN106320333B (zh) 一种联排式水上灌注桩装置及施工方法
CN105275381A (zh) 富水卵石地层中冲击钻成孔施工方法
CN101691751A (zh) 超长人工挖孔桩穿越溶洞施工方法及穿越溶洞的超长桩
CN103924585A (zh) 新型风电嵌岩桩的施工方法
CN113550340A (zh) 一种深水入岩条件下无封底双壁钢围堰深水基础施工方法
CN105442605A (zh) 拔出phc桩再利用于深基坑支护施工方法
CN107869351A (zh) 一种高狭型大型溶洞空腔处理安全防护的方法
CN104047542A (zh) 嵌岩斜桩冲击钻管锤***及嵌岩斜桩冲击施工方法
CN105133581A (zh) 支护结构中抗拔桩、格构柱及降水井三合一施工方法
CN107246007A (zh) 一种cfg桩的施工方法
CN110700860B (zh) 一种穿越黄土沟谷的土石分界隧道施工方法
CN104894926A (zh) 既有铁路高路堤上支挡结构及其施工方法
CN109779640A (zh) 一种盾构始发洞门破除施工方法
CN109056808A (zh) 一种地铁车站中桩及钢管柱施工方法
CN108179759A (zh) 导向井水下钻芯掏槽无封底方法
CN201296932Y (zh) 分节预制下沉的地下室外墙及其导墙
CN106245668A (zh) 一种桁架式桩基础及其施工方法
CN105625435B (zh) 海积岛屿多截面、多层次异型设备深基坑快速成型方法
CN114232602A (zh) 地下连续桩施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130327