CN102989267B - A kind of rule stream packed bed and its installation method - Google Patents
A kind of rule stream packed bed and its installation method Download PDFInfo
- Publication number
- CN102989267B CN102989267B CN201210531377.0A CN201210531377A CN102989267B CN 102989267 B CN102989267 B CN 102989267B CN 201210531377 A CN201210531377 A CN 201210531377A CN 102989267 B CN102989267 B CN 102989267B
- Authority
- CN
- China
- Prior art keywords
- collar tie
- tie beam
- guide bar
- flow guide
- packed bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of rule stream packed bed, it is made up of bracing frame, collar tie beam, flow guide bar, four part of intermediate blind cylinder, support frame as described above is used to support and fix collar tie beam, collar tie beam is the annular girder on bracing frame, multiple collar tie beams are in distribution with one heart, flow guide bar is movably installed between two neighboring collar tie beam, and intermediate blind cylinder is located in the collar tie beam of center, to close intermediate space.The present invention discloses the rule flow the installation method of packed bed.The all components of rule stream packed bed of the present invention can be dismantled, and the component in windward side is easily changed, and reduces maintenance load, while reducing the manufacturing cost of rule stream packed bed.
Description
Technical field
The present invention relates to a kind of rule stream packed bed and its installation method.
Background technology
Existing rule stream packed bed is that the bulk metallic materials for adopting make, and bed surface is one overall, in running,
Due to due to corrosion, in rule stream packed bed windward side, local corrosion is very big, and corrosion area is all distributed in whole bed surface.Though
So corrosion failure is local, but will such as carry out keeping in repair the work that failure area certainly will be cut and be welded, time-consuming
Take a lot of work.
The content of the invention
In order to solve problem above there is provided a kind of rule stream packed bed, the rule stream packed bed is adopted and is easy to dismounting the present invention
Modular construction, when solving existing rule stream filler bed operating, windward side corrosion is big, not easy-maintaining deficiency after corrosion.
The technical scheme is that:Whole rule stream packed bed is by bracing frame, collar tie beam, flow guide bar, four part of intermediate blind cylinder
Constitute, support frame as described above is used to supporting and fixing collar tie beam, and collar tie beam is the annular girder on bracing frame, and multiple collar tie beams are in concentric
Distribution, flow guide bar are movably installed between two neighboring collar tie beam, and intermediate blind cylinder is located in the collar tie beam of center, to close intermediate space.
The present invention further can also be implemented by following technical solution:Intermediate beam and therefrom of the support frame as described above by ring-type
Between the radiation beam composition that laterally extends around outside beam;The flow guide bar is installed between two neighboring collar tie beam by screw rod.It is described
Flow guide bar is made by anti-corrosion material.
Present invention also offers above-mentioned rule flow the installation method of packed bed, completed by following steps:Bracing frame is fixedly mounted with
On pedestal, intermediate blind cylinder is fixed to into bracing frame center, first lap collar tie beam on the basis of intermediate blind cylinder, by first lap circle
Beam is welded to the side wall of intermediate blind cylinder, forms a whole circle, then flow guide bar is fixed on first lap collar tie beam, following root
Second is installed according to mounted flow guide bar and encloses collar tie beam, by that analogy, next collar tie beam below and flow guide bar are installed.It is so whole
The installation of individual rule fluidized bed.
It is an advantage of the invention that:
Rule of the present invention are flowed all components of packed bed and can be dismantled, and the component in windward side is easily changed, and subtracts
Maintenance load is lacked, while reducing the manufacturing cost of rule stream packed bed.
Description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the three-dimensional exploded view of invention.
Specific embodiment
Below in conjunction with the accompanying drawings the present invention is further described in detail.
From accompanying drawing, the rule stream packed bed of the present invention, by bracing frame 1, collar tie beam 2, flow guide bar 3,4 four part of intermediate blind cylinder
Constitute, support frame as described above 1 is used to supporting and fixing collar tie beam 2, and support beam 1 is divided into intermediate beam 11 and radiation beam 12 again;Collar tie beam 2 is peace
The annular girder being mounted on bracing frame, multiple collar tie beams in one heart distribution, flow guide bar 3 by screw rod be installed on two neighboring collar tie beam it
Between, intermediate blind cylinder 4 is located in the collar tie beam of center, to close intermediate space.
In the present embodiment, bracing frame 1 is made up of an annular intermediate beam 11 and 8 radiation beams 12.Flow guide bar 3 is by preserving timber
Material is made.
The step that the rule stream packed bed of the present invention is installed on absorption tower is as follows:
Circumferentially decile is welded beam 12 is radiated on smoke absorption tower tower body relevant position, then the intermediate beam that is welded, then will
Intermediate blind cylinder 4 is fixed on intermediate beam 11, and first lap collar tie beam 2 is welded on the side wall of intermediate blind cylinder 4 on the basis of intermediate blind cylinder 4,
A whole circle is formed, then flow guide bar 3 is fixed on first lap collar tie beam, flow guide bar 3 can be adopted with being fixedly connected for collar tie beam 2
With various ways, in the present embodiment, screw rod connection is exactly a good method.Next install second and enclose collar tie beam, due to water conservancy diversion
Bar has been fixed flat and has been evenly distributed on first lap collar tie beam, therefore the collar tie beam of the second circle can be according to mounted water conservancy diversion
Bar, scene do a collar tie beam, to ensure that enclosing collar tie beam coordinates tight with flow guide bar.Next by that analogy, install collar tie beam below and
Flow guide bar.The installation of so whole rule stream packed bed.
The above, is only presently preferred embodiments of the present invention, not makees any pro forma restriction to the present invention, is appointed
What any is simply repaiied according to what the technical spirit of the present invention made to above example without departing from technical solution of the present invention content
Change, equivalent variations and modification, still fall within the range of technical solution of the present invention.
Claims (3)
1. a kind of rule stream packed bed, is characterized in that:It is made up of bracing frame, collar tie beam, flow guide bar, four part of intermediate blind cylinder, described
Support is used to supporting and fixing collar tie beam, the radiation that support frame as described above is laterally extended around by the intermediate beam of ring-type and from outside intermediate beam
Beam is constituted, and collar tie beam is the annular girder on bracing frame, and in being distributed with one heart, flow guide bar is movably installed in two circles to N number of collar tie beam
Between beam, intermediate blind cylinder is located in the collar tie beam of center, and to close intermediate space, the flow guide bar is made by anti-corrosion material.
2. a kind of rule stream packed bed according to claim 1, is characterized in that:The flow guide bar is installed on two by screw rod
Between collar tie beam.
3. the installation method of packed bed is flowed according to a kind of arbitrary described rule of claim 1-2, is comprised the steps:By bracing frame
Be packed on pedestal, intermediate blind cylinder be fixed to into bracing frame center, first lap collar tie beam on the basis of intermediate blind cylinder, by first
Circle collar tie beam is welded to the side wall of intermediate blind cylinder, forms a whole circle, then flow guide bar is fixed on first lap collar tie beam, is connect down
The second circle collar tie beam is installed according to mounted flow guide bar, by that analogy, next collar tie beam below and flow guide bar are installed, this
Sample entirely advises the installation of fluidized bed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210531377.0A CN102989267B (en) | 2012-12-12 | 2012-12-12 | A kind of rule stream packed bed and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210531377.0A CN102989267B (en) | 2012-12-12 | 2012-12-12 | A kind of rule stream packed bed and its installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102989267A CN102989267A (en) | 2013-03-27 |
CN102989267B true CN102989267B (en) | 2017-03-29 |
Family
ID=47918677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210531377.0A Active CN102989267B (en) | 2012-12-12 | 2012-12-12 | A kind of rule stream packed bed and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102989267B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103394321B (en) * | 2013-07-22 | 2015-04-01 | 杭州杭氧股份有限公司 | Mounting method for large-diameter packed tower internals |
CN107789929A (en) * | 2017-12-19 | 2018-03-13 | 湖南碧绿环保产业发展有限公司 | One kind rule stream packed bed rule stream phase change device |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101172219A (en) * | 2006-10-31 | 2008-05-07 | 中国石油大学(北京) | Component in gas-solid fluidized beds |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56163727A (en) * | 1980-05-21 | 1981-12-16 | Kyowa Kako Kk | Gas absorption tower |
US5514205A (en) * | 1994-12-30 | 1996-05-07 | Awaji; Toshio | Apparatus for removing harmful objects from a gas |
CN1287884C (en) * | 2004-10-01 | 2006-12-06 | 方达辉 | Self revolving planet fluidized bed |
CN201896101U (en) * | 2010-10-13 | 2011-07-13 | 杭州金枫叶科技有限公司 | Microbe suspending medium for moving bed biofilm reactor |
CN203017948U (en) * | 2012-12-12 | 2013-06-26 | 湖南碧绿环保产业发展有限公司 | Regulated fluidization packed bed |
-
2012
- 2012-12-12 CN CN201210531377.0A patent/CN102989267B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101172219A (en) * | 2006-10-31 | 2008-05-07 | 中国石油大学(北京) | Component in gas-solid fluidized beds |
Also Published As
Publication number | Publication date |
---|---|
CN102989267A (en) | 2013-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
HRP20151083T1 (en) | Wind energy plant tower | |
CN104857836A (en) | Flue gas desulfurization absorber interactive spray system | |
CN102989267B (en) | A kind of rule stream packed bed and its installation method | |
CN202977082U (en) | Transformer table frame | |
CN105756382A (en) | Natural ventilation steel structure tower | |
CN207980737U (en) | A kind of rule stream packed bed rule stream phase change device | |
CN203664972U (en) | Wind power tower and flange installation platform | |
CN204551936U (en) | A kind of steel external staircase | |
CN207063469U (en) | A kind of Combined annular inspection platform | |
CN203017948U (en) | Regulated fluidization packed bed | |
CN205064389U (en) | Air cooling fan crane span structure installation base | |
CN205637722U (en) | Natural draft's steel construction tower body | |
CN203247703U (en) | Steel structural plant frame | |
CN204162323U (en) | The standard knot of ruggedized construction | |
CN205857885U (en) | Novel single tube tower base | |
CN203961318U (en) | A kind of underground nuclear power station reactor cavern containment dome installation structure | |
CN203522065U (en) | Vertical-section phase-isolated bus conductor temporary supporting structure | |
CN207419703U (en) | A kind of rack dome inner core coil structures | |
CN203380535U (en) | Pipe tower flange plate pairing tool | |
CN207110060U (en) | A kind of novel embedded part device applied to internally climbing tower crane | |
CN203834661U (en) | Steel-structure supporting frame | |
CN209701494U (en) | Agricultural products storage library | |
CN204672130U (en) | The interactive spray system of fume desulfurating absorption tower | |
CN207453098U (en) | New steel structure house mounting seat | |
CN204174917U (en) | A kind of disc type scaffold upright rod and fixed disk mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |