CN203664972U - Wind power tower and flange installation platform - Google Patents
Wind power tower and flange installation platform Download PDFInfo
- Publication number
- CN203664972U CN203664972U CN201320810569.5U CN201320810569U CN203664972U CN 203664972 U CN203664972 U CN 203664972U CN 201320810569 U CN201320810569 U CN 201320810569U CN 203664972 U CN203664972 U CN 203664972U
- Authority
- CN
- China
- Prior art keywords
- platform
- round platform
- concrete round
- fan
- flange
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009434 installation Methods 0.000 title abstract 3
- 238000003466 welding Methods 0.000 claims description 12
- 230000002093 peripheral effect Effects 0.000 claims description 7
- 238000000034 method Methods 0.000 abstract description 4
- 238000005266 casting Methods 0.000 abstract 4
- 238000012937 correction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
Landscapes
- Wind Motors (AREA)
Abstract
The utility model provides a wind power tower and flange installation platform mainly composed of a concrete round platform and a casting working platform. The concrete round platform is arranged at the bottom, and a concrete round platform periphery plate is arranged on the periphery. The casting working platform is laid on the upper portion of the concrete round platform, and the planeness of the casting working platform is smaller than or equal to 0.2 mm. The casting working platform is divided into multiple sector-shaped division pieces. Each sector-shaped division piece is provided with 2-4 inverted-T-type grooves toward the circle center and provided with a fixed lug plate in the radial direction, and the fixed lug plates are fastened through embedded bolts on the concrete round platform. Inner baffles are welded to the inner circles of the sector-shaped division pieces, and outer baffles are welded to the outer circles of the sector-shaped division pieces and welded to the periphery plate of the concrete round platform. The wind power tower and flange installation platform has the advantages that a wind power tower and a flange are convenient to assemble and weld, repeated utilization can be achieved, it is guaranteed that the planeness of the welded flange is 100% qualified, correcting work in the follow-up processes is omitted, working efficiency is improved, and labor intensity is greatly relieved.
Description
Technical field
The utility model relates to a kind of wind-power tower and flange mounting equipment.
Background technology
Wind-power tower is taper barrel weldment, segmentation manufacture, tens meters of every section of height, every section of internode adopts flange to connect, in making, the control of planeness of flange is most important, be applied in group to, weld, proofread and correct in whole process, planeness of flange is final to be required as 0.5-2mm, especially the requirement of epimere flange is the most sternly≤0.5mm, and do not allow to turn up, generally taked to level up group right, the method for tightly welding, effect is not satisfactory, and subsequent handling needs a large amount of corrections.
Summary of the invention
The purpose of this utility model is to provide a wind-power tower flange mounting platform, is suitable for different-diameter flange and tower wound packages is joined, and guarantees that assembly welding rear flange flatness reaches technical requirement control range.
The utility model is mainly made up of concrete round platform, foundry work platform, and bottom is 180-220mm concrete round platform, and periphery arranges thickness 18-22mm concrete round platform peripheral board; The thick foundry work platform of 180-220mm is laid on concrete round platform top, the flatness≤0.2mm of foundry work platform, and foundry work platform outside dimension is Φ 4500-5500mm, internal diameter size is Φ 1500-2200mm; Foundry work platform is divided into some fan-shaped bursts, every fan-shaped burst is 18-22 degree, interval 8-12 degree is uniform, every fan-shaped burst outer is provided with 2-4 bar towards center of circle direction and falls T-shape slot, the upper end open of falling T-shape slot 47-53mm, high 37-43mm, lower ending opening 62-68mm, dark 32-38mm; Every fan-shaped burst radially arranges fixing otic placode, fastening by the pre-embedded bolt on concrete round platform; Fan-shaped burst inner ring welding Internal baffle, outer ring is provided with outer baffle and the welding of concrete round platform peripheral board.
Adopt good effect wind-power tower of the present utility model and flange welding convenient operation, can reuse, guaranteed the flatness of welding rear flange, reach 100% qualified, reduced the correction work in subsequent handling, operating efficiency improves, and labour intensity reduces greatly.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated:
Fig. 1 is structural representation of the present utility model;
T-shape slot, 6 fixing otic placodes, 7 pre-embedded bolts, 8 Internal baffles of 1 concrete round platform, 2 concrete round platform peripheral boards, 3 foundry work platforms, 4 outer baffles, 5 in figure.
The specific embodiment
As shown in the figure, bottom is 180-220mm concrete round platform 1, and periphery arranges thickness 18-22mm concrete round platform peripheral board 2; The thick foundry work platform 3 of 180-220mm is laid on concrete round platform 1 top, the flatness≤0.2mm of foundry work platform 3, and foundry work platform 3 outside dimensions are Φ 4500-5500mm, internal diameter size is Φ 1500-2200mm; Foundry work platform 3 is divided into some fan-shaped bursts, every fan-shaped burst is 18-22 degree, interval 8-12 degree is uniform, every fan-shaped burst outer is provided with 2-4 bar towards center of circle direction and falls T-shape slot 5, T-shape slot 5 upper end open 47-53mm, high 37-43mm, lower ending opening 62-68mm, dark 32-38mm; Every fan-shaped burst radially arranges fixing otic placode 6, fastening by the pre-embedded bolt 7 on concrete round platform 1; Fan-shaped burst inner ring welding Internal baffle 8, outer ring is provided with outer baffle 4 and welds with concrete round platform peripheral board 2.
When use, according to flange diameter, flange is placed in to the position that foundry work platform 3 is suitable, makes it fixed, tight with foundry work platform 3 with service bolt, the flatness of control flange neck, hangs in shell ring and docks with neck flange.Before docking, should check circularity, orifice plane degree and the girth of shell ring, guarantee shell ring and the poor 3.0mm that is not more than of flange girth; Group to after carry out CO
2gas shield backing welding, backing welding is taked equidistant segmentation bottoming method, interrupted, be symmetrically welded, until the bottoming of whole piece circumferential weld completes, its weld seam should be regular, even, postwelding is cleared up in time welding and is flown.
Claims (1)
1. a wind-power tower flange mounting platform, is characterized in that, is mainly made up of concrete round platform, foundry work platform, and bottom is 180-220mm concrete round platform, and periphery arranges thickness 18-22mm concrete round platform peripheral board; The thick foundry work platform of 180-220mm is laid on concrete round platform top, the flatness≤0.2mm of foundry work platform, and foundry work platform outside dimension is Φ 4500-5500mm, internal diameter size is Φ 1500-2200mm; Foundry work platform is divided into some fan-shaped bursts, every fan-shaped burst is 18-22 degree, interval 8-12 degree is uniform, every fan-shaped burst outer is provided with 2-4 bar towards center of circle direction and falls T-shape slot, the upper end open of falling T-shape slot 47-53mm, high 37-43mm, lower ending opening 62-68mm, dark 32-38mm; Every fan-shaped burst radially arranges fixing otic placode, fastening by the pre-embedded bolt on concrete round platform; Fan-shaped burst inner ring welding Internal baffle, outer ring is provided with outer baffle and the welding of concrete round platform peripheral board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320810569.5U CN203664972U (en) | 2013-12-07 | 2013-12-07 | Wind power tower and flange installation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320810569.5U CN203664972U (en) | 2013-12-07 | 2013-12-07 | Wind power tower and flange installation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203664972U true CN203664972U (en) | 2014-06-25 |
Family
ID=50961306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320810569.5U Expired - Lifetime CN203664972U (en) | 2013-12-07 | 2013-12-07 | Wind power tower and flange installation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203664972U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104368932A (en) * | 2014-10-30 | 2015-02-25 | 南通虹波机械有限公司 | Conical barrel jig frame |
CN106312410B (en) * | 2016-10-11 | 2018-04-20 | 许继集团有限公司 | A kind of wind-power tower flange state modulator auxiliary mould |
CN114799410A (en) * | 2022-05-06 | 2022-07-29 | 南通中远海运船务工程有限公司 | Forming process of ultra-large marine flange |
-
2013
- 2013-12-07 CN CN201320810569.5U patent/CN203664972U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104368932A (en) * | 2014-10-30 | 2015-02-25 | 南通虹波机械有限公司 | Conical barrel jig frame |
CN106312410B (en) * | 2016-10-11 | 2018-04-20 | 许继集团有限公司 | A kind of wind-power tower flange state modulator auxiliary mould |
CN114799410A (en) * | 2022-05-06 | 2022-07-29 | 南通中远海运船务工程有限公司 | Forming process of ultra-large marine flange |
CN114799410B (en) * | 2022-05-06 | 2024-04-26 | 南通中远海运船务工程有限公司 | Forming process of ultra-large marine flange |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203664972U (en) | Wind power tower and flange installation platform | |
CN204081623U (en) | The servicing unit of a kind of reducing desulfurizing tower upside-down mounting | |
CN201783541U (en) | Repairing tooling for internal wall of pipe orifice | |
CN201705594U (en) | Foundation reinforcing cage of wind generating set | |
CN105200173A (en) | Cross construction method of replacing furnace shells and cooling walls of blast furnaces | |
CN204487084U (en) | Pipe flange butt welding support | |
CN201443475U (en) | Sectional type high-power wind turbine tower | |
CN203018951U (en) | Fast pairing jig frame for seal end of hot air furnace shell ball crown | |
CN202924075U (en) | Detachable Chinese character 'mi'-shaped support device | |
CN206425139U (en) | Tower spray painting sandblasting pivot flange | |
CN204258464U (en) | Detachable stator core mounting structure | |
CN205166279U (en) | Welding frock of welding burst ball sealing head | |
CN210944892U (en) | Container formula sewage treatment unit convenient to remove | |
CN205823351U (en) | Turbine blade trial assembly adapted bogey | |
CN102989267B (en) | A kind of rule stream packed bed and its installation method | |
CN111075202A (en) | Absorption tower hole reserved installation method | |
CN103794334B (en) | A kind of encapsulating method of transformer rectangle mouth of pipe closure plate | |
CN108913833B (en) | Quick assembly method for expanded belt furnace shell and lining structure of top combustion type hot blast stove | |
CN201794285U (en) | Hoop member and detachable operation platform | |
CN213952520U (en) | Tenon welding integrated structure spherical steel support | |
CN205674093U (en) | Nuclear power station evaporating dish inner sleeve | |
CN105525603B (en) | Method and device for reusing balance oil cylinder of vertical ship lift | |
CN103775785B (en) | The header pipe termination enclosure method of a kind of transformer circle | |
CN209810962U (en) | Die for calibrating circular steel tube | |
CN203095373U (en) | Coiling block of mine elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20140625 |
|
CX01 | Expiry of patent term |