CN102900259B CN201210348200.7A CN201210348200A CN102900259B CN 102900259 B CN102900259 B CN 102900259B CN 201210348200 A CN201210348200 A CN 201210348200A CN 102900259 B CN102900259 B CN 102900259B
Authority
CN
China
Prior art keywords
shaft
rod bodies
lower shaft
inner lining
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210348200.7A
Other languages
English (en)
Other versions
CN102900259A (zh
Inventor
刘明惠
李君明
于鑫
王军
陈家宏
张广洲
马文广
潘吉林
朱晓东
史小靖
柳欢欢
梅端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan NARI Ltd
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Wuhan NARI Ltd
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan NARI Ltd, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210348200.7A priority Critical patent/CN102900259B/zh
Publication of CN102900259A publication Critical patent/CN102900259A/zh
Application granted granted Critical
Publication of CN102900259B publication Critical patent/CN102900259B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及一种复合材料杆塔组合杆成套装置,它包括有至少一组杆身组件,所述杆身组件是由上杆身与下杆身组成的,上杆身与下杆身是首尾两端开口的空心圆台形结构,上杆身与下杆身的首端的横截面均小于尾端的横截面,上杆身尾端套装在下杆身的首端上,上杆身尾端的内壁面与下杆身的首端的外壁面形成配合面,配合面上涂抹有将上、下杆身连成一体的粘结剂,下杆身首端的内壁上安装有增强杆件局部刚度的金属组件。本发明通过在配合面上涂抹树脂将上下杆身连成一体,在上杆身外壁上缠绕浸润了热固性树脂的玻璃纤维丝或布经固化处理行成的环向局部增强部,以及在下杆身内壁面配合金属内衬,有效保证了相互嵌套复合材料杆体在应用中的可靠性和稳定性。

Description

复合材料杆塔组合杆成套装置
技术领域
本发明涉及复合材料杆塔,尤其是涉及一种复合材料杆塔组合杆成套装置。
背景技术
复合材料杆塔较传统杆塔具备极大优势,可显著解决传统杆塔应用中出现的诸多问题,例如可解决运维成本高、体型笨重、受气候影响闪络事故率高等问题,因此复合材料杆塔得到越来越广泛应用。现复合材料杆塔的成套组装方式,多采用法兰工装方式连接已制备的杆体。但是通过法兰工装的方式组装复合材料整塔不仅增加了杆塔自重以及运输成本,同时为杆塔的组装工作增加了繁琐工序。因此为了便于复合材料杆塔的货运运输以及现场安装,将设计所需塔体分成若干段,并采用相互嵌套的方式进行组装,这将极大解决上述问题,例如公开日2007年4月4日,专利号ZL 200680000002.4,专利名称为《形成组合杆的方法和组合杆装置》的发明专利提及了此类方法。然而,尽管相互嵌套的方法有助于运输和安装,但是却没有解决材料特性与结构设计相协调的相关问题,如受压刚度不足、变形不协调等。因此相互嵌套的组装方式在应用上和结构设计上受到了极大限制。
发明内容
本发明的目的是针对上述问题,提供一种复合材料杆塔组合杆成套装置,有效改善了组合杆受压刚度不足导致局部变形以及变形不协调的问题,保证了组合杆的承力荷载。
为了实现上述目的,本发明采用的技术方案为:
复合材料杆塔组合杆成套装置,包括有至少一组杆身组件,所述的杆身组件是由上杆身与下杆身组成的,上杆身与下杆身是首尾两端开口的空心圆台形结构,上杆身与下杆身的首端的横截面均小于尾端的横截面,上杆身的尾端套装在下杆身的首端上,上杆身的尾端的内壁面与下杆身的首端的外壁面形成配合面,配合面上涂抹有将上、下杆身连成一体的粘结剂,下杆身首端的内壁上安装有增强杆件局部刚度的金属组件。
所述的金属组件包括有置于下杆身的首端端面上的金属盖板、与下杆身首端的内壁面相配合的金属内衬以及将金属盖板与金属内衬收紧连接的螺杆,所述金属盖板为底端具有支撑件的环状结构,金属盖板中空环的内径小于下杆身首端端面内径,金属盖板的外径小于下杆身首端端面外径;所述金属内衬包括上金属内衬与下金属内衬,上金属内衬与下金属内衬的顶面具有环状盖板,环状盖板内径与金属盖板中空环内径相等。
所述的上杆身与下杆身的接缝处的外壁上设置有环向局部增强部。
所述的环向局部增强部是由浸润热固性树脂的玻璃纤维丝或布,经固化处理形成的加固带。
    本发明所具有的优点与效果是:
本发明复合材料杆塔组合杆成套装置包括有至少一组杆身组件,杆身组件是由上杆身与下杆身组成的,上杆身的尾端套装在下杆身的首端上,下杆身首端的内壁上安装有增强杆件局部刚度的金属组件,该结构有效改善了圆台形杆嵌套后承受荷载时发生变形不协调,导致上杆身受拉破坏的问题,以及下杆身受压刚度不足导致的局部变形的问题,保证了圆台形杆的承力荷载。本发明通过在上、下杆身的配合面上涂抹粘结剂将上、下杆身连成一体,用以改善变形不协调问题;上杆身外壁上通过缠绕浸润了热固性树脂的玻璃纤维丝或布,经固化处理形成加固带进行了环向局部增强,有效保证了相互嵌套复合材料组合杆在应用中的可靠性和稳定性。
附图说明                    
图1为本发明复合材料杆塔组合杆成套装置的主视图;
图2为本发明复合材料杆塔组合杆成套装置的俯视图。
图中:上杆身1、下杆身2、配合面3、金属组件4、金属盖板41、金属内衬42、收紧螺杆43、支撑件411、上金属内衬421、下金属内衬422、环状盖板4211、环状盖板4221、环向局部增强部11。
具体实施方式
下面结合附图对本发明作进一步详述:
如图1、2所示,本发明复合材料杆塔组合杆成套装置包括有至少一组杆身组件,所述的杆身组件是由上杆身1与下杆身2组成的,上杆身1与下杆身2是首尾两端开口的空心的圆台形结构,上杆身1与下杆身2的首端的横截面小于尾端的横截面,上杆身1的尾端套装在下杆身2的首端上,上杆身1的尾端的内壁面与下杆身2的首端的外壁面形成配合面3,配合面3上涂抹有将上、下杆身连成一体的粘结剂,下杆身2首端的内壁上安装有增强杆件局部刚度的金属组件4。
所述的金属组件4包括有金属盖板41、金属内衬42和收紧螺杆43,所述的金属盖板41为环状结构,金属盖板41的底端具有一体设置的支撑件411,支撑件411置于下杆身2的首端端面上。金属盖板41与下杆身2的首端端面不接触。金属盖板41中空环的内径小于下杆身首端端面内径,金属盖板41的外径小于下杆身首端端面外径;金属盖板41的环状结构上设有4-8个对称螺孔。
所述金属内衬42包括上金属内衬421与下金属内衬422,金属内衬42与下杆身首端的内壁面相配合,上金属内衬421的顶面具有环状盖板4211,环状盖板4211的内径与金属盖板41中空环内径相等,环状盖板4211上设有与金属盖板41相对应的对称螺孔。下金属内衬422的顶面具有环状盖板4221,环状盖板4221的内径与金属盖板41中空环内径相等,环状盖板4221上设有与金属盖板41相对应的对称螺孔。
收紧螺杆43依次穿过金属盖板41、上金属内衬421与下金属内衬422上的螺孔并将金属内衬42收紧固定于下杆身2内壁面;上金属内衬421被收紧后的上端面略高于下杆身2的上端面。下金属内衬被收紧后,上杆身1尾端端面处于下金属内衬422的横向中心线的延长线上。
所述的上杆身1与下杆身2的接缝处的外壁上缠绕有上、下两段浸润了热固性树脂的玻璃纤维丝或玻璃纤维布,并经固化处理形成的环向局部增强部11。

Claims (3)

1.复合材料杆塔组合杆成套装置,其特征在于包括有至少一组杆身组件,所述的杆身组件是由上杆身与下杆身组成的,上杆身与下杆身是首尾两端开口的空心圆台形结构,上杆身与下杆身的首端的横截面小于尾端的横截面,上杆身的尾端套装在下杆身的首端上,上杆身的尾端的内壁面与下杆身的首端的外壁面形成配合面,配合面上涂抹有将上、下杆身连成一体的粘结剂,下杆身首端的内壁上安装有增强杆件局部刚度的金属组件,所述的金属组件包括有置于下杆身的首端端面上的金属盖板、与下杆身首端的内壁面相配合的金属内衬以及将金属盖板与金属内衬收紧连接的收紧螺杆,所述金属盖板为底端具有支撑件的环状结构,金属盖板中空环的内径小于下杆身首端端面内径,金属盖板的外径小于下杆身首端端面外径;所述金属内衬包括上金属内衬与下金属内衬,上金属内衬与下金属内衬的顶面具有环状盖板,环状盖板内径与金属盖板中空环内径相等。
2. 根据权利要求1所述的复合材料杆塔组合杆成套装置,其特征在于所述的上杆身与下杆身的接缝处的外壁上设置有环向局部增强部。
3.根据权利要求2所述的复合材料杆塔组合杆成套装置,其特征在于所述的环向局部增强部是由浸润热固性树脂的玻璃纤维丝或布,经固化处理形成的加固带。
CN201210348200.7A 2012-09-19 2012-09-19 复合材料杆塔组合杆成套装置 Active CN102900259B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210348200.7A CN102900259B (zh) 2012-09-19 2012-09-19 复合材料杆塔组合杆成套装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210348200.7A CN102900259B (zh) 2012-09-19 2012-09-19 复合材料杆塔组合杆成套装置

Publications (2)

Publication Number Publication Date
CN102900259A CN102900259A (zh) 2013-01-30
CN102900259B true CN102900259B (zh) 2014-11-05

Family

ID=47572722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210348200.7A Active CN102900259B (zh) 2012-09-19 2012-09-19 复合材料杆塔组合杆成套装置

Country Status (1)

Country Link
CN (1) CN102900259B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453332A (zh) * 2013-09-22 2015-03-25 国家电网公司 输电杆塔
CN112502465A (zh) * 2020-11-25 2021-03-16 北京中网华通设计咨询有限公司 一种单管杆塔加固强化实用改造方法
CN113700367A (zh) * 2021-08-11 2021-11-26 国网电力科学研究院武汉南瑞有限责任公司 一种台阶形复合材料电杆分段节点连接结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88100488A (zh) * 1985-05-28 1988-10-12 卡奥尔电器设备制造公司 主要用于支撑电线的塑料杆上实现纤维绕线的装置
CN1112634A (zh) * 1994-02-09 1995-11-29 莎士比亚公司 复合材料的公用电线杆及其制造方法
CN2331723Y (zh) * 1997-11-12 1999-08-04 无锡市华能电力设备厂 插接式钢管塔
RU2244083C2 (ru) * 2002-05-17 2005-01-10 Галинская Ольга Олеговна Башенное сооружение и способ изготовления его секций
CN201043360Y (zh) * 2007-05-31 2008-04-02 西安航天复合材料研究所 复合材料电线杆

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88100488A (zh) * 1985-05-28 1988-10-12 卡奥尔电器设备制造公司 主要用于支撑电线的塑料杆上实现纤维绕线的装置
CN1112634A (zh) * 1994-02-09 1995-11-29 莎士比亚公司 复合材料的公用电线杆及其制造方法
CN2331723Y (zh) * 1997-11-12 1999-08-04 无锡市华能电力设备厂 插接式钢管塔
RU2244083C2 (ru) * 2002-05-17 2005-01-10 Галинская Ольга Олеговна Башенное сооружение и способ изготовления его секций
CN201043360Y (zh) * 2007-05-31 2008-04-02 西安航天复合材料研究所 复合材料电线杆

Also Published As

Publication number Publication date
CN102900259A (zh) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900259B (zh) 复合材料杆塔组合杆成套装置
CN104859160B (zh) 适合拉挤工艺的风机叶片根部预埋螺栓套及其制备方法
CN107310821B (zh) 一种推进剂贮箱裙座安装结构及其制造方法
CN102400587A (zh) 骨架增强复合材料电杆及其制作方法
CN104309960A (zh) 一种大型玻璃钢储罐的制作方法
CN107323698A (zh) 星箭对接采用复合材料端框的承力筒结构
CN106121045A (zh) 一种网架杆组合件及制作方法
CN102085655A (zh) 一种复合材料机械臂及其制备方法
CN103243650B (zh) 一种复合材料缠绕丝
CN205202331U (zh) 一种玻璃钢筒体
CN102705180A (zh) 一种复合材料风电塔筒
CN204786485U (zh) 一种玻璃钢烟筒的快接结构
CN203115014U (zh) 一种带包覆层的直行电梯补偿链
CN206220625U (zh) 纤维增强复合材料输配电杆的连接结构
CN209907600U (zh) 一种木材和竹材连接结构
CN103775515A (zh) 一种碳纤维复合材料轴与金属轴的连接结构
CN205134739U (zh) 一种六边形套圆形中空复合钢管混凝土柱
CN103726711B (zh) 一种输电线路单体柱式抱杆
CN207919385U (zh) 一种加筋复合材料泡沫夹芯筒/柱混合连接结构
CN206449159U (zh) 一种高强度花篮螺丝
CN205857407U (zh) 内圆外方中空夹层带预应力筋钢管混凝土桁架相贯节点
CN205533641U (zh) 一种矿用安全销
CN104075622B (zh) 一种内表面抗燃气冲刷的发射筒装置
US20090174184A1 (en) Working method of the external threaded frp (fiberglass-reinforced plastic) pipe and fitting
CN202698401U (zh) 新型钢货架立柱

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 118000 Zhenxing Road, Zhenxing District, Liaoning, Dandong, No. 8, No. five

Applicant after: Dandong Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 430074 Hubei Province, Wuhan city Hongshan District Luoyu Road No. 143

Applicant before: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Applicant before: Dandong Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant before: State Grid Corporation of China

CB03 Change of inventor or designer information

Inventor after: Liu Minghui

Inventor after: Shi Xiaojing

Inventor after: Liu Huanhuan

Inventor after: Mei Duan

Inventor after: Li Junming

Inventor after: Yu Xin

Inventor after: Wang Jun

Inventor after: Chen Jiahong

Inventor after: Zhang Guangzhou

Inventor after: Ma Wenguang

Inventor after: Pan Jilin

Inventor after: Zhu Xiaodong

Inventor before: Wang Jun

Inventor before: Shi Xiaojing

Inventor before: Liu Huanhuan

Inventor before: Mei Duan

Inventor before: Chen Jiahong

Inventor before: Zhang Guangzhou

Inventor before: Li Junming

Inventor before: Liu Minghui

Inventor before: Yu Xin

Inventor before: Ma Wenguang

Inventor before: Pan Jilin

Inventor before: Zhu Xiaodong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG JUN CHEN JIAHONG ZHANG GUANGZHOU LI JUNMING LIU MINGHUI YU XIN MA WENGUANG PAN JILIN ZHU XIAODONG SHI XIAOJING LIU HUANHUAN MEI DUAN TO: LIU MINGHUI LI JUNMING YU XIN WANG JUN CHEN JIAHONG ZHANG GUANGZHOU MA WENGUANG PAN JILIN ZHU XIAODONG SHI XIAOJING LIU HUANHUAN MEI DUAN

Free format text: CORRECT: APPLICANT; FROM: WUHAN NARI LIMITED LIABILITY COMPANY OF STATE GRID ELECTRIC POWER RESEARCH INSTITUTE TO: DANDONG POWER SUPPLY COMPANY OF LIAONING ELECTRIC POWER CO., LTD.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant