CN102900259B - Combined rod completing device of composite material tower - Google Patents

Combined rod completing device of composite material tower Download PDF

Info

Publication number
CN102900259B
CN102900259B CN201210348200.7A CN201210348200A CN102900259B CN 102900259 B CN102900259 B CN 102900259B CN 201210348200 A CN201210348200 A CN 201210348200A CN 102900259 B CN102900259 B CN 102900259B
Authority
CN
China
Prior art keywords
shaft
rod bodies
lower shaft
inner lining
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210348200.7A
Other languages
Chinese (zh)
Other versions
CN102900259A (en
Inventor
刘明惠
李君明
于鑫
王军
陈家宏
张广洲
马文广
潘吉林
朱晓东
史小靖
柳欢欢
梅端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan NARI Ltd
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Wuhan NARI Ltd
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan NARI Ltd, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210348200.7A priority Critical patent/CN102900259B/en
Publication of CN102900259A publication Critical patent/CN102900259A/en
Application granted granted Critical
Publication of CN102900259B publication Critical patent/CN102900259B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a combined rod completing device of a composite material tower. The combined rod completing device comprises at least one group of rod body components, wherein each rod body component consists of an upper rod body and lower rod body; the upper rod bodies and the lower rod bodies have hollow frustum-shaped structures with openings in the head ends and the tail ends; the cross sections of the head ends of the upper rod bodies and the cross sections of the head ends of the lower rod bodies are smaller than those of the tail ends; the tail ends of the upper rod bodies are sleeved on the head ends of the lower rod bodies; the inner wall surfaces of the tail ends of the upper rod bodies and the outer wall surfaces of the head ends of the lower rod bodies form matched surfaces; adhesives for ingetrally connecting the upper rod bodies and the lower rod bodies are smeared on the matched surfaces; and metal components for enhancing partial rigidity of a rod piece are arranged on the inner walls of the head ends of the lower rod bodies. According to the combined rod completing device, resin is coated on the matched surfaces, so that the upper rod bodies and the lower rod bodies are connected with each other to form a whole; and annular partial enhancement parts formed by solidifying glass fiber yarns or cloth humidified by thermoset resin are coiled on the outer walls of the upper rod bodies, and metal linings are matched with the inner wall surfaces of the lower rod bodies, so that the reliability and the stability of application of embedded composite material rod bodies are effectively guaranteed.

Description

Composite material pole tower compound rod the complete sets of equipment
Technical field
The present invention relates to composite material pole tower, especially relate to a kind of composite material pole tower compound rod the complete sets of equipment.
Background technology
The more traditional shaft tower of composite material pole tower possesses very big advantage, can significantly solve the problems that occur in traditional shaft tower application, for example can solve that O&M cost is high, build is heavy, climate affects the problems such as flashover fault rate height, therefore composite material pole tower obtains more and more extensive use.The complete assembling mode of existing composite material pole tower, adopts flange frock mode to connect the body of rod of having prepared more.Shaft tower deadweight and cost of transportation are not only increased but assemble the whole tower of composite material by the mode of flange frock, simultaneously for the assembly working of shaft tower has increased loaded down with trivial details operation.Therefore install for the ease of freight shipments and the scene of composite material pole tower, design tower body is divided into some sections, and adopt mutually nested mode to assemble, this will greatly address the above problem, for example open day on April 4th, 2007, patent No. ZL 200680000002.4, patent name is that the patent of invention of " method and the compound rod device that form compound rod " has been mentioned this class methods.But, although mutually nested method contributes to transport and installs, but do not solve the relevant issues that material behavior and structure design are coordinated mutually, as pressurized insufficient rigidity, deformation etc.Therefore mutually nested assembling mode has been subject to very big restriction in application and in structure design.
Summary of the invention
The object of the invention is for the problems referred to above, a kind of composite material pole tower compound rod the complete sets of equipment are provided, effectively improved the problem that compound rod pressurized insufficient rigidity causes local distortion and deformation, ensured the load load of compound rod.
To achieve these goals, the technical solution used in the present invention is:
Composite material pole tower compound rod the complete sets of equipment, include at least one group of shaft assembly, described shaft assembly is made up of upper shaft and lower shaft, upper shaft and lower shaft are the hollow round table shape structures of head and the tail both ends open, the cross section of the head end of upper shaft and lower shaft is all less than the cross section of tail end, the tail end of upper shaft is sleeved on the head end of lower shaft, the outside wall surface of the head end of the internal face of the tail end of upper shaft and lower shaft forms fitting face, on fitting face, be coated with upper, the cementing agent that lower shaft is connected, the metal assembly of Reinforced shaft local stiffness is installed on the inwall of lower shaft head end.
Described metal assembly includes metal cover board, the metal inner lining matching with the internal face of lower shaft head end on the head end end face that is placed in lower shaft and metal cover board and metal inner lining is tightened up to the screw rod being connected, described metal cover board is the circulus that bottom has support member, the internal diameter of metal cover board hollow ring is less than lower shaft head end end face internal diameter, and the external diameter of metal cover board is less than lower shaft head end end face external diameter; Described metal inner lining comprises metal inner lining and lower metal inner lining, and the end face of upper metal inner lining and lower metal inner lining has circumferential butt, and circumferential butt internal diameter equates with metal cover board hollow ring internal diameter.
On the outer wall of described upper shaft and the seam crossing of lower shaft, be provided with hoop local enhancement portion.
Described hoop local enhancement portion is glass fiber or the cloth by heat of emersion thermosetting resin, processes through solidifying the reinforce belt forming.
Advantage and effect that the present invention has are:
Composite material pole tower compound rod the complete sets of equipment of the present invention include at least one group of shaft assembly, shaft assembly is made up of upper shaft and lower shaft, the tail end of upper shaft is sleeved on the head end of lower shaft, the metal assembly of Reinforced shaft local stiffness is installed on the inwall of lower shaft head end, this structure deforms inharmonious while effectively having improved the nested rear bearing load of truncated cone-shaped bar, cause the problem of upper boom body tensile failure, and lower beam experiences and press the problem of the local distortion that causes of insufficient rigidity, ensure the load load of truncated cone-shaped bar.The present invention is connected upper and lower shaft by smear cementing agent on the fitting face of upper and lower shaft, in order to improve deformation problem; On upper shaft outer wall, infiltrate glass fiber or the cloth of thermosetting resin by winding, carried out hoop local enhancement through solidifying processing formation reinforce belt, effectively ensured the reliability and stability of mutually nested composite material compound rod in application.
Brief description of the drawings
Fig. 1 is the front view of composite material pole tower compound rod the complete sets of equipment of the present invention;
Fig. 2 is the top view of composite material pole tower compound rod the complete sets of equipment of the present invention.
In figure: go up shaft 1, lower shaft 2, fitting face 3, metal assembly 4, metal cover board 41, metal inner lining 42, tighten up screw rod 43, support member 411, upper metal inner lining 421, lower metal inner lining 422, circumferential butt 4211, circumferential butt 4221, hoop local enhancement portion 11.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described:
As Fig. 1, shown in 2, composite material pole tower compound rod the complete sets of equipment of the present invention include at least one group of shaft assembly, described shaft assembly is made up of with lower shaft 2 upper shaft 1, upper shaft 1 is hollow truncated cone-shaped structures of head and the tail both ends open with lower shaft 2, the cross section of the head end of upper shaft 1 and lower shaft 2 is less than the cross section of tail end, the tail end of upper shaft 1 is sleeved on the head end of lower shaft 2, the outside wall surface of the head end of the internal face of the tail end of upper shaft 1 and lower shaft 2 forms fitting face 3, on fitting face 3, be coated with upper, the cementing agent that lower shaft is connected, the metal assembly 4 of Reinforced shaft local stiffness is installed on the inwall of lower shaft 2 head ends.
Described metal assembly 4 includes metal cover board 41, metal inner lining 42 and tightens up screw rod 43, and described metal cover board 41 is circulus, and the bottom of metal cover board 41 has the support member 411 being wholely set, and support member 411 is placed on the head end end face of lower shaft 2.Metal cover board 41 does not contact with the head end end face of lower shaft 2.The internal diameter of metal cover board 41 hollow ring is less than lower shaft head end end face internal diameter, and the external diameter of metal cover board 41 is less than lower shaft head end end face external diameter; The circulus of metal cover board 41 is provided with 4-8 symmetrical screw.
Described metal inner lining 42 comprises metal inner lining 421 and lower metal inner lining 422, metal inner lining 42 matches with the internal face of lower shaft head end, the end face of upper metal inner lining 421 has circumferential butt 4211, the internal diameter of circumferential butt 4211 equates with metal cover board 41 hollow ring internal diameters, and circumferential butt 4211 is provided with the symmetrical screw corresponding with metal cover board 41.The end face of lower metal inner lining 422 has circumferential butt 4221, and the internal diameter of circumferential butt 4221 equates with metal cover board 41 hollow ring internal diameters, and circumferential butt 4221 is provided with the symmetrical screw corresponding with metal cover board 41.
Tightening up screw rod 43 passes successively the screw on metal cover board 41, upper metal inner lining 421 and lower metal inner lining 422 and metal inner lining 42 is tightened up and is fixed on lower shaft 2 internal faces; Upper metal inner lining 421 is the upper surface a little more than lower shaft 2 by the upper surface after tightening up.After lower metal inner lining is tightened up, on the extended line of the cross central line of upper shaft 1 tail end end face in lower metal inner lining 422.
On the outer wall of described upper shaft 1 and the seam crossing of lower shaft 2, be wound with upper and lower two sections of glass fiber or glass fabrics that infiltrated thermosetting resin, and through solidifying the hoop local enhancement portion 11 forming that processes.

Claims (3)

1. composite material pole tower compound rod the complete sets of equipment, it is characterized in that including at least one group of shaft assembly, described shaft assembly is made up of upper shaft and lower shaft, upper shaft and lower shaft are the hollow round table shape structures of head and the tail both ends open, the cross section of the head end of upper shaft and lower shaft is less than the cross section of tail end, the tail end of upper shaft is sleeved on the head end of lower shaft, the outside wall surface of the head end of the internal face of the tail end of upper shaft and lower shaft forms fitting face, on fitting face, be coated with upper, the cementing agent that lower shaft is connected, the metal assembly of Reinforced shaft local stiffness is installed on the inwall of lower shaft head end, described metal assembly includes the metal cover board on the head end end face that is placed in lower shaft, the metal inner lining matching with the internal face of lower shaft head end and metal cover board and metal inner lining are tightened up to the screw rod that tightens up being connected, described metal cover board is the circulus that bottom has support member, the internal diameter of metal cover board hollow ring is less than lower shaft head end end face internal diameter, the external diameter of metal cover board is less than lower shaft head end end face external diameter, described metal inner lining comprises metal inner lining and lower metal inner lining, and the end face of upper metal inner lining and lower metal inner lining has circumferential butt, and circumferential butt internal diameter equates with metal cover board hollow ring internal diameter.
2. composite material pole tower compound rod the complete sets of equipment according to claim 1, are provided with hoop local enhancement portion on the outer wall of the upper shaft described in it is characterized in that and the seam crossing of lower shaft.
3. composite material pole tower compound rod the complete sets of equipment according to claim 2, is characterized in that described hoop local enhancement portion is glass fiber or the cloth by heat of emersion thermosetting resin, process through solidifying the reinforce belt forming.
CN201210348200.7A 2012-09-19 2012-09-19 Combined rod completing device of composite material tower Active CN102900259B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210348200.7A CN102900259B (en) 2012-09-19 2012-09-19 Combined rod completing device of composite material tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210348200.7A CN102900259B (en) 2012-09-19 2012-09-19 Combined rod completing device of composite material tower

Publications (2)

Publication Number Publication Date
CN102900259A CN102900259A (en) 2013-01-30
CN102900259B true CN102900259B (en) 2014-11-05

Family

ID=47572722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210348200.7A Active CN102900259B (en) 2012-09-19 2012-09-19 Combined rod completing device of composite material tower

Country Status (1)

Country Link
CN (1) CN102900259B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453332A (en) * 2013-09-22 2015-03-25 国家电网公司 Transmission tower
CN112502465A (en) * 2020-11-25 2021-03-16 北京中网华通设计咨询有限公司 Practical reconstruction method for reinforcing and strengthening single-tube tower
CN113700367A (en) * 2021-08-11 2021-11-26 国网电力科学研究院武汉南瑞有限责任公司 Stepped composite material pole subsection node connecting structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88100488A (en) * 1985-05-28 1988-10-12 卡奥尔电器设备制造公司 Be mainly used in the device of realizing fibre winding on the plastic bar of supporting electric wire
CN1112634A (en) * 1994-02-09 1995-11-29 莎士比亚公司 A composite utility pole and method for making same
CN2331723Y (en) * 1997-11-12 1999-08-04 无锡市华能电力设备厂 Inserted steel pipe tower
RU2244083C2 (en) * 2002-05-17 2005-01-10 Галинская Ольга Олеговна Tower structure and method for tower structure sections production
CN201043360Y (en) * 2007-05-31 2008-04-02 西安航天复合材料研究所 Composite-material telegraph pole

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN88100488A (en) * 1985-05-28 1988-10-12 卡奥尔电器设备制造公司 Be mainly used in the device of realizing fibre winding on the plastic bar of supporting electric wire
CN1112634A (en) * 1994-02-09 1995-11-29 莎士比亚公司 A composite utility pole and method for making same
CN2331723Y (en) * 1997-11-12 1999-08-04 无锡市华能电力设备厂 Inserted steel pipe tower
RU2244083C2 (en) * 2002-05-17 2005-01-10 Галинская Ольга Олеговна Tower structure and method for tower structure sections production
CN201043360Y (en) * 2007-05-31 2008-04-02 西安航天复合材料研究所 Composite-material telegraph pole

Also Published As

Publication number Publication date
CN102900259A (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN102900259B (en) Combined rod completing device of composite material tower
CN104859160B (en) It is suitble to the root of fan blade pre-embedded bolt set and preparation method thereof of pultrude process
CN107310821B (en) Propellant storage tank skirt mounting structure and manufacturing method thereof
CN102400587A (en) Pole made of skeleton reinforced composite material and manufacturing method thereof
JP2010241420A (en) Rudder stock
CN104309960A (en) Method for manufacturing large fiber reinforced plastic storage tank
CN107323698A (en) Satellite-rocket docking uses the load barrel structure of composite end frame
CN106121045A (en) A kind of rack bar molectron and manufacture method
CN102085655A (en) Composite material mechanical arm and manufacture method thereof
CN103243650B (en) Composite material winding wire
CN104033724B (en) Bamboo is wound around the preparation method of combined vertical storage tank
CN102705180A (en) Wind power tower cylinder made of composite materials
CN204786485U (en) Fast tying of glass steel chimney constructs
CN203115014U (en) Straight elevator compensation chain with wrapping layers
CN104912748A (en) Wind power spindle locking plate
CN206220625U (en) The attachment structure of fibre reinforced composites transmission & distribution electric pole
CN209907600U (en) Timber and bamboo timber connection structure
CN103775515A (en) Structure for connecting carbon fiber composite shaft and metal shaft
CN205134739U (en) Circular cavity compound steel pipes concrete column of hexagon cover
CN103726711B (en) A kind of single column type derrick of electric transmission line
CN203795946U (en) Electric transmission line lattice type derrick
CN206449159U (en) A kind of high intensity turnbuckle
CN205857407U (en) Inner circle foreign side hollow sandwich band presstressed reinforcing steel concrete-filled steel tube truss tubular joint
CN205533641U (en) Mining safe round pin
CN104075622B (en) Launch barrel device with inner surface resisting gas flushing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 118000 Zhenxing Road, Zhenxing District, Liaoning, Dandong, No. 8, No. five

Applicant after: Dandong Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 430074 Hubei Province, Wuhan city Hongshan District Luoyu Road No. 143

Applicant before: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Applicant before: Dandong Power Supply Company of Liaoning Electric Power Co., Ltd.

Applicant before: State Grid Corporation of China

CB03 Change of inventor or designer information

Inventor after: Liu Minghui

Inventor after: Shi Xiaojing

Inventor after: Liu Huanhuan

Inventor after: Mei Duan

Inventor after: Li Junming

Inventor after: Yu Xin

Inventor after: Wang Jun

Inventor after: Chen Jiahong

Inventor after: Zhang Guangzhou

Inventor after: Ma Wenguang

Inventor after: Pan Jilin

Inventor after: Zhu Xiaodong

Inventor before: Wang Jun

Inventor before: Shi Xiaojing

Inventor before: Liu Huanhuan

Inventor before: Mei Duan

Inventor before: Chen Jiahong

Inventor before: Zhang Guangzhou

Inventor before: Li Junming

Inventor before: Liu Minghui

Inventor before: Yu Xin

Inventor before: Ma Wenguang

Inventor before: Pan Jilin

Inventor before: Zhu Xiaodong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WANG JUN CHEN JIAHONG ZHANG GUANGZHOU LI JUNMING LIU MINGHUI YU XIN MA WENGUANG PAN JILIN ZHU XIAODONG SHI XIAOJING LIU HUANHUAN MEI DUAN TO: LIU MINGHUI LI JUNMING YU XIN WANG JUN CHEN JIAHONG ZHANG GUANGZHOU MA WENGUANG PAN JILIN ZHU XIAODONG SHI XIAOJING LIU HUANHUAN MEI DUAN

Free format text: CORRECT: APPLICANT; FROM: WUHAN NARI LIMITED LIABILITY COMPANY OF STATE GRID ELECTRIC POWER RESEARCH INSTITUTE TO: DANDONG POWER SUPPLY COMPANY OF LIAONING ELECTRIC POWER CO., LTD.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant