CN102733375B - Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump - Google Patents

Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump Download PDF

Info

Publication number
CN102733375B
CN102733375B CN201210223897.5A CN201210223897A CN102733375B CN 102733375 B CN102733375 B CN 102733375B CN 201210223897 A CN201210223897 A CN 201210223897A CN 102733375 B CN102733375 B CN 102733375B
Authority
CN
China
Prior art keywords
pile
heat pump
source heat
ground source
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210223897.5A
Other languages
Chinese (zh)
Other versions
CN102733375A (en
Inventor
朱佳君
孙承
叶东杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201210223897.5A priority Critical patent/CN102733375B/en
Publication of CN102733375A publication Critical patent/CN102733375A/en
Application granted granted Critical
Publication of CN102733375B publication Critical patent/CN102733375B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a pipe pile cap joint of a cast-in-place pile pre-buried ground source heat pump. The pipe pile cap joint comprises an engineering drilling pile and a ground source heat pump pipe buried in the engineering drilling pile, wherein the top end of the engineering drilling pile is provided with a concrete pile cap, and the top of the ground source heat pump pipe is wrapped in the concrete pile cap. The pipe pile cap joint has the advantages that the pipe cap joint is arranged in the pipe top position, the pre-buried ground source heat pump pipe is effectively protected, the survival rate of the ground source heat pump pipe is ensured, and meanwhile, the stress construction requirement of a pile body and a bottom plate is ensured.

Description

The pre-buried earth source heat pump pile tube of castinplace pile cap node
Technical field
The present invention relates to civil engineering field, specifically the pre-buried earth source heat pump pile tube of a kind of castinplace pile cap node.
Background technology
For the relevant policies of response national green building, keep the comprehensive and sustainable utilization of the energy, in new construction, wide model adopts ground source heat pump technology at present.
In deep-foundation pit engineering, engineering was embedded in the U-shaped pipe of earth source heat pump in diaphragm wall mostly in the past, and pre-buried in engineering the drilling stake also do not have successful case, but because stake top bit is easily destroyed in the construction of bottom plates stage, need design node.
Summary of the invention
The present invention seeks to: propose the pre-buried earth source heat pump pile tube of a kind of castinplace pile cap node; by being set in stake top bit, stake emits node; effectively protect pre-buried ground source heat pump line, guaranteed the survival rate of ground source heat pump line, guaranteed the stress structure requirement of pile body and base plate simultaneously.
Technical scheme of the present invention is: the pre-buried earth source heat pump pile tube of a kind of castinplace pile cap node, comprise engineering the drilling stake and be embedded in the ground source heat pump line in engineering the drilling stake, the top of described engineering the drilling stake is provided with described ground source heat pump line top parcel concrete pile follower within it.
Described concrete pile follower comprises the pile cover body of concrete material, is provided with structure muscle and the some ring-shaped stirrups that distribute up and down of some horizontal distribution in described pile cover body.
Described concrete pile follower also comprises and is coated on this external rubber thermal insulation casing of described pile cover.
The outline of described concrete pile follower is cylindrical, and it is highly 100mm, and diameter is 1300mm.
Described ring-shaped stirrup has three, and the vertical spacing between adjacent two ring-shaped stirrups is 30mm.
Described ground source heat pump line is PE pipe.
Described engineering the drilling stake comprises the some vertical reinforcements that distribute ringwise of arranging in it and is wrapped in the spiral stirrup that these vertical reinforcements have outward, described ground source heat pump line is close to described spiral stirrup inner side and vertical reinforcement sidepiece is arranged, and by Plastic Bandage, bands together between ground source heat pump line and vertical reinforcement.
Advantage of the present invention is:
1, effectively guarantee to arrange in a survival rate of position, top ground source heat pump line and stake the feasibility of ground source heat pump line;
2, met the design structure requirement on base plate and engineering the drilling stake stake top.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the invention will be described further:
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is that the A-A of Fig. 1 is to sectional view;
Wherein: 1 engineering the drilling stake, 1-1 vertical reinforcement, 1-2 spiral stirrup, 1-3 Plastic Bandage,
2 ground source heat pump lines,
3 concrete pile followers, 3-1 pile cover body, 3-2 ring-shaped stirrup, 3-3 rubber thermal insulation casing,
4 base plates.
The specific embodiment
As shown in Figure 1, the pre-buried earth source heat pump pile tube of the castinplace pile of the present embodiment cap node, comprises engineering the drilling stake 1 and is embedded in the ground source heat pump line 2 in engineering the drilling stake, and wherein ground source heat pump line 2 is PE pipe.The top of described engineering the drilling stake 1 is provided with concrete pile follower 3, and this concrete pile follower 3 wraps up the top of described ground source heat pump line 2 within it, thereby the pipe that picks out of place, 1 top of protection engineering the drilling stake ground source heat pump line 2 exempts from destruction in the base arrangement construction stage.
As shown in Figure 2, described concrete pile follower 3 comprises the pile cover body 3-1 of concrete material, is provided with structure muscle (not shown) and the some ring-shaped stirrup 3-2 that distribute up and down of some horizontal distribution in described pile cover body 1.
In the present embodiment, the outline of concrete pile follower 3 is cylindrical, and it is highly 100mm, and diameter is 1300mm.Described ring-shaped stirrup 3-2 has three, and the vertical spacing between adjacent two ring-shaped stirrup 3-2 is 30mm.During Specific construction, increase by three ring-shaped stirrup 3-2 divide other to construct muscle with many levels in engineering pile drilled pile 1 base plate dowel position, disturbing concrete then, just forms that 100mm is high, the concrete pile follower of diameter 1300mm 3.
In order to make this concrete pile follower 3 have good heat-insulating property, the concrete pile follower 3 in this example also comprises the rubber thermal insulation casing 3-3 being coated on outside described pile cover body 3-1.
Described engineering the drilling stake 1 comprises the some vertical reinforcement 1-1 that distribute ringwise that arrange in it and is wrapped in the spiral stirrup 1-2 that these vertical reinforcements have outward, described ground source heat pump line 2 is close to the inner side of described spiral stirrup 1-2 and is close to the sidepiece of vertical reinforcement 1-1 simultaneously, and with Plastic Bandage 1-3, bands together between ground source heat pump line 2 and vertical reinforcement 1-1.
The pre-buried earth source heat pump pile tube of castinplace pile cap node in the present embodiment completes before base plate 4 constructions; the Structural Tectonics form of pile cover has been guaranteed 1 top of engineering the drilling stake and base plate 4 design structure requirements, earth source heat pump pipe 2 has been played to protective effect in the construction stage simultaneously.
Certainly, above-described embodiment is only explanation technical conceive of the present invention and feature, and its object is to allow people can understand content of the present invention and implement according to this, can not limit the scope of the invention with this.All equivalent transformation or modification that according to the present invention, the Spirit Essence of main technical schemes is done, within all should being encompassed in protection scope of the present invention.

Claims (6)

1. the pre-buried earth source heat pump pile tube of a castinplace pile cap node, comprise engineering the drilling stake (1) and be embedded in the ground source heat pump line (2) in engineering the drilling stake, it is characterized in that: the top of described engineering the drilling stake (1) is provided with described ground source heat pump line (2) top parcel concrete pile follower (3) within it, described concrete pile follower (3) comprises the pile cover body (3-1) of concrete material, is provided with structure muscle and the some ring-shaped stirrups (3-2) that distribute up and down of some horizontal distribution in described pile cover body (3-1).
2. the pre-buried earth source heat pump pile tube of castinplace pile according to claim 1 cap node, is characterized in that: described concrete pile follower (3) also comprises the rubber thermal insulation casing (3-3) being coated on outside described pile cover body (3-1).
3. the pre-buried earth source heat pump pile tube of castinplace pile according to claim 2 cap node, is characterized in that: the outline of described concrete pile follower (3) is cylindrical, and it is highly 100mm, and diameter is 1300mm.
4. the pre-buried earth source heat pump pile tube of castinplace pile according to claim 3 cap node, is characterized in that: described ring-shaped stirrup (3-2) has three, and the vertical spacing between adjacent two ring-shaped stirrups (3-2) is 30mm.
5. according to the pre-buried earth source heat pump pile tube of the castinplace pile cap node described in arbitrary claim in claim 1~4, it is characterized in that: described ground source heat pump line (2) is PE pipe.
6. according to the pre-buried earth source heat pump pile tube of the castinplace pile cap node described in arbitrary claim in claim 1~4, it is characterized in that: described engineering the drilling stake (1) comprises the some vertical reinforcements (1-1) that distribute ringwise of arranging in it and is wrapped in the spiral stirrup (1-2) outside these vertical reinforcements, described ground source heat pump line (2) is close to described spiral stirrup inner side and vertical reinforcement sidepiece is arranged, and by Plastic Bandage (1-3), bands together between ground source heat pump line (2) and vertical reinforcement (1-1).
CN201210223897.5A 2012-06-29 2012-06-29 Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump Active CN102733375B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210223897.5A CN102733375B (en) 2012-06-29 2012-06-29 Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210223897.5A CN102733375B (en) 2012-06-29 2012-06-29 Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump

Publications (2)

Publication Number Publication Date
CN102733375A CN102733375A (en) 2012-10-17
CN102733375B true CN102733375B (en) 2014-07-30

Family

ID=46989632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210223897.5A Active CN102733375B (en) 2012-06-29 2012-06-29 Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump

Country Status (1)

Country Link
CN (1) CN102733375B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102937211B (en) * 2012-11-28 2014-08-13 中铁二局股份有限公司 Vertical spiral-type buried pipe construction method for GRHP (ground source heat pump)
CN105040679B (en) * 2015-08-12 2016-08-31 河海大学 A kind of heat-transfer pipe being embedded in prefabricated tubular pile stake and method for embedding thereof
CN109881664A (en) * 2019-01-24 2019-06-14 东南大学 A kind of energy pile and its construction method based on FRP
CN115012404A (en) * 2022-07-19 2022-09-06 青岛理工大学 Heat transfer enhanced prefabricated spiral energy pile and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1786615A (en) * 2004-12-06 2006-06-14 郝英男 Underground energy resource collecting pile
CN201116803Y (en) * 2007-11-22 2008-09-17 湖北风神净化空调设备工程有限公司 Ground source heat pump imbedded pipe heat-exchanging pile device
CN202672172U (en) * 2012-06-29 2013-01-16 上海建工二建集团有限公司 Pile cap node of embedded ground-source heat pump tube of filling pile

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100778936B1 (en) * 2006-09-08 2007-11-22 지앤에스건설 주식회사 Ground reinforcement method integrating geothermal pipe for heat pump

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1786615A (en) * 2004-12-06 2006-06-14 郝英男 Underground energy resource collecting pile
CN201116803Y (en) * 2007-11-22 2008-09-17 湖北风神净化空调设备工程有限公司 Ground source heat pump imbedded pipe heat-exchanging pile device
CN202672172U (en) * 2012-06-29 2013-01-16 上海建工二建集团有限公司 Pile cap node of embedded ground-source heat pump tube of filling pile

Also Published As

Publication number Publication date
CN102733375A (en) 2012-10-17

Similar Documents

Publication Publication Date Title
CN102733375B (en) Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump
CN202672172U (en) Pile cap node of embedded ground-source heat pump tube of filling pile
CN203335090U (en) Shield segment
MY198373A (en) Composite pipe
GB201117162D0 (en) Concrete panels
CN204001396U (en) A kind of good wallboard of high strength damping property of interior ring
CL2012002639A1 (en) Habitable structure, it comprises at least one transport container that has at least one wall with at least one opening, cement or concrete that surrounds at least one wall of the container, where the cement adheres, fixes or anchors to the wall of the container through said at least one opening; and concrete construction.
CN204140106U (en) The meticulous explosion grouted anchor bar of a kind of controlling
CN203846692U (en) Basement top board waterproof structure
GB2493663A (en) Control line protection
CN203947469U (en) Two carrying helical burr ram for building
CN203892804U (en) Natural gas pipeline explosion-proof heat insulation heat preserving plate
CN202901570U (en) High-strength polyethylene (PE) pipe
CN203189896U (en) Double-plain-wall steel-plastic composite winding pipe
CN204112323U (en) A kind of earth anchor water pipe precaution cap
CN103437376A (en) Sidewall retaining structure of basement
CN203429663U (en) Basement side wall earth-retaining structure
CN204512963U (en) A kind of safety type natural feed channel
CN203734269U (en) Blocking ring for fireproof blocking material in electric cable pipe
CN206451938U (en) Discharge ball repid discharge drop bar
CN202708342U (en) Waterproof structure for wall feed-through trunked pipes
CN207260741U (en) A kind of gardens protective fence square tube
CN207230022U (en) Gas pipeline grounding-for-lightning device
Geshi et al. Vertical cross section of a phreatomagmatic explosion crater exposing on Miyakejima 2000 caldera, Japan
CN203514488U (en) Inclination prevention structure for glass fiber reinforced plastics inspection well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant