CN109881664A - A kind of energy pile and its construction method based on FRP - Google Patents

A kind of energy pile and its construction method based on FRP Download PDF

Info

Publication number
CN109881664A
CN109881664A CN201910070807.5A CN201910070807A CN109881664A CN 109881664 A CN109881664 A CN 109881664A CN 201910070807 A CN201910070807 A CN 201910070807A CN 109881664 A CN109881664 A CN 109881664A
Authority
CN
China
Prior art keywords
frp
frp pipe
pipe
energy pile
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910070807.5A
Other languages
Chinese (zh)
Inventor
戴国亮
龚维明
曹小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201910070807.5A priority Critical patent/CN109881664A/en
Publication of CN109881664A publication Critical patent/CN109881664A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of energy pile in FRP extremely construction methods, including the first FRP pipe, the 2nd FRP pipe, steel reinforcement cage, concrete and heat exchanger tube;The first FRP pipe is coaxially nested in the outside of the 2nd FRP pipe, and the steel reinforcement cage and the concrete form armored concrete, and are filled between the first FRP pipe and the 2nd FRP pipe;The heat exchanger tube is arranged in the inside of the 2nd FRP pipe.The energy pile is compound with reinforced concrete structure using FRP material, greatly improves the durability of energy pile, improves service life;Using inside and outside two layers of FRP pipe as permanent template, the problems such as ensure that the quality of growth, avoid collapse hole;Heat exchanger tube is arranged in inside internal layer FRP pipe, on the one hand effectively heat exchanger tube can be avoided to be corroded by external environment, increases and uses the time, is on the other hand convenient for the maintenance and replacement of heat exchanger tube.Prefabricated mode or cast-in-place mode can be used in the construction method, and construction is flexibly simple, and construction cost is low.

Description

A kind of energy pile and its construction method based on FRP
Technical field
The present invention relates to a kind of energy pile and its construction methods, and in particular to a kind of energy pile and its construction based on FRP Method.
Background technique
With the rapid development of social economy with the sharp increase of population, energy shortages, environmental pollution, ecological disruption etc. one Series of problems is increasingly prominent, and more stringent requirements are proposed for this effective use and environmental protection to the energy.Global environment is broken Oneself hinders the unfavorable factor of social sustainable development through becoming to bad and shortage of resources, and the mankind actively take counter-measure to this, and Renewable energy is included in the pioneer field of national development.It economizes on resources, environment, propulsion energy-saving emission reduction work is protected also to be mentioned Upper schedule.China is second-biggest-in-the-world economy, while being also the first big country of carbon emission, and environmental improvement is very urgent.In order to The problem of coping with energy shortages, exploitation are realized to building with using ground source heat pump technology and provide heating, refrigeration and domestic hot-water Highly effective energy-conserving environmental-protecting type air-conditioning technical, which not only reduces the consumption to conventional energy resource, and meets social environment friend The theory developed well greatly reduces the destruction to environment.Drilling underground pipe heat transmitter in ground-source heat pump system is embedded in In building pile basis, makes pile foundation while playing the role of carrying and heat exchange, and this novel pile foundation pattern is exactly Energy stake;Energy stake is a kind of by ground-source heat pump system and the Novel pile foundation of conventional piles base junction altogether, and stake plays carrying simultaneously With the function of heat transfer, with good application prospect.
Currently used energy pile be heat exchanger tube is fixed on stake week or the prestressed-concrete pile on steel reinforcement cage or Person's cast-in-place concrete pile, material used by pile foundation is common armored concrete, durability and poor corrosion resistance, is had Higher maintenance and replacement cost.Although traditional material can take the anti-corrosions method such as coating, strand ecology can be caused Very big influence.
Summary of the invention
Goal of the invention: in order to overcome the drawbacks of the prior art, the present invention provides a kind of energy pile based on FRP, the energy Stake durability with higher, improves the service life of energy pile.
It is a further object of the present invention to provide a kind of construction methods of above-mentioned energy pile.
Technical solution: a kind of energy pile based on FRP of the present invention, including the first FRP pipe, the 2nd FRP pipe, reinforcing bar Cage, concrete and heat exchanger tube;The first FRP pipe is coaxially nested in the outside of the 2nd FRP pipe, the steel reinforcement cage and institute It states concrete and forms armored concrete, and be filled between the first FRP pipe and the 2nd FRP pipe;The heat exchanger tube is arranged in second The inside of FRP pipe.
Wherein, which includes multiple heat exchanger tubes, and multiple heat exchanger tubes are circumferentially equal along the inner wall of the 2nd FRP pipe Even setting.
The material of the first FRP pipe and the 2nd FRP pipe is that glass fibre, carbon fiber, aramid fiber or basalt are fine That ties up is a kind of or several.
The thickness of the first FRP pipe and the 2nd FRP pipe is 4-10mm.
The construction method of a kind of energy pile based on FRP of the present invention, including using the prefabricated energy pile based on FRP Construction procedure or using the cast-in-place energy pile based on FRP construction procedure.
Wherein, the construction procedure of the prefabricated energy pile based on FRP includes:
(1) according to the prefabricated first FRP pipe of Engineering technical parameters, the 2nd FRP pipe and steel reinforcement cage;
(2) the first FRP pipe is nested in outside the 2nd FRP pipe, steel reinforcement cage is fixed on the first FRP pipe and the 2nd FRP manages it Between, it is managed using the first FRP and the 2nd FRP pipe is template, thereto casting concrete;
(3) heat exchanger tube is arranged in inside and the fixation of the 2nd FRP pipe, obtains the prefabricated energy pile based on FRP;
(4) energy pile based on FRP is transported to engineering construction scene, and carries out lifting piling.
The construction procedure of the cast-in-place energy pile based on FRP includes:
(a) according to the prefabricated first FRP pipe of Engineering technical parameters, the 2nd FRP pipe and steel reinforcement cage;
(b) in engineering construction scene borehole, and the first FRP pipe, the 2nd FRP pipe and reinforcing bar cage hoisting is into hole and solid It is fixed, heat exchanger tube is worn and is fixed on inside the 2nd FRP pipe;
(c) it is managed using the first FRP and the 2nd FRP pipe is template, thereto casting concrete.
The utility model has the advantages that compared with prior art, the energy pile is compound using FRP material and reinforced concrete structure, significantly The durability of energy pile is improved, service life is improved;Using inside and outside two layers of FRP pipe as permanent template, the matter of growth ensure that The problems such as measuring, avoiding collapse hole;Heat exchanger tube is arranged in inside internal layer FRP pipe, on the one hand can effectively avoid heat exchanger tube outer Portion's environmental attack increases and uses the time, is on the other hand convenient for the maintenance and replacement of heat exchanger tube.Prefabricated molds can be used in the construction method Formula or cast-in-place mode, construction is flexibly simple, and construction cost is low.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure of energy pile of the invention.
Specific embodiment
In the following, being described in further details in conjunction with the accompanying drawings and embodiments to the present invention.
As shown in Figure 1, present embodiment discloses a kind of energy pile based on FRP, including the first FRP pipe 1, the 2nd FRP Pipe 2, steel reinforcement cage 3, concrete 4 and heat exchanger tube 5.Wherein, the material of the first FRP pipe 1 and the 2nd FRP pipe 2 be glass fibre, Carbon fiber, aramid fiber or basalt fibre it is a kind of or several.Thickness is preferably 4-10mm according to requirement of engineering.
First FRP pipe 1 is coaxially nested in the outside of the 2nd FRP pipe 2, and steel reinforcement cage 3 and concrete 4 form armored concrete, And it is filled in the first FRP pipe 1 and the 2nd FRP pipe) between.According to engineering actual demand, more heat exchanger tubes 5, more heat exchanger tubes are set 5 are arranged in the inside of the 2nd FRP pipe 2, and along the circumferential uniformly arrangement of the inner wall of the 2nd FRP pipe 2.
Meanwhile present embodiment also discloses the construction method of the above-mentioned energy pile based on FRP, which can be used Two kinds of different construction procedures:
Embodiment 1 uses the construction procedure of the prefabricated energy pile based on FRP, comprising:
(1) according to the prefabricated first FRP pipe of Engineering technical parameters, the 2nd FRP pipe and steel reinforcement cage;Wherein, engineering technology is joined Number includes size, the intensity of arrangement of reinforcement and concrete of stake.
(2) the first FRP pipe is nested in outside the 2nd FRP pipe, steel reinforcement cage is fixed on the first FRP pipe and the 2nd FRP manages it Between, it is managed using the first FRP and the 2nd FRP pipe is template, thereto casting concrete;
(3) heat exchanger tube is arranged in inside and the fixation of the 2nd FRP pipe, obtains the prefabricated energy pile based on FRP;
(4) energy pile based on FRP is transported to engineering construction scene, and carries out lifting piling, the side specifically driven piles Formula is driven piles using static pressure or pile driving by vibration.
Embodiment 2 uses the construction procedure of the cast-in-place energy pile based on FRP, comprising:
(a) according to the prefabricated first FRP pipe of Engineering technical parameters, the 2nd FRP pipe and steel reinforcement cage;Wherein, engineering technology is joined Number includes size, the intensity of arrangement of reinforcement and concrete of stake.
(b) in engineering construction scene borehole, and the first FRP pipe, the 2nd FRP pipe and reinforcing bar cage hoisting is into hole and solid It is fixed, heat exchanger tube is worn and is fixed on inside the 2nd FRP pipe;
(c) it is managed using the first FRP and the 2nd FRP pipe is template, thereto casting concrete.

Claims (9)

1. a kind of energy pile based on FRP, which is characterized in that including the first FRP pipe (1), the 2nd FRP pipe (2), steel reinforcement cage (3), Concrete (4) and heat exchanger tube (5);The first FRP pipe (1) is coaxially nested in the outside of the 2nd FRP pipe (2), described Steel reinforcement cage (3) and the concrete (4) form armored concrete, and be filled in the first FRP pipe (1) and the 2nd FRP manage (2) it Between;The heat exchanger tube (5) is arranged in the inside of the 2nd FRP pipe (2).
2. the energy pile according to claim 1 based on FRP, which is characterized in that more including multiple heat exchanger tubes (5) A heat exchanger tube (5) is circumferentially uniformly arranged along the inner wall of the 2nd FRP pipe (2).
3. the energy pile according to claim 1 based on FRP, which is characterized in that the first FRP pipe (1) and the 2nd FRP The material for managing (2) is a kind of or several of glass fibre, carbon fiber, aramid fiber or basalt fibre.
4. the energy pile according to claim 1 based on FRP, which is characterized in that the first FRP pipe (1) and the 2nd FRP The thickness for managing (2) is 4-10mm.
5. a kind of construction method of the energy pile according to claim 1-4 based on FRP, which is characterized in that adopt Construction procedure with the prefabricated energy pile based on FRP or the construction procedure using the cast-in-place energy pile based on FRP.
6. construction method according to claim 5, which is characterized in that the construction of the prefabricated energy pile based on FRP walks Suddenly include:
(1) according to the prefabricated first FRP pipe of Engineering technical parameters, the 2nd FRP pipe and steel reinforcement cage;
(2) the first FRP pipe being nested in outside the 2nd FRP pipe, steel reinforcement cage is fixed between the first FRP pipe and the 2nd FRP pipe, with First FRP pipe and the 2nd FRP pipe are template, thereto casting concrete;
(3) heat exchanger tube is arranged in inside and the fixation of the 2nd FRP pipe, obtains the prefabricated energy pile based on FRP;
(4) energy pile based on FRP is transported to engineering construction scene, and carries out lifting piling.
7. construction method according to claim 6, which is characterized in that the mode driven piles in the step (4) uses static pressure Piling or pile driving by vibration.
8. construction method according to claim 5, which is characterized in that the construction of the cast-in-place energy pile based on FRP walks Suddenly include:
(a) according to the prefabricated first FRP pipe of Engineering technical parameters, the 2nd FRP pipe and steel reinforcement cage;
(b) in engineering construction scene borehole, and the first FRP pipe, the 2nd FRP pipe and reinforcing bar cage hoisting is into hole and fixed, Heat exchanger tube is worn and is fixed on inside the 2nd FRP pipe;
(c) it is managed using the first FRP and the 2nd FRP pipe is template, thereto casting concrete.
9. the construction method according to claim 6 or 8, which is characterized in that the Engineering technical parameters include energy pile The intensity of size, arrangement of reinforcement and concrete.
CN201910070807.5A 2019-01-24 2019-01-24 A kind of energy pile and its construction method based on FRP Pending CN109881664A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910070807.5A CN109881664A (en) 2019-01-24 2019-01-24 A kind of energy pile and its construction method based on FRP

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910070807.5A CN109881664A (en) 2019-01-24 2019-01-24 A kind of energy pile and its construction method based on FRP

Publications (1)

Publication Number Publication Date
CN109881664A true CN109881664A (en) 2019-06-14

Family

ID=66926900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910070807.5A Pending CN109881664A (en) 2019-01-24 2019-01-24 A kind of energy pile and its construction method based on FRP

Country Status (1)

Country Link
CN (1) CN109881664A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177966A (en) * 2007-12-06 2008-05-14 合肥工业大学 Hollow double-layer FRP pipe concrete combination structure
CN102733375A (en) * 2012-06-29 2012-10-17 上海建工二建集团有限公司 Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump
CN104278669A (en) * 2014-10-23 2015-01-14 南京工业大学 Prefabricated reinforced concrete pipe pile with double-semicircle W-shaped parallel heat exchanger for ground source heat pump
CN106677552A (en) * 2016-12-23 2017-05-17 武汉大学 Method for solidifying steel pipe column through external sleeveing of circular steel pipe concrete
CN207260440U (en) * 2017-07-04 2018-04-20 东莞理工学院 A kind of FRP pipes seawater sea sand regenerates self-compacting concrete environment protection architecture component
CN109056708A (en) * 2018-08-22 2018-12-21 沈阳建筑大学 A kind of FRP pipe-PHC tubular pole interlayer concrete filled composite structure
CN109098173A (en) * 2018-09-28 2018-12-28 浙江工业大学 A kind of prefabricated energy pile concrete tubular pile

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177966A (en) * 2007-12-06 2008-05-14 合肥工业大学 Hollow double-layer FRP pipe concrete combination structure
CN102733375A (en) * 2012-06-29 2012-10-17 上海建工二建集团有限公司 Pipe pile cap joint of cast-in-place pile pre-buried ground source heat pump
CN104278669A (en) * 2014-10-23 2015-01-14 南京工业大学 Prefabricated reinforced concrete pipe pile with double-semicircle W-shaped parallel heat exchanger for ground source heat pump
CN106677552A (en) * 2016-12-23 2017-05-17 武汉大学 Method for solidifying steel pipe column through external sleeveing of circular steel pipe concrete
CN207260440U (en) * 2017-07-04 2018-04-20 东莞理工学院 A kind of FRP pipes seawater sea sand regenerates self-compacting concrete environment protection architecture component
CN109056708A (en) * 2018-08-22 2018-12-21 沈阳建筑大学 A kind of FRP pipe-PHC tubular pole interlayer concrete filled composite structure
CN109098173A (en) * 2018-09-28 2018-12-28 浙江工业大学 A kind of prefabricated energy pile concrete tubular pile

Similar Documents

Publication Publication Date Title
CN104675141B (en) A kind of FRP pipe constraint cement-base composite material reinforces pillarwork
CN104594921B (en) A kind of High-geotemperature tunnel heat insulation and dissipation liner structure
WO2017041583A1 (en) Prefabricated bamboo composite pipe gallery
CN106760212A (en) A kind of ripple multiple tube seawater marine sand concrete structure
CN105401955A (en) Seepage-proofing bearing structure of soft soil pressure tunnel
CN103669336A (en) Geothermal air conditioner preformed pile
CN110453676B (en) Prefabricated energy pile structure design and construction method
CN206583138U (en) Pipe-buried type ground source heat pump system in a kind of stake
CN109881664A (en) A kind of energy pile and its construction method based on FRP
CN206467899U (en) A kind of ripple multiple tube seawater sea-sand concrete member
CN202787240U (en) Precast pile of geothermal air-conditioner
CN104762961B (en) A kind of ultra-high performance concrete and ordinary concrete compound pile and construction method thereof
CN202164601U (en) External thread type hollow grouting anchor rod made of composite materials and provided with wall holes
CN110744677A (en) Prefabricated built-in light filling body concrete segment and prefabricating method
CN207211139U (en) A kind of prestressed concrete pipe pile
CN104153630A (en) Transition connection method of hybrid wind power towers
CN205776191U (en) A kind of stake for port and pier permanent support
CN106766364B (en) A kind of energy pile-Concrete-filled Double Skin Steel Tube Columns geothermal heating system
CN205314126U (en) FRP pipe corridor
CN211774800U (en) Tibetan rubble wall body
CN209399990U (en) A kind of field surface observation pier structure
CN207317072U (en) The system that a kind of vertical drilling pipe laying is combined with energy piles
CN217782140U (en) Energy underground stereo parking garage using support piles for heat exchange
CN110685343A (en) Prefabricated built-in light filling body concrete pipe ring and prefabricating method
CN216108458U (en) Concrete energy pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614