CN202157529U - Embedded scaffold wall connector - Google Patents
Embedded scaffold wall connector Download PDFInfo
- Publication number
- CN202157529U CN202157529U CN2011202052182U CN201120205218U CN202157529U CN 202157529 U CN202157529 U CN 202157529U CN 2011202052182 U CN2011202052182 U CN 2011202052182U CN 201120205218 U CN201120205218 U CN 201120205218U CN 202157529 U CN202157529 U CN 202157529U
- Authority
- CN
- China
- Prior art keywords
- wall
- embedded
- scaffold
- steel pipe
- branch sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ladders (AREA)
Abstract
An embedded scaffold wall connector comprises an embedded steel bar (1) and a connecting sleeve (2). The embedded scaffold wall connector is characterized in that one end of the embedded steel bar (1) is shaped like a curved hook; threads are machined at the other end of the embedded steel bar (1); one end of the connecting sleeve (2) is screwed to the threaded end of the embedded steel bar (1); the other end of the connecting sleeve (2) is inserted in a steel pipe (4) for circumferential welding; and the steel pipe (4) is connected with a scaffold through a fastener. The wall connector with simple structure cannot generate wall penetration holes in the wall or cause wall leakage. Therefore, after construction, no leakage which cannot be blocked could occur.
Description
Technical field
The utility model relates to a kind of building operations apparatus, especially a kind of be used for scaffold linked to each other with body of wall prevent the wall-connecting piece that topples, specifically a kind of embedded scaffold connecting tube.
Background technology
At present, in building operations, topple in order to prevent scaffold, need perforating on shear wall, then wall connecting rod is passed shear wall, the end on the both sides of shear wall with wall connecting rod is fixed in the body of wall, and the other end of wall connecting rod then links to each other with scaffold through fastener.There is following problem in this connected mode: the one, and eye can on shear wall, stay through walls, this eye through walls be in addition shutoff after construction finishes, if shutoff sternly is not easy to cause body of wall to receive seepage behind the rain, maintenance is difficulty very.The 2nd, owing to need fixedly be easy to cause the damage of body of wall inside and outside adiabator layer to wall connecting rod.To this, still there is not good solution.
Summary of the invention
The purpose of the utility model be to existing scaffold fixedly time need on body of wall, punch the wall eye; This eye through walls must carry out shutoff after construction finishes; Form the problem of body of wall leak source when increasing construction volume easily; Design a kind of perforating on body of wall that need not, construction need not shutoff after finishing, the pre-buried type wall-connecting piece that more can not cause body of wall seepage and insulation layer to damage.
The technical scheme of the utility model is:
A kind of embedded scaffold connecting tube; It comprises embedded bar 1 and branch sleeve 2; An end that it is characterized in that described embedded bar 1 is hook solid, and its end is processed with screw thread, and an end spinning of branch sleeve 2 is on the end of thread of embedded bar 1; The other end of branch sleeve 2 inserts steel pipe 4 and carries out the border welding, and steel pipe 4 links to each other with foot rest through fastener.
The beneficial effect of the utility model:
The utility model not only can make shear wall remove the hidden leakage defect that perforating causes from, and can guarantee can not cause crush injury to warming plate as connector through prepackage reinforcing bar in concrete flat slab.
The utility model has been removed the shutoff workload that construction finishes from.
The twice laid that the utility model is realized, therefore the leftover bits and pieces of all connecting reinforcement job sites capable of using has the advantage of energy-conserving and environment-protective.
Description of drawings
Fig. 1 is the structural representation of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described.
As shown in Figure 1.
A kind of embedded scaffold connecting tube; It comprises embedded bar 1 and branch sleeve 2; One end of described embedded bar 1 is hook solid, and its end is processed with screw thread, and an end spinning of branch sleeve 2 is on the end of thread of embedded bar 1; The other end of branch sleeve 2 inserts steel pipe 4 and carries out the border welding, and steel pipe 4 links to each other with foot rest through fastener.One end spinning of branch sleeve 2 is on the end of thread of embedded bar 1, and the other end of branch sleeve 2 and steel pipe 4 are weldingly connected, and steel pipe 4 links to each other with scaffold through fastener.
As shown in Figure 1.
The job practices of the utility model is:
Elder generation's cut-off directly be the first headgear silk of reinforcing bar of 20-25 millimeter, and other end bending is loaded onto branch sleeve 2 on one of mantle fiber, and half spinning of branch sleeve 2 is on steel bar end, and second half is used for being weldingly connected with being connected steel pipe, on the most handy plug blocks up when casting.When carrying out reinforcing bar binding; According to the requirement of external scaffolding support body layout dimension, be embedded in above-mentioned bending and the reinforcing bar that is set with branch sleeve in the concrete flat slab, when scaffold building is to pre-buried height in the construction; Insert in the steel pipe branch sleeve 2 also fixing through the border welding; With fastener steel pipe is fixed on the scaffold upright rod and gets final product, construction finishes the back only to need steel pipe cut off from branch sleeve and gets final product, and need not to carry out shutoff.
The utility model does not relate to all identical with the prior art prior art that maybe can adopt of part to be realized.
Claims (1)
1. embedded scaffold connecting tube; It comprises embedded bar (1) and branch sleeve (2); An end that it is characterized in that described embedded bar (1) is hook solid, and its end is processed with screw thread, and an end spinning of branch sleeve (2) is on the end of thread of embedded bar (1); The other end of branch sleeve (2) inserts steel pipe (4) and carries out the border welding, and steel pipe (4) links to each other with foot rest through fastener.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202052182U CN202157529U (en) | 2011-06-17 | 2011-06-17 | Embedded scaffold wall connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202052182U CN202157529U (en) | 2011-06-17 | 2011-06-17 | Embedded scaffold wall connector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202157529U true CN202157529U (en) | 2012-03-07 |
Family
ID=45765170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202052182U Expired - Fee Related CN202157529U (en) | 2011-06-17 | 2011-06-17 | Embedded scaffold wall connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202157529U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704667A (en) * | 2012-06-08 | 2012-10-03 | 四汇建设集团有限公司 | Scaffold pre-buried assembled connecting wall device |
CN106245899A (en) * | 2016-10-09 | 2016-12-21 | 上海宏金设备工程有限公司 | A kind of to drawing wall-connecting piece |
-
2011
- 2011-06-17 CN CN2011202052182U patent/CN202157529U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704667A (en) * | 2012-06-08 | 2012-10-03 | 四汇建设集团有限公司 | Scaffold pre-buried assembled connecting wall device |
CN106245899A (en) * | 2016-10-09 | 2016-12-21 | 上海宏金设备工程有限公司 | A kind of to drawing wall-connecting piece |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101892738B (en) | Embedded scaffold connecting tube and construction method thereof | |
CN204850414U (en) | Shaped steel of encorbelmenting draws wire rope instrument formula anchor to one side | |
CN204402005U (en) | A kind of novel overhanging unloading platform anchor ring | |
CN202157529U (en) | Embedded scaffold wall connector | |
CN202577939U (en) | Reusable overhanging I-beam fixing device | |
CN204059953U (en) | Hang mould prefab form | |
CN104372923B (en) | Scaffolding | |
CN202170630U (en) | Embedded fastener to wall for scaffold | |
CN106013763A (en) | Flat iron fastener type external scaffold wall connecting piece | |
CN205777527U (en) | A kind of assembly of reserved split bolt eye | |
CN203907010U (en) | Flexible connection device for pipe jacking construction in soft soil layer | |
CN201704954U (en) | Formwork opposite-pulling device for pouring waterproof walls | |
CN204266571U (en) | A kind of builder's jack i iron pre-embedded device | |
CN206815804U (en) | A kind of new builder's jack girder steel built-in fitting | |
CN203755676U (en) | Perpendicularity control tool for wall column | |
CN206385794U (en) | A kind of wall-connecting piece and its connection system | |
CN204284664U (en) | Pump pipe reinforcing device of high-pressure concrete delivery pump | |
CN204001715U (en) | A kind of L-type tool-type column template bracing means | |
CN208763396U (en) | A kind of horizontal construction joint reinforcing bolt | |
CN203569693U (en) | Pre-buried iron part with steel ties arranged on concrete structure | |
CN103104099A (en) | Method for constructing wall pulling steel bars in frame column and structure thereof | |
KR20110129188A (en) | System formwork | |
CN203499250U (en) | Concrete formwork structure for floor plate-penetrating pipe | |
CN202090599U (en) | Combined water stop screw rod | |
CN204098471U (en) | A kind of detachable suspension scaffold fastening devices |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120307 Termination date: 20200617 |
|
CF01 | Termination of patent right due to non-payment of annual fee |