CN102606171A - Gob-side entry retaining method for pouring spacing concrete walls in tunnel of advanced highwall - Google Patents

Gob-side entry retaining method for pouring spacing concrete walls in tunnel of advanced highwall Download PDF

Info

Publication number
CN102606171A
CN102606171A CN2012100880483A CN201210088048A CN102606171A CN 102606171 A CN102606171 A CN 102606171A CN 2012100880483 A CN2012100880483 A CN 2012100880483A CN 201210088048 A CN201210088048 A CN 201210088048A CN 102606171 A CN102606171 A CN 102606171A
Authority
CN
China
Prior art keywords
concrete
side entry
entry retaining
flexible formwork
gob
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100880483A
Other languages
Chinese (zh)
Inventor
王晓利
吴玉意
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012100880483A priority Critical patent/CN102606171A/en
Publication of CN102606171A publication Critical patent/CN102606171A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a gob-side entry retaining method for pouring spacing concrete walls in a tunnel of an advanced highwall. A plurality of flexible formworks which are arranged at intervals are hung in a return air laneway of the advanced highwall by single bodies or anchor rods, concrete is poured into the flexible formworks via a concrete pump, a spacing concrete wall is formed and clings to a roof, then the flexible formworks are hung in space intervals of the spacing concrete wall by a lagging work surface, the concrete is pumped into the flexible formworks, so that a closed concrete continuous wall is formed, and finally a gob-side entry is formed. The spacing concrete wall is poured in the advanced highwall to realize gob-side entry retaining, requirements of ventilation, recovery and construction are met, supporting is safe and reliable, and recovery is not affected. The method is suitable for crushing the roof to realize gob-side entry retaining during recovery, and is widely used for industries of coal mines, metallurgical mines and the like.

Description

Build the method for compartment concrete wall gob side entry retaining in the leading face lane
Technical field
The present invention relates to does not have coal pillar mining, is specifically related to build in the leading face lane method of compartment concrete wall gob side entry retaining.
Background technology
Traditional gob side entry retaining mode all is in goaf, coal-face rear, to adopt forms such as spoil bag, wood point post, grillage, concrete wall, high-water material wall or building block to carry out roadside support; The method of this construction at the coal-face rear needs in goaf, hydraulic support rear, to set monomer or wood point post carries out temporary lining; Roof cracking when this method can not adapt to back production, the back top board of trying to stop people from fighting each other collapse immediately and fall or situation that the amount of crushing is big, and reason is that the goaf operational security is poor or the low amount of crushing of temporary lining intensity is big, stay that the lane height is too little can not to satisfy instructions for use and the big drawing speed that influences of hydraulic support rear primary concreting concrete continuous wall workload.And for the mine of the complicated high gas of some roof wall rock conditions; In order to solve gas exceeding limit, keeping tensions down relation, to reclaim coal column; Carry out gob side entry retaining and be only basic way, but there are many difficult problems in construction roadside support body in goaf, work plane rear.
Summary of the invention
The purpose of this invention is to provide a kind ofly can take into account face advance support, immediate support goaf, reduce gob side entry retaining in coal-face rear area work amount, improve the method for the gob side entry retaining of safety.
In order to overcome the deficiency of prior art, build the method for compartment concrete wall gob side entry retaining in the leading face lane and undertaken by following step:
A, leading face are hung a plurality of spaced apart Flexible formwork assemblies through individual prop or anchor pole in air return way;
B, in a plurality of Flexible formwork assemblies, fill with concrete successively through elephant trunk;
Remove the individual prop that is used to hang Flexible formwork assembly after c, the hardening of concrete, in the air return way of first advance, form the discontinuous body of wall of concrete of one compartment;
D, face advance;
E, hysteresis face are keeping in the tunnel along empty, in the clearance space of compartment concrete wall, hang a plurality of Flexible formwork assemblies with individual prop and anchor pole or the wooden post of putting;
F, fill with concrete in a plurality of Flexible formwork assemblies in clearance space successively through elephant trunk;
Remove the individual prop that is used to hang Flexible formwork assembly after g, the hardening of concrete, form one closed concrete diaphragm wall in the tunnel in keeping of hysteresis work plane along sky.
H, repetition a, b, c, d, e, f, g go round and begin again, and finish until whole coal-face back production, accomplish the gob side entry retaining of whole piece air return way.
The invention has the beneficial effects as follows: coal-face advance support intensity height, immediate support goaf, reduced the workload of gob side entry retaining at the coal-face rear; Satisfy ventilation, back production and construction requirement; Supporting is safe and reliable, does not influence back production, is fit to the breaking roof gob side entry retaining; Be widely used in the colliery, industries such as metallurgical mine.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Fig. 1 is the sketch map of building compartment concrete wall gob side entry retaining in the leading face of the present invention lane;
Fig. 2 is the sectional drawing of the I-I of Fig. 1;
Fig. 3 is the sectional drawing of the II-II of Fig. 1;
Among the figure: 1-individual prop, 2-Flexible formwork assembly, 3-compartment body of wall, 4-clearance space, 5-hydraulic support, 6-elephant trunk, 7-anchor pole.
The specific embodiment
Below in conjunction with accompanying drawing summary of the invention is further specified:
With reference to Fig. 1-shown in Figure 3:
A, leading coal-face are in air return way; Hang three to six spaced apart Flexible formwork assemblies 2 through individual prop 1, Flexible formwork assembly 2 length b are 1~3m, and width c is 0.2~2m; Height is identical with head-room, and the spacing distance a of Flexible formwork assembly 2 is 1~6m.
B, in three to six Flexible formwork assemblies 2, fill with concrete successively through elephant trunk 6;
Remove the individual prop 1 that is used to hang Flexible formwork assembly 2 after c, the hardening of concrete, in the air return way of first advance, form the discontinuous body of wall 3 of concrete of one compartment;
D, coal-face advance;
E, hysteresis coal-face are keeping in the tunnel along empty, in the clearance space 4 of compartment concrete wall, hang one to six Flexible formwork assembly 2 with individual prop 1 and anchor pole 7 or wood point post;
F, fill with concrete in one to six Flexible formwork assembly 2 in clearance space successively through elephant trunk 6;
Remove the individual prop 1 that is used to hang Flexible formwork assembly 2 after g, the hardening of concrete, form one closed concrete diaphragm wall in the tunnel in keeping of hysteresis work plane along sky.
H, repetition a, b, c, d, e, f, g go round and begin again, and finish until whole coal-face back production, accomplish the gob side entry retaining of whole piece air return way.
Above-mentioned Flexible formwork assembly 2 is made by high strength fibre cloth and is formed, and has from moulding and permeable characteristics of not passing through slurry.

Claims (2)

1. build the method for compartment concrete wall gob side entry retaining in the leading face lane, it is characterized in that:
A, leading face are hung a plurality of spaced apart Flexible formwork assemblies (2) through individual prop (1) or anchor pole (7) in air return way;
B, in a plurality of Flexible formwork assemblies (2), fill with concrete successively through elephant trunk (6);
Remove after c, the hardening of concrete and be used to hang the individual prop (1) of Flexible formwork assembly (2), the discontinuous body of wall of concrete (3) of one compartment of formation in the air return way of first advance;
D, face advance;
E, hysteresis face are keeping in the tunnel along empty, the clearance space (4) of compartment concrete wall in, hang a plurality of Flexible formwork assemblies (2) with individual prop (1) and anchor pole (7) or the wooden post of putting;
F, in a plurality of Flexible formwork assemblies (2) of clearance space (4) lining, fill with concrete successively through elephant trunk (6);
Remove after g, the hardening of concrete and be used to hang the individual prop (1) of Flexible formwork assembly (2), one closed concrete diaphragm wall of formation in empty reservation tunnel, the edge of hysteresis work plane.
H, repetition a, b, c, d, e, f, g go round and begin again, and finish until whole face back production, accomplish the gob side entry retaining of whole piece air return way.
2. according to the method for building compartment concrete wall gob side entry retaining in the said leading face of claim 1 lane, it is characterized in that Flexible formwork assembly is made by cloth to form, be shaped as cuboid or cube.
CN2012100880483A 2012-03-29 2012-03-29 Gob-side entry retaining method for pouring spacing concrete walls in tunnel of advanced highwall Pending CN102606171A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100880483A CN102606171A (en) 2012-03-29 2012-03-29 Gob-side entry retaining method for pouring spacing concrete walls in tunnel of advanced highwall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100880483A CN102606171A (en) 2012-03-29 2012-03-29 Gob-side entry retaining method for pouring spacing concrete walls in tunnel of advanced highwall

Publications (1)

Publication Number Publication Date
CN102606171A true CN102606171A (en) 2012-07-25

Family

ID=46523891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100880483A Pending CN102606171A (en) 2012-03-29 2012-03-29 Gob-side entry retaining method for pouring spacing concrete walls in tunnel of advanced highwall

Country Status (1)

Country Link
CN (1) CN102606171A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905507A (en) * 2019-12-06 2020-03-24 河南力行科创矿山技术开发有限公司 Advanced roof cutting pressure relief gob-side entry retaining process for high-gas large-mining-height high-efficiency mining working face
CN113550782A (en) * 2021-08-20 2021-10-26 太原理工大学 Gob-side entry retaining working face goaf gas and natural ignition composite disaster treatment method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3798414B2 (en) * 2004-11-22 2006-07-19 新日本製鐵株式会社 Continuous fiber reinforced member for concrete wall to be cut and construction method of concrete wall to be cut using the same
CN101413393A (en) * 2008-11-28 2009-04-22 兖州煤业股份有限公司 Gob-side entry retaining side support method of coal bed fully mechanized caving face
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN102337906A (en) * 2011-09-09 2012-02-01 陕西开拓建筑科技有限公司 Construction method for pouring airtight partition wall between recovered roadway and reserved roadway
JP2012046986A (en) * 2010-08-27 2012-03-08 Fukuda Corp Curing device
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3798414B2 (en) * 2004-11-22 2006-07-19 新日本製鐵株式会社 Continuous fiber reinforced member for concrete wall to be cut and construction method of concrete wall to be cut using the same
CN101413393A (en) * 2008-11-28 2009-04-22 兖州煤业股份有限公司 Gob-side entry retaining side support method of coal bed fully mechanized caving face
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
JP2012046986A (en) * 2010-08-27 2012-03-08 Fukuda Corp Curing device
CN102337906A (en) * 2011-09-09 2012-02-01 陕西开拓建筑科技有限公司 Construction method for pouring airtight partition wall between recovered roadway and reserved roadway
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110905507A (en) * 2019-12-06 2020-03-24 河南力行科创矿山技术开发有限公司 Advanced roof cutting pressure relief gob-side entry retaining process for high-gas large-mining-height high-efficiency mining working face
CN113550782A (en) * 2021-08-20 2021-10-26 太原理工大学 Gob-side entry retaining working face goaf gas and natural ignition composite disaster treatment method

Similar Documents

Publication Publication Date Title
CN108625856B (en) Mining method for one ore removal roadway of two adjacent stopes of underground mine
CN103321654B (en) The method of flexible air-bag process coal mine roadway roof collapse
CN103628911B (en) Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining
CN104763425A (en) Pressure relief presplitting blasting gob-side entry retaining pillar-free mining method
CN102852552A (en) High-water material filling column and construction method thereof
CN107035405A (en) One kind is used for the double filling wall constructions of gob side entry retaining and cuts top pressure relief method
CN102852551A (en) Gob-side entry retaining method using high-water material filling columns
CN101775991A (en) Method for significant reduction of bracket support of gob-side roadway of fully-mechanized mining face
CN104074534B (en) A kind of combining adopts/the gob-side entry retaining method of fully mechanized coal face
CN102587933A (en) Gob-side entry retaining method using prefabricated walls
CN202851078U (en) High water material filling column bag body
CN205277446U (en) Colliery collecting space area roadway support device
CN201972707U (en) Reinforced concrete gob-side isolation wall of sandwich anchor
CN105484763B (en) A kind of semiclosed reinforced concrete segment method for protecting support of deep coalmine
CN210948688U (en) Artificial false lane
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN104500109A (en) Underground support pillar and construction method thereof
CN102587942A (en) Preliminary supporting bag cast isolation wall and placing method thereof
CN201288586Y (en) Structure for preventing slipping of filled wall body along spatially keeping lane
CN102606171A (en) Gob-side entry retaining method for pouring spacing concrete walls in tunnel of advanced highwall
CN104295315A (en) Low coal seam gob-side entry retaining method
CN203847127U (en) Device for supporting soft rock masses at roadway intersections in coal mine under dynamic pressure environment
CN205400744U (en) Utilize along empty supporting construction who realizes closely coal seam exploitation in lane that protects
CN209742903U (en) Tunnel structure
CN205477640U (en) Safety support device to collecting space area roof cutting release

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120725