CN102587933A - Gob-side entry retaining method using prefabricated walls - Google Patents

Gob-side entry retaining method using prefabricated walls Download PDF

Info

Publication number
CN102587933A
CN102587933A CN2012100818514A CN201210081851A CN102587933A CN 102587933 A CN102587933 A CN 102587933A CN 2012100818514 A CN2012100818514 A CN 2012100818514A CN 201210081851 A CN201210081851 A CN 201210081851A CN 102587933 A CN102587933 A CN 102587933A
Authority
CN
China
Prior art keywords
wall
gob
concrete
walls
entry retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100818514A
Other languages
Chinese (zh)
Inventor
黄福昌
倪兴华
张广文
李振安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanzhou Coal Mining Co Ltd
Yanzhou Coal Industry Co Ltd
Original Assignee
Yanzhou Coal Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanzhou Coal Industry Co Ltd filed Critical Yanzhou Coal Industry Co Ltd
Priority to CN2012100818514A priority Critical patent/CN102587933A/en
Publication of CN102587933A publication Critical patent/CN102587933A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a support method for anthracitic column mining roadside gob-side entry retaining, in particular to a gob-side entry retaining method using prefabricated walls. The technical method includes the steps: a, fixing a prefabricated wall template on one side of a roadway; b, filling concrete into the template preliminarily fixed on one side of the roadway in advance, and forming a concrete wall module with high force bearing capacity after solidification; c, dragging the prefabricated wall module to a roadside support position close to a gob in the roadway; d, adjusting the wall module to form support walls; and e, casting a gap between the adjacent walls with sealing materials to form walls with good integral tightness, and casting a sealing layer above the concrete walls to fill a connecting gap between a roadway top and each wall. One-step construction area is large, the formed concrete walls are fine in integrity, high in strength and excellent in sealing effect, and the method has outstanding superiority in both economic and social benefits.

Description

A kind of gob-side entry retaining method that adopts precast wall body
Technical field
The present invention relates to not have a kind of supporting method of the other gob side entry retaining in coal pillar mining lane, specifically is a kind of gob-side entry retaining method that adopts precast wall body.
Background technology
Coal-face needs two tunnels at least for guaranteeing safety in production, and one is the air intake lane, and one is return airway.The mode of taking reserved coal pillar between the common adjacent work plane is isolated the goaf pernicious gas to guarantee the roadway support effect.Stay the safety pillar of establishing in order to reclaim in traditional mining mode, adopt crossheading that certain technological means will go up a section again supporting leave next section for and use, this lane method of staying that former crossheading is kept along the edge, goaf just is called gob side entry retaining.The basic mode of gob side entry retaining is after the upper curtate working face extraction; The transporter lane or the return airway of work plane are safeguarded with special support material; Make transporter lane or the return airway of this tunnel that remains as the lower curtate work plane, such tunnel can obtain twice utilization.Gob side entry retaining is the reasonable development coal resources, improves coal recovery rate, improves roadway maintenance, reduces the tunnelling amount, helps mine safety production and improves an advanced person's of mine technology economic benefit underground mining technology.
Roadside support mode that gob side entry retaining is traditional such as close standing props, grillage all are difficult to fully isolated goaf, and rigid material is built a wall and is difficult to effectively connect the top, and grillage and close standing props leak out seriously; Must be used the spoil bag; And spoil bag intensity is low, and contractibility is big, and the problem of leaking out is difficult to fine solution.Though work stone is built a wall, precast concrete block is built a wall and the cast-in-place concrete wall sealing is better, solidification cycle is long, and initial stage body of wall support capacity is low, can not play good supporting effect; Simultaneously, wall construction and working surface production time that influences each other is long, and programming is slow, has a strong impact on the fltting speed of work plane.
Therefore it is strong to study a kind of body of wall initial stage bearing capacity, and the wall construction and the advance of the face influence each other few, stay speed fast, effective edge air gallery technology in lane imperative.
Summary of the invention
The objective of the invention is provides a kind of gob-side entry retaining method that adopts precast wall body to deficiency of the prior art, improves body of wall initial stage bearing capacity, strengthens the sealing of body of wall and top board, and it is little that the wall construction and the advance of the face are influenced each other, and stays lane speed fast.
This programme is realized through following technical measures: a kind of gob-side entry retaining method that adopts precast wall body, and said technical method comprises step: a fixes the template of precast wall body in a side in tunnel; B is injected into predetermined fixed in the template of tunnel one side in advance with concrete, solidifies the back and forms the concrete wall chunk with strong bearing capacity; C near the goaf, drags prefabricated concrete wall chunk to the roadside support position in the tunnel; D adjustment body of wall chunk forms the supporting body of wall; E forms overall tightness body of wall preferably with the slit between the encapsulant cast neighboring walls, and at cast one deck sealant above concrete wall, the slit that is connected with body of wall is pushed up in the filling tunnel.
In order to make the precast wall body chunk can be overlapped to form complete body of wall each other, said precast wall body structure adopts zigzag.
Adopt high performance flowing concrete among the said step b; The sealant of body of wall top can adopt the soft-medium filler to connect the top among the step e; Sealant forms the back and with encapsulant the slit is handled, and the soft-medium filler can adopt and in the slit, build rate of set concrete faster.
The beneficial effect of this programme can learn according to the narration to such scheme, uses the precast wall body roadside support, and body of wall initial stage setting load is bigger, and have suitably can the amount of contracting characteristic, and have the supporting rigidity after the cast-in-place notes concrete setting.Precast wall body roadside support technique building technology is simple, lacks with the working surface production time that influences each other, and face propulsion speed is fast.Adopt the precast wall body roadside support, realized cutting the top unloading, the roadway deformation amount is little, and drift section satisfies the production needs in the period of service, and maintenance is little.Construction area of precast wall body roadside support is big, and the concrete wall good integrity of formation, intensity are high, sealing effectiveness is good, on economic benefit and social benefit, all have outstanding superiority.This shows that invention compared with prior art has substantive distinguishing features and progress, the beneficial effect of its enforcement also is conspicuous.
Description of drawings
Fig. 1 is the structural representation of construction tunnel among the present invention.
Fig. 2 is the structural representation of precast wall body back-up block among the present invention.
The body of wall sketch map that Fig. 3 forms for the present invention.
Wherein, 1-stope, 2-mobile substation, 3-hydraulic support, 4-body of wall chunk, 5-supporting frame, 6-goaf, 7-anchor pole, 8-top board, 9-sealant, 10-base plate.
The specific embodiment
For clearly demonstrating the technical characterstic of this programme, below through a specific embodiment, and combine its accompanying drawing, this programme is set forth.
Embodiment, in tunnel structure as shown in Figure 1, above-mentioned a kind of gob-side entry retaining method of precast wall body that adopts comprises step: the side that a is provided with mobile substation 2 at heading stope 1 fixes the template of precast wall body; B is injected into predetermined fixed in the template of tunnel one side in advance with high performance flowing concrete, solidifies the back and forms the concrete wall chunk 4 with strong bearing capacity; C is goaf 6 in the tunnel, earlier with hydraulic support 3 supportings, prefabricated concrete wall chunk 4 is dragged to the roadside support chord position put then during mining; D adjustment body of wall chunk 4 forms the supporting body of wall; E is with the slit between the encapsulant cast neighboring walls; Form overall tightness body of wall preferably; And at cast one deck sealant 9 above concrete wall; Fill the slit that is connected between back 8, base plate 10 and the body of wall, sealant 9 and former tunnel support anchor rod 7 in advance interconnect and are integral, and improve intensity.Said precast wall body chunk 4 structures adopt zigzag.Precast wall body chunk 4 structures are as shown in Figure 2, the length of body of wall, thickness, and body of wall butt joint length, body of wall butt joint width and body of wall height etc., size is all confirmed according to the big or small actual conditions of work plane, is principle to satisfy the roadside support needs.The sealant 9 of body of wall top can adopt the soft-medium filler to connect the top among the step e, and sealant forms the back and with encapsulant the slit handled, and improves isolation effect, and structure is as shown in Figure 3.

Claims (3)

1. gob-side entry retaining method that adopts precast wall body, it is characterized in that: said technical method comprises step: a fixes the template of precast wall body in a side in tunnel; B is injected into predetermined fixed in the template of tunnel one side in advance with concrete, solidifies the back and forms the concrete wall chunk with strong bearing capacity; C near the goaf, drags prefabricated concrete wall chunk to the roadside support position in the tunnel; D adjustment body of wall chunk forms the supporting body of wall; E forms overall tightness body of wall preferably with the slit between the encapsulant cast neighboring walls, and at cast one deck sealant above concrete wall, the slit that is connected with body of wall is pushed up in the filling tunnel.
2. the gob-side entry retaining method of employing precast wall body according to claim 1 is characterized in that: said precast wall body structure is a zigzag, can be overlapped to form complete body of wall each other.
3. the gob-side entry retaining method of employing precast wall body according to claim 2; It is characterized in that: adopt high performance flowing concrete among the said step b; The sealant of body of wall top can adopt the soft-medium filler to fill and connect the top among the step e, and sealant forms the back and with encapsulant the slit handled.
CN2012100818514A 2012-03-26 2012-03-26 Gob-side entry retaining method using prefabricated walls Pending CN102587933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100818514A CN102587933A (en) 2012-03-26 2012-03-26 Gob-side entry retaining method using prefabricated walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100818514A CN102587933A (en) 2012-03-26 2012-03-26 Gob-side entry retaining method using prefabricated walls

Publications (1)

Publication Number Publication Date
CN102587933A true CN102587933A (en) 2012-07-18

Family

ID=46477100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100818514A Pending CN102587933A (en) 2012-03-26 2012-03-26 Gob-side entry retaining method using prefabricated walls

Country Status (1)

Country Link
CN (1) CN102587933A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089693A (en) * 2015-09-09 2015-11-25 中国矿业大学 Goaf-side-roadway-retaining wall roof-contact improving method
CN105971644A (en) * 2016-05-11 2016-09-28 四川芙蓉集团实业有限责任公司 Quick metal anchor wall construction method for controlling air leakage of total mine return airway in karst area
CN106703879A (en) * 2015-11-13 2017-05-24 山东科技大学 Monitoring method for support effect of new concrete prefabricated block self-locking solid wall
CN106703882A (en) * 2015-11-13 2017-05-24 山东科技大学 Mine pressure observation method for novel concrete precast block self-locking solid wall gob-side entry retained roadway
CN106703878A (en) * 2015-11-13 2017-05-24 山东科技大学 Novel concrete precast block self-locking solid wall
CN108590710A (en) * 2018-06-25 2018-09-28 中南大学 Prefabricated tunnel and construction method in a kind of underground goaf to be filled
CN111911196A (en) * 2020-08-10 2020-11-10 山西煤炭运销集团晋城有限公司 Non-pillar mining concrete modular roadway support structure along empty space
CN111980747A (en) * 2020-09-04 2020-11-24 山西天地煤机装备有限公司 Gob-side entry retaining roadside filling support method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4145918A (en) * 1976-09-07 1979-03-27 Akzona Incorporated Freeze-thaw indicator
DE3446043C1 (en) * 1984-12-18 1986-06-19 NLW Fördertechnik GmbH, 4232 Xanten Face-boundary support
CN101289939A (en) * 2008-06-10 2008-10-22 沈阳天安矿山机械科技有限公司 Comprehensive support device for gob-side entry retaining
CN201314241Y (en) * 2008-11-05 2009-09-23 中国矿业大学 Built-in three-dimensional strengthening rib-strengthened filled wall structure for roadway retained for next sublevel
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN201568083U (en) * 2009-12-24 2010-09-01 攀枝花煤业(集团)有限责任公司 Gob-side entry retaining filling wall structure
CN102146797A (en) * 2011-01-21 2011-08-10 中国矿业大学 Short-section temporary gob-side entry retaining method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4145918A (en) * 1976-09-07 1979-03-27 Akzona Incorporated Freeze-thaw indicator
DE3446043C1 (en) * 1984-12-18 1986-06-19 NLW Fördertechnik GmbH, 4232 Xanten Face-boundary support
CN101289939A (en) * 2008-06-10 2008-10-22 沈阳天安矿山机械科技有限公司 Comprehensive support device for gob-side entry retaining
CN201314241Y (en) * 2008-11-05 2009-09-23 中国矿业大学 Built-in three-dimensional strengthening rib-strengthened filled wall structure for roadway retained for next sublevel
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN201568083U (en) * 2009-12-24 2010-09-01 攀枝花煤业(集团)有限责任公司 Gob-side entry retaining filling wall structure
CN102146797A (en) * 2011-01-21 2011-08-10 中国矿业大学 Short-section temporary gob-side entry retaining method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089693B (en) * 2015-09-09 2017-07-04 中国矿业大学 One kind improves gob side entry retaining wall and connects top method
CN105089693A (en) * 2015-09-09 2015-11-25 中国矿业大学 Goaf-side-roadway-retaining wall roof-contact improving method
CN106703879B (en) * 2015-11-13 2019-05-21 山东科技大学 A kind of monitoring method of the prefabricated block self locking solid wall supporting effect of pair of new concrete
CN106703882B (en) * 2015-11-13 2019-05-21 山东科技大学 A kind of pressure observation method of the prefabricated block self locking solid wall gob side entry retaining of pair of new concrete
CN106703878A (en) * 2015-11-13 2017-05-24 山东科技大学 Novel concrete precast block self-locking solid wall
CN106703879A (en) * 2015-11-13 2017-05-24 山东科技大学 Monitoring method for support effect of new concrete prefabricated block self-locking solid wall
CN106703882A (en) * 2015-11-13 2017-05-24 山东科技大学 Mine pressure observation method for novel concrete precast block self-locking solid wall gob-side entry retained roadway
CN106703878B (en) * 2015-11-13 2019-05-21 山东科技大学 A kind of block method of the prefabricated block self locking solid wall of new concrete
CN105971644B (en) * 2016-05-11 2017-12-12 四川芙蓉集团实业有限责任公司 Administer the quick metal anchors wall construction method that karst region mine total return air lane is leaked out
CN105971644A (en) * 2016-05-11 2016-09-28 四川芙蓉集团实业有限责任公司 Quick metal anchor wall construction method for controlling air leakage of total mine return airway in karst area
CN108590710A (en) * 2018-06-25 2018-09-28 中南大学 Prefabricated tunnel and construction method in a kind of underground goaf to be filled
CN108590710B (en) * 2018-06-25 2023-12-15 中南大学 Underground goaf inner prefabricated roadway to be filled and construction method
CN111911196A (en) * 2020-08-10 2020-11-10 山西煤炭运销集团晋城有限公司 Non-pillar mining concrete modular roadway support structure along empty space
CN111911196B (en) * 2020-08-10 2022-03-15 山西煤炭运销集团晋城有限公司 Non-pillar mining concrete modular roadway support structure along empty space
CN111980747A (en) * 2020-09-04 2020-11-24 山西天地煤机装备有限公司 Gob-side entry retaining roadside filling support method
CN111980747B (en) * 2020-09-04 2022-04-12 山西天地煤机装备有限公司 Gob-side entry retaining roadside filling support method

Similar Documents

Publication Publication Date Title
WO2020211784A1 (en) Non-pillar automatically formed roadway-based mining method applicable to fully mechanized top-coal caving of thick coal seam
CN102587933A (en) Gob-side entry retaining method using prefabricated walls
CN102966354B (en) Non-pillar mining method for hard roof coal wall of thick coal seam
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN101749018B (en) Coal mining method with direct coal pillar recovery
CN202064981U (en) Soft coal layer roadway supporting structure
CN103485288B (en) A kind ofly pass through both wired double-deck jacking culvert construction technology
CN102071941B (en) Fully mechanized mining gob-side entry retaining-based concrete block staggered joint longitudinal stacking wall forming method
CN104763434B (en) A kind of without coal column double lanes driving method
CN204729099U (en) Rock quality layer tunneling three layers of subway station canopy structure
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN107725052B (en) One kind, which is adopted, stays integration exploitation gob side entry top plate constant-resistance anchor body beam method for protecting support
CN110259449B (en) Strip filling mining method for extra-thick coal seam by means of steel mould trolley
CN110242334B (en) Assembled FRP high-water-content material mining combined strut and construction method
CN102852551A (en) Gob-side entry retaining method using high-water material filling columns
CN107355223A (en) A kind of stope drift active workings gob-side entry retaining method suitable for easy inbreak top plate
CN113062354A (en) Assembly method for prefabricated subway station of open-cut pile support system
CN103850708A (en) Method for performing gob-side entry retaining through concrete filling body
CN109751063A (en) A kind of large section tunnel supporting construction and its construction method
CN104074534B (en) A kind of combining adopts/the gob-side entry retaining method of fully mechanized coal face
CN104100271A (en) Side-supporting roadway forming method by pre-digging guide cavern and filling with artificial side wall for secondary use
CN104295315A (en) Low coal seam gob-side entry retaining method
CN103089298A (en) Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN110295903B (en) Method for setting parallelogram island coal pillar of thin coal seam working face entry retaining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120718