CN104295315A - Low coal seam gob-side entry retaining method - Google Patents

Low coal seam gob-side entry retaining method Download PDF

Info

Publication number
CN104295315A
CN104295315A CN201410401702.0A CN201410401702A CN104295315A CN 104295315 A CN104295315 A CN 104295315A CN 201410401702 A CN201410401702 A CN 201410401702A CN 104295315 A CN104295315 A CN 104295315A
Authority
CN
China
Prior art keywords
gob
side entry
entry retaining
bastard coal
woven bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410401702.0A
Other languages
Chinese (zh)
Inventor
秦涛
刘永立
董长吉
冯俊杰
刘旸
邱照辉
张明
林大力
刘振文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang University of Science and Technology
Original Assignee
Heilongjiang University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang University of Science and Technology filed Critical Heilongjiang University of Science and Technology
Priority to CN201410401702.0A priority Critical patent/CN104295315A/en
Publication of CN104295315A publication Critical patent/CN104295315A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/02Supporting means, e.g. shuttering, for filling-up materials
    • E21F15/04Stowing mats; Goaf wire netting; Partition walls
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a coal mining roadway gob-side entry retaining method and provides a low coal seam gob-side entry retaining method which is low in cost, high in safety, high in mining rate, low in labor intensity, convenient to construct and capable of being adaptive to coal seam thickness and dip angle changing. The method is called a cement coal and rock cinder stone wall and woven bag wall gob-side entry retaining method. According to the method, two-time gob-side entry retaining construction is carried out, cement rock cinder stone wall building method is used for first-time gob-side entry retaining, and a woven bag wall method is used for second-time gob-side entry retaining. A woven bag wall can well prevent gas in a gob from flowing into a reserved roadway in a controlling mode, the roadway which can meet a ventilation requirement is formed, by post-mining gob-side entry retaining, the advancing work amount can be lowered, cost can be lowered, labor intensity can be lowered, and the coal recovery rate can be improved.

Description

A kind of girdle gob-side entry retaining method
Technical field
The present invention relates to a kind of coal mining tunnel gob-side entry retaining method, particularly a kind of gob-side entry retaining method of girdle.
Background technology
In order to reclaim the safety pillar staying in traditional mining mode mode and establish, adopt certain technological means the crossheading of a upper section again supporting to be left for next section to use, this way in lane of staying retains along edge, goaf in former crossheading position, be called gob side entry retaining, gob side entry retaining can Resource recovery to greatest extent, avoids coal body to lose.For girdle gob-side entry retaining method, mainly contain following several form at present:
(1) slabbing form: the problems such as this mode is because support material is wide in variety, and workload is large, and supporting effect is poor, goaf isolation effect difference are seldom applied.
(2) spoil way of stacking: the method can not reach timely and effective roof supporting, easily causes the excessive sinking of top board to cause tunnel to be unfavorable for actual mining.Although this mode material unit price is low, can consume a large amount of manpowers, and isolation effect is very poor, therefore adaptive surface is very little.
(3) masonry wall method: what the method still can not solve body of wall and top board connects top problem, often causes the excessive absciss layer of top board to make supporting effect not good.
(4) high-water material roadside packing method: the method is the left road way of main flow, be applicable to carrying out extensive gob side entry retaining, but its cost is high.
(5) cast-in-situ concrete partition wall method: the shortcoming of the method is that the complexity of its higher engineering cost and construction and the speed of intensity rising can not adapt to high yield and high efficiency mine work plane.
Summary of the invention
In order to solve above deficiency, the object of the present invention is to provide a kind of cost low, high safety, recovery ratio are high, labour intensity is low, easy construction, can adapt to the girdle gob-side entry retaining method of coal seam thickness, change of pitch angle, is referred to as cement bastard coal slag stone walling and woven bag wall gob side entry retaining method.
The object of the invention is to be achieved through the following technical solutions:
A kind of girdle gob-side entry retaining method, comprises the following steps:
(1) first time left road way
The method gob side entry retaining building cement bastard coal slag stone walling is adopted in side, tunnel, add dozen single anchor cable in Bing Liu lane to reinforce rock stratum unstable above tunnel, described cement bastard coal slag stone walling is built into by bastard coal slag cement woven bag wall, bastard coal pulp water mud wall and bastard coal slag woven bag wall, before bastard coal slag cement woven bag wall is positioned at bastard coal pulp water mud wall as template, after bastard coal slag woven bag wall is positioned at bastard coal pulp water mud wall, the wall of bastard coal pulp water mud wall is wide is 0.8m, and the wall of bastard coal slag cement woven bag wall and bastard coal slag woven bag wall is wide is 0.4m.
(2) second time left road way
After staying lane for the first time, the mode gob side entry retaining arranging woven bag wall is adopted after the same side, tunnel, supporting facility, described woven bag wall is built into by bastard coal slag woven bag wall and bastard coal slag, bastard coal slag woven bag wall is arranged in both sides, centre bastard coal slag tamps, and the wall of bastard coal slag woven bag wall is wide is 0.4m.
Gob side entry retaining method provided by the invention has the following advantages:
1) this method stays lane to construct by twice, and cement cash slag stone walling method gob side entry retaining is built in first time left road way employing; Second time left road way adopts arranges woven bag wall method gob side entry retaining.Arrange woven bag Qiang Liu lane, tamp with spoil, cement material in woven bag wall gap, and build with water.The method realizes down-hole and gathers materials on the spot, and technique is simple, and easy construction, is beneficial to operation.
2) in tunnel, supporting safeguards double array pitch 1m × 1m prestressed anchor that top board is used during being driving, the anchor cable of work order trestle column 2m before exploitation Hou Liu lane, anchor cable and woven bag wall effectively improve tunnel supporting capacity, control roadway deformation, and roadway maintenance is effective.
3) woven bag wall can control gas string in goaf well and, to reserved tunnel, define the tunnel that can meet ventilation requirement, by Cai Houliu lane, can reduce excavation work amount, both cost-saved, can reduce labour intensity again, improves coal recovery rate.
Accompanying drawing explanation
Fig. 1 is a kind of girdle gob-side entry retaining method of the present invention tunnel filling arrangement diagram; In figure: 1-bastard coal slag cement woven bag wall; 2-bastard coal pulp water mud wall; 3-bastard coal slag woven bag wall; 4-bastard coal slag; 5-wood point post; 6-anchor cable; 7-anchor pole.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme of the present invention is further described; but be not limited thereto; everyly technical solution of the present invention modified or equivalent to replace, and not departing from the spirit and scope of technical solution of the present invention, all should be encompassed in protection scope of the present invention.
Girdle gob-side entry retaining method provided by the invention stays lane to construct by twice, and cement cash slag stone walling method gob side entry retaining is built in first time left road way employing; Second time left road way adopts woven bag wall method gob side entry retaining.Concrete steps are as follows:
(1) first time left road way
(1) adopt the method gob side entry retaining building cement bastard coal slag stone walling, add dozen anchor cable in Bing Liu lane and rock stratum unstable above tunnel is reinforced.
(2) construction technical data and technological requirement:
1. the quality proportioning of cement and bastard coal slag is 1:3.
2. stone walling width built by cement is bastard coal pulp water mud wall 2, before wall wide 0.8m(cash pulp water mud wall preliminary roof caving, 1.1m is wide), adopt the woven bag of dress cash slag cement to do template, bastard coal slag cement woven bag wall 1 and bastard coal pulp water mud wall 2 beam overall are that before 1.2m(preliminary roof caving, 1.5m is wide).
3. cable parameters: diameter is 15.24mm steel strand 4.5m, anchored force 200KN, and resin explosive roll length is 1200mm, anchor cable 6 length of appearing is 150 ~ 300mm.
(3), for ensureing the effective execution of above construction parameter, spy has carried out strict regulations to construction technology:
1. strict proportioning on request, must use clear water during proportioning, must stir, must use pneumatic shock club tamping when building, stone walling plug gets rid of stubble and is forbidden flush.
2. striking time is not less than 24 hours, and revetment post 1m mono-, delayed break line is no less than 40m.
3. cement must be placed on dry place, and the cement of moist scleroma is firmly inaccurate to be used, and is provided with cement and uses machine account, guarantee cement consumption.
(2) second time left road way
(1) adopt and arrange that woven bag wall mode stays lane, retain the supporting facilities such as the anchor pole 7 in its former tunnel, anchor cable 6, add in soft side side during arranging sack and make a call to row's wood point post 5 and assist and cut top.
(2) construction technical data and technological requirement:
1. woven bag wall (being built into by bastard coal slag woven bag wall 3 and bastard coal slag 4) arranges that width is 2m in open-off cut, upper lane 1.5m.
2. interior side rail point post 5 spacing is 1m.
(3) for ensureing the effective execution of above construction parameter, spy has carried out strict regulations to construction technology. and woven bag wall must be arranged sternly, reality, connect top, connect the end and must not leak out, be arranged in both sides with knitting bagged spoil and form bastard coal slag woven bag wall 3, centre bastard coal slag 4(spoil and cement) to tamp, when spoil and cement are filled out in centre, use water irrigates.

Claims (8)

1. a girdle gob-side entry retaining method, it is characterized in that described method stays for twice lane to construct, concrete steps are as follows:
(1) first time stays lane
The method gob side entry retaining building cement bastard coal slag stone walling is adopted in side, tunnel;
(2) second time stays lane
First time adopts the mode gob side entry retaining arranging woven bag wall after staying lane after the same side, tunnel, supporting facility.
2. girdle gob-side entry retaining method according to claim 1, when it is characterized in that described first time stays lane, stays in lane to add and plays single anchor cable and reinforce rock stratum unstable above tunnel.
3. girdle gob-side entry retaining method according to claim 2, is characterized in that described cable interval 2m.
4. the girdle gob-side entry retaining method according to Claims 2 or 3, is characterized in that described anchor cable length of appearing is 150 ~ 300mm.
5. girdle gob-side entry retaining method according to claim 1, it is characterized in that described cement bastard coal slag stone walling is built into by bastard coal slag cement woven bag wall, bastard coal pulp water mud wall and bastard coal slag woven bag wall, before bastard coal slag cement woven bag wall is positioned at bastard coal pulp water mud wall as template, after bastard coal slag woven bag wall is positioned at bastard coal pulp water mud wall.
6. girdle gob-side entry retaining method according to claim 5, it is characterized in that the wall of described bastard coal pulp water mud wall is wide for 0.8m, the wall of bastard coal slag cement woven bag wall and bastard coal slag woven bag wall is wide is 0.4m.
7. girdle gob-side entry retaining method according to claim 1, is characterized in that described woven bag wall is built into by bastard coal slag woven bag wall and bastard coal slag, and bastard coal slag woven bag wall is arranged in both sides, and centre bastard coal slag tamps.
8. girdle gob-side entry retaining method according to claim 7, is characterized in that the wall of described bastard coal slag woven bag wall is wide for 0.4m.
CN201410401702.0A 2014-08-15 2014-08-15 Low coal seam gob-side entry retaining method Pending CN104295315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410401702.0A CN104295315A (en) 2014-08-15 2014-08-15 Low coal seam gob-side entry retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410401702.0A CN104295315A (en) 2014-08-15 2014-08-15 Low coal seam gob-side entry retaining method

Publications (1)

Publication Number Publication Date
CN104295315A true CN104295315A (en) 2015-01-21

Family

ID=52315231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410401702.0A Pending CN104295315A (en) 2014-08-15 2014-08-15 Low coal seam gob-side entry retaining method

Country Status (1)

Country Link
CN (1) CN104295315A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971640A (en) * 2016-07-08 2016-09-28 西安科技大学 Strengthening method for gob-side entrydriving narrow coal pillar
CN106014479A (en) * 2016-05-16 2016-10-12 大同煤矿集团有限责任公司 Bracket reducing method for mining lower-layer working surface of ultra-close coal seam
CN106907177A (en) * 2017-04-28 2017-06-30 山东科技大学 A kind of girdle gob side entry retaining roadside packing method for protecting support
CN107035405A (en) * 2016-12-06 2017-08-11 太原理工大学 One kind is used for the double filling wall constructions of gob side entry retaining and cuts top pressure relief method
CN112943250A (en) * 2021-04-02 2021-06-11 湖南科技大学 Method for reserving roadway in filling area

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3922236A1 (en) * 1989-07-06 1991-01-17 Lehmacher & Sohn Masch Triangular plastics bag mfr. - from double layer of plastics film strip cut and welded obliquely
CN101949301A (en) * 2010-08-30 2011-01-19 山东新矿赵官能源有限责任公司 Different-strength bearing roadway-beside filling body of gob-side entry under coal mine
CN101967992A (en) * 2010-09-17 2011-02-09 山东新矿赵官能源有限责任公司 Different-strength bearing roadside filler for pillar-free mining of thin coal bed
CN202215249U (en) * 2011-07-05 2012-05-09 徐州贝壳迈宁矿业科技有限公司 Layering pack wall along for hollow entry retaining in solid filling coal mining

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3922236A1 (en) * 1989-07-06 1991-01-17 Lehmacher & Sohn Masch Triangular plastics bag mfr. - from double layer of plastics film strip cut and welded obliquely
CN101949301A (en) * 2010-08-30 2011-01-19 山东新矿赵官能源有限责任公司 Different-strength bearing roadway-beside filling body of gob-side entry under coal mine
CN101967992A (en) * 2010-09-17 2011-02-09 山东新矿赵官能源有限责任公司 Different-strength bearing roadside filler for pillar-free mining of thin coal bed
CN202215249U (en) * 2011-07-05 2012-05-09 徐州贝壳迈宁矿业科技有限公司 Layering pack wall along for hollow entry retaining in solid filling coal mining

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘永辉: "预留瓦斯尾巷的施工方法", 《煤矿安全》, vol. 34, no. 10, 5 October 2003 (2003-10-05), pages 9 - 10 *
韩广力: "水泥煤矸渣浇筑石墙在煤矿沿空留巷中的应用", 《民营科技》, no. 11, 20 January 2013 (2013-01-20), pages 318 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106014479A (en) * 2016-05-16 2016-10-12 大同煤矿集团有限责任公司 Bracket reducing method for mining lower-layer working surface of ultra-close coal seam
CN106014479B (en) * 2016-05-16 2018-02-23 大同煤矿集团有限责任公司 Ultra close distance coal seam exploitation lower floor working face reduction stent Methods
CN105971640A (en) * 2016-07-08 2016-09-28 西安科技大学 Strengthening method for gob-side entrydriving narrow coal pillar
CN105971640B (en) * 2016-07-08 2018-08-03 西安科技大学 A kind of reinforcement means of gob side entry driving thin coal pillar
CN107035405A (en) * 2016-12-06 2017-08-11 太原理工大学 One kind is used for the double filling wall constructions of gob side entry retaining and cuts top pressure relief method
CN107035405B (en) * 2016-12-06 2018-12-18 太原理工大学 One kind cutting top pressure relief method for the double filling wall constructions of gob side entry retaining
CN106907177A (en) * 2017-04-28 2017-06-30 山东科技大学 A kind of girdle gob side entry retaining roadside packing method for protecting support
CN106907177B (en) * 2017-04-28 2019-05-03 山东科技大学 A kind of girdle gob side entry retaining roadside packing method for protecting support
CN112943250A (en) * 2021-04-02 2021-06-11 湖南科技大学 Method for reserving roadway in filling area

Similar Documents

Publication Publication Date Title
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
AU2013354613B2 (en) Method of local filling to control surface subsidence in worked-out area
AU2015345830B2 (en) Coal mining method with digging, mining and filling parallel operations under control of cover rock cracks and surface subsidence
CN104763434B (en) A kind of without coal column double lanes driving method
CN104061001B (en) Gob side entry retaining exploitation support process method
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN102155259B (en) Filling retaining wall constructed by using tunneling waste stones, and construction method of retaining wall
CN107725052B (en) One kind, which is adopted, stays integration exploitation gob side entry top plate constant-resistance anchor body beam method for protecting support
CN105545353B (en) A kind of Man-made False construction method based on paste body filling
CN212296427U (en) Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure
CN108979638B (en) Composite gob-side entry retaining method for wedge-shaped regenerated wall and single-leg shed beam of coal mining roadway
CN104295315A (en) Low coal seam gob-side entry retaining method
CN109098714A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
WO2020098033A1 (en) Supporting structural body for local goaf filling under hard roof conditions and construction method therefor
CN108049896B (en) A kind of fully mechanized coal face gob-side entry retaining method
CN107091091A (en) A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support
CN109209490A (en) It adopts bank face and withdraws method in a kind of waste filling auxiliary end
CN111425205B (en) Mining support method for steeply inclined extremely thin ore body
CN109812269A (en) It is a kind of suitable for second mining working face without pillar mining method
WO2021237912A1 (en) Subsidence-restricted stoping method for false mined-out layer support formed in combination with waste rock
CN105649673A (en) Roadside gangue mixture filling and gob-side entry retaining method for large-dip angle coal seams
CN206280090U (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility
CN205400744U (en) Utilize along empty supporting construction who realizes closely coal seam exploitation in lane that protects
CN102505949B (en) Support method for coal seam roadway to cross gob

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150121

RJ01 Rejection of invention patent application after publication