CN102505963A - Stope face roof water pre-drainage construction method - Google Patents
Stope face roof water pre-drainage construction method Download PDFInfo
- Publication number
- CN102505963A CN102505963A CN2011103559269A CN201110355926A CN102505963A CN 102505963 A CN102505963 A CN 102505963A CN 2011103559269 A CN2011103559269 A CN 2011103559269A CN 201110355926 A CN201110355926 A CN 201110355926A CN 102505963 A CN102505963 A CN 102505963A
- Authority
- CN
- China
- Prior art keywords
- water
- roof
- stope face
- stoping
- unrestrained
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110355926.9A CN102505963B (en) | 2011-11-11 | 2011-11-11 | Stope face roof water pre-drainage construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110355926.9A CN102505963B (en) | 2011-11-11 | 2011-11-11 | Stope face roof water pre-drainage construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102505963A true CN102505963A (en) | 2012-06-20 |
CN102505963B CN102505963B (en) | 2017-02-01 |
Family
ID=46218091
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110355926.9A Active CN102505963B (en) | 2011-11-11 | 2011-11-11 | Stope face roof water pre-drainage construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102505963B (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102913280A (en) * | 2012-10-30 | 2013-02-06 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Method for draining roof water in flood mine |
CN102926802A (en) * | 2012-10-30 | 2013-02-13 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Method for reducing silt coal by using underground water drainage tunnel of coal mine |
CN102926803A (en) * | 2012-10-30 | 2013-02-13 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Water drainage method for simultaneously exploiting water and coals under complicated hydrological condition |
CN103104289A (en) * | 2013-02-05 | 2013-05-15 | 神华集团有限责任公司 | Mine water disaster treatment method |
CN103742145A (en) * | 2013-12-24 | 2014-04-23 | 山东新阳能源有限公司 | Water control method for abnormal water-enriched region of coal mine |
CN104963721A (en) * | 2015-05-26 | 2015-10-07 | 安徽建筑大学 | Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes |
CN106285777A (en) * | 2016-10-28 | 2017-01-04 | 河北钢铁集团矿业有限公司 | The method that flood mine mineral building discharges water in advance |
WO2017198109A1 (en) * | 2016-05-16 | 2017-11-23 | 中国矿业大学 | Pitshaft coal uncovering method for coal mines whose coal seam lies in main aquifer |
CN108590754A (en) * | 2018-04-24 | 2018-09-28 | 中煤西安设计工程有限责任公司 | Concentrate sluicing lane method for arranging in a kind of monocline coal seam exploiting field |
CN108643966A (en) * | 2018-04-24 | 2018-10-12 | 中煤西安设计工程有限责任公司 | A kind of floor undulation concentration sluicing lane method for arranging |
CN109458217A (en) * | 2018-11-07 | 2019-03-12 | 陕西南梁矿业有限公司 | A kind of unrestrained water in mine water-bearing layer rationally utilizes device and method |
CN109681269A (en) * | 2019-01-16 | 2019-04-26 | 内蒙古上海庙矿业有限责任公司 | Soft rocks are lauched-and husky mixing is prominent gushes Prevention Technique method |
CN110374674A (en) * | 2019-08-07 | 2019-10-25 | 大同煤矿集团有限责任公司 | An a kind of lane is mostly used the discharge method of formula water in gob area |
CN110685744A (en) * | 2019-11-18 | 2020-01-14 | 内蒙古上海庙矿业有限责任公司 | Arrangement mode of water detection and drainage hole series |
CN111042861A (en) * | 2019-12-31 | 2020-04-21 | 淮北矿业股份有限公司 | Advanced treatment method for water damage of working surface of coal mine underground roadway |
CN112302715A (en) * | 2020-11-06 | 2021-02-02 | 天地科技股份有限公司 | Soft sandstone aquifer dredging and lowering method |
CN112878310A (en) * | 2021-01-20 | 2021-06-01 | 天津市华普生产力促进有限公司 | Foundation construction method for municipal engineering |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1737337A (en) * | 2004-08-19 | 2006-02-22 | 神华集团有限责任公司 | Water preventing method for mine in structure of thin base rock and thick loose aquifer |
CN101196123A (en) * | 2007-12-27 | 2008-06-11 | 淮北矿业(集团)有限责任公司 | Aquifer preventing and controlling method for coal face roof plate separation layer |
CN101403314A (en) * | 2008-11-18 | 2009-04-08 | 河南理工大学 | Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique |
CN101446200A (en) * | 2008-07-10 | 2009-06-03 | 梁如林 | Advancing coal-mining method |
-
2011
- 2011-11-11 CN CN201110355926.9A patent/CN102505963B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1737337A (en) * | 2004-08-19 | 2006-02-22 | 神华集团有限责任公司 | Water preventing method for mine in structure of thin base rock and thick loose aquifer |
CN101196123A (en) * | 2007-12-27 | 2008-06-11 | 淮北矿业(集团)有限责任公司 | Aquifer preventing and controlling method for coal face roof plate separation layer |
CN101446200A (en) * | 2008-07-10 | 2009-06-03 | 梁如林 | Advancing coal-mining method |
CN101403314A (en) * | 2008-11-18 | 2009-04-08 | 河南理工大学 | Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique |
Non-Patent Citations (1)
Title |
---|
张红军: "二水平回采工作面涌水原因分析与综合防治", 《山西焦煤科技》 * |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102926802A (en) * | 2012-10-30 | 2013-02-13 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Method for reducing silt coal by using underground water drainage tunnel of coal mine |
CN102926803A (en) * | 2012-10-30 | 2013-02-13 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Water drainage method for simultaneously exploiting water and coals under complicated hydrological condition |
CN102913280B (en) * | 2012-10-30 | 2014-11-12 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Method for draining roof water in flood mine |
CN102926802B (en) * | 2012-10-30 | 2014-12-10 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Method for reducing silt coal by using underground water drainage tunnel of coal mine |
CN102926803B (en) * | 2012-10-30 | 2014-12-10 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Water drainage method for simultaneously exploiting water and coals under complicated hydrological condition |
CN102913280A (en) * | 2012-10-30 | 2013-02-06 | 开滦(集团)有限责任公司东欢坨矿业分公司 | Method for draining roof water in flood mine |
CN103104289A (en) * | 2013-02-05 | 2013-05-15 | 神华集团有限责任公司 | Mine water disaster treatment method |
CN103104289B (en) * | 2013-02-05 | 2015-09-09 | 神华集团有限责任公司 | A kind of mine water disaster treatment method |
CN103742145A (en) * | 2013-12-24 | 2014-04-23 | 山东新阳能源有限公司 | Water control method for abnormal water-enriched region of coal mine |
CN104963721A (en) * | 2015-05-26 | 2015-10-07 | 安徽建筑大学 | Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes |
WO2017198109A1 (en) * | 2016-05-16 | 2017-11-23 | 中国矿业大学 | Pitshaft coal uncovering method for coal mines whose coal seam lies in main aquifer |
CN106285777A (en) * | 2016-10-28 | 2017-01-04 | 河北钢铁集团矿业有限公司 | The method that flood mine mineral building discharges water in advance |
CN106285777B (en) * | 2016-10-28 | 2018-05-08 | 河北钢铁集团矿业有限公司 | The method that flood mine mineral building discharges water in advance |
CN108590754A (en) * | 2018-04-24 | 2018-09-28 | 中煤西安设计工程有限责任公司 | Concentrate sluicing lane method for arranging in a kind of monocline coal seam exploiting field |
CN108643966A (en) * | 2018-04-24 | 2018-10-12 | 中煤西安设计工程有限责任公司 | A kind of floor undulation concentration sluicing lane method for arranging |
CN109458217A (en) * | 2018-11-07 | 2019-03-12 | 陕西南梁矿业有限公司 | A kind of unrestrained water in mine water-bearing layer rationally utilizes device and method |
CN109681269A (en) * | 2019-01-16 | 2019-04-26 | 内蒙古上海庙矿业有限责任公司 | Soft rocks are lauched-and husky mixing is prominent gushes Prevention Technique method |
CN110374674A (en) * | 2019-08-07 | 2019-10-25 | 大同煤矿集团有限责任公司 | An a kind of lane is mostly used the discharge method of formula water in gob area |
CN110685744A (en) * | 2019-11-18 | 2020-01-14 | 内蒙古上海庙矿业有限责任公司 | Arrangement mode of water detection and drainage hole series |
CN111042861A (en) * | 2019-12-31 | 2020-04-21 | 淮北矿业股份有限公司 | Advanced treatment method for water damage of working surface of coal mine underground roadway |
CN111042861B (en) * | 2019-12-31 | 2021-07-13 | 淮北矿业股份有限公司 | Advanced treatment method for water damage of working surface of coal mine underground roadway |
CN112302715A (en) * | 2020-11-06 | 2021-02-02 | 天地科技股份有限公司 | Soft sandstone aquifer dredging and lowering method |
CN112878310A (en) * | 2021-01-20 | 2021-06-01 | 天津市华普生产力促进有限公司 | Foundation construction method for municipal engineering |
Also Published As
Publication number | Publication date |
---|---|
CN102505963B (en) | 2017-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102505963B (en) | Stope face roof water pre-drainage construction method | |
CN100560944C (en) | Aquifer preventing and controlling method for coal face roof plate separation layer | |
CN103557002B (en) | A kind of mechanized concentrates drop shaft filling-up method | |
CN102635392B (en) | Co-extraction method for pillar-less coal and gas of advanced entry-retaining construction extraction engineering | |
CN102392678A (en) | Gas drainage method combining surface and underground fracturing and permeability improvement | |
CN107100625B (en) | Overlying strata water filling filling, which reduces, leads high water retaining mining method | |
CN102392677A (en) | Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification | |
CN103527200A (en) | Sill-pillar-free sublevel rhombus room subsequent filling mining method | |
CN106703880B (en) | The unrestrained through type water conservancy diversion spilled water hole of mining high-order absciss layer water and its construction method | |
CN101240715A (en) | One well three-purpose mash gas harnessing method for ground well drilling and ground well drilling | |
CN102979498A (en) | Coal bed gas multi-branch horizontal well system | |
CN109667562A (en) | Mining body gas well up-down combined universe extraction method | |
CN102705005A (en) | Technology for plugging water bursting in mine by directional diversion grouting | |
CN104975868A (en) | Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling | |
CN104963721A (en) | Downhole stereo rapid water drainage method through the combination of horizontal drilling holes and vertical drilling holes | |
CN113374440B (en) | Rapid plugging method and construction method for water burst channel of hidden collapse column | |
CN104895531A (en) | Single thick coal seam ground mining well extraction process | |
CN102493831A (en) | Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes | |
CN109162713B (en) | Coal-water dual-resource mine mining method without changing overlying strata hydrogeological conditions | |
CN107194615A (en) | The evaluation method of coal mine underground reservoir construction applicability | |
CN102828730A (en) | Nonmetallic mineral underground in-situ drilling corrosion mining new technology | |
CN113653531B (en) | Method for dredging low-permeability roof water | |
CN109899105A (en) | A kind of multistage crossing-hole gas extraction method of low level for coal petrography alternating layers coal seam | |
CN109736876A (en) | Large-diameter directional long-drill-hole extraction method for gas roof gushed by mining body | |
CN114439428B (en) | Enhanced extraction method for coal bed gas horizontal well of coal group under goaf group |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhao Fangliang Inventor after: Zhang Yuheng Inventor after: Liu Hongjun Inventor after: Xue Xiaoxing Inventor after: He Jian Inventor after: Wang Jiaxue Inventor after: Cui Yuxiang Inventor before: Zhao Fangliang Inventor before: Zhang Yuheng Inventor before: Liu Hongjun Inventor before: Xue Xiaoxing Inventor before: He Jian Inventor before: Wang Jiaxue |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |