CN107100625B - Overlying strata water filling filling, which reduces, leads high water retaining mining method - Google Patents

Overlying strata water filling filling, which reduces, leads high water retaining mining method Download PDF

Info

Publication number
CN107100625B
CN107100625B CN201710305269.4A CN201710305269A CN107100625B CN 107100625 B CN107100625 B CN 107100625B CN 201710305269 A CN201710305269 A CN 201710305269A CN 107100625 B CN107100625 B CN 107100625B
Authority
CN
China
Prior art keywords
water
filling
drilling
overlying strata
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710305269.4A
Other languages
Chinese (zh)
Other versions
CN107100625A (en
Inventor
朱卫兵
齐祥瑞
郭宇隆
史泽凯
李枝
于胜超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201710305269.4A priority Critical patent/CN107100625B/en
Publication of CN107100625A publication Critical patent/CN107100625A/en
Application granted granted Critical
Publication of CN107100625B publication Critical patent/CN107100625B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of water filling filling of overlying strata, which reduces, leads high water retaining mining method, is particularly suitable for fwaater resources protection and the surface subsidence control of coal mining.First obtain overlying strata correlation geologic information; appropriate opportunity is selected to drill in reasonable layer position; and carry out overlying strata high pressure water injection; lower part rock mass is actively compacted by absciss layer area pressure water injection; to achieve the purpose that reduce water flowing fractured zone development height, the impermeable layer thickness led between high and water-bearing layer is increased indirectly, improves the water-resisting ability of water barrier; the fwaater resources protection under the high tension coal mining of mine of western is realized, is the important component of coal mine lasting exploit.Its method is simple and convenient to operate, is practical, capital investment is few, at low cost and pollution-free to water-bearing layer, simultaneously can make full use of mine discharge water resource, be able to solve cause underground water to be largely lost in existing mining, the problem of water pollution and Water-saving effect difference.

Description

Overlying strata water filling filling, which reduces, leads high water retaining mining method
Technical field
The present invention relates to a kind of water retaining mining method, the overlying strata water filling filling for being particularly suitable for coal mining reduce lead it is high Water retaining mining method.
Background technique
Coal resources in China is mainly distributed on the north and the Northwest of arid and semi-arid, and coal mining often leads to mining area The water resources such as the betrunking of stream, groundwater level decline be largely lost phenomenon.Meanwhile it can also be discharged in progress of coal mining big The mine water of amount and old water in gob area, annual mine water discharge amount can reach 46 billion cubic meters, and averagely often adopting 1t coal will discharge 2m3The water of left and right, average utilization only 26%.Mine water resource shortage and the discharge of Mine System have seriously affected the mining area people Life, constrain economic sustainable development, hinder the developing steps of national Ecological Civilization Construction.Coal mining is to environment Contradiction between the destruction and the ecological protections such as water resource of water resource is outstanding day by day, and water-retaining production technology is to solve this contradiction Provide direction.
Striping noise, the exploitation of room (column) formula, wangeviry mining method, knife pillar-and-panel work etc. belong to partial mining method, i.e., A part of coal resources are only produced, using the movement for the coal column control overlying rock left, lead height to reduce to reach water conservation The requirement of exploitation, still, such method resource recovery rate are low, are typically only 20~50%, resources loss is serious;(super) Gao Shuicai Material filling, waste filling, paste body filling etc. belong to filling mining method, i.e., fill external material in goaf, pass through this The movement of a little obturation control overlying rocks leads height to realize water-retaining production, disadvantage is that filling mining to reduce Cost is very high, filling process is complicated, investment is big, production efficiency is low;Groundwater reservoir is to deposit the aquifer water transfer of Mining failure It stores up in old goaf, by caved gangue purified treatment and energetically recycles old water in gob area, the method increase The utilization rate of mine water, but the leakage of aquifer water or the decline of level of ground water are inevitably resulted in, and in groundwater reservoir Water receive heavy metal ion pollution, can not generally be used as domestic water.Therefore, seek pollution-free, at low cost, resource reclaim The recovery method that rate is high, Water-saving effect is good is to realize the inevitable choice of Coal Green exploitation.
Summary of the invention
Goal of the invention, shortcoming in view of the above technology, provide it is a kind of it is convenient and easy, at low cost, environmental-friendly, adopt and fill Method small, that height of water flowing fractured zone is effectively reduced is interfered, directly overlying strata are filled as filling medium using mining area waste water The water retaining mining method filled out.
In order to achieve the above objectives, overlying strata of the invention water filling filling, which reduces, leads high water retaining mining method, and its step are as follows:
A. production zone water-bearing layer position and sand coated iron mold feature are determined by hydrogeologic prospecting first;
B. multiple water injecting drillings are being arranged to the earth's surface above mining face coal seam, and overall length is installed in water injecting drilling Steel water injecting drilling casing;
Wherein first water injecting drilling is arranged in the current coal work Middle face in coal seam, and horizontal distance cuts a 40m~90m Place, along advance of the face direction arranged for interval water injecting drilling until current exploitation working face stop adopt line;
Water injecting drilling is bored by ground configuration position is vertically lower, and lower drilling depth should be located at leading above height of normally exploiting or need to protect It is water filling layer position in the aqueous position layer by layer of shield;
C., high-pressure hydraulic pump, and the ground water-supply-pipe formed using screwed flange and stainless steel tube are set at water injecting drilling High-pressure hydraulic pump and water injecting drilling casing are fastenedly connected by road;
D. working face mining is carried out according to conventional production practice, section isolated coal pillar is retained when exploitation, works as the advance of the face When to horizontal distance water injecting drilling 10m-30m, height is carried out into water injecting drilling by ground hydraulic pipeline using high-pressure hydraulic pump Pressure injection water, injects water into overlying strata;
E. the water injection rate filled the water to water injecting drilling mesohigh is read using the flowmeter for being located at high-pressure hydraulic pump water outlet, When reaching the 30%~45% of goaf volume to the total amount of overlying strata injection water, stop water filling;
F. high-pressure hydraulic pump is closed, ground hydraulic pipeline is removed, sealing of hole is carried out to water injecting drilling using concreteness material;
G. step c, d, e, f are repeated, it is just right when the advance of the face is at next water injecting drilling 10-30m Corresponding water injecting drilling implements high pressure water injection, until the water filling and sealing of hole work of all water injecting drillings are completed, in the working face extraction While, it tunnels the stope drift active workings of next Adjacent Working Face and cuts eye;
H. after the completion of working face extraction, the stope drift active workings dug by next Adjacent Working Face are to being completed back production Be in tilted layout at overlying strata multiple drillings that discharge water above working face, and multiple drillings that discharge water are put along advance of the face direction arranged for interval Water dip angle of hole is 37 ° ~ 42 °, and the drilling that discharges water is drilled into water filling layer position, is emitted into back the water for injecting overlying strata using drilling is discharged water It adopts in the sink of tunnel and ground is discharged by underground drainage system, to eliminate gushing water hidden danger, discharge water simultaneously, overlying rock is integrally transported Dynamic, development degree is low again in crack, effective protection overlying aquifer water resource;
I. step g and step h is repeated to complete all water-retaining productions to mining coal seam.
The hydrogeologic prospecting determines production zone water-bearing layer position and sand coated iron mold feature includes rock bulk densityInformation With rock stratum buried depth H information;The pressure of the high pressure water injection is higher than water filling layer position strata pressure 0.5-1Mpa.The overlying strata water filling The water source that method uses is mine water, old water in gob area or earth surface water source, is not necessarily to secondary operation, is situated between directly as filling Matter.The spacing of wells of the water injecting drilling (7) and the drilling (10) that discharges water is 300~500m, and specific spacing is by place work Face mining conditions and corresponding sand coated iron mold feature determine.
The utility model has the advantages that
1. reducing the development height for adopting water flowing fractured zone by overlying strata high pressure water injection, water proof thickness is increased indirectly Degree, improves the water-resisting ability of water barrier, to realize water-retaining production;
2. material source is extensive using water as unique filler, at low cost, waste water of mine can be directly taken, is not necessarily to Secondary operation improves mine drainage utilization rate;And, ecological safety pollution-free to the water-bearing layer water body that need to be protected;
3. this method realizes that simple, easy for construction, comprehensive benefit is good, it is only necessary in several high-pressure hydraulic pumps of ground configuration, close Reason design water filling layer position and waterflood timing, control pressure, can be filled the water by water injecting drilling to destination layer position;
4. surface drilling the injecting process and down-hole coal excavation work is independent carries out, interfere with each other small, ensure that the production of working face Amount.
Figure of description
Fig. 1 is that high water retaining mining method schematic diagram is led in overlying strata water filling reduction of the invention;
Fig. 2 is of the invention to be inclined to pouring water into borehole along working face and drilling discharges water schematic diagram.
In figure: 1- earth's surface, the water-bearing layer that 2- need to be protected, the coal seam 3-, the goaf 4-, 5- high-pressure hydraulic pump, the ground 6- water-supply-pipe Road, 7- water injecting drilling, the water producing fractures belt profile that 8- is normally exploited, the water producing fractures belt profile after 9- water filling, 10- discharge water brill Hole, 11- section isolated coal pillar,Impermeable layer thickness under normal mining conditions,Water proof thickness under the conditions of overlying strata water filling Degree,Height of water flowing fractured zone under normal mining conditions,Height of water flowing fractured zone under the conditions of overlying strata water filling.
Specific embodiment
One embodiment of the present of invention is further described with reference to the accompanying drawing:
As depicted in figs. 1 and 2, overlying strata of the invention water filling filling, which reduces, leads high water retaining mining method, and its step are as follows:
A. production zone water-bearing layer position and sand coated iron mold feature are determined by hydrogeologic prospecting first;The hydrology Geological prospecting determines production zone water-bearing layer position and sand coated iron mold feature includes rock bulk densityInformation and rock stratum buried depth H information; The pressure of the high pressure water injection is higher than water filling layer position strata pressure 0.5-1Mpa;
B. multiple water injecting drillings 7, and the overall length in water injecting drilling 7 are being arranged to the earth's surface 1 above mining face coal seam 3 Install steel water injecting drilling casing;The spacing of wells of water injecting drilling 7 is 300~500m, and specific spacing is by place working face Mining conditions and corresponding sand coated iron mold feature determine;
Wherein first water injecting drilling 7 is arranged in the current coal work Middle face in coal seam 3, horizontal distance cut a 40m~ At 90m, along advance of the face direction arranged for interval water injecting drilling 7 until current exploitation working face stop adopt line;
Water injecting drilling 7 is bored by ground configuration position is vertically lower, and lower drilling depth should lead above height or need positioned at what is normally exploited It is water filling layer position in 2 layers of the water-bearing layer position of protection;
C., high-pressure hydraulic pump 5, and the ground water delivery formed using screwed flange and stainless steel tube are set at water injecting drilling 7 High-pressure hydraulic pump 5 and water injecting drilling casing are fastenedly connected by pipeline 6;
D. working face mining is carried out according to conventional production practice, section isolated coal pillar 11 is retained when exploitation, when working face pushes away When proceeding at horizontal distance water injecting drilling 710m-30m, pass through ground hydraulic pipeline 6 into water injecting drilling 7 using high-pressure hydraulic pump 5 High pressure water injection is carried out, overlying strata are injected water into;The water source that the method for overlying strata water filling uses be mine water, old water in gob area or It is earth surface water source, secondary operation is not necessarily to, directly as filling medium;
E. the water filling filled the water to 7 mesohigh of water injecting drilling is read using the flowmeter for being located at 5 water outlet of high-pressure hydraulic pump Amount stops water filling when reaching the 30%~45% of 4 volume of goaf to the total amount of overlying strata injection water;
F. high-pressure hydraulic pump 5 is closed, ground hydraulic pipeline 6 is removed, sealing of hole is carried out to water injecting drilling 7 using concreteness material;
G. step c, d, e, f are repeated, it is just right when the advance of the face is at next water injecting drilling 710-30m Corresponding water injecting drilling 7 implements high pressure water injection, until completing the water filling and sealing of hole work of all water injecting drillings 7, returns in the working face While adopting, tunnels the stope drift active workings of next Adjacent Working Face and cut eye;
H. after the completion of working face extraction, the stope drift active workings dug by next Adjacent Working Face are to being completed back production Be in tilted layout at overlying strata multiple drillings 10 that discharge water above working face, and multiple drillings 10 that discharge water are along advance of the face direction interval cloth It sets, the spacing of wells for the drilling 10 that discharges water is 300~500m, and specific spacing is by place working face mining condition and corresponding overlying strata Structure feature determines that 10 inclination angles of drilling that discharge water are 37 ° ~ 42 °, and the drilling 10 that discharges water is drilled into water filling layer position, and using discharging water, drilling 10 will The water of injection overlying strata is emitted into stope drift active workings sink and ground is discharged by underground drainage system, to eliminate gushing water hidden danger, discharges water Meanwhile overlying rock mass motion, development degree is low again in crack, effective protection overlying aquifer water resource;
I. step g and step h is repeated to complete all water-retaining productions to mining coal seam.
As shown in Figure 1, water filling layer lower part rock mass actively pushes, caving zone under the effect of 5 water injection pressure of ground high-pressure hydraulic pump Spoil is compacted rapidly, and the water producing fractures belt profile 8 normally exploited forms the water producing fractures belt wheel after water filling after high pressure water injection Exterior feature 9, height of water flowing fractured zone will be from the height under normal mining conditionsDrop to the water flowing fractured zone under the conditions of overlying strata water filling Highly, and impermeable layer thickness then fromIncrease to the impermeable layer thickness under the conditions of overlying strata water filling, enhance the resistance of water barrier Outlet capacity, to realize water protection mining.

Claims (4)

1. a kind of overlying strata water filling filling, which reduces, leads high water retaining mining method, it is characterised in that steps are as follows:
A. production zone water-bearing layer position and sand coated iron mold feature are determined by hydrogeologic prospecting first;
B. multiple water injecting drillings (7) are being arranged to the earth's surface (1) above mining face coal seam (3), and in water injecting drilling (7) Overall length installs steel water injecting drilling casing;
Wherein first water injecting drilling (7) is arranged in the current coal work Middle face in coal seam (3), horizontal distance cut a 40m~ At 90m, along advance of the face direction arranged for interval water injecting drilling (7) until current exploitation working face stop adopt line;
Water injecting drilling (7) is bored by ground configuration position is vertically lower, and lower drilling depth should be located at leading above height of normally exploiting or need to protect It is water filling layer position in water-bearing layer (2) layer position of shield;
C. the ground water delivery for high-pressure hydraulic pump (5) being set at water injecting drilling (7), and being formed using screwed flange and stainless steel tube High-pressure hydraulic pump (5) is fastenedly connected by pipeline (6) with water injecting drilling casing;
D. carry out working face mining according to conventional production practice, before exploitation according to geology condition determining work face rational width and It stays and sets section isolated coal pillar, when at the advance of the face to horizontal distance water injecting drilling (7) 10m-30m, utilize high-pressure hydraulic pump (5) High pressure water injection is carried out into water injecting drilling (7) by ground hydraulic pipeline (6), injects water into overlying strata;
E. the water filling filled the water to water injecting drilling (7) mesohigh is read using the flowmeter for being located at high-pressure hydraulic pump (5) water outlet Amount stops water filling when reaching the 30%~45% of goaf (4) volume to the total amount of overlying strata injection water;
F. high-pressure hydraulic pump (5) are closed, removes ground hydraulic pipeline (6), water injecting drilling (7) is sealed using concreteness material Hole;
G. step c, d, e, f are repeated, when the advance of the face is at next water injecting drilling (7) 10-30m, just to phase Water injecting drilling (7) are answered to implement high pressure water injection, until the water filling and sealing of hole work of all water injecting drillings (7) are completed, in the working face While back production, tunnels the stope drift active workings of next Adjacent Working Face and cut eye;
H. after the completion of working face extraction, the stope drift active workings dug by next Adjacent Working Face are to the work that back production is completed Inclination arrangement is multiple at overlying strata above face discharges water drilling (10), and multiple drillings (10) that discharge water are along advance of the face direction interval cloth It sets, drilling (10) inclination angle that discharges water is 37 ° ~ 42 °, and the drilling (10) that discharges water is drilled into water filling layer position, and using discharging water, drilling (10) will inject The water of overlying strata is emitted into stope drift active workings sink and ground is discharged by underground drainage system, to eliminate gushing water hidden danger, discharges water simultaneously, Overlying rock mass motion, development degree is low again in crack, effective protection overlying aquifer water resource;
I. step g and step h is repeated to complete all water-retaining productions to mining coal seam.
2. overlying strata water filling filling according to claim 1, which reduces, leads high water retaining mining method, it is characterised in that: the water Literary geological prospecting determines production zone water-bearing layer position and sand coated iron mold feature includes rock bulk densityInformation and rock stratum buried depth H letter Breath;The pressure of the high pressure water injection is higher than water filling layer position strata pressure0.5-1Mpa。
3. overlying strata water filling filling according to claim 1, which reduces, leads high water retaining mining method, it is characterised in that: described to cover The water source that the method for rock water filling uses is mine water, old water in gob area or earth surface water source, is not necessarily to secondary operation, directly as Filling medium.
4. overlying strata water filling filling according to claim 1, which reduces, leads high water retaining mining method, it is characterised in that: the note The spacing of wells of water drilling hole (7) and the drilling (10) that discharges water is 300~500m, and specific spacing is by place working face mining condition And corresponding sand coated iron mold feature determines.
CN201710305269.4A 2017-05-03 2017-05-03 Overlying strata water filling filling, which reduces, leads high water retaining mining method Active CN107100625B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710305269.4A CN107100625B (en) 2017-05-03 2017-05-03 Overlying strata water filling filling, which reduces, leads high water retaining mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710305269.4A CN107100625B (en) 2017-05-03 2017-05-03 Overlying strata water filling filling, which reduces, leads high water retaining mining method

Publications (2)

Publication Number Publication Date
CN107100625A CN107100625A (en) 2017-08-29
CN107100625B true CN107100625B (en) 2019-08-13

Family

ID=59657450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710305269.4A Active CN107100625B (en) 2017-05-03 2017-05-03 Overlying strata water filling filling, which reduces, leads high water retaining mining method

Country Status (1)

Country Link
CN (1) CN107100625B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108119142B (en) * 2017-11-09 2019-05-17 中国矿业大学 - three-two subregion water-protection coal-mining methods of band of five figures
CN109209493B (en) * 2018-10-29 2019-10-11 六盘水师范学院 A kind of leting speeper method of seam mining under thick loess grouting goaf
CN112824651A (en) * 2019-11-21 2021-05-21 辽宁工程技术大学 Method for reserving isolation coal pillars for fire prevention between goafs of steep coal seams
CN111931264B (en) * 2020-06-11 2023-10-20 中国矿业大学 Design method for deep mine water heating type geothermal energy and coal seam collaborative mining working face
CN111894671B (en) * 2020-08-14 2022-06-24 山东科技大学 Ground water pumping hole pumping and draining method aiming at working face top plate separation layer water damage
CN113175325B (en) * 2021-04-25 2022-03-08 中国矿业大学 Coal and intergrown sandstone type uranium ore coordinated mining method based on key layer protection
CN114575848B (en) * 2022-03-15 2023-03-24 中国矿业大学(北京) Method for controlling surface damage under high-strength mining of shallow coal seam

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1802128C (en) * 1991-04-15 1993-03-15 Днепропетровский Хозрасчетный Филиал Центра Научно-Инженерных Проблем Method for mining of thin manganese ore beds
RU1806268C (en) * 1991-05-20 1993-03-30 Евгений Михайлович Попков Process of development of fire-hazardous coal seams
CN1065215C (en) * 1996-10-22 2001-05-02 中国矿业大学 Method for treating circulating water by mineral type flocculant
CN1224660C (en) * 2003-02-27 2005-10-26 中国矿业大学 Hang sand thickener for preventing coal from self combustion

Also Published As

Publication number Publication date
CN107100625A (en) 2017-08-29

Similar Documents

Publication Publication Date Title
CN107100625B (en) Overlying strata water filling filling, which reduces, leads high water retaining mining method
CN102505963B (en) Stope face roof water pre-drainage construction method
CN102852546B (en) Method for pre-pumping coal roadway stripe gas of single soft protruded coal seam of unexploited area
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
CN112392431A (en) Technology for preventing and treating water damage of coal seam roof by dynamic pressure-maintaining grouting and plugging of horizontal long drill hole in mining fracture zone
CN113175325B (en) Coal and intergrown sandstone type uranium ore coordinated mining method based on key layer protection
CN102493831B (en) Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes
CN107740707A (en) Thick coal-layer mining water damage prevention and controls under a kind of deep high artesian
CN109162731B (en) Water inrush grouting treatment method for deep mining of iron mine area
Qu et al. Analysis of longwall goaf gas drainage trials with surface directional boreholes
CN106089291A (en) A kind of collaborative extraction is caving the old dead zone of formula and the method for lower coal seam coal bed gas
CN107194615A (en) The evaluation method of coal mine underground reservoir construction applicability
CN109162713B (en) Coal-water dual-resource mine mining method without changing overlying strata hydrogeological conditions
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN104895531A (en) Single thick coal seam ground mining well extraction process
CN104633996A (en) Water source heat pump recharging technical method
CN110173238A (en) The anti-reflection extraction of high seam three-dimensional roadway layout networking explosion thick gas method entirely
CN109593957A (en) A kind of active method for extracting of in-situ leaching ion type rareearth ore
CN111827878A (en) Method for quickly and accurately probing hidden water inrush channel of coal seam floor
CN109899105A (en) A kind of multistage crossing-hole gas extraction method of low level for coal petrography alternating layers coal seam
CN106014345B (en) A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed
Niu et al. Numerical investigation on mechanism and fluid flow behavior of goaf water inrush: a case study of Dongyu coal mine
CN113653531A (en) Method for draining low-permeability roof water
CN103362541A (en) Method for locally improving coal seam air permeability in coal seam with high gas and low air permeability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant