CN102493553B - Construction method of member for connection node of reinforced beam and steel beam - Google Patents
Construction method of member for connection node of reinforced beam and steel beam Download PDFInfo
- Publication number
- CN102493553B CN102493553B CN201110412559.1A CN201110412559A CN102493553B CN 102493553 B CN102493553 B CN 102493553B CN 201110412559 A CN201110412559 A CN 201110412559A CN 102493553 B CN102493553 B CN 102493553B
- Authority
- CN
- China
- Prior art keywords
- steel
- lag
- welded
- steel plates
- blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention relates to a member for a connection node of a reinforced beam and a steel beam and a construction method thereof, which belong to the technical field of building engineering and combined structures. The node is composed of the reinforced beam, a U-shaped groove and the steel beam, wherein the U-shaped groove is formed by welding three steel plates, studs are welded on the steel plates, and connection between the reinforced beam and the U-shaped groove is guaranteed to be reliable. The steel beam is welded on vertical steel plates of the U-shaped groove, and the two vertical steel plates of the U-shaped groove are connected through bolts and are used for resisting pull force of the flange of the steel plate on the steel plates. The member for the connection node of the reinforced beam and the steel beam is excellent in stressed performance, safe and reliable and convenient to construct.
Description
Technical field
The present invention relates to the connected node of a kind of reinforced concrete beam and girder steel, belong to construction work and combining structure technical field.
Background technology
Along with the development of high building structure form, there is many new structural system.In Mixed Architecture, sometimes can encounter reinforced concrete beam and the interlaced situation being connected of girder steel.In order to guarantee between reinforced concrete beam and girder steel transmission internal force reliably, both connected nodes must have rational structural form.And the current reinforced concrete beam and the steel beam connecting joint forms that adopt pre-buried reinforcing bar in engineering, pre-buried reinforcing bar passes the stirrup colligation in reinforced concrete beam and vertical muscle and has brought very large difficulty, affects construction quality. more
Summary of the invention
The object of the invention is to overcome deficiency of the prior art, propose structure and the construction method thereof of a kind of reinforced concrete beam and steel beam connecting joint, make the connected node stress performance of reinforced concrete beam and girder steel superior, safe and reliable, easy construction.
The member of a kind of reinforced concrete beam of the present invention and steel beam connecting joint, it is characterized in that, this node comprises reinforced concrete beam 1, with girder steel 3, it is characterized in that, also comprise a U-lag 2, described U-lag 2 is welded by two blocks of vertical steel plates 6 and a horizontal steel plate 7, on steel plate in U-lag, be welded with peg 5, two blocks of vertical steel plates 6 in described U-lag outside are welded with respectively girder steel 3, and two blocks of described vertical steel plates 6 connect by bolt 4.
The construction method of the member of a kind of reinforced concrete beam of the present invention and steel beam connecting joint, is characterized in that, step is as follows:
A. the U-lag 2 that two blocks of vertical steel plates 6 and a horizontal steel plate 7 is welded, weld stud 5 on the steel plate of U-lag inner side, two blocks of vertical steel plates 6 welded steel beams 3 respectively in U-lag outside, and install bolt 4;
B. member a step being processed is transported to job site installation in position;
C. the reinforcing bar of assembling reinforcement concrete beam, concreting;
D. when concrete intensity reaches design load, tight a bolt 4, complete construction.
The present invention has the following advantages:
(1) reasonable stress.This connected node transmits the shearing between reinforced concrete beam and girder steel by peg, by bolt, resists the pulling force of the girder steel edge of a wing to the vertical steel plate of U-lag, has guaranteed effective transmission of stress, connects reliable.(2) easy construction.U-lag, the welding job of girder steel can complete in advance in factory, and U-lag can be used as the template of reinforced concrete beam and uses, and direct concreting, constructs very convenient in the above.
Accompanying drawing explanation
Fig. 1 is node schematic diagram of the present invention;
Fig. 2 is not node schematic diagram during concreting of the present invention;
Fig. 3 is not node elevation during concreting of the present invention;
Fig. 4 is not nodal plane figure during concreting of the present invention;
Fig. 5 is not node A-A sectional drawing during concreting of the present invention.
In figure: 1-reinforced concrete beam; 2-U shape groove; 3-girder steel; 4-bolt; 5-peg; The vertical steel plate of 6-; The horizontal steel plate of 7-.
The specific embodiment
Below in conjunction with accompanying drawing, specific embodiment of the invention method is further described.
The present invention is the member of the connected node of a kind of reinforced concrete beam and girder steel, and its stress performance is superior, safe and reliable, easy construction.As shown in Figure 1, this node comprises reinforced concrete beam 1, U-lag 2 and girder steel 3.Described U-lag 2 is welded by two blocks of vertical steel plates 6 and a horizontal steel plate 7, is welded with peg 5 on the steel plate in U-lag, for guaranteeing that described reinforced concrete beam 1 is connected with the reliable of U-lag 2.Described girder steel 3 is welded on vertical steel plate 6 outsides of U-lag 2, and two blocks of vertical steel plates 6 of U-lag 2 connect by bolt 4, for resisting the pulling force of girder steel 3 to vertical steel plate 6.
The construction method of the member of the connected node of a kind of reinforced concrete beam of the present invention and girder steel is:
A. in factory by two blocks of vertical steel plates 6 and a horizontal steel plate 7 U-lag that is welded, on the steel plate of U-lag inner side, weld peg 5, for guaranteeing that described reinforced concrete beam 1 is connected with the reliable of U-lag 2.Described girder steel 3 is welded on vertical steel plate 6, and installs bolt 4, as shown in Figure 2.
B. the above-mentioned member processing is transported to job site installation in position;
C. the reinforcing bar of assembling reinforcement concrete beam, concreting;
D. when concrete intensity reaches design load, tight a bolt, complete construction.
Claims (1)
1. a component construction method for reinforced concrete beam and steel beam connecting joint, the member of described connected node comprises reinforced concrete beam (1), girder steel (3) and a U-lag (2); Described U-lag (2) is welded by two blocks of vertical steel plates (6) and a horizontal steel plate (7), on steel plate in U-lag, be welded with peg (5), two blocks of vertical steel plates (6) in described U-lag outside are welded with respectively girder steel (3), and described two blocks of vertical steel plates (6) connect by bolt (4); It is characterized in that, described construction method step is as follows:
A. U-lag (2) is welded two blocks of vertical steel plates (6) and a horizontal steel plate (7), weld stud (5) on the steel plate of U-lag inner side, two blocks of vertical steel plates (6) in U-lag outside welded steel beam (3) respectively, and install bolt (4);
B. member a step being processed is transported to job site installation in position;
C. the reinforcing bar of assembling reinforcement concrete beam, concreting;
D. when concrete intensity reaches design load, tight a bolt (4), complete construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110412559.1A CN102493553B (en) | 2011-12-09 | 2011-12-09 | Construction method of member for connection node of reinforced beam and steel beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110412559.1A CN102493553B (en) | 2011-12-09 | 2011-12-09 | Construction method of member for connection node of reinforced beam and steel beam |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102493553A CN102493553A (en) | 2012-06-13 |
CN102493553B true CN102493553B (en) | 2014-04-16 |
Family
ID=46185407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110412559.1A Active CN102493553B (en) | 2011-12-09 | 2011-12-09 | Construction method of member for connection node of reinforced beam and steel beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102493553B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104746893B (en) * | 2015-03-31 | 2017-04-19 | 铁道第三勘察设计院集团有限公司 | Connecting method for newly added steel beam and existing steel reinforced concrete beam |
CN106958296A (en) * | 2017-04-05 | 2017-07-18 | 上海大学 | A kind of connecting node of buckling-restrained steel plate wall and concrete frame beam |
CN107965055B (en) * | 2017-12-15 | 2023-10-03 | 北京万兴建筑集团有限公司 | Connecting node of H-shaped steel beam and steel reinforced concrete beam and manufacturing method |
CN108679310A (en) * | 2018-06-26 | 2018-10-19 | 湖北郢都水利水电建设有限公司 | A kind of pumping plant water outlet steel tube track holder device of rapid construction |
CN112627333A (en) * | 2020-09-28 | 2021-04-09 | 北京赛博思工程技术研究院 | Bracket subassembly and be used for primary and secondary roof beam connected node of steel construction |
CN112324178B (en) * | 2020-10-26 | 2023-02-21 | 华侨大学 | Nondestructive steel beam reinforced concrete frame and construction method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201474083U (en) * | 2009-08-04 | 2010-05-19 | 华侨大学 | Novel steel-concrete combined panel node |
CN201648950U (en) * | 2010-05-11 | 2010-11-24 | 天津市市政工程设计研究院 | Novel beam structure of steel-concrete combination section |
CN202347665U (en) * | 2011-12-09 | 2012-07-25 | 清华大学 | Connection node constructional member of reinforced concrete beam and steel beam |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07331737A (en) * | 1994-06-02 | 1995-12-19 | Taisei Corp | Joint structure of reinforced concrete girder and steel beam |
-
2011
- 2011-12-09 CN CN201110412559.1A patent/CN102493553B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201474083U (en) * | 2009-08-04 | 2010-05-19 | 华侨大学 | Novel steel-concrete combined panel node |
CN201648950U (en) * | 2010-05-11 | 2010-11-24 | 天津市市政工程设计研究院 | Novel beam structure of steel-concrete combination section |
CN202347665U (en) * | 2011-12-09 | 2012-07-25 | 清华大学 | Connection node constructional member of reinforced concrete beam and steel beam |
Also Published As
Publication number | Publication date |
---|---|
CN102493553A (en) | 2012-06-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493553B (en) | Construction method of member for connection node of reinforced beam and steel beam | |
CN204252286U (en) | A kind of rectangular steel-tube concrete column-steel beam connecting joint | |
CN103015536B (en) | Beam-column joint connecting device for multi-story/high-rise assembly type steel structure system | |
CN104047367A (en) | Novel connecting structure capable of achieving replacement of steel coupling beams | |
CN103334499B (en) | A kind of beam column node connection device | |
CN103924674A (en) | High-strength bolt shear key structure and constructing method thereof | |
CN108867889B (en) | Construction method for connecting joint of prefabricated reinforced concrete superposed beam and steel pipe column | |
CN203361354U (en) | Beam column pitch point connecting device | |
JP2009280971A (en) | Joint structure of precast concrete pole and precast concrete beam | |
CN103437493A (en) | Connecting node of prefabricated reinforced concrete beam and construction method of connecting node | |
CN103806593B (en) | A kind of precast concrete | |
JP6067403B2 (en) | Beam-to-column connection and steel beam connection at beam-to-column connection | |
KR101577327B1 (en) | Hybrid composite girder | |
CN103806538B (en) | A kind of precast reinforced concrete structure | |
CN203440993U (en) | Connection joint of prefabricated reinforced concrete beam | |
KR101520033B1 (en) | PSC composite truss girder | |
CN202347665U (en) | Connection node constructional member of reinforced concrete beam and steel beam | |
CN101608474B (en) | H-shaped steel beam connecting node | |
CN205295915U (en) | Wave form steel web nose girder | |
JP2011174289A (en) | Main girder connecting structure of bridge | |
JP2019190137A (en) | Binder end joint structure, and method of constructing binder end joint structure | |
CN103835399A (en) | Prestress embedded steel plate-concrete combined shear wall | |
CN108049504B (en) | Connecting method for assembled type combined wall | |
CN204139334U (en) | Girder steel and steel column weld temporary connecting structure entirely | |
CN210508035U (en) | Assembly type combination beam secondary beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |