CN108679310A CN201810667989.XA CN201810667989A CN108679310A CN 108679310 A CN108679310 A CN 108679310A CN 201810667989 A CN201810667989 A CN 201810667989A CN 108679310 A CN108679310 A CN 108679310A
Authority
CN
China
Prior art keywords
track
steel pipe
water outlet
construction
bracket plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810667989.XA
Other languages
Chinese (zh)
Other versions
CN108679310B (en
Inventor
张珉珉
张祖银
李建恒
倪高宇
夏应锋
张定研
焦伟
王思军
张铭
张师玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd
Original Assignee
Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd filed Critical Hubei Yedu Water Conservancy And Hydropower Construction Co Ltd
Priority to CN201810667989.XA priority Critical patent/CN108679310B/en
Publication of CN108679310A publication Critical patent/CN108679310A/en
Application granted granted Critical
Publication of CN108679310B publication Critical patent/CN108679310B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B5/00Use of pumping plants or installations; Layouts thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/26Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting the pipes all along their length, e.g. pipe channels or ducts

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of pumping plants of rapid construction to be discharged steel tube track holder device, belongs to rivers lift pumping station and is discharged steel tube track technical field of construction.It is made of water outlet steel pipe, track and bracket component, bracket component is packed on concrete floor, steel-pipe welding is discharged in the U-shaped steel plate of bracket component upper end, two tracks are symmetrically packed in by briquetting on the bracket component of water outlet steel pipe both sides, and the bracket component is made of U-bracket plate, steel pipe, track.The present invention will be discharged steel pipe and track is transported after workshop machine-shaping to building site, at the scene casting concrete one-pass molding, short time limit, shortens the construction period 50% or more than conventional method construction, engineering can build up current year operation and be benefited for the year.It is first to pour U-type groove concrete cradle to solve conventional method, then pours the fill concrete in U-type groove again, and underwater portion construction must the problem of construction time could complete, and cause centainly to lose to the agricultural production of current year in 2 year.

Description

A kind of pumping plant water outlet steel tube track holder device of rapid construction
Technical field
The present invention relates to a kind of pumping plants of rapid construction to be discharged steel tube track holder device, belongs to rivers lift pumping station and is discharged steel Pipe track construction technical field.
Background technology
It, will in order to make full use of ChangJiang River to build more lift pumping stations along the Yangtze River to the irrigation effect of agricultural Yangtze River Water, which is irrigated by lifting water to a higher level with a water pump, etc., irrigates farmland into channel.The existing lift pumping station built along the Yangtze River generally uses Cable Railway shape Formula, previous arrangement and method for construction are:In order to ensure the construction time, first has to fill high cofferdam water retaining, then carry out intake pool base Hole excavation → bottom cushion concreting → baseplate reinforcing bar peace → underplate concrete pours → and underplate concrete reaches certain After intensity(48 hours or more)Make U-type groove wall steel bar, built-in fitting peace → U-type groove wall form installation → U-type groove coagulation Soil pours → Pipe installing → attached metal installing engineering → U-type groove in the second stage of fill concrete pour, long construction period, water Lower pipeline construction needs effective 170 days working days or more.Once and when construction in the Changjiang river spring water level go up in advance, cofferdam is overflowed It floods, can only wait for that water level is stepped back and restore cofferdam again, again dewatering excavation foundation pit.On the other hand, the fastener for connection installation of pipeline It is welded on the slope of building site, material splicing, human weld's work by instrument and equipment and place because being limited to, it is difficult to meet The required precision of design.Former arrangement and method for construction does high cofferdam and there is unrestrained weir and the security risk on dam, to race against time in quality It is difficult to ensure again;Therefore, in order to not only ensure construction quality, but also evade security risk, lift pumping station is built all under normal circumstances It needs 2 year duration, engineering that cannot be benefited for the year, has not only seriously affected the agricultural production in irrigated area, but also increase construction cost.
Invention content
It is an object of the present invention in view of the above shortcomings of the prior art, provide a kind of that water outlet steel pipe and track is prior It is welded on water outlet steel pipe with U-bracket plate in workshop machine-shaping, while in workshop, then will water outlet steel pipe and rail Road finished product is transported onto building site, then poured in place concrete one-pass molding, not only can guarantee construction quality and construction safety, but also energy One times of work efficiency is improved, the duration is saved, realizes that engineering current year is benefited, reducings the construction costs;It is highly suitable for rivers slope surface rail cable Building for vehicle type lift pumping station, is especially limited by river level, it is desirable that the engineering of underwater construction short time limit, pumping plant are discharged steel pipe Track support device can realize rapid construction.
The present invention is to realize above-mentioned purpose by the following technical solutions:
A kind of pumping plant of rapid construction is discharged steel tube track holder device, it by water outlet steel pipe, track and U-bracket plate, reinforcing bar, Pre-embedded bolt, built-in fitting and briquetting are constituted, it is characterised in that:Water outlet steel pipe is packed on U-bracket plate, and U-bracket plate is length Square structure, making on U-bracket plate has reinforced hole, and two tracks are symmetrically packed in the U-shaped of water outlet steel pipe both sides by briquetting The bracket component of water outlet steel pipe and track is formed on supporting plate;Bracket component is packed on the concrete floor poured, pump truck One end steel wire rope is installed and is slided in orbit by the realization of pump house hoist engine, pump truck upper-loading has immersible pump and by an armful rail Device is buckled on two tracks;Reinforcing bar is penetrated by the reinforced hole on U-bracket plate in each U-bracket plate, is used in combination stirrup by steel The cast that concrete is carried out after muscle banding fixed, is put into concrete top when cast by pre-embedded bolt and built-in fitting.
The advantageous effect of the present invention compared with prior art is:
1, the pumping plant water outlet steel tube track holder device use of the rapid construction will be discharged steel pipe and track in advance in workshop Machine-shaping, while U-bracket plate being welded on water outlet steel pipe in workshop, then steel tube track bracket component is transported Building site, then poured in place concrete one-pass molding, the construction period is short, shortens the construction period 50% or more than previous methods construction, saves Time, engineering can build up current year operation and be benefited for the year.It is first to pour U-type groove concrete cradle to solve conventional method, waits for coagulation Soil carries out water outlet penstock installation after reaching some strength, then pours the fill concrete in U-type groove again.Such as the Changjiang river winter water When position cannot persistently drop to ideal working water level, underwater portion construction must could be completed 2 year construction time, the agriculture to current year Industry production causes certain loss.
2, the U-type groove steel pipe arrangement and method for construction of opposite previous methods reduces compared to concrete cross section area, greatly reduces mixed Solidifying soil and amount of reinforcement, decrease artificial dosage, have saved engineering cost, and economic benefit and social benefit ten are clearly demarcated It is aobvious.
3, the water outlet steel pipe of the pumping plant water outlet steel tube track holder device of the rapid construction and track are in advance in workshop Machine-shaping, machining accuracy higher, the welding quality of making are more preferable, not only increase working efficiency, moreover it is possible to ensure construction quality And construction safety.
4, water outlet steel pipe, track and the bracket component of the pumping plant water outlet steel tube track holder device of the rapid construction are in workshop Mechanized Processing is more more environmentally friendly than manual manufacture at the scene, more efficient, reduces injury of the pernicious gas to worker, reduces remnants Being scattered for waste is stretched, and environmental pollution is effectively mitigated.
Description of the drawings
Fig. 1 is that a kind of pumping plant of rapid construction is discharged the structural representation that pump truck is housed on the track of steel tube track holder device Figure;
Fig. 2 is the structural schematic diagram that a kind of pumping plant of rapid construction is discharged the cross section of steel tube track holder device;
Fig. 3 is that a kind of pumping plant of rapid construction is discharged water outlet steel pipe, track and U-bracket the plate installation of steel tube track holder device Structural schematic diagram afterwards.
In figure:1, it is discharged steel pipe, 2, track, 3, pump truck, 4, steel wire rope, 5, U-bracket plate, 6, reinforcing bar, 7, reinforced hole, 8, Pre-embedded bolt, 9, built-in fitting, 10, briquetting.
Specific implementation mode
The pumping plant of the rapid construction is discharged steel tube track holder device, it by water outlet steel pipe 1, track 2, U-bracket plate 5, Reinforcing bar 6, pre-embedded bolt 8, built-in fitting 9 and briquetting 10 are constituted, and water outlet steel pipe 1 is packed on U-bracket plate 5, and U-bracket plate 5 is Rectangle structure, making on U-bracket plate 5 has reinforced hole 7, and two tracks 2 symmetrically are packed in by briquetting 10 and are discharged 1 liang of steel pipe The bracket component of water outlet steel pipe and track is formed on the U-bracket plate 5 of side;Bracket component is packed in the concrete floor poured On, one end of pump truck 2 is equipped with steel wire rope 4 and is realized by pump house hoist engine slides on track 2, equipped with diving on pump truck 2 It pumps and is buckled on two tracks by embracing rail device;Reinforcing bar 6 penetrates each U-bracket plate 5 by the reinforced hole 7 on U-bracket plate 5 In, it is used in combination stirrup that will carry out the cast of concrete after 6 banding fixed of reinforcing bar, pre-embedded bolt 8 and built-in fitting 9 are put into mixed by when cast Solidifying soil top.
The manufacturing process of the pumping plant water outlet steel tube track holder device of the rapid construction is as follows:
The first step, first workshop by a diameter of 110 cm, length be 6m steel pipe according to water outlet steel pipe 1 needed for length pair It is discharged steel pipe 1 and carries out welding processing, while welding processing is carried out to track 2 according to the length needed for track 2, then in workshop The U-bracket plate 5 that thickness is 3cm is welded on by design requirement on water outlet steel pipe 1.
The water outlet steel pipe 1 for being welded with U-bracket plate 5 and track 2 made are transported to building site and are placed on bottom by second step It on plate, is mounted on bottom plate by design requirement, and pipeline is done and is connected and fixed with the built-in fitting on bottom plate after leveling straightening is checked.
Third step penetrates reinforcing bar 6 in each U-bracket plate 5 by the reinforced hole 7 on U-bracket plate 5, then will with stirrup The cast that concrete is carried out after 6 banding fixed of reinforcing bar, concrete is put into when being poured into top by pre-embedded bolt 8 and built-in fitting 9 Top is fixed tightly on concrete upon the setting of the concrete.
4th step, after concrete setting, two tracks 2 are symmetrically packed in water outlet steel pipe 1 both sides by briquetting 10 On bracket component, the water outlet steel tube track holder device of pumping plant completes;Pump truck 3 is mounted in two by embracing rail device again On track 2, steel wire rope 4 is loaded onto on pump truck 2 and completes pumping plant installation.
The above is presently preferred embodiments of the present invention, and the example above illustrates that the substantive content not to the present invention is made Limitation in any form, technology of the person of an ordinary skill in the technical field after having read this specification according to the present invention Essence is to any simple modification or deformation made by the above specific implementation mode, and the technology contents possibly also with the disclosure above The equivalent embodiment for being changed or being modified to equivalent variations, in the range of still falling within technical solution of the present invention, without departing from The spirit and scope of the invention.

Claims (1)

1. a kind of pumping plant of rapid construction is discharged steel tube track holder device, it is by water outlet steel pipe(1), track(2), U-bracket Plate(5), reinforcing bar(6), pre-embedded bolt(8), built-in fitting(9)And briquetting(10)It constitutes, it is characterised in that:It is discharged steel pipe(1)It is fixedly mounted with In U-bracket plate(5)On, U-bracket plate(5)For rectangle structure, U-bracket plate(5)Upper making has reinforced hole(7), two Track(2)Pass through briquetting(10)Symmetrically it is packed in water outlet steel pipe(1)The U-bracket plate of both sides(5)Upper formation water outlet steel pipe and rail The bracket component in road;Bracket component is packed on the concrete floor poured, pump truck(2)One end steel wire rope is installed(4) And it is realized in track by pump house hoist engine(2)On slide, pump truck(2)It is upper to be buckled in two equipped with immersible pump and by embracing rail device On track;Reinforcing bar(6)Pass through U-bracket plate(5)On reinforced hole(7)Penetrate each U-bracket plate(5)In, it is used in combination stirrup by steel Muscle(6)The cast that concrete is carried out after banding fixed, by pre-embedded bolt when cast(8)And built-in fitting(9)It is put into concrete top.
CN201810667989.XA 2018-06-26 2018-06-26 Pump station water outlet steel pipe track support device capable of achieving rapid construction Active CN108679310B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810667989.XA CN108679310B (en) 2018-06-26 2018-06-26 Pump station water outlet steel pipe track support device capable of achieving rapid construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810667989.XA CN108679310B (en) 2018-06-26 2018-06-26 Pump station water outlet steel pipe track support device capable of achieving rapid construction

Publications (2)

Publication Number Publication Date
CN108679310A true CN108679310A (en) 2018-10-19
CN108679310B CN108679310B (en) 2024-07-16

Family

ID=63812335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810667989.XA Active CN108679310B (en) 2018-06-26 2018-06-26 Pump station water outlet steel pipe track support device capable of achieving rapid construction

Country Status (1)

Country Link
CN (1) CN108679310B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07173940A (en) * 1992-02-15 1995-07-11 Tomohisa Ishida Floating temporary frame supporting system
EP1109204A2 (en) * 1999-12-16 2001-06-20 The Boc Group, Inc. Compact equipment
CN202248368U (en) * 2011-09-27 2012-05-30 深圳市建筑设计研究总院有限公司 Water-stopping and leakage-preventing reinforced concrete shear wall of optical fiber wiring room
CN102493553A (en) * 2011-12-09 2012-06-13 清华大学 Member for connection node of reinforced beam and steel beam and construction method thereof
CN103669127A (en) * 2012-09-05 2014-03-26 中国葛洲坝集团股份有限公司 Combined type tunnel trolley guide rail
CN103726537A (en) * 2012-10-13 2014-04-16 葛洲坝集团第五工程有限公司 Movable combination type water intake pumping station
CN105735399A (en) * 2016-05-11 2016-07-06 湖北拓宇水电科技有限公司 Irrigation and drainage complete device of multifunctional submersible sewage pump station
CN205578905U (en) * 2016-04-15 2016-09-14 江苏建筑职业技术学院 Bury conduit support of wall body
CN206529791U (en) * 2017-01-18 2017-09-29 中国电建集团北京勘测设计研究院有限公司 A kind of cable car type moves water intake pumping station foundation structure
CN206738723U (en) * 2017-03-01 2017-12-12 江苏建筑职业技术学院 A kind of U-shaped hydraulic pipeline support
CN108163144A (en) * 2017-11-21 2018-06-15 大连中船新材料有限公司 Water floating body sits pier automatic positioning clamp device
CN208331448U (en) * 2018-06-26 2019-01-04 湖北郢都水利水电建设有限公司 A kind of pumping plant water outlet steel tube track holder device of rapid construction

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07173940A (en) * 1992-02-15 1995-07-11 Tomohisa Ishida Floating temporary frame supporting system
EP1109204A2 (en) * 1999-12-16 2001-06-20 The Boc Group, Inc. Compact equipment
CN202248368U (en) * 2011-09-27 2012-05-30 深圳市建筑设计研究总院有限公司 Water-stopping and leakage-preventing reinforced concrete shear wall of optical fiber wiring room
CN102493553A (en) * 2011-12-09 2012-06-13 清华大学 Member for connection node of reinforced beam and steel beam and construction method thereof
CN103669127A (en) * 2012-09-05 2014-03-26 中国葛洲坝集团股份有限公司 Combined type tunnel trolley guide rail
CN103726537A (en) * 2012-10-13 2014-04-16 葛洲坝集团第五工程有限公司 Movable combination type water intake pumping station
CN205578905U (en) * 2016-04-15 2016-09-14 江苏建筑职业技术学院 Bury conduit support of wall body
CN105735399A (en) * 2016-05-11 2016-07-06 湖北拓宇水电科技有限公司 Irrigation and drainage complete device of multifunctional submersible sewage pump station
CN206529791U (en) * 2017-01-18 2017-09-29 中国电建集团北京勘测设计研究院有限公司 A kind of cable car type moves water intake pumping station foundation structure
CN206738723U (en) * 2017-03-01 2017-12-12 江苏建筑职业技术学院 A kind of U-shaped hydraulic pipeline support
CN108163144A (en) * 2017-11-21 2018-06-15 大连中船新材料有限公司 Water floating body sits pier automatic positioning clamp device
CN208331448U (en) * 2018-06-26 2019-01-04 湖北郢都水利水电建设有限公司 A kind of pumping plant water outlet steel tube track holder device of rapid construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
于鲁田: "缆车式泵站若干技术问题", 排灌机械, no. 02, pages 21 - 26 *

Also Published As

Publication number Publication date
CN108679310B (en) 2024-07-16

Similar Documents

Publication Publication Date Title
CN207193982U (en) A kind of dam slope slope concrete pours transporting equipment
CN108385627B (en) Hydropower station diversion tunnel plugging construction method based on karst landform
CN108252290A (en) The soft thick soil treatment structures and methods of high-strength water-permeable fiber concrete pipe rubble core stake
CN208331448U (en) A kind of pumping plant water outlet steel tube track holder device of rapid construction
CN108301440A (en) With waterproof, the underground pipe gallery construction method of drain function
CN105332386B (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN206428752U (en) Multifunctional diving pumping plant oblique pull suspension type fixes corollary apparatus
CN112694230A (en) Comprehensive treatment method for high-garbage-content rotten and aged sludge pond
CN108679310A (en) A kind of pumping plant water outlet steel tube track holder device of rapid construction
CN210797432U (en) Water conservancy river course bank protection
CN205296164U (en) Fill ability of swimming slip form construction device
CN205711980U (en) A kind of chute cast-in-place construction device
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN108130889A (en) Pump lock main body bottom plate and flow channel layer side wall step construction joint method for production
Shiryaeva et al. Mathematical justification constructive solutions project to modernize sewage treatment plants in the HPP
CN114212686A (en) River bank protection precast block compensation throwing device and compensation throwing method
CN209397926U (en) A kind of elevator fence operation platform structure
CN210066763U (en) Foundation pit side wall structure reinforcing and supporting device
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut
CN208167743U (en) A kind of concrete sealing bottom magazine attachment
CN111827239A (en) Construction method of assembled berthing pier
CN206034382U (en) Cross a river traffic dam
CN201021658Y (en) Hydraulic pressure water supply device
CN219260906U (en) Spillway concrete structure defect rapid repair structure
CN109537599A (en) The construction method of deep foundation pit support system support changing structure for use

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant