CN102493524A - Cable stretching device - Google Patents
Cable stretching device Download PDFInfo
- Publication number
- CN102493524A CN102493524A CN2011103856142A CN201110385614A CN102493524A CN 102493524 A CN102493524 A CN 102493524A CN 2011103856142 A CN2011103856142 A CN 2011103856142A CN 201110385614 A CN201110385614 A CN 201110385614A CN 102493524 A CN102493524 A CN 102493524A
- Authority
- CN
- China
- Prior art keywords
- cable
- electric block
- groove
- electric
- cutting ferrule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
- Electric Cable Arrangement Between Relatively Moving Parts (AREA)
Abstract
The invention discloses a cable stretching device which comprises a cable, a clamping device, an electric lifting rod and an electric hoist, wherein the electric lifting rod and the electric hoist are installed on operation equipment; on the coincident position of the cable and the electric hoist, a steel rope is expanded in a clamping sleeve on the outer wall of the cable; the electric hoist is used for retracting and releasing the steel rope to drive the cable to be retracted and released, and therefore the cable is pulled away from the ground for certain height to provide power for the operation equipment; and the cable moves along with the operation equipment without affecting the operation of the operation equipment.
Description
Technical field
The present invention relates to a kind of cable stretching device.
Background technology
Existing excavator and loader etc. are fuel oil mostly with diesel oil, and diesel oil all can pollute environment from producing to use, and replace more environmental protection of diesel oil with electric power comparatively speaking.If but the electricity consumption masterpiece is the power of excavator or loader; Because the cable that is used to transmit electric power is long and not flexible; Excavator or loader are broken it in operation process easily; Then will certainly remove low operating efficiency if avoid long cable, therefore, providing a kind of can drag cable ground away from and not influence excavator or the device of loader operation seems particularly important.
Summary of the invention
The technical problem that the present invention will solve provide a kind of with cable be pulled away from the ground certain altitude, for implement provides electric power, and cable moved along with implement and do not influence the cable stretching device of its operation.
Cable stretching device of the present invention, bar and electric block fall in electronic the stretching that comprise cable, is installed on the implement, wherein:
Said electronic stretching fallen bar and is installed on the implement through a fixed support, and its top is connected with cursor through steering bearing, and said cursor is provided with pulley;
Be installed with cutting ferrule on the outer wall of said cable, the height of said cutting ferrule and cable equal in length, its center line is parallel with cable, and the internal orifice shape of said cutting ferrule matches with the steel cable profile;
Under electronic elevating lever installation site on the fixed support, be fixed with an engaging device; Second vertical groove that said engaging utensil has the steel cable of a power supply the cable first vertical groove that passes through and the moving cucurbit of supplying power to pass through; First vertical groove wherein is made up of cable groove and cutting ferrule groove, and said cable groove and cutting ferrule groove are interconnected; On the upper surface of engaging device, the cutting ferrule groove of described second vertical groove and composition first vertical groove overlaps and is provided with, and on the lower surface of engaging device, described second vertical groove and first vertical groove are separated setting;
The below of the installation position set elevating lever of said electric block; The steel cable of electric block gets into the engaging device by second vertical groove inlet on the engaging device lower surface; Pass by the vertical groove outlet in second on its upper surface through the engaging device, get into the electric up-down bar and be fixed on the actionless object in a certain relative ground through behind the pulley;
One end of cable is connected with external power source; The other end engages in first vertical groove on the device through entering behind steel cable fixed point, pulley and the electric up-down bar along the steel cable trend successively; Wherein cable gets into the cable groove; Cutting ferrule gets into the cutting ferrule groove and steel cable is coated in the cutting ferrule; Cable is connected in electrical power control cabinet at last, and the said electronic power line that falls bar and electric block of stretching is connected in electrical power control cabinet respectively, and the output of said electrical power control cabinet is connected with the parts of needs power supply in the implement.
In order to make cable more flexible through pulley the time, preferably select flat cable for use.
The actionless object in above-mentioned a certain relative ground can be the wall in house, a certain ground iron prop etc. that is fixed in.
In order to make the electric block can long steel cable and the cable of automatic drawing back; Can electric block be installed on the implement through a spring support; This spring support comprises a steel axle and two page or leaf sheets that are hinged with this steel axle; Described electric block is installed on going up on the page or leaf sheet of top, and the nextpage sheet of below is fixed on the implement; On the nextpage sheet, be provided with a touch switch, be with a spring on this touch switch, the power line of said touch switch is connected with the power line of electric block; In cable and the equitant part of steel cable, in the cutting ferrule of described steel cable swelling on the cable outer wall.
Said electric block preferably is installed on the page or leaf sheet away from an end of steel axle.At this moment, described touch switch is corresponding with the installation site of electric block on last page or leaf sheet in the installation site on the nextpage sheet, or the position farther apart from the steel axle, so more helps the automatic startup of electric block.
The drift of described spring is less than the diameter of steel axle, and the maximum working load of this spring preferably is slightly smaller than the weight of electric block simultaneously.
Device according to the invention is through electronic cooperation of stretching parts such as falling bar, electric block, realize with cable be pulled away from the ground certain altitude, for implement provides electric power, and cable moved along with implement and do not influence its operation.
Description of drawings
Fig. 1 is the structural representation of a kind of embodiment of cable stretching device according to the invention;
Fig. 2 is provided with the profile of the cable of cutting ferrule for the outer wall that uses in the embodiment shown in Figure 1;
Fig. 3 is the vertical view of engaging device in the embodiment shown in Figure 1;
Fig. 4 is the upward view of engaging device in the embodiment shown in Figure 1;
Fig. 5 is vertical cut-away view of engaging device in the embodiment shown in Figure 1.
Label is among the figure:
1 steel cable; 2 electric blocks; 3 spring supports; 3-1 steel axle; The last page or leaf of 3-2 sheet; 3-3 nextpage sheet; The 3-4 spring; The 3-5 touch switch; 4 power lines; 5 electrical power control cabinets; 6 cables; 7 fixed supports; 8 electric up-down bars; 9 steering bearings; 10 pulleys; 11 cursors; 12 iron props; 13 external power sources; 14 engaging devices; 15 cutting ferrules; 16 first vertical grooves; 16-1 cable groove; 16-2 cutting ferrule groove; 17 second vertical grooves.
The specific embodiment
Shown in Fig. 1~5, cable stretching device of the present invention comprises cable 6, is installed on electric up-down bar 8 and electric block 2 on the implement, wherein,
Said electric up-down bar 8 is installed on the implement through a fixed support 7, and its top is connected with cursor 11 through steering bearing 9, and said cursor 11 is provided with 2 pulleys 10, lays respectively at the two ends of cursor 11;
Be installed with cutting ferrule 15 on the outer wall of said cable 6, the equal in length of the height of said cutting ferrule 15 and cable 6, its center line is parallel with cable 6, and the internal orifice shape of said cutting ferrule 15 matches with steel cable 1 profile, and is as shown in Figure 2;
Under electronic elevating lever 8 installation sites on the fixed support 7, be fixed with an engaging device 14; Said engaging device 14 has the first vertical groove 16 that a power supply cable 6 passes through and power supply and moves second vertical groove 17 that the steel cable 1 of cucurbit 2 passes through; First vertical groove 16 wherein is made up of cable groove 16-1 and cutting ferrule groove 16-2, and said cable groove 16-1 and cutting ferrule groove 16-2 are interconnected; On the upper surface of engaging device 14, the cutting ferrule groove 16-2 of described second vertical groove 17 and composition first vertical groove 16 overlaps and is provided with, and on the lower surface of engaging device 14, described second vertical groove 17 and first vertical groove 16 are separated setting; Fig. 3, Fig. 4 and Fig. 5 are respectively vertical view, upward view and vertical cut-away view of engaging device 14;
The installation site of said electric block 2 is positioned at the below of elevating lever; It is installed on the implement through a spring support 3; This spring support 3 comprises a steel axle 3-1 and two page or leaf sheets that are hinged with this steel axle 3-1; The page or leaf sheet 3-2 that goes up that described electric block 2 is installed on the top goes up the end away from steel axle 3-1, and the nextpage sheet 3-3 of below is fixed on the implement; On nextpage sheet 3-3 than electric block 2 apart from being provided with a touch switch 3-5 outside the farther position of steel axle 3-1; Be with a spring 3-4 on this touch switch 3-5; The drift of this spring 3-4 is less than the diameter of steel axle 3-1, and the maximum working load of this spring 3-4 is slightly smaller than the weight of electric block 2 simultaneously.The steel cable 1 of electric block 2 gets into engaging device 14 by second vertical groove 17 inlets on engaging device 14 lower surfaces; Pass by vertical groove 17 outlets in second on its upper surface through engaging device 14, get into electric up-down bar 8 and be fixed on the actionless iron prop 12 in a relative ground through behind the pulley 10;
One end of cable 6 is connected with external power source 13; The other end gets in first vertical groove 16 on the engaging device 14 through steel cable fixed point, pulley 10 and electric up-down bar 8 backs along steel cable 1 trend successively; Wherein cable 6 gets into cable 6 groove 16-1; Cutting ferrule 15 gets among the cutting ferrule groove 16-2; Cable 6 is connected in electrical power control cabinet 5 after from engaging device 14, stretching out, and the power line 4 of said electric up-down bar 8 and electric block 2 is connected to electrical power control cabinet 5, and the output of said electrical power control cabinet 5 is connected with the parts of needs power supply in the implement; In cable 6 and steel cable 1 equitant part, in the cutting ferrule 15 of described steel cable 1 swelling on cable 6 outer walls.
When above-mentioned each parts install; Whole stretching device is in an original state; At this moment the steel cable between steel cable fixed point and electric up-down bar 81 should be straightened with cable 6, and the touch switch 3-5 that goes up on page or leaf sheet 3-2 and the nextpage sheet 3-3 at electric block 2 places is discontiguous.Because steel cable 1 is in the cutting ferrule 15 of swelling on cable 6 outer walls,, electric block 2 just can drive the contraction of cable 6 like this when shrinking steel cable 1 in the lump.
In order to make cable 6 more flexible through pulley 10 time, the cable 6 described in this embodiment is the flat cable of profile 6, and promptly flat cable 6.
Described implement can be miscellaneous equipments such as excavator or loader.During concrete the installation, described electric up-down bar 8 can be installed on the chassis of excavator or loader with electric block 2, and electrical power control cabinet 5 can be installed in operating room.
After equipment installed, the electric power that implement can use cable 6 to carry carried out operation as power.In the operation process, when steel cable between fixed point and electric up-down bar 81 and cable 6 ropes were long, electric block 2 was not owing to be in the state that steel cable 1 is stretching; Thereby will inevitably pressed downward owing to the reason of himself gravity, can contact with spring 3-4 in the process that presses down, when the reduction length of spring 3-4 during less than the height of touch switch 3-5; Touch switch 3-5 on the nextpage sheet 3-3 promptly is touched; Electric block 2 is opened automatically, and the steel cable 1 of electric block 2 is straightened, because steel cable 1 is in the cutting ferrule 15 of swelling on cable 6 outer walls; Being equivalent to steel cable 1 links together with cable 6; Therefore, when steel cable 1 is straightened, cable 6 also be straightened (being that long cable 6 is retracted).When steel cable 1 and cable 6 by after all stretching, electric block 2 can be along with the pulling force up lifting automatically of steel cable 1, in the process of lifting on a page or leaf sheet 3-2 leave the spring 3-4 on the nextpage sheet 3-3 gradually, thereby break off being connected of electric block 2 and power supply.
When electric block 2 was directly installed on the implement, device according to the invention still can be realized technical problem to be solved by this invention, just need manually boot the power supply of electric block 2.
Claims (7)
1. the cable stretching device comprises cable (6), is installed on electric up-down bar (8) and electric block (2) on the implement, it is characterized in that:
Said electric up-down bar (8) is installed on the implement through a fixed support (7), and its top is connected with cursor (11) through steering bearing (9), and said cursor (11) is provided with pulley (10);
Be installed with cutting ferrule (15) on the outer wall of said cable (6), the height of said cutting ferrule (15) and cable (6) equal in length, its center line is parallel with cable (6), and the internal orifice shape of said cutting ferrule (15) matches with steel cable (1) profile of electric block (2);
Under last electronic elevating lever (8) installation site of fixed support (7), be fixed with an engaging device (14); Said engaging device (14) has second vertical groove (17) that first vertical groove (16) of passing through of a power supply cable (6) and the steel cable (1) that moves cucurbit (2) of supplying power pass through; First vertical groove (16) wherein is made up of cable groove (16-1) and cutting ferrule groove (16-2), and said cable groove (16-1) and cutting ferrule groove (16-2) are interconnected; On the upper surface of engaging device (14); The cutting ferrule groove (16-2) of described second vertical groove (17) and composition first vertical groove (16) overlaps and is provided with; On the lower surface of engaging device (14), described second vertical groove (17) and first vertical groove (16) are separated setting;
The below of the installation position set elevating lever of said electric block (2); The steel cable (1) of electric block (2) gets into engaging device (14) by second vertical groove (17) inlet on engaging device (14) lower surface;, engaging device (14) is fixed on the actionless object in a certain relative ground after being passed by the vertical groove in second on its upper surface (17) outlet, get into electric up-down bar (8) process pulley (10);
One end of cable (6) is connected with external power source (13); The other end passes through steel cable fixed point, pulley (10) and electric up-down bar (8) back successively along steel cable (1) trend and gets in first vertical groove (16) on the engaging device (14); Wherein cable (6) gets into cable groove (16-1); Cutting ferrule (15) gets into cutting ferrule groove (16-2); Cable (6) is connected in electrical power control cabinet (5) at last, and the power line (4) of said electric up-down bar (8) and electric block (2) is connected to electrical power control cabinet (5), and the output of said electrical power control cabinet (5) is connected with the parts of needs power supply in the implement; In cable (6) and the equitant part of steel cable (1), in the cutting ferrule (15) of described steel cable (1) swelling on cable (6) outer wall.
2. cable stretching device according to claim 1 is characterized in that: described cable (6) is a flat cable.
3. cable stretching device according to claim 1 and 2; It is characterized in that: said electric block (2) is installed on the implement through a spring support (3); This spring support (3) comprises a steel axle (3-1) and two page or leaf sheets that are hinged with this steel axle (3-1); Described electric block (2) is installed on going up on the page or leaf sheet (3-2) of top, and the nextpage sheet (3-3) of below is fixed on the implement; On nextpage sheet (3-3), be provided with a touch switch (3-5), be with a spring (3-4) on this touch switch (3-5), the power line (4) of said touch switch (3-5) is connected with the power line (4) of electric block (2).
4. cable stretching device according to claim 3 is characterized in that: said electric block (2) is installed on page or leaf sheet (3-2) and goes up the end away from steel axle (3-1).
5. cable stretching device according to claim 4; It is characterized in that: described touch switch (3-5) is corresponding with the installation site of electric block (2) on last page or leaf sheet (3-2) in the installation site on the nextpage sheet (3-3), or apart from the farther position of steel axle (3-1).
6. cable stretching device according to claim 3 is characterized in that: the drift of described spring (3-4) is less than the diameter of steel axle (3-1).
7. cable stretching device according to claim 3 is characterized in that: the maximum working load of described spring (3-4) is slightly smaller than the weight of electric block (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110385614 CN102493524B (en) | 2011-11-29 | 2011-11-29 | Cable stretching device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110385614 CN102493524B (en) | 2011-11-29 | 2011-11-29 | Cable stretching device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102493524A true CN102493524A (en) | 2012-06-13 |
CN102493524B CN102493524B (en) | 2013-11-06 |
Family
ID=46185380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110385614 Expired - Fee Related CN102493524B (en) | 2011-11-29 | 2011-11-29 | Cable stretching device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102493524B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104104050A (en) * | 2013-04-11 | 2014-10-15 | 韩益民 | Power supply device for electric equipment frequently moving up and down |
CN105914669A (en) * | 2016-06-28 | 2016-08-31 | 成都西南交大驱动技术有限责任公司 | Cable pulling force buffering apparatus for engineering machinery |
CN107104394A (en) * | 2017-04-30 | 2017-08-29 | 陶霞霞 | A kind of method that blow-off line is crossed in extra-high-tension cable process of deployment |
CN107154600A (en) * | 2017-04-30 | 2017-09-12 | 陶霞霞 | The method whether cable stretches is judged in a kind of extra-high-tension cable process of deployment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003511321A (en) * | 1999-10-05 | 2003-03-25 | ディープ テク リミテッド | Method and apparatus for use in handling loads |
WO2004035454A1 (en) * | 2002-10-15 | 2004-04-29 | Deep Tek Limited | Apparatus and a method for use in handling a load |
CN101345403A (en) * | 2008-08-18 | 2009-01-14 | 北京星光影视设备科技股份有限公司 | Contactless trailing cable drum device |
EP2325124A1 (en) * | 2009-11-18 | 2011-05-25 | Harald Bont | Cable rolling device for two cable ends with an electric connection |
US20110184597A1 (en) * | 2010-01-22 | 2011-07-28 | Joy Mm Delaware, Inc. | Device for reducing the likelihood of damage to a trailing cable |
CN202359607U (en) * | 2011-11-29 | 2012-08-01 | 沈福兴 | Cable stretching device |
-
2011
- 2011-11-29 CN CN 201110385614 patent/CN102493524B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003511321A (en) * | 1999-10-05 | 2003-03-25 | ディープ テク リミテッド | Method and apparatus for use in handling loads |
WO2004035454A1 (en) * | 2002-10-15 | 2004-04-29 | Deep Tek Limited | Apparatus and a method for use in handling a load |
CN101345403A (en) * | 2008-08-18 | 2009-01-14 | 北京星光影视设备科技股份有限公司 | Contactless trailing cable drum device |
EP2325124A1 (en) * | 2009-11-18 | 2011-05-25 | Harald Bont | Cable rolling device for two cable ends with an electric connection |
US20110184597A1 (en) * | 2010-01-22 | 2011-07-28 | Joy Mm Delaware, Inc. | Device for reducing the likelihood of damage to a trailing cable |
CN202359607U (en) * | 2011-11-29 | 2012-08-01 | 沈福兴 | Cable stretching device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104104050A (en) * | 2013-04-11 | 2014-10-15 | 韩益民 | Power supply device for electric equipment frequently moving up and down |
CN105914669A (en) * | 2016-06-28 | 2016-08-31 | 成都西南交大驱动技术有限责任公司 | Cable pulling force buffering apparatus for engineering machinery |
CN105914669B (en) * | 2016-06-28 | 2018-06-08 | 成都西南交大驱动技术有限责任公司 | A kind of cable tension buffer unit of engineering machinery |
CN107104394A (en) * | 2017-04-30 | 2017-08-29 | 陶霞霞 | A kind of method that blow-off line is crossed in extra-high-tension cable process of deployment |
CN107154600A (en) * | 2017-04-30 | 2017-09-12 | 陶霞霞 | The method whether cable stretches is judged in a kind of extra-high-tension cable process of deployment |
CN107104394B (en) * | 2017-04-30 | 2019-01-04 | 芜湖泰庆电子科技有限公司 | The method of blow-off line is crossed in a kind of extra-high-tension cable process of deployment |
Also Published As
Publication number | Publication date |
---|---|
CN102493524B (en) | 2013-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204254040U (en) | A kind of cable channel electric power cable bearer | |
CN102493524A (en) | Cable stretching device | |
CN202359607U (en) | Cable stretching device | |
CN210558505U (en) | Environment-friendly energy-saving type pay-off device for wireless communication technology | |
CN103010942A (en) | Lifting appliance for reeled cable | |
CN203942204U (en) | The live line working of a kind of 35kV supply line is carried line apparatus with insulation | |
CN203584341U (en) | Automatic handling device for drill stem of horizontal directional drilling machine | |
CN204493895U (en) | Electric cable support | |
CN203654287U (en) | Pile casing pulling device | |
CN204243626U (en) | Cable unwinding device | |
CN204241620U (en) | A kind of power system transmission line proving installation | |
CN204848090U (en) | Tubular product hoisting accessory | |
CN202488076U (en) | Bidirectional cable pulley | |
CN210669375U (en) | Fireproof wire casing that can install fast | |
CN103795003A (en) | Insulating wire lifting device for hot-line work of 35kV power supply line | |
CN204243239U (en) | A kind of electric power system high-altitude p-wire eminence assembling and removing device | |
CN204098818U (en) | Independent separate formula clamping device | |
CN103334592B (en) | Step-type sliding installation construction method for convex structure of high-rise building | |
CN203039301U (en) | A high-fall pipeline device | |
CN204103205U (en) | A kind of conductor compression jointing pipe straightener | |
CN204528933U (en) | Sliding drilling electric cable folding and unfolding storage rack | |
CN104518457A (en) | Electric cable laying and unfolding device | |
CN201113308Y (en) | Climbing roller for laying heavy cable | |
CN204953537U (en) | Sizing mill roll dismouting device | |
CN100365744C (en) | Loading device of large-scale mobile electric generator load experimental-station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131106 Termination date: 20181129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |