CN203039301U - A high-fall pipeline device - Google Patents

A high-fall pipeline device Download PDF

Info

Publication number
CN203039301U
CN203039301U CN 201320070835 CN201320070835U CN203039301U CN 203039301 U CN203039301 U CN 203039301U CN 201320070835 CN201320070835 CN 201320070835 CN 201320070835 U CN201320070835 U CN 201320070835U CN 203039301 U CN203039301 U CN 203039301U
Authority
CN
China
Prior art keywords
pipeline
pipeline device
base
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320070835
Other languages
Chinese (zh)
Inventor
李建勇
杨兆斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU NANFANG ELECTRIC CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGZHOU NANFANG ELECTRIC CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU NANFANG ELECTRIC CONSTRUCTION GROUP CO Ltd filed Critical GUANGZHOU NANFANG ELECTRIC CONSTRUCTION GROUP CO Ltd
Priority to CN 201320070835 priority Critical patent/CN203039301U/en
Application granted granted Critical
Publication of CN203039301U publication Critical patent/CN203039301U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a high-fall pipeline device comprising a pedestal. A horizontally-disposed main pulley is arranged on the middle of the top crossbeam of the pedestal. The two ends of the top crossbeam are respectively equipped with an auxiliary pulley connected with the middle of the bottom crossbeam of the pedestal. A pipeline may pass through the center of a triangle surrounded by the two auxiliary pulleys and the main pulley. By using the above structure, the pipeline passes through the center of the triangle surrounded by the two auxiliary pulleys and the main pulley. Therefore, the position of the pipeline is limited by the two auxiliary pulleys so that the pipeline is prevented from moving left and right when dragged, facilitating pipeline dragging for workers.

Description

A kind of high drop pipeline device
Technical field
The utility model relates to the equipment of cable laying, recovery, particularly a kind of high drop pipeline device.
Background technology
At present, the comprehensive pit foundation of cable originally is with preheating embedding line, the form of transition well is set, during cable laying, pull rope is because of the reason of physical features difference of height, cause the cable in moving to cut pvc pipe open easily, the phenomenon of glass reinforced plastic pipe, some pipeline devices have also appearred now on the market, this pipeline device is provided with the pulley of a horizontal positioned, cable is from pvc pipe, when pulling out in the glass reinforced plastic pipe, upwards be drawn out by the below of walking around pulley, cable can not touch the pipe end of pvc pipe or glass reinforced plastic pipe, has prevented that cable from cutting pvc pipe open, glass reinforced plastic pipe, but this kind pipeline device has only a pulley, when cable slides at pulley, swing easily, inconvenient people's trailing cable, the height of this kind pipeline device is certain in addition, can only be applied on the preheating embedding line of sustained height, for those preheating embedding lines on sustained height not, the workman need prepare the pipeline device of a plurality of differing heights, has been with inconvenience to construction.
The utility model content
In order to address the above problem, it is a kind of simple in structure that the purpose of this utility model is to provide, and both can prevent that cable from swinging in distraction procedure, goes for the high drop pipeline device of the preheating embedding line of differing heights again.
The utility model for the technical scheme that solves its technical problem and adopt is:
A kind of high drop pipeline device, comprise base, the entablature middle part of described base is provided with the head pulley of horizontal positioned, the two ends of described entablature are respectively arranged with the auxiliary pulley that is connected with the sill middle part of base, and described two auxiliary pulleys and head pulley surround a triangle that can allow pipeline pass from its center.
In order to make pipeline device of the present utility model can be applicable to the preheating embedding line of differing heights, also be provided with the support that to regulate its height in vertical direction on the described base.
Easy for installation in order to make pipeline device of the present utility model produce, two horizontal supporting plates about described support comprises, be respectively arranged with montant on described two horizontal supporting plates, the vertical beam of described base both sides is set in respectively on two montants, also is provided with one or bolt above, that be used for extruding locking montant on the described vertical beam.
In order to make the locking between vertical beam and the montant more firm, the described number that is arranged on the bolt on the vertical beam is two.
The beneficial effects of the utility model are: because the utility model adopts above-mentioned structure, pipeline passes from the triangle center that two auxiliary pulleys and head pulley surround, by two auxiliary pulleys pipeline is carried out an alignment restrictions, prevent that pipeline from swinging in being pulled process, making things convenient for the workman to draw pipeline; Also be provided with the support that to regulate its height in vertical direction in addition on the base, make the utility model can adapt to the preheating embedding line of differing heights, made things convenient for workman's construction operation.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
Fig. 1 is surface structure schematic diagram of the present utility model;
Fig. 2 is the surface structure schematic diagram of base of the present utility model.
Embodiment
See figures.1.and.2, a kind of high drop pipeline device, comprise base 1, entablature 10 middle parts of described base 1 are provided with the head pulley 2 of horizontal positioned, the two ends of described entablature 10 are respectively arranged with the auxiliary pulley 3 that is connected with sill 11 middle parts of base 1, and described two auxiliary pulleys 3 surround a triangle that can allow pipeline pass from its center with head pulley 2.
Further, the vertical beam 12 of described base 1 both sides is set in respectively on two montants 41, about the lower end of described two montants 41 is installed in respectively on two horizontal supporting plates 40, also be provided with a connecting rod between two horizontal supporting plates 40 about described, above-mentioned two montants 41 and about two horizontal supporting plates 40 splicings form supports 4, also be provided with on the described vertical beam 12 one or more than, the bolt 120 that is used for extruding locking montant 41, here, the number of the bolt on the described vertical beam 12 that is arranged on each side is preferably two, and it is also passable to be set to other numbers certainly.
During the utility model work, pipeline passes from the triangle center that head pulley 2 and two auxiliary pulleys 3 surround, carry out spacing from the left and right sides to pipeline by two auxiliary pulleys 3, prevent that pipeline from swinging in distraction procedure, make things convenient for the workman to draw pipeline, in addition, the workman is by loosering a bolt 120, namely can move up and down base 1 to suitable height, and then tight a bolt 120 and base 1 is locked on the support 4, realize the height adjusting of pipeline device of the present utility model, made the utility model go for the preheating embedding line of differing heights.
The above only is preferential execution mode of the present utility model, as long as realize that with basic identical means the technical scheme of the utility model purpose all belongs within the protection range of the present utility model.

Claims (4)

1. one kind high drop pipeline device, it is characterized in that: comprise base (1), entablature (10) middle part of described base (1) is provided with the head pulley (2) of horizontal positioned, the two ends of described entablature (10) are respectively arranged with the auxiliary pulley (3) that is connected with sill (11) middle part of base (1), and described two auxiliary pulleys (3) surround a triangle that can allow pipeline pass from its center with head pulley (2).
2. a kind of high drop pipeline device according to claim 1 is characterized in that: also be provided with the support (4) that can regulate its height in vertical direction on the described base (1).
3. a kind of high drop pipeline device according to claim 2, it is characterized in that: two horizontal supporting plates (40) about described support (4) comprises, be respectively arranged with montant (41) on described two horizontal supporting plates (40), the vertical beam (12) of described base (1) both sides is set in respectively on two montants (41), also is provided with one or bolt (120) above, that be used for extruding locking montant (41) on the described vertical beam (12).
4. a kind of high drop pipeline device according to claim 3, it is characterized in that: the described number that is arranged on the bolt (120) on the vertical beam (12) is two.
CN 201320070835 2013-02-06 2013-02-06 A high-fall pipeline device Expired - Fee Related CN203039301U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320070835 CN203039301U (en) 2013-02-06 2013-02-06 A high-fall pipeline device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320070835 CN203039301U (en) 2013-02-06 2013-02-06 A high-fall pipeline device

Publications (1)

Publication Number Publication Date
CN203039301U true CN203039301U (en) 2013-07-03

Family

ID=48691388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320070835 Expired - Fee Related CN203039301U (en) 2013-02-06 2013-02-06 A high-fall pipeline device

Country Status (1)

Country Link
CN (1) CN203039301U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500960A (en) * 2013-09-05 2014-01-08 国家电网公司 Tension trolley supporting and locating guide pulley capable of ascending and descending
CN107425480A (en) * 2017-06-15 2017-12-01 国网四川省电力公司德阳供电公司 A kind of cable shaft special pulley

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500960A (en) * 2013-09-05 2014-01-08 国家电网公司 Tension trolley supporting and locating guide pulley capable of ascending and descending
CN107425480A (en) * 2017-06-15 2017-12-01 国网四川省电力公司德阳供电公司 A kind of cable shaft special pulley

Similar Documents

Publication Publication Date Title
CN103993745B (en) A kind of conversion beam integral hoisting device for rapid and hanging method thereof
CN103663301B (en) Inclined nacelle device in a kind of
CN207194416U (en) A kind of scaffold for building for being easy to assembling
CN203039301U (en) A high-fall pipeline device
CN106121343B (en) Compound polyurethane material electric pole and its installation method
CN205992699U (en) A kind of cable lays telescopic support device
CN104775771A (en) Ground pipe arrangement method and device of mechanical well repair operation
CN108988215A (en) High pressure electric cable with large cross-section route can right position height adjustment laying engineering method
CN103296616A (en) Rigid crossing support and crossing method for construction of overhead transmission lines
CN204325939U (en) Large span arch bridge erection without scaffolding cable hoisting device
CN204125841U (en) For the movable Lifting basket of constructing under bridge floor
CN206466801U (en) A kind of lift cable unreeling rack
CN102277999B (en) Large-section portal steel structure holding pole
CN203983926U (en) A kind of non-conventional glass steel cable support
CN206447489U (en) A kind of fibrous cement cable pipe aids in installation apparatus
CN202746770U (en) Cable bracket trolley for coal mining roadway
CN201666967U (en) Guide frame for laying underground pipeline optical cable
CN203653193U (en) Internal inclined type hanging basket device
CN206487128U (en) A kind of Guiding Support Elevating Scaffold
CN203878625U (en) Landfill film mulching device
CN207144963U (en) Anchor net laying sets emergency support
CN201990347U (en) Construction lift body-connecting device
CN106121353B (en) Hydraulic vertical lever apparatus
CN205330549U (en) Oil derrick for petroleum drilling and repairing equipment
CN204632255U (en) A kind of cable warning board

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20190206

CF01 Termination of patent right due to non-payment of annual fee