CN102433935B - 隔震支座安装定位架 - Google Patents

隔震支座安装定位架 Download PDF

Info

Publication number
CN102433935B
CN102433935B CN2011104339459A CN201110433945A CN102433935B CN 102433935 B CN102433935 B CN 102433935B CN 2011104339459 A CN2011104339459 A CN 2011104339459A CN 201110433945 A CN201110433945 A CN 201110433945A CN 102433935 B CN102433935 B CN 102433935B
Authority
CN
China
Prior art keywords
horizontal
height
clamping
position adjuster
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011104339459A
Other languages
English (en)
Other versions
CN102433935A (zh
Inventor
高行友
李庆录
唐义
马月菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING Co Ltd
Original Assignee
SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING Co Ltd filed Critical SUQIAN HUAXIA CONSTRUCTION (GROUP) ENGINEERING Co Ltd
Priority to CN2011104339459A priority Critical patent/CN102433935B/zh
Publication of CN102433935A publication Critical patent/CN102433935A/zh
Application granted granted Critical
Publication of CN102433935B publication Critical patent/CN102433935B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种隔震支座安装定位架,包括钢梁支架、水平位置调节器和高度位置调节器;所述水平位置调节器包括水平调节丝杆、水平调节螺母、水平套筒、夹持槽钢和压紧螺母;水平套筒与夹持槽钢连接;水平调节丝杆架在钢梁支架上,用水平调节螺母固定,一端与水平套筒连接;所述高度位置调节器包括高度调节丝杆、高度调节螺母固定槽钢、紧锁螺栓、夹持固定装置和压紧螺栓;高度调节螺母固定槽钢设置在钢梁支架的上水平横梁上,用锁紧螺栓固定;高度调节丝杆固定在高度调节螺母固定槽钢上,下端与夹持固定装置连接。本发明施工方法简单,安装质量可靠,有效解决了预埋板埋入困难的问题。适用于各种隔震支座、滑移支座的安装施工。

Description

隔震支座安装定位架
技术领域
本发明涉及一种隔震支座安装定位架,属于建筑工程领域。
背景技术
隔震技术是在建筑基础和上部结构之间设置隔震层,把上部结构与下部结构分开,当发生地震时,隔震层中隔震支座和粘滞阻尼器吸收缓冲大量的地震能量,降低地震对建筑上部结构的破坏。该技术减震效果明显,具有经济、安全、节能等特点,在高烈度地震区高层建筑工程中得到了普遍的应用。
目前隔震支座下预埋板安装过程中,由于单体面积大,安装精度要求高,板下结构钢筋密集,安装位置小,而预埋板上锚固连接螺栓套筒的锚固钢板面积大,导致埋入困难。
发明内容
本发明为了克服背景技术中的不足,设计了一种隔震支座安装定位架,目的在于:解决隔震支座下预埋板安装工艺复杂,精度控制困难等施工难题。
本发明的技术解决方案:
一种隔震支座安装定位架,其特征在于:所述定位架包括钢梁支架、水平位置调节器和高度位置调节器;所述水平位置调节器包括水平调节丝杆、水平调节螺母、水平套筒、夹持槽钢和压紧螺母;水平套筒与夹持槽钢连接;水平调节丝杆架在钢梁支架上,用水平调节螺母固定,一端与水平套筒连接;所述高度位置调节器包括高度调节丝杆、高度调节螺母固定槽钢、紧锁螺栓、夹持固定装置和压紧螺栓;高度调节螺母固定槽钢设置在钢梁支架的上水平横梁上,用锁紧螺栓固定;高度调节丝杆固定在高度调节螺母固定槽钢上,下端与夹持固定装置连接。
所述钢梁支架由型钢焊接而成,水平横梁之间的间距根据隔震支座预埋板及隔震支座墩台尺寸确定,横梁距预埋板边的水平距离不小于300mm,上部横梁距预埋板表面的高度不小于200mm。
所述水平套筒与夹持槽钢通过焊接或铆接的方式连接。
本发明有益效果:
本发明施工方法简单,安装质量可靠,有效解决了预埋板埋入困难的问题。适用于各种隔震支座、滑移支座的安装施工。
附图说明
图1是本发明结构示意图;
图2是本发明的水平位置调节器结构示意图;
图3是本发明的高度位置调节器结构示意图。
具体实施方式
以下结合实施例来具体说明本发明。
如图1至图3所示,一种隔震支座安装定位架包括钢梁支架1、水平位置调节器2和高度位置调节器3;所述水平位置调节器2包括水平调节丝杆2-1、水平调节螺母2-2、水平套筒2-3、夹持槽钢2-4和压紧螺栓6;水平套筒2-3与夹持槽钢2-4连接;水平调节丝杆2-1架在钢梁支架1上,用水平调节螺母2-2固定,一端与水平套筒2-3连接;所述高度位置调节器3包括高度调节丝杆3-1、高度调节螺母固定槽钢3-2、锁紧螺栓3-3、夹持固定装置3-4和压紧螺栓6;高度调节螺母固定槽钢3-2设置在钢梁支架1的上水平横梁上,用锁紧螺栓3-3固定;高度调节丝杆3-1固定在高度调节螺母固定槽钢3-2上,下端与夹持固定装置3-4连接。
具体安装过程:
隔震支座定位架安装使用时,水平位置调节器沿钢梁支架下排横梁四周布置,每边2套,共8套;高度位置调节器沿钢梁支架上排横梁对边布置,每边2套,共4套。
待隔震支座预埋板下部结构施工完成后,将钢梁支架1放置在预埋板安装位置,使钢梁支架横梁与预埋板周边之间的距离大致相等,用膨胀螺栓通过钢梁支架固定孔4将钢梁支架1固定于楼面结构上。将隔震支座下预埋板5吊装至安装位置,把高度位置调节器3的夹持固定装置3-4和水平位置调节器2的夹持槽钢2-4安放在预埋板相应位置。用锁紧螺栓3-3将高度位置调节器3的高度调节螺母固定槽钢3-2固定在上水平横梁上。用扳手转动高度调节螺母,调整预埋板高度,使预埋板表面高度符合设计要求,再用扳手转动水平调节螺母2-2,调整预埋板平面位置,使预埋板平面位置符合设计要求。复查预埋板高度尺寸和平面位置尺寸,当完全符合设计要求时,用压紧螺栓6将夹持槽钢2-4及夹持固定装置3-4锁紧固定。用连接固定件将预埋板锚固件与墩台锚固钢筋焊接牢固,拆除隔震支座定位架,行预埋板下混凝土浇筑施工。
上面所述的实施例仅仅是对本发明优选实施方式进行描述,并非对本发明的构思和范围进行限定,在不脱离本发明设计思想的前提下,本领域中普通工程技术人员对本发明的技术方案作出的各种变形和改进,均应属于本发明的保护范围。

Claims (3)

1.一种隔震支座安装定位架,其特征在于:所述定位架包括钢梁支架、水平位置调节器和高度位置调节器;所述水平位置调节器包括水平调节丝杆、水平调节螺母、水平套筒、夹持槽钢和压紧螺母;水平套筒与夹持槽钢连接;水平调节丝杆架在钢梁支架上,用水平调节螺母固定,一端与水平套筒连接;所述高度位置调节器包括高度调节丝杆、高度调节螺母固定槽钢、紧锁螺栓、夹持固定装置和压紧螺栓;高度调节螺母固定槽钢设置在钢梁支架的上水平横梁上,用锁紧螺栓固定;高度调节丝杆固定在高度调节螺母固定槽钢上,下端与夹持固定装置连接。
2.根据权利要求1所述的隔震支座安装定位架,其特征在于:所述钢梁支架由型钢焊接而成,水平横梁之间的间距根据隔震支座预埋板及隔震支座墩台尺寸确定,横梁距预埋板边的水平距离不小于300mm,上部横梁距预埋板表面的高度不小于200mm。
3.根据权利要求1所述的隔震支座安装定位架,其特征在于:所述水平套筒与夹持槽钢通过焊接或铆接的方式连接。
CN2011104339459A 2011-12-21 2011-12-21 隔震支座安装定位架 Expired - Fee Related CN102433935B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104339459A CN102433935B (zh) 2011-12-21 2011-12-21 隔震支座安装定位架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104339459A CN102433935B (zh) 2011-12-21 2011-12-21 隔震支座安装定位架

Publications (2)

Publication Number Publication Date
CN102433935A CN102433935A (zh) 2012-05-02
CN102433935B true CN102433935B (zh) 2013-10-16

Family

ID=45982263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104339459A Expired - Fee Related CN102433935B (zh) 2011-12-21 2011-12-21 隔震支座安装定位架

Country Status (1)

Country Link
CN (1) CN102433935B (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104526199B (zh) * 2014-12-18 2016-08-24 国家电网公司 钢管梁组装焊接辅助支架
CN105386531A (zh) * 2015-12-01 2016-03-09 中国建筑第八工程局有限公司 用于支墩与隔震支座之间的定位装置及其施工方法
CN106593058B (zh) * 2016-12-19 2019-11-19 中国建筑第八工程局有限公司 橡胶隔震支座的定位装置及其制作与安装方法
CN106812212B (zh) * 2017-02-16 2022-06-14 中国建筑第八工程局有限公司 网架单元快速拼装支架及网架单元拼装方法
CN107762150B (zh) * 2017-10-18 2021-02-12 中国五冶集团有限公司 建筑内部施工用吊挂结构
CN108221707B (zh) * 2018-03-23 2023-09-01 中国五冶集团有限公司 便于桥梁支座安装的设备
CN109363443B (zh) * 2018-12-05 2024-02-23 西安建筑科技大学 一种可调节的文物固定装置
CN110306814A (zh) * 2019-07-01 2019-10-08 扬州工业职业技术学院 一种隔震支座安装定位架
CN111173223A (zh) * 2019-12-31 2020-05-19 江苏省建筑工程集团有限公司 一种alc板外挂墙板非预埋式节点结构
CN112030771B (zh) * 2020-09-10 2022-03-15 中建三局集团有限公司 一种用于隔震支座预埋件安装的装置的施工方法
CN113503029A (zh) * 2021-07-20 2021-10-15 广州大学 一种装配式消能支墩连接节点的施工方法
CN114856243B (zh) * 2022-06-15 2024-01-30 江苏鸿基节能新技术股份有限公司 建筑增加隔震层的施工装置及方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1327726B1 (de) * 2002-01-03 2006-10-11 Franz Mitsch Einstellbarer Schwingungstilger
JP2005048523A (ja) * 2003-07-31 2005-02-24 Matsui Construction Co Ltd 免震部材据付け及び養生方法並びに養生用仮固定具
CN101736827B (zh) * 2009-11-05 2011-05-25 中国建筑第八工程局有限公司 橡胶隔震支座施工方法
CN201850669U (zh) * 2010-11-22 2011-06-01 中建七局第三建筑有限公司 隔震装置空间精确定位支架
CN102116010B (zh) * 2010-12-20 2012-05-23 江苏扬州合力橡胶制品有限公司 一种叠层隔震橡胶支座的安装方法
CN102162305B (zh) * 2011-05-16 2012-07-04 江苏兴邦建工集团有限公司 一种弹性滑移隔震支座安装施工工艺
CN202370098U (zh) * 2011-12-21 2012-08-08 宿迁华夏建设(集团)工程有限公司 隔震支座安装定位架

Also Published As

Publication number Publication date
CN102433935A (zh) 2012-05-02

Similar Documents

Publication Publication Date Title
CN102433935B (zh) 隔震支座安装定位架
CN104005338B (zh) 一种大跨斜拉桥塔梁三向临时固结结构
EP1873308A1 (en) Concrete slab railroad track system and method of installing same
JP2012102601A (ja) 構造物用高さ調整支承装置および構造物用支承装置の高さ調整工法
CN105544762A (zh) 隔震层的安装方法
KR101993298B1 (ko) 수평 및 회전변위 허용을 이용한 강합성 라멘교 및 그 시공방법
CN202370098U (zh) 隔震支座安装定位架
CN215802680U (zh) 钢骨柱安装结构
CN104120802A (zh) 一种隔震支座安装定位简易方法
JP5753811B2 (ja) ソーラパネル用の架台とその施工方法
KR101095449B1 (ko) 리프트 장치를 이용한 교량 해체장치 및 교량 해체 공법
CN207728800U (zh) 设备抗震支吊架
KR20110010248A (ko) 교량공사용 멀티유헤드 브래킷장치
CN203866711U (zh) 一种大跨斜拉桥塔梁三向临时固结结构
CN103174231B (zh) 混合控制减震结构施工方法
CN203766764U (zh) 一种地铁站台加固装置
CN203879041U (zh) 预埋板定位支架
CN106758796B (zh) 可更换减隔震橡胶支座及该支座的安装和更换方法
CN202073682U (zh) 水轮机座环刚性支撑结构
JP3996741B2 (ja) 柵横梁支持金具及び柵の横梁支持方法
JP5455943B2 (ja) 可動ホーム柵装置の基礎構造、及び可動ホーム柵装置の基礎工事方法
KR20040076348A (ko) 아이형강빔의 인상과 낙교방지를 위한 교좌장치 및 그설치방법
JP6910235B2 (ja) 容器の補強方法及び容器の支持構造
CN105015554A (zh) 一种地铁站台加固施工方法
CN109838087A (zh) 可重复使用的装配式建筑支撑装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gao Xingyou

Inventor after: Yu Ping

Inventor after: Chen Debao

Inventor after: Zhang Jin

Inventor after: Ma Yueju

Inventor before: Gao Xingyou

Inventor before: Li Qinglu

Inventor before: Tang Yi

Inventor before: Ma Yueju

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GAO XINGYOU LI QINGLU TANG YI MA YUEJU TO: GAO XINGYOU YU PING CHEN DEBAO ZHANG JIN MA YUEJU

C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Shaomin

Inventor after: Yu Ping

Inventor after: Chen Debao

Inventor after: Zhang Jin

Inventor after: Ma Yueju

Inventor before: Gao Xingyou

Inventor before: Yu Ping

Inventor before: Chen Debao

Inventor before: Zhang Jin

Inventor before: Ma Yueju

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GAO XINGYOU YU PING CHEN DEBAO ZHANG JIN MA YUEJU TO: ZHANG SHAOMIN YU PING CHEN DEBAO ZHANG JIN MA YUEJU

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20161221

CF01 Termination of patent right due to non-payment of annual fee