CN102322143A - 砼剪力墙与加气砼砌块连接处防裂施工方法 - Google Patents

砼剪力墙与加气砼砌块连接处防裂施工方法 Download PDF

Info

Publication number
CN102322143A
CN102322143A CN201110164913A CN201110164913A CN102322143A CN 102322143 A CN102322143 A CN 102322143A CN 201110164913 A CN201110164913 A CN 201110164913A CN 201110164913 A CN201110164913 A CN 201110164913A CN 102322143 A CN102322143 A CN 102322143A
Authority
CN
China
Prior art keywords
stage
concrete
aerated concrete
building block
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110164913A
Other languages
English (en)
Inventor
赵法强
李成民
郭旭东
张立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG NINGJIAN CONSTRUCTION GROUP CO Ltd
Original Assignee
SHANDONG NINGJIAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG NINGJIAN CONSTRUCTION GROUP CO Ltd filed Critical SHANDONG NINGJIAN CONSTRUCTION GROUP CO Ltd
Priority to CN201110164913A priority Critical patent/CN102322143A/zh
Publication of CN102322143A publication Critical patent/CN102322143A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

砼剪力墙与加气砼砌块连接处防裂施工方法,准备阶段是起始阶段,准备阶段的左侧包括有材料准备、机械准备和人员准备,准备阶段的右侧包括有技术交底、水平控制线复核和确定植筋点。从准备阶段向下,连接到砼墙体打孔植筋,砼墙体打孔植筋向下,连接到加气砼砌块排布放样。加气砼砌块排布放样向下,连接到加气砼砌块砌筑,加气砼砌块砌筑向下,连接到加气砼墙体养护,加气砼墙体养护向下,再连接到过渡带支模及砼浇筑。过渡带支模及砼浇筑向下,连接到加气砼墙面抹灰及预留沟槽和喷水养护,加气砼墙面抹灰及预留沟槽和喷水养护向下,再连接到密封胶嵌实预留沟槽,然后到最后的墙体接缝处验收。采用本发明可节约建筑物内部空间,降低工程成本,消除后期抹灰面和剪力墙体之间的裂纹。

Description

砼剪力墙与加气砼砌块连接处防裂施工方法
技术领域
本发明涉及建筑施工过程中建筑物连接处防裂的施工方法,尤其涉及砼剪力墙与加气砼砌块连接处防裂施工方法。
背景技术
钢筋砼剪力墙结构已经在小高层房屋建设中普遍采用,这种钢筋砼剪力墙的整体性能好,承载力高,抗震性能好,但这种钢筋砼剪力墙的墙体自重大,刚度过大,自震周期短。在大的地震力的作用下,其破坏形态呈脆性的剪切破坏或者反拱破坏,因此,为了抵抗较大的地址剪切力,就需要加大截面尺寸和增大配筋量,因而造成剪力墙的成本较高。现有技术有一种采用轻质夹心模的剪力墙结构,整体重量有所减轻,可以减少建筑材料的整体上的用量,降低建筑物的成本,形成带有暗桁架结构的整体板状墙体,可以提高建筑物的抗震和抗风载的能力。但这种剪力墙相对来说施工复杂,尤其是斜向或者对角线方向的钢筋布置,以及需要有严格的安装捆扎夹心模,仍难以确保各部分尺寸的准确定位,模板消耗大,胀模严重,且整体重量仍太大,两面的墙面板砼不易浇满,易产生空鼓和空洞现象。再者,墙体使用轻质夹心模,其自身的强度低,施工过程中,尤其是搬运过程中易破损。
发明内容
本发明的目的在于,克服现有技术的不足之处,提供一种砼剪力墙与加气砼砌块连接处防裂施工方法,可以使现浇钢筋砼墙的施工简单,成本低,施工速度快。
本发明所述的砼剪力墙与加气砼砌块连接处防裂施工方法,包括有材料准备、技术交底、机械准备、准备阶段、水平控制线复核、人员准备、砼墙体打孔植筋、确定植筋点、加气砼砌块排布放样、加气砼砌块砌筑、加气砼墙体养护、过渡带支模及砼浇筑、加气砼墙面抹灰及预留沟槽和喷水养护、密封胶嵌实预留沟槽和墙体接缝处验收组成。准备阶段是起始阶段,准备阶段的左侧包括有材料准备、机械准备和人员准备,准备阶段的右侧包括有技术交底、水平控制线复核和确定植筋点。从准备阶段向下,连接到砼墙体打孔植筋,砼墙体打孔植筋向下,连接到加气砼砌块排布放样。加气砼砌块排布放样向下,连接到加气砼砌块砌筑,加气砼砌块砌筑向下,连接到加气砼墙体养护,加气砼墙体养护向下,再连接到过渡带支模及砼浇筑。过渡带支模及砼浇筑向下,连接到加气砼墙面抹灰及预留沟槽和喷水养护,加气砼墙面抹灰及预留沟槽和喷水养护向下,再连接到密封胶嵌实预留沟槽,然后到最后的墙体接缝处验收。本发明所述的砼剪力墙与加气砼砌块连接处防裂施工方法,具体的措施如下:定制的加气砼砌块宽度比剪力墙板小3㎝.砌筑时每边收进1.5㎝;在剪力墙和加气砼砌块之间设置C20砼过渡带,长度≥200㎜,宽度同砌块厚度;墙体拉结筋长度除满足规范要求外,还要加上过渡带的长度;C20砼过渡带与其他构造柱同时施工,与过渡带接茬处得砌块留置马牙槎。砌块表面抹灰后,及时将与剪力墙板接缝的部位划割出3㎜宽,5㎜深的沟槽;抹灰面及时浇水养护;抹灰面层与剪力墙板接茬部位的混合砂浆充分收缩以后,对密封胶嵌实预先划出的沟槽;最后进行内墙腻子的施工。
采用本发明所述砼剪力墙与加气砼砌块连接处防裂施工方法,在钢筋砼框架剪力墙结构的建筑中,可以省去剪力墙板上的抹灰工作,节约建筑物内部空间,降低工程成本。可以通过有效的构造措施,消除后期抹灰面和剪力墙体之间的裂纹。
附图说明
附图1是本发明所述砼剪力墙与加气砼砌块连接处防裂施工方法的步骤示意图。1—材料准备  2—技术交底  3—机械准备  4—准备阶段  5—水平控制线复核  6—人员准备  7—砼墙体打孔植筋  8—确定植筋点  9—加气砼砌块排布放样  10—加气砼砌块砌筑  11—加气砼墙体养护  12—过渡带支模及砼浇筑  13—加气砼墙面抹灰及预留沟槽和喷水养护  14—密封胶嵌实预留沟槽  15—墙体接缝处验收。
具体实施方式
现参照附图1,结合实施例说明如下:本发明所述的砼剪力墙与加气砼砌块连接处防裂施工方法,包括有材料准备1、技术交底2、机械准备3、准备阶段4、水平控制线复核5、人员准备6、砼墙体打孔植筋7、确定植筋点8、加气砼砌块排布放样9、加气砼砌块砌筑10、加气砼墙体养护11、过渡带支模及砼浇筑12、加气砼墙面抹灰及预留沟槽和喷水养护13、密封胶嵌实预留沟槽14和墙体接缝处验收15组成。准备阶段4是起始阶段,准备阶段4的左侧包括有材料准备1、机械准备3和人员准备6,准备阶段4的右侧包括有技术交底2、水平控制线复核5和确定植筋点8。从准备阶段4向下,连接到砼墙体打孔植筋7,砼墙体打孔植筋7向下,连接到加气砼砌块排布放样9。加气砼砌块排布放样9向下,连接到加气砼砌块砌筑10,加气砼砌块砌筑10向下,连接到加气砼墙体养护11,加气砼墙体养护11向下,再连接到过渡带支模及砼浇筑12。过渡带支模及砼浇筑12向下,连接到加气砼墙面抹灰及预留沟槽和喷水养护13,加气砼墙面抹灰及预留沟槽和喷水养护13向下,再连接到密封胶嵌实预留沟槽14,然后到最后的墙体接缝处验收15。本发明所述的砼剪力墙与加气砼砌块连接处防裂施工方法,具体的措施如下:定制的加气砼砌块宽度比剪力墙板小3㎝.砌筑时每边收进1.5㎝;在剪力墙和加气砼砌块之间设置C20砼过渡带,长度≥200㎜,宽度同砌块厚度;墙体拉结筋长度除满足规范要求外,还要加上过渡带的长度;C20砼过渡带与其他构造柱同时施工,与过渡带接茬处得砌块留置马牙槎。砌块表面抹灰后,及时将与剪力墙板接缝的部位划割出3㎜宽,5㎜深的沟槽;抹灰面及时浇水养护;抹灰面层与剪力墙板接茬部位的混合砂浆充分收缩以后,对密封胶嵌实预先划出的沟槽;最后进行内墙腻子的施工。采用本发明所述砼剪力墙与加气砼砌块连接处防裂施工方法,在钢筋砼框架剪力墙结构的建筑中,为了省去剪力墙板上的抹灰工作,节约建筑物内部空间,降低工程成本。可以通过有效的构造措施,消除后期抹灰面和剪力墙体之间的裂纹。

Claims (1)

1. 砼剪力墙与加气砼砌块连接处防裂施工方法,其特征在于准备阶段(4)是起始阶段,准备阶段(4)的左侧包括有材料准备(1)、机械准备(3)和人员准备(6),准备阶段(4)的右侧包括有技术交底(2)、水平控制线复核(5)和确定植筋点(8);从准备阶段(4)向下,连接到砼墙体打孔植筋(7),砼墙体打孔植筋(7)向下,连接到加气砼砌块排布放样(9),加气砼砌块排布放样(9)向下,连接到加气砼砌块砌筑(10),加气砼砌块砌筑(10)向下,连接到加气砼墙体养护(11),加气砼墙体养护(11)向下,再连接到过渡带支模及砼浇筑(12),过渡带支模及砼浇筑(12)向下,连接到加气砼墙面抹灰及预留沟槽和喷水养护(13),加气砼墙面抹灰及预留沟槽和喷水养护(13)向下,再连接到密封胶嵌实预留沟槽(14),然后到最后的墙体接缝处验收(15);具体的措施如下:定制的加气砼砌块宽度比剪力墙板小3㎝,砌筑时每边收进1.5㎝;在剪力墙和加气砼砌块之间设置C20砼过渡带,长度≥200㎜,宽度同砌块厚度;墙体拉结筋长度除满足规范要求外,还要加上过渡带的长度;C20砼过渡带与其他构造柱同时施工,与过渡带接茬处得砌块留置马牙槎;砌块表面抹灰后,及时将与剪力墙板接缝的部位划割出3㎜宽,5㎜深的沟槽;抹灰面及时浇水养护;抹灰面层与剪力墙板接茬部位的混合砂浆充分收缩以后,对密封胶嵌实预先划出的沟槽;最后进行内墙腻子的施工。
CN201110164913A 2011-06-20 2011-06-20 砼剪力墙与加气砼砌块连接处防裂施工方法 Pending CN102322143A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110164913A CN102322143A (zh) 2011-06-20 2011-06-20 砼剪力墙与加气砼砌块连接处防裂施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110164913A CN102322143A (zh) 2011-06-20 2011-06-20 砼剪力墙与加气砼砌块连接处防裂施工方法

Publications (1)

Publication Number Publication Date
CN102322143A true CN102322143A (zh) 2012-01-18

Family

ID=45449967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110164913A Pending CN102322143A (zh) 2011-06-20 2011-06-20 砼剪力墙与加气砼砌块连接处防裂施工方法

Country Status (1)

Country Link
CN (1) CN102322143A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561691A (zh) * 2012-03-15 2012-07-11 云南惠丰工程建设有限公司 一种消除清水混凝土剪力墙与砌体结合部开裂的方法
CN104674980A (zh) * 2015-02-09 2015-06-03 葛加君 再生混凝土复合保湿砖榫卯串管墙体的施工方法
CN109577186A (zh) * 2018-12-17 2019-04-05 山东汇通建设集团有限公司 高架桥防撞墙防开裂结构及施工工法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1558052A (zh) * 2004-01-30 2004-12-29 吴淑环 外部为混凝土结构、内部为砌体承重的多层建筑承重结构
CN101333827A (zh) * 2007-06-28 2008-12-31 中太建设集团股份有限公司 预防框架、排架及短肢剪力墙其填充墙裂缝工艺方法
CN101457556A (zh) * 2006-06-16 2009-06-17 罗进南 芯梁构造柱混合式组合墙及建筑的建造方法和相关砌块
CN201474100U (zh) * 2009-08-18 2010-05-19 天津二建建筑工程有限公司 带有过渡缝的柱墙界面
CN101858142A (zh) * 2010-06-25 2010-10-13 中天建设集团有限公司天津分公司 防止主体结构与填充墙体之间竖向开裂的施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1558052A (zh) * 2004-01-30 2004-12-29 吴淑环 外部为混凝土结构、内部为砌体承重的多层建筑承重结构
CN101457556A (zh) * 2006-06-16 2009-06-17 罗进南 芯梁构造柱混合式组合墙及建筑的建造方法和相关砌块
CN101333827A (zh) * 2007-06-28 2008-12-31 中太建设集团股份有限公司 预防框架、排架及短肢剪力墙其填充墙裂缝工艺方法
CN201474100U (zh) * 2009-08-18 2010-05-19 天津二建建筑工程有限公司 带有过渡缝的柱墙界面
CN101858142A (zh) * 2010-06-25 2010-10-13 中天建设集团有限公司天津分公司 防止主体结构与填充墙体之间竖向开裂的施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄志强: "关于住宅外墙渗漏成因及防治", 《科技导报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561691A (zh) * 2012-03-15 2012-07-11 云南惠丰工程建设有限公司 一种消除清水混凝土剪力墙与砌体结合部开裂的方法
CN104674980A (zh) * 2015-02-09 2015-06-03 葛加君 再生混凝土复合保湿砖榫卯串管墙体的施工方法
CN104674980B (zh) * 2015-02-09 2017-03-22 中如建工集团有限公司 再生混凝土复合保湿砖榫卯串管墙体的施工方法
CN109577186A (zh) * 2018-12-17 2019-04-05 山东汇通建设集团有限公司 高架桥防撞墙防开裂结构及施工工法

Similar Documents

Publication Publication Date Title
CN201217898Y (zh) 混凝土预制楼梯
CN203394170U (zh) 装配式围墙
CN105064511A (zh) 预应力空心楼板与h型钢梁的连接构造及其施工方法
CN102561553A (zh) 预制钢管混凝土边框剪力墙及其施工方法
CN107558626A (zh) 一种预制装配式墙体结构及采用此结构建造房屋的方法
CN204983662U (zh) 一种对拉螺杆与钢管排架组合单侧支模装置
CN110792164B (zh) 一种装配式剪力墙横向拼装装置和拼装方法
CN102094525B (zh) 一种钢筋混凝土过梁施工方法
CN107119901A (zh) 剪力墙转角节点的模板结构及剪力墙现浇体系及施工方法
CN106245817A (zh) 一种装配式剪力墙竖向连接结构及其安装方法
CN107152104A (zh) 装配式空腔剪力墙水平接缝齿槽式湿式连接结构
CN105525753A (zh) 一种构造柱与主体结构同时施工的方法及结构
CN108999281A (zh) 一种新型预制混凝土梁柱节点及其施工方法
CN106894538A (zh) 填充墙与主体结构混凝土整体成型方法
CN201567584U (zh) 预制建筑钢筋砼承台基础
CN102322143A (zh) 砼剪力墙与加气砼砌块连接处防裂施工方法
CN208168479U (zh) 一种检查坑预制柱结构
CN106284653A (zh) 一种阳台构造柱顶预留空隙的施工方法
CN205677235U (zh) 一种应用在卫生间的预制反坎施工构造
CN105019645A (zh) 逆作法中取土口处构建混凝土结构的模板***及施工方法
CN105040855B (zh) 装配式预制剪力墙焊接端板及水平型钢组合连接装置
CN204753834U (zh) 一种剪刀楼梯的隔墙板与楼层梁的连接结构
CN205024843U (zh) 预应力空心楼板与h型钢梁的连接构造
CN206693469U (zh) 一种预制楼板连接节点
CN204715764U (zh) 一种构造柱与主体结构同时施工的结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120118